Loading...
HomeMy WebLinkAbout6E(7) Proposal for Oliver Industrial Park signage~ ~ c>> • • 4 Sou'ra BF o ~pli,i~ y/„ do Community & Economic Development ~~ a~' \ .,,_- 7865 1200 County-City Building, 227 West Jefferson, South Bend, Indiana 46601-1830 Phone 574/235-9371 Fax 5741235-9021 To: Redevelopment Commission From: Bill Schalliol, Economic Development Planner Subject: Oliver Industrial Park -Design Services -Park Siga age Date: May 17, 2010 At the April 23~d meeting of the Redevelopment Commission, the Commission approved a proposal from Danch, Harner & Associates to provide a variety of planning and design services related to planned improvements within and adjacent to the Oliver Industrial Park on Chapin Street. One element that was left out of the scope of work was design services for entry park signage. The attached proposal from Danch, Harner & Associates is to provide design services for park entry signage to the Oliver Industrial Park. With the recent opening of Underground Pipe & Value located towards the rear of the park, there is no tenant signage that identifies their new location. This scope of this proposal would design main and tenant signage for the park entrance at Chapin. The proposal for the project is projected to be $3,480.00 with cost for Bidding & Negotiation (Task 3) and Construction Inspection (Task 4) to be expensed at a time & materials amount. Staff would propose approval of Tasks 1-4 with aNot-To-Exceed amount of $6,000.00. Staff requests Commission approval of this proposal. What We Do Today Makes A Difference! ~~ Danch Harner & Associates Inc. Michael J. Danch, L.A. Ron Harner, P.S. May 14, 2010 Mr. Bill Schalliol Community & Economic Development 12th Floor County City Building South Bend, Indiana 46601 Land Surveyors • Professional Engineers Landscape Architects • Land Planners Re: Proposal for Professional Design Services: a) Entry signage for the Oliver industrial Park Dear Mr. Schalliol, Danch Harner & Associates is pleased to submit this proposal for professional services for your consideration. It is our understanding that this project will include designing the main entry signage for the Oliver Industrial Park. The signage will be of the monumental type, placed symmetrically on the both sides of the entry drive with individual business information being incorporated on one side. The sign design will include features that relate to the Oliver Boiler House. This work will coincide with the Oliver Trail and Chilled Plow Memorial Project. Task 1: Preliminary Concepts: a) This task will include providing two preliminary concepts and probable cost estimates to the City for review and comment. The designs will be based off of input from Ann Kolata and the City Signage Standard. Cost for this task would be $600 Task 3: Construction Documents: a) After review and approval from City staff, Danch Harner will provide bid ready, final construction drawings that will include existing conditions, layout plan, grading plans, utility coordination plans, landscape plans, details, specifications, and final construction cost estimates. Cost for this task would be $2,880 1643 Commerce Drive • South Bend, IN 46628 208 West Mars • Berrien Springs, MI 49103 Office: (574)234-4003 / (800)594-4003 • Fax: (574)234-4119 Office: (616)471-3010 • Fax: (616)471-7237 -2- Task 4: Bidding: May 14, 2010 a) Bidding: Danch Harner will provide bidding and negotiating services at a time and material basis. Task 5: Construction Inspection: a) Construction inspection: If required, construction inspection services will be provided at a time and material basis and will consist of monitoring day to day construction methods and practices to insure proper installation of the trail, amenities, landscape, and any other project components. Weekly progress reports will be sent to the City and Contractor for review and action. A final punch list would be developed and issued to the City and Contractor before issuing substantial completion. Summary of Fees: Task 1 Project Kick-off & Preliminary Design $600 2 Construction Documents $2,880 3 Bidding & Negotiation Time & Materials 4 Construction Inspection Time & Materials Project Total: $3,480 Revisions to the plans requested by the City would be completed at our standard hourly rates (attached). If you have any questions, please I free to call our office. Items approved to proceed: Approved By & Date: Sincerely, Jeffrey T. Ballard, RLA, ASLA, LEED AP Senior Landscape Architect Danch Harner & Associates, Inc.