Loading...
HomeMy WebLinkAboutChange Order No. 1 - Studebaker Museum Rooftop Unit Replacements - Project No 117-081 - BC Mechanical1316 COLINTY-0-rY BuILDING 227 W. JEFFERSON BOULEVARD SOUTH BEND, INDIANA 46601-1830 CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR BOARD OF PUBLIC WORKS March 27, 2018 Mike Fields B.C, Mechanical, Inc. 882 Anderson Road Niles, MI 49120 PHONE 574/235-9251 FAX 574/ 2359171 RE: Change Order No. I - Studebaker Museum Rooftop Unit Replacements — Project No. 117-081 Dear Mr. Fields: The Board of Public Works, at its meeting held on March 27, 2018, approved the above referenced Change Order, for an increase of $573, bringing the current contract amount to $157,573, Enclosed is a copy of the Change Order for your records. If you have any further questions regarding this matter, please call this office at (574) 235- 9251. Sincerely, Linda M. Martin, Clerk Enclosure c: Toy Villa, Engineering GARY A. Ga,o'r SUZANNA M. FRj,rZBEjw ELIZABETH A. MARADIK JAW's A. MUELLER THEM73SE J. DORAIJ WSJ kJJ 0 a - ;9 1 , A LIC"I al. - U6111 R" IVA: V DATE: PROJECT NO: PROJECT NAME: CONTRACT D. CHANGE ORDER NO; SUBJECT OF CHANGE ORDER- 3/13/2018 117-081 Studebaker Museum Rooftop Unit Replacements 12/12/2017 PCR #I -Change RTUs The original contract sum $ 157,000.00 Net change by previously authorized change orders $ 0,00 The contract sum prior to this change order $ 157,000.00 By this Change Order, the project amount is increased F1 Decreased $ 573,.00 The new contract sum including this change order $ 157,573.00 This Change Order represents a total change of 0.36 % Total change for entire project 036 % Original contracted completion date/time Extension of date/time by previous change orders Date/time extension by this change order New completion date/time CONTRACTOR 4a Contractor Signature Printed Name and Title B.C. Mechanical, Inc, Company Name 882 Anderson Rd. Address Niles, MI, 49120 City, State, Zip 5/14/2018 0-days 0 days 5/14/2018 RECOMMENDED FOR APPROVAL CONSTRION MANAGER Is 111 WKS] a 6-1019 BOARD OF PUBLI� KS Approved Date: Gary A. 13ilot, President al Elizabeth A. Maradik, Member Therese J. DoraLt, Member James A. Mueller, Member City of South Bend Project No. 117-081 Change Order No. 1 — 3/27118 OWNER: City of South Bend ENGINEER: City of South Bend Engineering Kara M. Boyles, P.E. Professional Engineer No. 10809510 CONTRACTOR: B.C. Mechanical, Inc. PROJECT: Studebaker Museum Rooftop Unit Replacements Project No. 117-081 SUBJECT: Change Order Explanation ISSUE DATE: March 27, 2018 This Change Order to the Contract document shall supplement, amend, and shall become a part of, and be incorporated as an Addendum to the Contract. The following is a summary and description of the revisions to the Contract by this Change Order: Item QtV Unit Price Days Total Change RTUs 1 LS $573.00 0 $573.00 Net Change Order amount $57100 1) Change RTUs: The RTU supplier discovered that the replacement units specified no longer fit the existing curb and ductwork due to a design change that they were not aware of. Smaller units are being substituted that will fit the existing curbs. Cost deducts for the smaller units will be applied to extra gas and electric work needed for the new units. This CO covers the remaining balance. Date Name J�1-; Toy Villa BOARD OF PUBLIC WORKS AGENDA ITEM RE, VIEW RE, QUEST FORM Department Division/Bureau Public Works Engineering BPW Date 03127/2018 Phone Extension 5920 Required Prior to Submittal to Board Legal F-1 Attorney Name: Controller ❑ Controller review is required for all Contracts $5,000.00 or more and greater than one year in length per the City Purchasing Policy Purchasing EJ H Agreement F] Contract El Proposal ❑ Addendum— R Professional Services R Resolution F1 Bid Opening R Bid Award El Req. to Advertise E] Title Sheet El Quote Opening F] Quote Award M Change Order No. 1 [] C/O & PCA No. ❑ PCA R Ease/Enicroach�. F-1 'Traffic Control: R Other: Company or Vendor Name New Vendor MBENVBE Contractor MBE/WBE Contractor Requested Project Name Project Number Funding Source Account No. Amount Terms of Contract Purpose/Description B.C. Mechanical, Inc. El Yes E No El If Yes, Approved by Purchasing F1 MBE 0 WBE D No F1 Yes Name of Company_ Studebaker Museum Rooftop Unit Replacements 117-081 Liability Insurance 226.0417.672.39.011 Changing of RTU's, El Required Contractor's Certification Forms Attached (Non - Collusion, Non -Discrimination, Non -Debarment, E-Verifv, Iran. etc. Amount of ❑ Increase $ 573.00 Decrease $ Previous, Amount $ 157,000.00 Current Percent of Change: 0.36% New Amount Total Percent of Change: Copy Original 1-1 F] F� 11 E] El $ 157,573,00 0.36%