Loading...
HomeMy WebLinkAbout08/11/1925 Board of Public Works Minutes722 We st The following Vacation Resolutions adopted. Vaeat,iOn of Medora Street, from HamlltonStreet to Wilson Streetiadopted and file'd Vacation of the Alleyy between Mishawaka Ave. and Rose Street from Beyer Ave. to the easterly line 6 the Grand Trunk Western Railway Company's new right of wiry. Also, the j31 y between. gnsa Street and Floral. Avenue from Eddy street to the easterly line of the Grand Trunk W08tern Railway 'Company's newrfght of way. Also to se portions Rose Street and.Beyer.Avenue lyingwithin the limits of the Grand Trunk Western Rai' Co Floral Avenue eaten; y mpany''s new right of war also, that portion of ding from Eddy Street and North side Blvd, on the west to the easterly line of the Grand Trunk Western Railway Co's new right of way n the east Under vacation Resolution No 103.1 adopre'd and file6d.Hearijng. Sept. 2nd. 1925 c 15 iv,, khff6aa'� ` �✓ Ste„ , g� Presiden . Actin Clerk, r + Tuesday August llth., 1925. Board met in regular session at 9:00 A. M. All members present. BIDS RECEIVED ANT) READ AS FOLLOWS: Under Improvement Resolu� on No. 1557. for Water connections on Wayne Street, Bits of Rocco rSexeri ands°Fred... P. Futter. ( see files for original Bids) Under Improvement Resolution No. 1559, for the Pavement on Sunnyside Ave. Williston Cobst. Co. ( Sea files for Original Bids.) Barn.at.331 W. Marion Street permission given to Lorenzo J. Hardy to remove the Barn and clean up for material in it. Engineer signed assessment roll and find estimate,s under Improvenent Res. No. 1330 Assessment roll adopted and final estimate itilowed. Notice of the adopik Lion o£ the asses�lmont roll and of hearing upon the same on the 26th.9 day 6 August 1925. at 7:15 P, M. ordered publishe$ as provided by law. 6" Engineer signed assessment roll and final estimated under Improvemnt Resolution No. 1456 Assessment roll adopted and final estimate allowed, Notice of adoption of the assessment; roll and of.hearing upon the same on the 26th., day ff Aug. 1925 at 7115 P. M. ordered published as provided by law. V Engineer signed assessment rli Arid final estimate under Improvement Resolution V 1526 Assessment Roil adopted and final estimate allowed, Notice of adoption of the a sessment roll and of hearing upon the sane on the 26th., day of August 1925. at 7*15 P. M. ordered published as provided by law. Engineer signed assessment roll and final estimate under Improvement No. 1475 Assessment roll for pavementon the alley North of Wasihington Ave. Assessment, roll adopted and final estimate allowed. Notice 6 adoption of the assessment 3F01 end of hearing upon the same on the 26th., day of August 1925. at, 7:15 P. Y. .ordered published as provided by law. 723 Engineers signed assessment roll and final estimate under Imp. Res,. No. 1473 for the Pavement 'on the alley b'atween Wakea Ave, & Tonti Ave. Assessment roll adopted and final estimate allowed. Notice of adopti of the assessment roll and of hearing upon the same on the 26th.9 ds of August 1925, at` 7:1(5 P. IT. ordered published as provided by law, Engineer signed assessment roll and final estimate under Imp. Res. No. 152E Assessment roll adopted and Yinai estimate allowed. Notice of adoption of the assessment roll and of hearing upon the same on tb 26th.9 day of August. 1925. at, 7:15 P..N:ordered published as provide .by law. Engineer filed Assessment roll for the Vacation of the alley lying be y` lot, 5 in Burrou hs Sub, & Lots 4 and 54 in Burroughs Sub. Eta. Under Vacation Resolution No. 96. T., 1925- -- 7:17 k Al t ._.Z ne.�„!L„sr K.',,¢ .8.r.,,.; .,,...u,iU„ „i - (•2-,..l,.,Q. '^a a. ..-t.a.,.,^€k f'... a "'.