HomeMy WebLinkAboutOpening of Bids - SBFD Training Center Classroom Building Proj No 117-127 - The Robert Henry CorporationBiDIPROPOSAL CITY OF SOUTI-1 BEND ProjectNarne South Send Fire Department Training Center Classroom Building Project No. 1 17 -1 27 Fcar Bids Due March 27,2018 gat 9:30AM Local Time BASE DID Item No,, Description Total Amount I Base Bid BASE BID TOTAL ALTERNVEM(ADD) Item No. Description Total Amount Provide costs for removal of existing stone and installation of turf in area designated on Site Demolition Plan and Site Grading / Utility Plan. ALTERNATEM TOTALA_/JV0j660-9 ALTERNATE #2 (DEDUCT)_ Item No. Description Total Amount Provide costs to furnish and install non -insulated metal roof panels in lieu of insulated metal roof panels. 2 Include addition of 3011 synthetic roofing underlayment and M" exterior roofing sheathing, ALJ'E,M�A E #3 (DEDuar) Item No. Description 3 Provide costs to furnish and install lieu of insulated metal wall oanels. Bidder (Firm): Address: Gity/State/Zip: ALTERNATE #2 TOTAL. fir, —A -7 ^^ 0! elated metal wall siding in ALTERNATE #3 TOTAL 42 oil C #�,-,djab Telephone NJ q( By Total Amount (Printed Narrie of Person Signing) Version '10117/2017 Contractor's Bid for Public Works - 7 r rl� C CITY OF SOUTH BEND, INDIANA F, CONTRACTOR'S BID FOR PUBLIC WORK Project Name South Bond Fire Department Training Center Classroom Building w. Project No. 117-127 For Bids Due March 27, 2018 at 9:30 AM Local Time PART I (Must be completed for all bids. Please type or print) Date: &a The. 6be-44- k" Bidder (Firm): Address:• FY&Y City/State/Zip'. & _ _UAf)_&A,;"JJeIephone Number: Agent of Bidder (if Applicable): Pursuant to notices given, the public works project of: _ n! riira the City of South Bend, Indian, to furnish labor and/or material necessary to complete the in accordance with plans, and Ch 14-r-cv s prepared by: and dated I ]Ej_b q Q.I(jr for the sum, of (enter the Total Bid as shown on the Proposal) _W0 1i (Enter sum of Total Base Bid shown on Proposal) J (Nukerical) The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified: in the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the City f South Bend. If the bid is to be awarded on a unit basis, the itemization of the units shall be shown separate attachment. By. ........ . . ........ .... ' (Signlatl�ure) 0"" f Pe CP-,'inktefl�, o mn Sig�nqq) ACCEPTANCE The above bid is accepted this day of Subject to the following conditions: NEMMKOZEW =- ' t- Fi ii�6 t �hA A. -M a-r@'-d- ik., Member '--§-u—za—nna M. F-r'IJt-z-b-e-r'-g-,Member Therese J. Doraui, Member James Member Attest, Linda M. Martin, Clerk Version 10/17/2017 Contractor's Bid for Public Works - 2 PART 11 (For projects of $100,000 or more — IC 36-1-12-4) These statements to be submitted under oath by each bidder with and as part of his bid. Attach additional pages for each section as needed. Q SECTION I EXPERIENCE QUESTIONNAIRE AA&,h-e d� 1. Attach information regarding projects your organization has completed for the period of one (1) year prior to the date of the current bid. 2. Attach a listing of public works projects currently in process of construction by your organization. 3. Attach information regarding any failure to complete any work awarded to you and the location thereof. 4. Attach references from private firms for which you have performed work. SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE Ai+aCI l S 1. Attach an explanation of your plan or layout for performing proposed work. (Examples could include a narrative of when you could begin work, complete the project, number of workers, etc. and any other information which you believe would enable the City of South Bend to consider your bid,) 2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside your own firm who have performed part of the work) that you have used on public works projects during the past five (5) years along with a brief description of the work done by each subcontractor. 3. If you intend to sublet any portion of the work, attach the name and address of each subcontractor, equipment to be used by the subcontractor, and whether you will require a bond. However, if you are unable to currently provide a listing, please understand a listing must be provided prior to contract approval. Until the completion of the proposed project, you are under a continuing obligation to immediately notify the City of South Bend in the event that you subsequently determine that you will use a subcontractor on the proposed project. 