Loading...
HomeMy WebLinkAbout04/02/1924 Board of Public Works Minutes21n Tuesday Spril 1, 1924. Continued. H.ibberd PrinVt"ng Compa ij 3 v L9 .O� 46.00 Northern Indiana Gas & Electric Company .30 Nathan S. Marsh f 3fl.00 Shilling &-Svoboda Company 30.00 Cemetery Department 30.50 Attest: Clerk of Beard Ac Ong Preside Wednesday April 2, 1924. f Beard met in special .session at 9:00 A.M. L. B. S1Aughter, President, absent. L. P. Hardy, Vice President, Acting President. This being date set for deferred hearing on Resolution No. 4 for Grade Se aeration of New York Central Railroad, Attoney Buczkowski aPpeared and presented petition -for property owners requesting change in Resolution. No o1ohor.interested parties were present. Hearing continued until Wednesday, AP`RIL 9J, IL924 at 9:00 A.M. Attest: Clerk of Board Acting President - Wednesdays April 2, 19249 7015 P. M. Beard met in regular session at 7:15 P.M: L. B. SLAUGHTER, President, Absent. L. P. HARDY, Vice President, acting President. , Petitition filed and approved for sewer and pavement on Robertson Street from Lincoln Way East to New York Central tracks, property owners appearing and re- questing both improvements. Hearing had nn Improvement Resolution No. 1327 for Pipe Sewer on Poland Street from Meade Street to Olive Street, in the City of South Bend, Indiana. Upon said hearing no remonstrators appeared and no written remonstrance was filed. The Board being fully advised in the premises, decides that the benefits to property liable to be assessed for said improvement are equal to the estimated cost of the same, as reported by the Uity Civil Engineer, and thereupon takes final action on said resolution as originally adapted and the same is hereby in all things ratified, cafifirmed and approved. Resolved further, that notices be 'publishod on the 30th day of April, 1924 and on the 7t;h4- day o f k a�:r,, 1924 in the Souk h Bend News Times and South b'uld Tribune in said Cii6ys stating tbwi. this Board will receive bids for the construction mf said improvement up to 10:00.A.M. on the 20th day of May, 1924. THE Board reserves the right tro reject sny and all bids. . Mr* Walter Fassnacht appeared in regard to having alley west of Miami STreet between Broadway and Pennsylvania Avenue vacated. No action was taken Hearing had on Resolution No. 1324 -roR Sewer on Broadway from the manhole at East end of tho $roadway sewer to the first gliley west of Miami Street. Irwin -Jackson appeared 4nd remonstrated against sewer for the reason he wioul:.i not be ben- afitted because of being unable to build on back of lots. Hearing deferred until Wednesday, April, 1924 At 7:15 P.M. Hearing had on Improvement Resolution No. 1325 for Pipe Sewer an Kescuiszko Street,from the south line of Indiana Avenue to the alley north of Prairie Avenue in the Cite of South Bonds I-Ad14n#j. 4 Wednesday APril 2, 1924, 7:15 P.M. Continued. I Upon said hearing no remonstrators appeared and no written remonstrance was filed. The Beard being fully advised in the premises, decides. that the benefits to property liable to be assessed for said improvement are equal to the estimated cost of the same, as rephr-tedby the City Civil Engineer,, and thereupon takes final action an said resolution originally adopted and the same is hereby in all things ratified, confirmed and approved. Resolved further, that notices be published on the 30th day 8f April, 1924, a nd can the 7th day of 1h y ,- 19N , in the South Bend News Times and South Bend Tribune in said 4i,,y, slating that this Board will receive bids for the construction of said improvement up t o 1D =0Q A .M. on the 20th day of , ley, 19e4 . The Beard reserves the right to re jest any and 11 bids . Bearing bad on Improvement Resolution No. 1326 for Sikwer on Glenn Street from Pro, it le Ave nue t o .the f irs t a lie y north of Ew ing Avenue in the C ity of South Bend, Indiana. Upon said hearing no remonstrators 1ppe3red. and no written remonstrance was filed be Board being fully advised in the premises, decides that the benefits to property liable to be assessed for said improvement are equal to the estinnted cost of the same, as re erted by the City Citil Engineer, and thereupon takes final action on said resolution as orlgIns lly adopted and the same is hereby in all things ratified, confirmed and approved,. Resolved further, that notices be published on the 30t1X day of April, 1924, -and on: the 7th day of Yay, 19e4, in the South Bend News Times and South Bend Tribune in said stating; that -this Board will receive bids for the construction of said improvement up t`o 1'0:00 A.M. on the 20th day of May, 1922. The Board reserves the right to reject any and all`bids. l Attest' ' Clerk of Bard— &AeAtng Presipt — Tuesday April 8th, 1924. _ Board met in regular session at 9:00 A.M. All members present. Clerk of the Board absent on account of sickness e Mr; Hurwi" appeared at 9:30 and reported to the Board that, property on South Lafayette Street was all cleared up. This being the date set frr bids on River Park Trunk Sewer District No,, 31 bids were received as follows: Bid of George Pontftrelli for Trunk Sewer in River Park, District No. 3 24 inch vitrified pipe per lineal febt 6.00 4.80 2 0 18 " " n n n n 4.50 15 '-.75 12 " n n n n n 2.45 10 " " " n.25 8,n n n n 980 6 n n n " n " 1.00 , Tunne 1 6 inch for 7.00 7.00 Tunnel 8 inch Reinforced Concrete Pipe (Leek point) 30 indh U.30 n n 33 inch 8.50 36 inch 12. 0. 42, inch 11.90 n o " 48 inch 14.05 54 'inch 24.10 n " " 72 inch 46.15 Manholes per foot in depth 10.00 20.00 Manholes; curbs.and covers each Storm water inlets, complete, each 11.00 2 Reinforced concrete junction chambers eaeh2000.00 12 feet of 42 inch cast iron outlet pipe 800.00 or reinfroad concrete outlet pipe 1200.00 Certified check $9375.00 . Bid referred to Engineering Department to be tabulated.