To: Redevelopment Commission/Board of Public Works
From: Bill Schalliol, Economic Development Planner ~~j~/
Subject: Resolution 2684 & Addendum to the Agency Agreement
Mayflower Realignment and Improvement Project
Professional Service Proposal -Danch, Harner & Associates
Date: May 18, 2010
Attached to this staff report is Resolution 2684 and an Addendum to the Master Agency
Agreement between the Commission and the Board of Public Works. Resolution 2684 and
the addendum relate to the Mayflower Realignment and Improvement Project. The
Mayflower Realignment and Improvement Project is part of the master planning and design
development fora 60 acre tract of land in the northeast quadrant of land at Cleveland and
Mayflower and the realignment and improvement of Mayflower Road is a central
development component of this project. A map of the project area is attached to this report.
Attached to the addendum as an exhibit is a professional services proposal from Danch,
Harner & Associates for the professional and design services related to the relocation of the
roadway, intersection improvements at Cleveland and the new Mayflower, and coordination
with the existing Mayflower Sewer Separation Project. The proposal amount for the
professional services is $124,725.00. Approval of the professional services proposal will be
done by the Board of Public Works.
Staff requests approval of this resolution and addendum.
What We Do Today Makes A Difference!
~;.
~~
~"~
s
`,. ~ _ ~.
k y
~,
@~@
~' f s
~, ~ °
~~
,~
0
0
~~`'~
i,
~;a ~ ~
t . '-^
RESOLUTION NO. 2684
RESOLUTION OF THE SOUTH BEND REDEVELOPMENT COMMISSION
APPROVING AND AUTHORIZING THE EXECUTION OF
AN ADDENDUM TO THE MASTER AGENCY AGREEMENT
(Mayflower Realignment and Improvement Project)
WHEREAS, effective January 1, 2010, the South Bend Department of
Redevelopment, acting by and through its Redevelopment Commission (the
"Commission"') and the South Bend Board of Public Works (the "BPW'') entered into a
Master Agency Agreement which authorized the BPW to act as agent for and on behalf
of the Commission for certain projects during 2010; and
WHEREAS, pursuant to the Master Agency Agreement, the Commission desires
to add the Mayflower Realignment and hmprovement Project by way of this Addendum.
NOW, THEREFORE, BE IT RESOLVED by the South Bend Redevelopment
Commission as follows:
Section 1. The Commission hereby approves the Addendum to Master
Agency Agreement (Brick Road-Dylan Drive Intersection Improvement Study) and
hereby authorizes its execution in substantially the form attached hereto with such
changes as the Commission may deem necessary or appropriate upon the advice of
counsel, said execution thereof to be conclusive evidence of the Commissions approval
of such changes. The Clerk is hereby directed to file a copy of the Addendum with the
BPW.
Section 2. This Resolution shall be in full force and effect after its adoption
by the Conunission.
Section 3. Don Inks or Jeff Gibney is authorized to execute on behalf of the
Commission any documents necessary to can-y out the intent of this resolution.
ADOPTED at a meeting of flee South Bend Redevelopment Commission held on
May 21, 2010, at 10:00 a.m., in Room 1308, County-City Building, South Bend, Indiana
46601.
CITY OF SOUTH BEND,
DEPARTMENT OF
REDEVELOPMENT
South Bend Redevelopment Commission
ATTEST:
South Bend Redevelopment Commission
ADDENDUM TO
MASTER AGENCY AGREEMENT
(Mayflower Realignment and Improvement Project)
This Addendum to Master Agency Agreement (this "Addendum"), made and
entered into as of the 24th day of May, 2010, by and between the South Bend Department
of Redevelopment, acting by and through its Redevelopment Commission (the
"Commission") and the City of South Bend, Indiana, a municipal corporation duly
organized and existing pursuant to the laws of the State of Indiana, acting by and through
its Board of Public Works (the "BPW"") for purposes of the Commission designating the
BPW to act as the Commission's agent to undertake the Mayflower Realignment and
hilprovement Project (the "Project'")
WHEREAS, effective January 1, 2010, the Commission and the BPW entered
into a Master Agency Agn•eement which authorized the BPW to act as agent for and on
behalf of the Commission for certain projects during 2010; and
WHEREAS, pursuant to the Master Agency Agreement, the Commission desires
to add the Mayflower Realignment and hmprovement Project to the Master Agency
Agreement by way of this Addendum.
