HomeMy WebLinkAboutTask Order No. 3 to Master Services Agreement - Stantec Consulting Services Inc - Green Stormwater Infrastructure Master Plan1316 COUN'ry-Crry BUILDING
227 W. JEFFERSON BOULEVARD
Souri-i BEND. INDIANA 46601-1830
CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR
BOARD OF PUBLIC WORKS
March 27, 2018
Thomas Johnson
Stantee Consulting Services, Inc.
350 N. Orleans Street, Suite 1301
Chicago, IL 60654
RE: Task Order No. 3 to Master Services Agreement
Dear Mr. Johnson:
PHONE 574/235-92511
FAX 574/ 235-9,171
The Board of Public Works, at its meeting held on March 27, 2018, approved the above
referenced agreement regarding the Green Stoimwater Infrastructure Master Plan in the
amount of $150,000.
Enclosed please find a copy of the agreement for your records.
If you have any further questions regarding this matter, please call this office at (574) 235-
9251.
Sincerely,
Linda M. Mat -tin, Clerk
Enclosure
c: Kieran Fahey, Engineering
GAjzy A. GILOT SUZANNA M. FRITZBERG ELIZABETI I A. MARADI�K JAm A. M UEAAJR THERESE J, DORAU
Attachment A
TASK ORDER 03
CSO LTCP GREEN STORMWATER INFRASTRUCTURE
MASTER PLAN DEVELOPMENT
This Task Order is made this the .Ll day of / ,y-' , 2018, by and between the Board of Public
Works, City of South Bend, Indiana ("CLIENT") and Stantec Consulting Services Inc. ("CONSULTANT")
pursuant to the terms and conditions set forth in the Master Services Agreement executed between the
parties on the 1 Ith day of April, 2017, ("Agreement"), which incorporated this Task Order by reference.
I . The CONSULTANT Job Number for this Task Order is 4jk 3 The
CONSULTANT Contract Number and Job Number shall be referenced in each invoice submitted by
CONSULTANT to CLIENT under this Task Order.
CLIENT seeks to develop a master plan for the effective implementation of green stormwater
infrastructure within targeted combined sewer overflow (CSO) basins to significantly reduce and/or
potentially eliminate CSOs thereby reducing the need for construction of consolidation sewers as part of
the CSO Long-term Control Plan (LTCP). Stantec will coordinate closely with its partner firms
(American Structurepoint, EmNet, LimnoTech) for the delivery of this project. American Structurepoint
will serve as the primary technical lead (TECHNICAL LEAD) for services under this task order.
2. The Services performed by CONSULTANT under this Task Order are as follows:
Task 3.1: Project Initiation --- CONSULTANT will facilitate a meeting of the project team and invited
CLIENT staff to kick off the project and establish a preliminary meeting schedule, project team
communication process, and a list of key stakeholders (if any) for the project. TECHNICAL LEAD will
lead the discussion of technical issues including vision for green infrastructure, support for green
infrastructure, and anticipated obstacles for the project.
Client Provided Items
None
Deliverables:
Kick off meeting agenda Project schedule
Kick off meeting summary
List of key stakeholders (if necessary)
Task 3.2: Confirm GSI Design Objectives — CONSULTANT will review previous modeling of the
City's sewer system and perform supplemental simulations to determine an acceptable release rate from
each of 9 CSO basins targeted for GSI implementation. The acceptable release rate will be the peak rate
of discharge that the interceptor system can accept from the basin under design storm conditions without
causing a CSO to the river with a specific program of improvements in place. The release rate
determined will serve as a target peak flow limit to be achieved through the implementation of specific
GSI measures. CONSULTANT will generate flow hydrographs for the trunk sewer in each basin at its
connection to the regulator that diverts flow to the interceptor or the CSO outfall. One hydrograph will
represent existing conditions; a second hydrograph will establish the target release rate for the basin.
Client Provided Items
None
Deliverables;
Flow hydrographs for 9 CSO basins targeted for GSI implementation
Task 3.3: Base Mapping and Data Collection — TECHNICAL LEAD will compile relevant
information pertaining to the existing physical, environmental, and cultural conditions of the project
area(s) and the broader context of its place in the larger regional system. The team will utilize data
collected as part of previous GSI evaluation tasks along with existing City GIS data, available County
wide data and available Indiana state data to create a comprehensive, system wide base map. If additional
site plans and/or survey data are available, the team will integrate the information as applicable. The GIS
data will be supplemented with data gained through field reconnaissance. Field work will be document
by photographs as necessary for each site. Mapping will be prepared at both a regional scale and site
specific scale to be used as necessary in later tasks.