- - i/1 ^oa . )i _41.,�., ;� �'+�_,�.,,a y7. ..k,x..,�,t,m,,,.. ,,.,•, ���„�T°•a da-'�, Q, �✓s,.�,..�.t.-�{.'"�.r. � �7.3.-.: �:K 6.c..�,,,.. IMPROVEMENT RESOLUTION NO. 156�!. for local sewer on Sunnytttede Ave. adopted and filed. Resolution. reads as follows: { insert. see files) The following Petitions and Waivers filed and Resolutions ordered: Grads Curb and Balk,on No..O'Brian Street from McCartney Acreek to West Werwinski Court. - Pipe Sewer on Wayne Street from Harriett Street to 18th., Street. Pipe Sewer on Bronson Street; from Eddy Street to Sunnyside Ave. Pavement, Grade Curb and Walks on Bronson Street from Eddy Street to Sunnyside Ave. Dedication of Plat of Ridgeville Approved. Communications frost the White COhst. Co, for the approval of the Board. Of the expiration on the Guarantee Period on the following 'streets. Pavement on MinAr Street. IIndTe r Imp. Res. No. 873. Pavement on Milton.Stree t. Under Imp. Res. No, s79. Pavement an Benton Court. Under Imp. Res. No. 883. Pavement on Fellow &--Milton Street. Under Imp. Res. No. 896. Pavetftent on McPherson.Street. Under Imp. -Res. No. 903 Pavement on Birner Street. Under -Im .I Res. No 674. Pavement on Carroll Street. Under Imp. Res. 712. Pavement on Dunham Street. Under Imp, Res. No. 751. Pavement on Bronson Street Under Imp Res. No. 716. Pavement on Miami Street. Under Im J Res. No. 714.' .. _-- —-- - ----- `—'-- ---- -------------------- Above referred to the City Engineer for investigation. to.be reported on at next regularsession. Petition filed and resolution ordered. to Open the following streets and allays front the west, line of High Street to a point eighty (80) feet_ west..of the -:eest line fi High Stree t by condemning the same aceordii to Law. 19 Fairview Ave. 29 Irington Ave. 3 Eckman Street, 4 Oakside St' Woodside Street, 6 the east and west alley vetween Victoria St, and Pei fairview Ave. 7 the east and west alley between Fairview Ave. and Irvin ton Ave. S the east -ad west alley between Irvington Ave. and Eckman St. 9 the east and west alley between Eckman Street and Oakside St. 10. the east and west alley between Oakside and Woodside Strea T. 11 the es'st an west, alley between Woddside Street and Donmoyer. Ave. Petition filed and Resolution Ordered to open Eckman Street from the east end of Eckman Street to Miami Street, and Dale Ave, from a point 17 feet, north of the north line of Eckman Street extended to the -north .line of Oaksida_Str$at_by_aondemnation according to law, Petition to place a light at cornerof Riley Court and Whitcomb Street. same referred to Pole & Wire Insp. Report from Pole & Wire Insp. regarding light at corner of Hill street' on Corby Street,. and Howard Street. Light refused. 7Z4 Tuesday AujZust lgos- Repot from Pole and Wire Insp, regarding ,light at 3,32 No. O'Brien SyZeet. .Board recommended a light, be place at No. W. corner of 4(Brien Street, and 1st. alley No. -of Linden Ave; ( 1000) candle Report from Pole & Wire Insp. on light at corner of Ewing Ave.'and Kendall St. Light refused. Report from Pole & Wire Insp. regarding light at dor. of Eekmar; Street and St: Joseph Strew t. light refused. Report from :POle and Wire Irrsp. -regarding light at corner of 28th., strelt s and Pleasant Street. Light refused. waiv*rr approved for Wainer Connections on Wayne Street. The foilowtng deed was given, by the Standard Oil, THIS INDENTURE, made this 3rd.9 day of August 19259 between the Standard Oil' Coo a corporation organized under the laws of the State of Indiana, of the first part, and the City d South Bend, a•municipal corporation of the -State of Indiana, (of the second part. WITNESSETH: That the said STANDARD OIL COMPANY$ party of the first part, does hereby give, grant and convey untd the said City of South