4. Attach a listing of equipment you have available to use for the proposed project. 5. Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing your proposal? If not, attach an explanation for the rationale used which would corroborate the prices listed. SECTION III CONTRACTOR'S FINANCIAL STATEMENT A#O_(-hifoC Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial statement as required by statute shall thereby be rendered invalid. The financial statement provided hereunder to the City of South Bend awarding the contract must be specific enough in detail so that said City of South Bend can make a proper determination of the bidder's capability for completing the project if awarded. Version 10/17/2017 Contractor's Bid for Public Works - 3 When the prospective Contractor is unable to certify to any of (lie statentents below, it shall attach an explanation to this Afftdavi CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON- DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (dust be completed for all quotes and bids. Please type or print) STATE OF � IOI..I a, ) ,�-�- S COUNTY SS: ) The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that: 1. Contractor has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. a. For purposes of this Certification, "Iran" means the government of Iran and any agency or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from time -to -tithe. b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor is engaged in investment activities in Iran if either: i. Contractor, its successor or its affiliate, provides goods or services of twenty million dollars ($20,000,000) or more in value in the energy sector of Iran; or ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for forty-five (45) days or more, if that person will (i) use the credit to provides goods and services in the energy sector in Iran; and (ii) at the time the financial institution extends credit, is a person identified on list published by the Indiana Department of Administration. 4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently learns is an unauthorized alien, Version 10/17/2017 Contractor's Bid for Public Works - 4 Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's documentation of enrollment and participation in the E-Verify Program is included and attached as part of this bid/quote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E-Verify Program, The Contractor agrees to maintain this certification throughout the term of the contract with the City of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. 6. Persons, partnerships, corporations, associations, or joint venturers awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of employment, or any matter directly or indirectly related to employment because of race, sex, religion, color, national origin, ancestry, age, gender expression, gender identity, sexual orientation or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions may consider the Contractor's good faith efforts to obtain participation by those Contractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder. In no event shall persons or entities seeking the award of a City contract be required to award a subcontract to an MBE/WBE; however, it may not unlawfully discriminate against said WBE/MBE. A finding of a discriminatory practice by the City's MBE/WBE Utilization Board shall prohibit that person or entity from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact for which the discriminatory practice or noncompliance pertains. 7. The undersigned contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. I, the undersigned bidder or agent as contractor on a public works project, understand illy statutory obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1), 1 hereby certify that I and all subcontractors employed by me for this project will use steel products or foundry products made in the United States on this project if awarded. I understand 1 have an affirmative duty to notify the City in my bid that my proposal does not include the use of steel products or foundry products made in the United States, i understand it is my sole obligation and responsibility to provide a justification to the City, subject to review and approval, why the cost of United States made steel or foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry products made in the United States, the City, through its director of public works, shall make a determination if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder may result in forfeiture of contractual payments. Version 10/17/2017 Contractor's Bid for, Public Works - 5 I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public works are true and correct. Dated this day of MaktK 20_L� C CD 0 Co4ntracto idler (Firm) 'rm e '01 /B Its agent Signatur ol`Contr�acr/Bidderot hen Printed Name and T"it11 C Subscribed and sworn to before me this Gt,day of _. _ My Commission Expires ic'e, Notary Public County of Residence Notary Public - W410 of Indiana St Joseph County GoMMjsslO!