NOW, THEREFORE, in consideration of the mutual covenants and promises
contained herein, and for other good and valuable consideration, the receipt of which is
hereby acknowledged, the BPW and the Commission agree as follows:
1. The Commission hereby empowers and appoints the BPW, pursuant to the
Master Agency Agreement, to act as the Commission's a~~ent for the limited purpose of
contracting for and managing the completion of the Project, the scope of said Project
being more specifically described in "Exhibit A", attached hereto and made a part hereof.
2. All of the tei-~ns and conditions of the Master Agency Agreement shall
control this appointment and this Addendum shall be attached to the Master Agency
Agreement.
3. Don Inks or Jeff Gibney is authorized to execute on behalf of the
Commission any documents necessary to carry out the intent of this resolution.
IN WITNESS WHEREOF, the undersigned execute this Addendum to Master
Agency Agreement to be effective as of the date first written above.
CITY OF SOUTH BEND,
DEPARTMENT OF
REDEVELOPMENT
South Bend Redevelopment Commission
ATTEST:
South Bend Redevelopment Commission
CITY OF SOUTH BEND, INDIANA
BOARD OF PUBLIC WORKS
Gary Gilot, President
Carl Littrell, Member
Don Inks, Member
ATTEST:
Linda Martin, Clerk
Exhibit "A"
MAYFLOWER REALIGNMENT AND IMPROVEMENT PROJECT
See Attached Proposal from Danch, Harner and Associates
Lunch, F/arner ~ Associates, Inc.
Land Surveyors • Professional Engineers
Landscape Architects • Land Planners
Office: (574)234-4003 / (800)594-4003 ~ Fax: (574)234-4009
1643 Commerce Drive • South Bend, IN 46628
March 1, 2010
Revised March 10, 2010
Mr. Bill Schalliol
Planner
Community and Economic Development Department
City of South Bend
12t Floor County-City Building
227 West Jefferson Blvd.
South Bend, Indiana 46601
RE: Proposal for Planning Services, Survey Services and
Engineering Services to prepare Street Vacation Documents and
Construction Plans for the Realignment of Mayflower Road from
Cleveland Road to Brick Road and Signalization Plans for the
Mayflower Road-Cleveland Road Intersection, South Bend, Indiana.
Dear Mr. Schalliol:
Danch, Harner & Associates, Inc. (DHA) is pleased to submit this proposal for
professional Planning, Surveying and Engineering services to provide road and storm
drainage construction plans for the realignment of Mayflower Road from Cleveland to
Brick Roads. Services would also include providing a Traffic Impact Analysis Study for
the proposed signalization of the Mayflower Road and Cleveland Road intersection and
preparation of a signalization Plan for said intersection by a Traffic Engineer. Planning
services would include preparing Street Vacation documents and representation at public
hearings for the vacation of a portion of the southern end of the existing Mayflower Road
right-of--way between Brick Road and Cleveland Road.
Our design team will include Traffic Engineering Consultants, PC of South Bend, Ken
Herceg & Associates, Inc. of South Bend and Alt & Witzig of South Bend.
We anticipate the following scope of services will be provided by DHA and our
consultants:
SCOPE OF SERVICES:
We would furnish construction plans for road and storm drainage improvements within
the road right-of--way and drainage easements provided to the City by the landowners in
the development area. A storm water pollution prevention plan will also be prepared.
All of the requested services must meet applicable standards of the City of South Bend
and the State of Indiana.
We have listed some optional items at the end of this proposal as extra services that we
can provide in the event they are needed.
Our understanding is that the City would supply us with current digital drawings and
survey information from Abonmarche Inc. for the pending sewer improvements along the
existing Mayflower Road alignment, so that we can coordinate our work with those plans
and the existing business access points.
Our surveying services will include picking up all topography necessary for the
proposed Mayflower Road re-alignment, for drainage improvements and for intersection
tie-ins to Cleveland Road and Brick Road. We would establish temporary benchmarks
for the project and tie into Abonmarches' work with a precision bench loop.
Planning Services:
1). Preparation of a Street Vacation Petition for a portion of the southern end of the
dedicated right-of--way of Mayflower Road as required. This will allow for the re-
direction of existing traffic to access the proposed re-aligned Mayflower Road. Services
includes preparation of a Street Vacation Diagram (working with Tony Molnar), all
required Application forms, representation at all required Public Hearings, and meeting
with affected property owners & City to discuss project and review proposed access for
affected property owners to re-aligned Mayflower Road.