Bend, party of the seed part, for municipal purposes and for no other purpose whatever, the ibllowing aesutibed parcel of land situate and being in the County of St. Joseph and State of Indiana, to-wit:w The South ten (10) - feet of Lots fif,6.v one (51) ar,d fiftyl two (52) in Barrier G1,0v4 First Addition in South Band, acavrding to the plat thereof reeroded, in) plftb Book 7, page 72; for the sUM of one dollar ($1.30$ and -other good and valuable consideration to it in had paid by said party of the second part, the receipt whereof is hereby confessed and acknowledged. This deed is made upon the espress condition that the above desvribed premises shall be used as a pbblie highway by the City df South Bend, and if said premises.are abandsnpd as a public highway bt saud CITY OF SOUTH BEND or cease to be used for said purpose, then and in that, event the title to said ra61 estate shall revert to the grantor herein and it shall be lawfull for the grantor, its successors, and $ssigns, to re-enter into or upon said �s1 esta6 and to hold and enjoy tho pame yhenceforth.as if these presents had not been made IN WITNESS WHER F.OF, said STANDARD OIL COMPANY, a cOrporation, has caused this instrument to be signed.by its, Vice President. and its seal to hereto affixed a4d attached by its Secretary, the day and year -above written. :Sgned, Baled and 'deliveree in the_presence of.• STATE OBE ILLINOIS County' of Cook SS, ITANDARD OIL COMPANY { INDiAnAOU By ---- 4112U_J%QkZQa-*-------- Viee Preside* Attest: E. G. Seubert ram. ----r-- �------------ Secretary'. Be It Remenbered,.that on the 3rd., day B August 1 925 A. D. 1925P before me, the undersigned a Notary Public in and for the County and State aforesa�.d personalleyy apppeared. 1�-a4okea�o-eVice President, and E. G. Seubert �eretar , 03' the STANDARD OIL C01PANX, ®� Indiana Corporation and acknowledged the ex9oution of the foregoing instrument, in behalf of said Co. and acknowledged that they OpOd,, sealed with the corporation goal of said corporation, and delivered the said instrument as their own free and voluntary act, and as the free and vhuntary act of said corporation,, for the uses and purposes therein set forth. Tuesday August Zlth, 1925 Cont. IN WITLESS WHEREOF* I have hereunto set my hadd and official seer: the day. and year first above written. { J: My Commission expires _.!bruar 16th_&__1929. W..D.;Roberts . Notary Public, Cook County, Illinois ( seal) APPROVED August llth., 1925. • Board of Public Works By L.B. Slaughter --------------- President. + Dr Basslar appeared with H. E. Goheen of Burke Plumbing Co.and discussed the matter of tap that was not in proper looation`, when sewer was put in. The Board called In inspectors John R*ese and L. Lederer and they said they aks Dr. Bassler about location of tap at the time they were putting in the sewer and he Sailed to give the m anti definite location so they ordered tap in front of his property Board said they saw no reason to take action against Pontarellie to have him change the location of the tap. Contract with L. H. Webster Co, - fox Pipe Sewer on Williem Street as provided in Improvement Resolution No. 1516. adopted June 17th., 1925 signed and Construction Bond attached thereto to in the sums of Eight Hundred Sixty,. -four Dollars. -with the Hartford Accident and Ind ` eo. as Surities, approved Conttraot and bond ordred filed. Contract with L. H. Webster for PYPs'Sewer on Diagonal Street, as p,. provided in Improvement Resolution No. 1515. adopted June 17th., 192 signed and construction Bond at.taohed thereto in the sum of $585 00 with Hartford Accident and Indemnity Co. as surety, approvedt Contrao bond ordred filed. The following Contracts were awardedt Conerning the