Client Provided Items
GIS shapefiles (Right of way, publicly owned property, combined sewer/sanitary sewer/storm sewer)
Deliverables
System wide base map (digital and hard copy)
Site specific maps (digital and hard copy)
Site photos (as necessary)
Client Provided Items
Private development project locations and contact information
Design and technical data related to City owned and maintained green infrastructure projects
Deliverables
Summary of existing policies Policy recommendations
Summary of existing green infrastructure projects (including written narratives, photographs and maps)
Summary of maintenance practices
Compiled Case Studies and Lessons Learned document (digital and hard copy)
Task 3.4: Green Infrastructure Conceptual Design - Using the information gained in Tasks 3.2 and
3.3, TECHNICAL LEAD will develop conceptual green infrastructure design recommendations for
CSO 4, CSO 7, CSO 8, CSO 10, CSO 14, CSO 19, CSO 21, CSO 25, and CSO 26. The conceptual
recommendations will be developed to limit the peals flow discharge from the trunk sewer in each basin
to the release rate defined in Task 3.2. The conceptual design for each site will be prepared using the
base data (GIS shapefiles) gained in Task 3.3. The conceptual design will include the following
information for each location:
Design Assumptions and Methodology
o A written narrative outlining why the selected green infrastructure technique was chosen
and the methodology behind the design application.
Applied practices to Overflow sites
o The design will be shown in plan view at an appropriate scale and will include
enlargements as necessary to convey the design intent and the technical
requirements necessary for the site.
o Cross sections will be used as necessary, along with general recommendations for
grading and utility infrastructure placement.
Preliminary opinion of probable costs
o A preliminary opinion of probable costs will be developed for each identified CSO
location and associated green infrastructure improvements.
2
• Operations and Maintenance
o A comprehensive set of operations and maintenance recommendations will be provided
for each CSO location and green infrastructure design. The recommendations will include
both immediate, short and long term maintenance needs and proposed operation costs that
would occur outside of the initial construction phase.
Client Provided Items
None
Deliverables
Conceptual design plans as outlined above
Preliminary opinion of probable costs for each basin
Operations and Maintenance guidelines
Task 3,5: Green Infrastructure Master Plan — TECHNICAL LEAD will prepare a Draft Green
Infrastructure Master Plan that summarizes the items outlined in Task 3.1 through 3.5 above. The
narratives, graphics, imagery and technical data will be published in a comprehensive document.
CONSULTANT will review the master plan documents and submit five (5) printed and one (1) electronic
copy of the draft Green Infrastructure Management Plan to the City for review. CONSULTANT will
schedule and facilitate a meeting with City staff to review the draft report. Following review of the Draft
Plan by CLIENT, the TECHNICAL LEAD will work to address CLIENT comments, finalize outstanding
items related to the report, and submit five (5) printed and one (1) electronic copy of the Final Green
Infrastructure Plan.
Client Provided Items
Attendance at Draft Plan presentation
Draft Master Plan Review comments
Deliverables
Draft Green Infrastructure Master Plan (digital and five hard copies)
Final Green Infrastructure Master Plan (digital and five hard copies)
Project Management: CONSULTANT will manage and monitor the delivery of services under this task
order and communicate progress with the CLIENT on a regular basis. CONSULTANT will track project
progress using earned value management tools and provide a summary of progress to the CLIENT with
each invoice.
3. The Project Schedule is as follows:
Services under Task Order 03 will begin upon receipt of authorization to proceed from the CLIENT.
Target submittal dates for specific deliverables are summarized below.
Milestone
Target Completion Schedule
Weeks after Notice-to-Procced
Flow Hydrographs for 9 CSO Basins
8 weeks
Green Infrastructure Conceptual Design (9 CSO Basins)
17 weeks
Green Infrastructure Master Plan (Draft)
21 weeks
Green Infrastructure Master Plan (Final)
2 weeks after receipt of Client comments
4. The Compensation to be paid to CONSULTANT for the performance of the Services under this
Task Order is set forth in Appendix I (Compensation), attached hereto and incorporated herein by reference.