_ExPIrOS Sep S, 2024 Version 10/17/2017 Contractor's Bid for Public Works - 6 zxo', 141 11 D CITY OF sou" rH BEND, INDIANA tit N'll'RACTOR' S BID FOR PUBLIC WORK CH CKLIST FOR BIDDERS Project Narne South Bend Fire Department 'rraining Center Classroom Bu ilding Project No. 117-127 For Bids Due, March 27, 20118 at 9:30 AM Local Time From time to time the South Bend Board of Public Works finds it necessary to reject a bid because it does not comply with statutory requirements, In preparing your bid, please use the followings checklist in order to MMW Sure that your bid is done in, the proper manner. Proper bid security included, The bidder has the option of providing either a Certified Check or Bid Bond. Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely executed. Contractor's Non -Collusion and Non -Debarment Affidavit, Certification; Regarding Investments with Iran, Employment Eligibility' Verification, Non -Discrimination Commitment, and Certification of use of United States Steel Products or Foundry Products. Proof of MBEANBE Participation Goal Form [MWBE-1.0], If minimum participation goal is not Vmet, also provide Evidence of Good Faith Efforts Form [MWBE-2.01 and MBE/WBE Contacted Form [MWBE-2.1], Acknowledge Receipt of -'A-- Addendum(s) included with the bid, All required additional information is included with the bid. Proposal statements and other affidavits all signed by the proper party with name either printed or typed underneath signature. L/ This checklist submitted with the Bid This checklist is provided for bidder's use in assuring compliance with required documentation; however, it does not include all specifications requirements and does not relieve the bidder of the need to read and comply with the specifications,. Bidder: By Authorized Representative: Signature: At Print Name & Title: Vorqion 1011712017 Contractor's Md for Pub0c Works - I Date-. Ai-a- 0-1 + Part II — Section I — Experience Questionnaire 1. St. Joseph County Public Library Project Completed 2009 — Contract Amount - $4,050,604. South Bend Transportation and Maintenance Facility Project Completed October 2010 — Contract Amount - $20,170,000. Ft. Wayne/South Bend Catholic Diocese — Marian High School Project Completed August 2011 - Contract Amount $557,000 Penn/Harris/Madison School Corporation Project Completed August 2011 - Contract Amount $3,320,000 Gurley Leep Addition and Remodel Project Completed December 2011 — Contract Amount $1,073,441 Elkhart County Library Projected Completed March 2012 - Contract Amount - $420,000 St. Joseph High School Project Completed June 2012 - Contract Amount - $2,000,000 Potawatomi Conservatory Project Completed June 2012 - $1,180,000 Granger Community Medicine Project Completed January 2013 - $904,000 Whole Foods Project Completed March 2013 — $435,000 Roseland Animal Hospital — Project Completed May 2013 - $780,000 St. Joseph County Library Digital Lab Job Completed June 2014 - $188,000 St. Jude Catholic Church Renovation Project Completed August 2013 - $3,524,000 Gurley Leep Audi Project Completed September 2014 - $1,018,000 Saint Joseph Regional Medical Center — ER Addition Plymouth - $4,900,000 Completed July 2015 Church of Jesus Christ of Latter Day Saints — Addition — $1,465,000 Completed July 2015 Cassopolis Hight School — Interior Finishes - $312,444 Completed Summer 2016 Penn High School Football Stadium - $1,093,000 Completed Summer 2017 Gurley Leep Honda Store - $5,722,000 Completed Fall 2017 3 cr W I , I Al" 3 > F4— co w m m 0 -0 KD 37—D Ta cn 0 0 (D CL cr M -U ID ED a 4 a j cl O. by CS rrs > C) R 00 E3 , rt 7171offiff I am pm I Q4 n A V100 CITY OF SOUTH BEND 4~00.TO MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY DEVELOPMENT PROGRAM' FORM MWBE-2.0 r` EVIDENCE OF GOOD FAITH EFFORTS This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MBENVBE participation. It is the bidder's sole responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority or Women's owned business as defined by the Indiana Department of Administration ("IDOA"). Project Number: 117-127 _ Date: Mxh a -7r aO t Project Name: South Bend Fire Department Trainincq Center Classroom Buildin Bidder: FQ p 1"t4.1 ��(jVT)OV ir_-� 'r Contact Person: ~{��• �,{/ _ Telephone: 57T ` a3a r 3 N Address:Q`1 S� S City: tJU l 6Ln ( State: Zip: (q V7 Email: S huh r u bm h en ru, CoC C 7yo To determine whether a bidder has emonstrated good faith effor0to reach the MBEANBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below": EVIDENCE OF GOOD FAITH EFFORTS MBE/WBE LIST(S). The bidder reviewed the City of South Bend's Minority and Women Business Enterprise Diversity Development Program, which uses the IDOA approved list of Minority and Women P Owned Business as found on their website (hftp://www,in.gov/idoa). ACTION (ADVERT ISEICONTACT): In order for your bid to be deemed responsive, the City of South Bend requires that all perspective bidders complete no loss than 2 of the following: 1. Attend all pre -bid meetings scheduled by the City to inform MBEMIBEs of contracting and subcontracting opportunities. 2. Advertise in general circulation and/or trade association publications concerning subcontracting opportunities, and allow MBE/WBEs reasonable time to respond. 3. Perform any and all necessary steps to provide written notice in a manner reasonably calculated to inform MBENVBEs of subcontracting opportunities and allowed sufficient time for there to participate effectively. 4. Utilize pre-existing services of available community organizations, small and/or disadvantaged business assistance offices and other organizations that provided assistance in the recruitment and placement of MBEANBE firms. "Bidder must circle or otherwise notate which of the two (2) required actions were performed. GOOD FAITH NEGOTIATIONS: The bidder negotiated in good faith with interested MBE/WBEs, including providing such MBE/WBE's with adequate information about the plans, specifications and other requirements of the subcontract and did not reject MBEM/BEs as unqualified without sound business reasons based on a thorough investigation of their capabilities. _ SMALL CONTRACT($): The bidder selected specific portions of the work to be performed by MBEIVVBEs in order to increase the likelihood of meeting the MBE/WBE goals (including breaking down contracts into smaller units to facilitate MBEIWBE participation) CONTRACT RECORDS: The bidder has maintained the following records for each MBEANBE that has bid on the subcontracting opportunity: I. Name, address, and telephone number; 2, A description of information provided by the bidder or subcontractor, and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the MBEANBE was unqualified to perform the job. "Proper demonstration of Good Faith Effort requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version 10/17/2017 Contractor's Bid for Public Works - 9 CITY OF SOUTH BEND o4 �urcr"�;r1 MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY u a,� DEVELOPMENT PROGRAM FORM MWBE-2.1 , MBEIWBE CONTACTED This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring contacted MBEIWBE to obtain Good Faith Efforts. It is the bidder's sole responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority or Women's owned business. PAGE -OF - Project Number: 117-127 MBENVBE Participation Goal Project Name: South Bend Fire Department Training Center Classroom Buildin Bidder: n _ "71v. &P v4 [- ,n u .1 Ob rWuJ_ a-n By: MBE/WBE Firm Owner or Contact at MBE/WBE Firm Arool d Telephone: a, „q / ' 5„- 4o 1�1`i Fax: aj� Lr i TYPE OF WORK SOLICITED FOR THIS PROJECT: Email: RESULTS OF CONTACT WITH THE MBE/WBE FIRM: Sf44 Bfd MSENVBE Firm (Date) -7 H Owner or Contact at MBENVBE Firm U GrbC S Telephone: Fax: Email: �G - �,3r� - G � 8fi ud stina e r , TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MBEIWBE FIRM: 100 %u SU - [V R i2>4 Version 10/17/2017 Contractor's Bid for Public Works - 10 FAD Fidelity & Deposit Company of Maryland Document A31OTM-2010 Conforrms with The American Institute of Architects AIA Document 310 CONTRACTOR: (Marne, legal staters and address) The Robert Henry Corporation PO Box 1407 South Bend, IN 46624-1407 OWNER: (Name legal stataas and address) City of South Bend, Board of Public Works 227 W Jefferson St., Ste 1200 N South Bend„ IN 46601-1830 SURETY: (Name, legal status andprincipal place of business) Fidelity and Deposit Company of Maryland 1299 Zurich Way Schaumburg, IL 60196-5870 Mailing Address for Notices BOND AMOUNT: *** Five Percent (5%) of the Accompanying Bid *** This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable. PROJECT: (Warne, location or address, and Project number, ef'any) South Bend Fire Department Training Center Classroom Building Project No, 117-127, 710 E. Sample Street, South Bend, IN The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, as provided herein. The conditions of this Bond are such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents, or within such time period as may be agreed to by the Owner and Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with the terms of such bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted in the jurisdiction of the Project and otherwise acceptable to the Owner; for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof or (2) pays to the Owner the difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount for which the Owner may in good faith contract with another party to perform the work covered by said bid„ then this obligation shall be null and void, otherwise to remain in full force and effect. The Surety hereby waives any notice of an agreement between the Owner and Contractor to extend the time in which the Owner may accept the bid. Waiver of notice by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time for acceptance of bids specified in the bid documents, and the Owner and Contractor shall obtain the Surety's consent for an extension beyond sixty (60) days. If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor. When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the Project, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. When so furnished, the intent is that this Bond shall be construed as a statutory bond and not as a common law bond. Signed and scaled this 27th day of March , 2018 The Robert Henry Corporation 4-14 ,� " (Principe (Seal) (Witness) fitness) Fidelity anr+ Deposit Company of Man (Surety) w T. Wiiliarbs, Attorney -in -Fact ILMS-10054 08110 EXTRACT FROM BY-LAWS OF THE COMPANIES "Article V, Section 8, Attorneys -in -Fact. The Chief Executive Officer, the President, or any Executive Vice President or Vice President may, by written instrument under the attested corporate sea[, appoint attorneys -in -fact with authority to execute bonds, policies, recognizances, stipulations, undertakings, or other like instruments on behalf of the Company, and may authorize any officer or any such attorney -in -fact to affix the corporate sea] thereto; and may with or without cause modify of revoke any such appointment or authority at any time." CERTIFICATE I, the undersigned, Vice President of the ZURICH AMERICAN INSURANCE COMPANY, the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, and the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, do hereby certify that the foregoing Power of Attorney is still in full force and effect on the date of this certificate; and I do further certify that Article V, Section 8, of the By -Laws of the Companies is still in force. This Power of Attorney and Certificate may be signed by facsimile under and by authority of the following resolution of the Board of Directors of the ZURICH AMERICAN INSURANCE COMPANY at a meeting duly called and held on the 15th day of December 1998. RESOLVED: "That the signature of the President or a Vice President and the attesting signature of a Secretary or an Assistant Secretary and the Seal of the Company may be affixed by facsimile on any Power of Attorney...Any such Power or any certificate thereof bearing such facsimile signature and seal shall be valid and binding on the Company." This flower of Attorney and Certificate may be signed by facsimile under and by authority of the following resolution of the Board of Directors of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at a meeting duly called and held on the 5th day of May, 1994, and the following resolution of the Board of Directors of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at a meeting duly called and held on the IOth day of May, 1990. RESOLVED: "That the facsimile or mechanically reproduced seal of the company and facsimile or mechanically reproduced signature of any Vice -President, Secretary, or Assistant Secretary of the Company, whether made heretofore or hereafter, wherever appearing upon a certified copy of any power of attorney issued by the Company, shall be valid and binding upon the Company with the same force and effect as though manually affixed. IN TESTIMONY WHEREOF, I have hereunto subscribed my name and affixed the corporate seals of the said Companies, this 27th day of March , 2018 . *'o otrorr 59AL Thomas 0. McClellan, Vice President