improvement of the roadway of Res* Street from Portage to Kessler Btvd. also kessler Blvs. for south line of lot 22 Portage heights addition to the north lien of north westerly corner of lot 3C in Portage Heights Add, and the north easterly line of lot 5 in said Addition. with asphalt, asphaltic oonerete, bitulithio, concrete, or brick in pursuance to Resolution No. 1509 this Board finds that no petition has been filed with said Board by a majority in number of th free holders residing on said street to be improved, requesting that it is imaprovemmied with a different kind of pavement than the kind hereto fore adopted by the Board of Public Works in its Preliminary ordret and the City Engineer reports that the Williston Bonst. Co. is the lowest, and best bidder for the kind of pavement heretofore adopts, by the Board, and the Board find that the williston Const. Co. is the lowest and best bidder and hereby lets the contract for -said improvement to them and ordres that said improvement be made with Sheet Asphalt using Mexican Asphalt, and all proceedings heretofore had in this metter are hereby confirmed and ratified, _------�- Concerning the improvement of the roadway of Brookfield Street -frame �v1�on �Street to New Jersey Indan & Illinois R. R. Co. with • asphalt, asphaltic concrete bitulithic concrete or brick, in pursuance to Resolution No. 1510. this Hoard findsa._t.hat_.na-4A44 -ion h has been filed with said Board by a ate jority in number of the freehol residing on said street to be improvedeirequesting that it be improve with a different kind of pavement, than the kind heretofore adopted -by the Board in its preliminary order; and the City Enginedr reporta.t.ha,. the Williston Const. CO. is the lowest and best bidder for the kind. Of pavement adopted by the Board. and the Board find thatthe Williston Conat, is the 1®wdt► and best bidder and hereby lets the 726 contract for said improvement, t®:them and orders that. said iimprove*ent be made with Sheet Asphalt using.Mexfoan Asphalt. and all proceedings heretofore had in this matter are hereby confirmed and ratified. Contract with Williston Con_st _Co:-fOr Pavement on Rose street and Kessler Blvd. as Provided in Improvement, Resolution No. 1509. adop d June gth., 1925. signed and Construction Bunch attached thereto in the sum of 4,953•00 with Inland Bonding COMPsny of South Bend, Ind. as surety, approved Conbeset and Be d ordered filed. Contract with the Williston Const. Co. for Pavement, on Brookfield Street. as provided in Improvement Resolution No, 1510. adopted June 9th., 1925. signed and construction Bend attached there to in the sum of 0 69504.00 with the Inland Banding Co. of South Bend, Indiana. as suretiy approved contract and bond ordered filed. - - - - Contract with H. b. Davis & Son. rfr Grgde Curb and Walk on Thrush Sheet . provided in Improvement Resolstin No. 1508. adopted Juno 9th., 1925. 111ned and Construction Bad attached thereto in the sum of $ 29129.00 with the United States Fidelity and Guaranty co. as suety, approved Contract and bond ordered filed.. Petition filed and Resolution ordered for the extension of Sunnyside Ave. across the reight of tray of the Gtand Trunk, Wester* R.-R. Co. Building Dept. filed monthly report sameptaeed on file. The following Partial estinm tes allowed. Hoban & Reach on alley-botween Between Wakewa and Tonti -$ 1876.72 Hoban & Reach alley north of Wayne St 391.08 Williston;Coast. Co. on twenty-seventh Street, 6043.20 Williston Consi . Co, on Vassar Ave. 0707.47 Riet,h-Riley Coast, Co. Michigan Street Pavement $ 26950.40 The following Plats were approved. Whitcomb.& Keller 2nd, Sunnymede Addition Bellevue Addition. Tuxedo Park first and second addition. u • 4 Preside 41