Loading...
HomeMy WebLinkAboutProfessional Services Agreement - KIL Architecture Planning - Services for Lafayette Bldg Roof1316 COUNry-CITY MILMNG 227 W, JrFFERSON Boui,L'VARD SOUTH BEND. INDIANA 46,601-1830 Ci'ryOFSOLJTH BEND PE'rEBUT'riGIEG,MAY BOARD OF PUBLIC Vft'� '�,A March 27, 2018 Gregory Kil KIL Architecture Planning 1126 Lincolnway East South Bend, IN 46601 RE: Professional Services Agreement Dear Mr. Kil: PHONE 574/235-9251 FAX 574/ 2359171 The Board of Public Works, at its meeting held on March 27, 2018, approved the above referenced agreement regarding structural engineering services for the Lafayette Building roof in the amount not to exceed $10,000. Enclosed please find a copy of the agreement for your records. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, P Linda M. Martin, Clerk Enclosure c: David Delos, Community Investment Judy Love, Community Investment GARY A. (PILOT SUZANNA M. FRITZBERo ELIZABE-114 A, MARADIK JAMEs A. MUFLLER THE R13SE J. DORALJ March 15, 2018 City of South Bend Department of Community Investment 227 West Jefferson, Suite 1400 South South Bend, IN 46601 Attn: Dave Relos Dear Dave, As per your request, please find our proposal for limited scope architectural and engineering design consultation for the Lafayette Building located at 115 So Lafayette Blvd., South Bend., IN 46601. I. General: This study entails providing limited scope architectural and/or engineering consultation for roof repairs to the Lafayette Building at 115 South Lafayette Street, South Bend, Indiana. The repair will provide a new roof for the building in order to secure the envelope and stabilize the structure for potential development at a future date. This long term plan is future development of this presently vacant building as office or another compatible use. li. Scope of Consultation Services: 1. Scope: The Architect and Engineer will provide limited scope architectural & engineering consultation as follows: a. Provide review and comment on the Roofing Contract and scope of work for the Project, submitted by Slatile. b. Be on call to perform site visits to observe field conditions and offers recommendations for repair as necessary, c. The building is a candidate for Preservation Tax Credits through 20% HTC through the National Park Service. Offer recommendations that are consistent with Interior Secretary Standards for Rehabilitation that would retain a path to secure HTCs for future development. d. If structural engineering is required, recommend the. Structural Engineer (Frost) review the conditions and offer engineering support for more involved problems. e. We understand that the specific issue is water deterioration related to the wood joist and deck deterioration at the top of the building. There may be some additional issues uncovered once the existing failed roof is removed and exposed for observation. III. Project Team: Gregory A Kil & Associates, Inc. Subchapter S Corporation (d/b/a) Kil Architecture Planning Registered in the State of Indiana, July 1, 1991 1126 Lincolnway East, So Bend, IN 46601 (574) 288-2654 phone (574) 289-2420 fax gkll@kilarchitecture.com email www.kilarchitecture.com website The Team will consist of the following members: Kil Architecture/Planning (K AIP):Architectural Design and Project Team Gregory A. Kil, Principal Architect K I L Page 1 of 3 ARCHITECTURE 03/15/2018 P L A N N I N G Lafayette Bldg. www,kilarrhitecture.com Kil AIP Proj. # 16019 1126 LINCOLNWAY FAST SOUTH BEND IN 46601 (574) 288.2654 VOICE 289. 2420 FAX Dan vonBergen, Architect Frost Engineering (Frost) Structural Engineering Troy Madlem, Professional Engineer 574-344-5900 Ext. 20 tmadlem(a-)frosteng. net IV. COMPENSATION: A. Fees: Consultation per hourly rate B. Standard 2018 Kil Architecture hourly rates as follows: Principal Architect $155.001hour Project Architect, Level I $118.00/hour Project Architect, Level I $95.00/hour Graduate Architect, Level III $88.001hour Graduate Architect, Level II $80.00/hour Graduate Architect, Level I $77.00/hour Senior Project Designer $86.00/hour Project Designer $80.00/hour Technical CAD Designer $78.00/hour Intern Architect, Level III $60.00/hour Intern Architect, Level 11 $55.00/hour Intern Architect, Level