HomeMy WebLinkAbout09/02/1924 Board of Public Works Minutes4 -
Board met in regular session at 9:00 A.M. All members present.
Bids received and read as followse Fellows Street pavement unde
Improvement Resolution No. 1414 Hoban & Roach, The Albert Construction Company,
H. N. Barnes, Pavementon Chapin Street one under Improvement Resolution No. s
141.5, 2oban & Roach, The Albert Construction Company, H.-N, Barnes, Pipe sewer on
Brookfield Street u er Improvement Resolution No, 1412, Rocco Simexi, Geo, A.
Harrop, L. H. Webster, S. U. Ackerman, C. E. Reesh. Pipe sewer on Almond Ct.
under Improvement Restution No. 1413; L. H. Webster, Rocco Simeri, Hoban & Roach,
( See files for original bids.} All.above bids referred to the 'City Engineer for
-.,tabt itation to be .reported on Wednesday September 3rd.,1924 at 7:15 P.M.
Are light ordered placed on the first alley north -of Hastings_
Street and.34th. Street.
No light necessary at'grant and Merry Avenue. Trees need trimmig
do
No light necessary on Studebaker Street between Colfax Avenue ad
and Linden Avenue..Tree need trimming.
Exchange 100 C. P. Light now at corner of Broadway and Marietta
Street to a 300 C. P. Light and reset the pole to the corner.,
In re petition signed by Dewsy Comer zxd et al in regard to set&
setting poles on Linden Avenue between Carlisle Street and Sadie Street, upon
investigation find that these poles are in proper place, but that buildings on th
the east side of the alley as standing 3 feet ut in alley. Buildings ordered
moved back on property line. Engineer's office zilk to furnish a list of names
and notices to be served according to law.
Release of Indiana Construction Company bond on Various Street
grade, curb and walk improve)nents approved.
Contract with L. H. Webster under Improvement Resolution. Np
1.410 for pipe sewer on Francis Street from Howard Street, to a point 71 feed, south
of St. Vincent Street adopted July 8th., 1924 signed and construction bond in the
sum of $566.00 *with Hartford Accident and Indemnity company as sureties,
approved, Contract and bond ordered filed.
Contract with C, H. Eldred as ontractor for grade, curb and walk
on Highland Blvd, from Delaware to Prdirie Avenue as provided in Improvement
Resolution No. 1296 adopted February 12th., 1924 signed and construction bond
attached thereto in the sum 'd: "ST,'>:06.00 with the Aetna Casualty and Surety
Company of Hartford Conn, as sureties, approved. Contract and bond ordered filed.
Contract with (C.-E. Reesh as contractor for pipe sewer on Rose
Street from Portage Avenue to 25 Ft. southwesterly of the.northeasterly line of
lot 23 Portage Heights Addition signed and construction bnd in the sum of
$1,295.00 attached thereto with fttl The AetharCasualty and Surety Company as
sureties approved. Contract and bona ordered filed.
Contract with C. E. Reesh as contractor for pipe sewer on Rose
Street from Portage Avenue to 25 feet southeasterly of the northeasterly line of
lot 23 Portage Heigghts Addition signed and construction boned atta hed thereto
in the sum of $744.00 with the Aetna Casualty and Surety Company as sureties,.
approved. , and contract and bond ordered filed.
Contract with Wm. H. Burke for wat;er'conneotions and extensions
on Lincoln Way East from Washington Avenue to Sample Street.under Improvement
'Resolution No. 1417 adopted July 29th. , 1924 approved and contract orde raid filed,
Contract with Wm. H. Burke as contractor for water connections on
Washington Avenue from Michigan Street to Lincoln Way East as provided in
Resolution No. 1416 adopted Jwly•29,1924 approyed.and contract ordered filed.
Contract with Wm. H. Burke for water connections on South Lafsyet
Street from a point 445' south of,Bronson Street to Sample Street as provided in
Resolution No. 1411 adopted July 16th., 1924 approved and contract ordered filed.
Engineer signed assessment rolls and final estimates under
the following improvements,
trade, curb and walk on Dorothy Street from Prairie Avenue to
Ewing Avenue, under Improvement Resolution No. 1361.
Pipe sewer on Poland Street from Olive Street to Meade Street,
under Improvement, Resolution No. 1327. L
49:7
Concrete pavement on McPherson Street from Dunham Street, to Sample
Street under Improvement Resolution NO. 1329+
Grade, curb and, walk on Hastings Street from 29th. Street to the alley
East of 29th. Street from 34th. Street to Logan Street., under Improvement Resolution
No. 1352. `
Mexican Sheet asphalt pavement on Victoria Itreet from Miami Street
to a point 88 ft;. west of High Street, under Improvement Resolution No. 1305.
" Fatter of hearing for assessment ro.11 for water connections on
Jefferson Blvd. from Lafayette Blvd. to Taylor Street, , same cntinued until September
10th.0 1924 on account of Board going to water Works hearing in Indianapolis September
3rd.1,-1924• (.
Remonstrance 8tled against. improvement of Ruskin Street from Oakland
Street to Emerson Avenue.
IMPROVEMENT RESOLUTION NO. 1415 ACTION ON BIDS HVINC BEEN DEFERRED
to this date, the Board now designated concrete as the kind of pavement with which
said street is to be improvea, nd further action herein is continued until Sept.
16th., 1924 ,
IMPROVEMENT RESOLUTION NO. 1414 Action on bids having been deferrred
to this date, the Board now designates Hoick on gravel base with bituminous filler
as the kind of pavement with which said street is to be iinprov*d and all further action
herein is continued to Seprt. 16th.9 1924.
Attest:- '
Clerk of the Board.