Cost of Planning Services including fees .............................................. $ 3,250
Surveying Services:
In order to proceed, we would need to conduct a topographic survey of the site and
verify the provided survey information for layout and elevations. Therefore, we must
include the following minimum Surveying services:
1. Survey Control:
a. Locate initial horizontal and vertical control points on the project site and
determine actual GPS location and elevation by OPUS solution.
b. Tie into existing control points, irons, and right-of--way markers to
coordinate the surveys and provided drawings.
c. Tie into existing benchmarks using a precise leveling loop to ensure
accuracy.
d. Establish Project Benchmarks on or near the site to facilitate construction.
2. Topography:
a. Conduct a topographic survey over the route of the proposed road
realignment and in the areas of proposed drainage improvements, and
connect to vertical and horizontal controls by Abonmarche in the existing
road right-of--way.
b. Verify the tie in locations and elevations of existing pavements in
Cleveland Road and Brick Road.
c. Verify the Location and Elevation of all existing Manhole and Inlet Rims
and other structures within the proposed right-of--way and proposed
intersection improvements.
d. Provide additional topographic survey services to be used for the
preparation of the signalization engineering plans for the intersection of
Mayflower Road and Cleveland Road.
We would orient provided cad drawings to our established local coordinate
system, perform a drawing translation, and incorporate them into our cad database
for the project.
Total Cost of Surveying Services as listed above ................................. $ 19,775
Note:
If for some reason the provided topographic information cannot be verified or is not
sufficient for our design work, we would request additional survey work be completed,
prior to commencing the Engineering Design work. That work is not included in this
contract, and would be charged on a time and materials basis.
Engineering Services:
We will provide the following engineering plans and services based upon our project
meeting.
1. Prepare roadway engineering, layout, plan & profile drawings:
Includes: Cover Sheet, Existing Site Conditions, Overall Site Layout and
Alignment Plan, Typical Road Cross-Sections, Road Plan & Profile Sheets,
Intersection Grading Details, Sanitary Sewer and Water Main Plan & Profile
Sheets with laterals, Storm Sewer Plan & Profile Sheets and Mass Grading Plan
with Cut & Fill Cross-Sections. Existing utilities will be shown according to our
field survey work and survey information from supplied Abonmarche drawings.
2. Bio-Retention Swale plans.
3. Storm Surge (100-yr) Retention Basin.
4. Outlet Control Structure(s) and controlled outflow pipe to Cleveland Road as
required.
5. SWPPP/SESC Plan & Details.
6. Standard Construction Details.
7. Standard Specifications.
8. Roadway Lighting Plan
9. Engineer's Estimate of Probable Cost.
Traffic Engineering Services for Si~nalization of the Re-aligned Mayflower Road
and Cleveland Road intersection and preparation of Traffic Impact Analysis Report
for intersection design:
We will provide the following traffic engineering plans and services based upon our
project meeting for the Re-aligned Mayflower Road Cleveland Road intersection.
Prepare roadway engineering, layout, plan & profile drawings:
Includes: Cover Sheet, Existing Site Conditions, Overall Site Layout and
Alignment Plan, Typical Road Cross-section, Road Plan & Profile Sheets,
Intersection Grading Details, Drainage/Storm Design Plan.
2. Bio-Retention Swale plans, as required or needed.
3. Standard Construction Details.
4. Standard Specifications.
5. Engineer's Estimate of Probable Cost.
6. Preparation of standard Traffic Impact Analysis report for forecasting vehicle
usage of signalized intersection.
7. Traffic Signalization Plan. (Traffic Signal Design & Typical Section Design)
8. Roadway Lighting Plan, Pavement markings and Signage.
9. Demolition Plan for proposed portion of Vacated Mayflower Road.
10. Develop Construction Demolition Plans and Specifications for existing
Mayflower Road and Cleveland Road intersection.
11. Prepare quantities and estimate.
Engineering plans for the signalized intersection will be based on an "isolated
intersection" and not an interconnected system with other intersections.
Our understanding is that we would provide astorm-water management plan that will
have adequate drainage and retention to serve the right-of--way development, and to
include provision of connection and increased retention storage for the eventual
development of all of the 44 or so acres of adjacent property.
Soil Borings Services:
We will contract with a local geotechnical firm to provide soil borings and furnish a
geotechnical report showing the existing soil types and bearing capacities, determination
of high-water table in proposed storage areas, hydraulic conductivity and percolation rate,
suitability for type 'B' backfill, and providing estimated support values and pavement
recommendations for the road.