ST AINTEC CONSULTING SERVICES, INC. CITY OF SOUTH BEND, INDIANA
BOARD OF PUBLIC OR, KS
Signature
Thomas J. Johnson, Vice President_
Printed Name and Title
Dale:
350 N. Orleans Street, Suite 1301
Sweet Address
P.OBox
Chicago, IL 60654
City,, State Lila
312.831.3117 312.8313999
Telephone Fax
Engineer License or Firin's Certificate toriarber;
062.045393 State of: Illinois
Consultant Designated Representative
"" Joe Johnson
350 N. Orleans Street, Suite 1301
Chicago, Illinois, 60654.
4
James
ueller,lVle ber
'n� 4
Elizabeth Maradik, Member
ATTEST:
'KV1
Linda Martin, Clerk
Date:
City (Client) Designated Representative.*
Name: Kieran Fahey
Title: Director, Long-term Control Plan
Appendix I (Compensation)
TASK ORDER 03 COMPENSATION
COMPENSATION
L l CLIENT shall pay to CONSULTANT under this Task Order, a lump sum amount of
$150,000 as Compensation for the performance of the Services.
1.2 The portion of the compensation amount billed monthly for Engineer's services will be
based upon Engineer's estimate of the percentage of the total services actually completed
during the billing period. Table 1 provides a breakdown of the basis for the lump sum
amount by task.
Table 1
Lump Sum Billing Amounts by Sub -Task
South Bend CSO LTCP Green Stormwater Infrastructure Master Plan
Task Order 03
Task
Description
Lump Sum
Amount
3.1
Project Initiation/Project Management
$17,000
3.2
Confirm GSI Design Objectives
$12,000
3.3
Base Mapping and Data Collection
$15,600
3.4
Design Assumptions and Estimating
$25,400
3.5
Green Infrastructure Master Plan
$80,000
Task Order 03 Total
$150,000
1.3 Electronic payment may be made to the following address:
BANK NAME:
Bank of America
BANK ADDRESS:
100 North Tryon Street
Charlotte, NC 28202
ACCOUNT #:
3752096026
ACCOUNT NAME:
Stantec Consulting Services, Inc. - AIR Collection
ROUTING/TRANSFER NUMBER FOR ACH: 111000012
ROUTING/TRANSFER NUMBER FOR WIRES: 026009593
MSA hump Satin (Appendix 1) (Rev. 01-01-2017)
1.4 Mail / Lock Box
Stantec Consulting Services Inc.
13980 Collections Center Drive
Chicago, IL 60693
Attn: Accounts Receivable
MSA Lump Sum (Appendix I) (Rev. 01-01-2017)
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date
Name
03/19/2018
Kieran Fahev
Department LTCP
BPW Date 03/27/2018 Phone Extension 5993
I Agreement
U Contract LJ Proposal U Addendum
® Professional Services
❑ Resolution
❑ Bid Opening
❑ Bid Award ❑ Req. to Advertise ❑ Title Sheet
❑
Quote Opening
❑
Quote Award
❑
Change Order No.
❑
CIO & PCA No. ❑ PCA
❑ Ease/Encroach.
❑
Traffic Control
n Other:
Company or Vendor Name: American Structurepoint
New Vendor ❑ Yes ® No ❑ If Yes, Approved by Purchasing
MBEANBE Contractor ❑ MBE ❑ WBE
MBEIWBE Contractor Requested ® No ❑ Yes Name of Company
Project Name
Project Number
Funding Source
Account No.
Amount
Terms of Contract
Green Stormwater Infrastructure Master Plan
118-040
Wastewater O&M
641-0630-793-63-35
$ 150,000
Citv master Wan to reduce CSO via GSI
Purpose/Description LTCP relook has highlighted 9 key CSO basin to be tackled with
GSI instead of GreV infrastructure this progresses that effort.
❑ Required Contractor's Certification Form Attached (Non -
Collusion. Non -Discrimination. Non -Debarment. E-Verifv. Iran. etc.)
Amount of U Increase $
❑ Decrease $
Previous Amount $
Current Percent of Change: %
New Amount $
Total Percent of Change: %
- Dispersal After Approval
Copy Original
® ❑ Jordan McCormack at American Structurepoint.
JMcCormack@structurepoint.com
❑ ❑
❑ ❑