I $50.00/hour Clerical Staff $42.00/hour These rates are subject to review and may be changed at the beginning of each calendar year. D. Reimbursables: 1. The Architect will bill reimbursable costs to the Owner without a mark-up. Reimbursable expenses entail travel mileage, long distance calls, reproduction costs, photographic documentation, mailing, delivery, and handling of documents or other similar expenses incurred by the Architect in the interest of the Project. Reimbursable expenses are anticipated at no more than $200.00. V. OTHER ITEMS 1. OWNER PROVIDED ITEMS: a. The Governmental Agency will provide access to the building in order to perform the walkthrough and provide recommendations. 2. WORK SCOPE QUALIFICATIONS: The following are not included in the scope of this proposal but can be provided as an additional service. a. Site rezoning and/or variances are not included in this proposal. b. Schematic Design (SD), Design Development DD, Construction Documents (CD), Bidding (B) and Construction Administrative (CA) services are not included in this proposal. K 1 L ARCHITECTURE PLANNING www.kilarchitecture.com Page 2 of 3 0311512018 Lafayette Bldg. Kil AIP Proj. # 16019 1126 LINCOLNwAY EAST SOUTH BEND IN 46601 (574) 288.2654 VOICE 289. 2420 FAX c. Development of mechanical/electricaldesign are not included in this proposal. d. Changes to the scope of the program requested by the Owner after the Study has begun, requiring additional time on behalf of the Architect e. Site storm water and sewer design is root included in this proposal. 3. PAYMENTTERMS: 11. Payments are due and payable 45 days from the date of the Architect's invoice. 2. If the Owner/Architect shall violate or breach the terms or conditions of this contract the negligent party shall pay costs, and expenses up to the amount of the architectural fees in this contract including attorney fees incurred by the Owner/Architect lin connection with its exercising its rights or remedies it may have under this agreement because of such violation or breach. Kil Architecture consents to the exclusive jurisdiction of the St. Joseph Circuit or Superior Court for this contract. 3. If this letter proposal properly sets forth the scope of the architectural planning and engineering services, please countersign below and we can begin work on your project. Thank you for the opportunity to Submit this proposal any questions please do not hesitate to contact us. Gregory A. Ki:l, NCARB, AIA President We look forward to working with you. If you have A 1: 0 F U flaxrd K I L Page 3 of 3 ARCHITECTURE 03/15/2018 P L A N N II N G Lafayette Bldg. www.kilarchilecture.com Kil A/P Proj. # 16019 1126 LINCOLNWAY EAST SOUTH BEND IN 46601 (574) 288,2654 VOICE 289. 2420 FAX BOARD OF PUBLIC WORKS AGENDA ITEM RE VIEW REi QUEST FORM Date Name March 19, 2018 David Relos March 27, 2018 Department DC1 Phone Extension 5836 Required Prior to Submittal to Board Legal Attorney Name Elliot Anderson Controller El Controller review is required for ail Contracts $5,000.00 or more and greater than one year in length per the City Purchasing Policy Purchasing El M Agreement El Professional Services ❑ Bid Opening ❑ Quote Opening F-1 Change Order No. El Ease/Encroach. ] Other: Company or Vendor Name H Contract F1 Resolution F-1 Bid Award n Quote Award F1 C/O & PCA No. El Traffic Control Kit Architecture Planning Ll Proposal H Addendum E] Req. to Advertise E] Title Sheet 10:1=11 New Vendor El Yes E] No El If Yes, Approved by Purchasing MBE/WBE Contractor F-1 MBE F-1 WBE Project Name Lafayette Building Reroof Project Number Funding Source RWDA Account No. 324-1050-460-31.06 Amount $ 10,000 not to exceed Terms of Contract Hourly basis; to be paid from RDC approved budget. Purpose/Description To provide structural engineering services for removal / repair of damaged roof joists once the current roof is removed, [:1 Required Contractor's Certification Form Attached (Non - Collusion, Non -Discrimination, Non -Debarment, E-Verify, Iran, etc.) Required For Change Orders Qrlly___ Amount of El increase $ F-1 Decrease $ Previous Amount $ Current Percent of Change: % New Amount $ Total Percent of Change: % Dispersal After Approval Copy Original David Relos E] Judy Love