We would:
1. Review the geotechnical report.
2. Coordinate our design based upon that information.
3. Include pertinent information from the report in the site plans.
Total Cost for Engineering services as listed above ................................ $ 89,500
Construction Engineering/Inspection would be done on our standard hourly rates as
needed.
Mayflower Streetscane:
Preliminary Plans:
This will include the submission of conceptual design options to the City staff. The
conceptual drawings will address various components of the design including an
integrated pedestrian path, landscape plans & material usage, bio-retention plant
materials, amenity types and styles along with their proposed locations, street light
locations using the City standard fixture, and probable construction cost estimates. The
conceptual plans will be submitted to the City for review and comment. We anticipate
two additional meetings with the City staff to finalize the conceptual design before
moving to final design.
Construction Documents:
After review and approval from City staff, Danch Harner will provide bid ready, final
construction drawings that will include landscape plans, bio-retention planting plans,
details, specifications, and final construction cost estimates.
Cost for Streetscape services listed above ........................................... $12,200
Special Conditions of this Contract:
Copyright protection:
Since we will be using drawings provided by others, we will assume that you will secure
the permission(s) of those parties for our use of their drawings, and that you will
indemnify us any claims, present or future, for our possession and use of the drawings in
the production of our derivative works.
Exclusions:
The following services may not be required for this project. Therefore, they are not
included in the scope of this contract. Upon request we can provide these services on a
time and materials basis:
~ Extended Watershed Analysis (North of Brick Road.)
• IDEM SWPPP approval.
• CDR Foundation Construction Design Release
• Bid documents other than sealed Construction Plans and City Standards that we
normally include in our plan sets.
We anticipate that, given our current workload, we can prepare the construction plans
with sufficient detail for preliminary review within 12 weeks of receiving your approval.
The final construction plans would be completed within two-to-three weeks after the
geotechnical report, and City comments have been received.
The Estimated Total Cost of this contract is $ 124,725 as detailed above.
We propose that our Construction Staking Services, if requested, be billed on the
basis of actual hours worked multiplied by our Schedule of Normal Hourly Rates and
Direct Expenses (enclosed.)
Additional services outside the scope of services will be billed on the basis of actual
hours worked multiplied by our schedule of normal hourly rates and direct expenses.
Terms
Special Conditions as listed on page four (4) of this contract apply. If revisions to the
above plans detailed above were requested by the owner or by review agencies, those
revisions would be made at our standard hourly rates.
Thank you for using DHA for this important project. If you have any questions,
please call us at (574) 234-4003. If you find the proposal acceptable, please execute this
document in the spaces provided below, and return it to us.
Sincerely,
Danch, Harner & Ass Inc.
Michael J. Danch -Preside
Board of Public Works: Approved By & Date
Member
Member
Member
Danch, Harner & Associates, lnc.
Effective Date: January 12, 2007
SCHEDULE OF HOURLY RATES AND DIRECT EXPENSES
CLASSIFICATION HOURLY BILLING RATE
_
Senior Professional Engineer $138.00
Engineering llesigner _ __ $80.00
Project Engineer _ $70.00
Senior Professional Land Surveyor _ _ $138.00
Survey/Engineering Tech
Senior ___ _ _ $80.00
_
Survey/Enginecring Tech _ $55.00
Senior Professional I~andscapc Architect $138.00
Two Person Field Crew- _ $120.00
Survey Manager $70.00
Principal _ $138.00
Clerical $45.00
ITEM UNITS UNIT PRICE
Mileage Miles $0.50
Copies* _ Each $0-2?
Standard Size Prints (24 x 36) Eacll $4-00
Oversize Prints Squ<lre Foot $1.00
Velhlnls (24 x 36 size) Each _ _ X10.00
Overnight Travel: _
Meals ~~
Lodginb __ ___ Cost
Public Transportation _ Cost
*Note: Copies include 81/2 x 11, 81/2 x 14, or 11 x 17 size sheets
Other direct expenses ma}~ include cost to obtai^ copies of documents such as deeds or plats, maps, or
other items purchased as a direct result of emplo}~ment on the project. NOTE THAT MILEAGE IS
NOT CHARGED FOR PROJECTS WITHIN ST. JOSEPH COUNTY, INDIANA OR BERRIF,N
COUNTY, MICI~IGAN.