HomeMy WebLinkAboutChange Order No. 1 - Berlin Place No 2 Electrical Mechanical & Plumbing Div A Project No 117-048R - CBS Services LLC1316 COUNTY -CITY BUILDING
227 W. JEFFERSON BoLiu,'VARD
Sotini BEND. INDIANA 46601- 1830
CITYOFSOUTHBEND PETEBUT11GIEG, MAY
BARD OF PU13LIC WO I
March 27, 2018
Jacob Shearer
CBS Services, LLC
5005 Lincoln ay East, Suite A
Mishawaka, IN 46544
PHONF" 574/235-9251
FAX 574/ 235-9171
RE: Change Order No. I - Berlin Place No. 2 Electrical, Mechanical, & Plumbing,
Division A — Project No. 117-048R
Dear Mr. Shearer:
The Board of Public Works, at its meeting held on March 27, 2018, approved the above
referenced Change Order for an additional ninety (90) days, bringing the current contract
completion date to November 12, 2018
Enclosed is a copy of the Change Order for your records.
If you have any further questions regarding this matter, please call this office at (574) 235-
9251.
Sincerely,
Linda M. Martin, Clerk
Enclosure
c: Toy Villa, Engineering
GAizy A. Gii.or SUZANNA M. FRITZBERo EuZABE','n i A. MAR ADIK JAMEs A. MUELLER THERESE J. DORAU
M 3:51121" Mel : In kne
DATE:
PROJECT NO:
PROJECT NAME:
CONTRACT DATE:
CHANGE ORDER NO.
SUBJECT OF CHANGE ORDER:
117-048P - R
Berlin Place No, 2 Electrical, Mechanical & Plumbing — Div. A
June 13, 2017
1
Time Extensuon
See attached letter for extension explanation
The original contract sum $ 3,818,000.00
Net change by previously authorized change orders $ 0.00
The contract sum prior to this change order $ 3,818,000.00
By this Change Order, the project amount is
The new contract sum including this change order
This Change Order represents a total change of
Total change for entire project
Original contracted completion date/time
Extension of date/time by previous change orders
Date/time extension by this change order
New completion date/time
CONTRACTOR
tractor Signature
D e ArA htf�
Printed Name and Title
CBS Services, LLC
Company name
5005 Lincoln Way E., Suite A
Address
Mishawaka, In. 46544
City, State, Zip
n Increased
F1 Decreased
0.00
3,818,000.00
0 %
0 %
August 14, 2018
0
90 Days
November 12, 2018
RECOMMENDED FOR APPROVAL
C� ction Manager
CITY OF SOUTH BEND
BOARD OF PUBLICWOR S
2
Approved Date. lk
Gary A. (j&t, President
A. Maradik, Member
James A. Mueller, Member
Therese J. Dorau, *ember
2, The Contractor shall apply for and obtain any and all required permits for the work from
local, state, and federal agencies and shall comply with permit requirements, including the
St. Joseph County / City of South Bend Building Department.
3. If the Contractor awarded this contract is not a resident of Indiana, within thirty days, the
Contractor shall provide the City with proof that the Contractor is duly licensed, qualified
and registered with the Secretary of State of Indiana to engage in business within the State
of Indiana.
4. The Contractor shall comply with all provisions of Indiana Code 5-116-13, as amended. The
City reserves the right to immediately terminate the public work project awarded should the
Contractor be found to be in violation of any provision: of Indiana Code 5-16-13 and such
violation shall result in the forfeiture of Contractor's performance bond to the City.
XIII. SUBMITTALS
A. Prevailing Specifications: 2016, INDOT Standard Specifications Section 106
B. Additions:
1. Submit four (4) copies or an electronic version of the submittals for all equipment or
materials used in this project to the City for approval. All submittals must be delivered
within 7 calendar days from the notice to proceed.
a, Digital submission of all submittals shall also be provided to TWG Construction, LLC
at time of submission.
2. The Department of Public Works will review and return two (2) copies or an electronic
version of the submittals within five (5) working days.
3. The review of the submittal information by the Department of Public Works is to facilitate
the satisfactory acceptance of the equipment. This review shall ineither relieve the
contractor from the responsibility for deviations from the Specifications, nor from errors and
omissions in the shop drawings or literature. Parts found not meeting the requirements of
these Specifications shall be removed, repaired or replaced at no cost to the City.
4. Submittals shall include complete manufacturer's descriptive information and shop
drawings for all the parts furnished under this contract.
5. Upon completion of project, the Contractor will supply one (1'1) conformed set of all
submittals to the City and TWG.
XIV. PR ,�ITIQN AND PROGRES&,,
TOS,EC _
A. Prevailing Specifications: 2016, INDOT Standard Specifications Sec. 108
B. Additions:
I The project will have a completion date of May 23rd , 2018 for Building 2, June 91h , 2018
for Building 1, June loth, 2018 for Building 3, and August 14 th for Building 4. The contract
time will start when the Notice to Proceed is delivered andl signed,
2. The City, Engineer, Contractor, and Td G Construction, LLC will hold a pre -construction
meeting following award of the contract. The date of the Notice to Proceed will be agreed
at that meeting.
Version 4/17/2015 Special Provisions - 5
(7 SER VI CE, L L C
5005 LincoInway E- 5TE A -Mishawaka, Indiana 46544
Office (574) 329-5191 Fax (574) 329-5471
March 15, 2018
Schedule Adjustment
Please accept the following electrical change order with the following scope of work:
106m, F0191ING110MI
SCOPE CHANGE:
1, We are requesting a 90 day extension due to delay of framing and roof on buildings
scheduled to be ready 12114/17. These buildings are still not ready to date.
EXPLANATION:
The original milestone schedule sent from TWG on 08/011/2017 was presented in pre -con and
agreed to by CBS Service (Jeremy Smith), TWG (John Lowery), and City of South Bend (Toy
Villa). MEP rougih start line items 104-112 on the original schedule were to start 12/14/2017.
TWG sent a revised schedule on 03/08/2018. The revised schedule pushed MEP rough start to
03/02/2,018 on line item 117. As of today, 03/15/2018, the framing is still not complete, and the
roof has not been installed. The new schedule also shortens the durations agreed to in the
original schedule along with: overlapping. CBS will not agree to an expedited schedule without
compensation. TWG has acknowledged this. Therefore, we are seeking full a 910-day extension
on the complete schedule.
ADDITIONAL 72 HOUR NOTICE:
CBS Service's contract with City of South Bend includes completion dates. These dates have
been pushed back by no fault of CBS. These delays have continued to date. On 03/14/2018 a
letter was written to TVVG stating that any further delay will cause additional burden as labor,
storage, and material prices rise. Additionally, the manpower and finance were secured per
schedule. CBS cannot continue to carry the burden of rising costs and shiftingi manpower. We
have notified TWG that our start date will be Monday 3/19/2018. If we are told not to start, we
will request additional compensation. If any re -work or additional trips to finish work are required
due to incomplete predecessor activities, we will request additional compensation. If any re-
work is needed due to added framing or weather -damaged product, we will seek compensation.
If additional protection is needed due to weather exposure, we will seek compensation.
Respectfully,
pm" smal
CBS Service LLC
An Equal Opportunity Employer
Ej SER VI CE'T LF L C
5005 Lincoinway E- STEA-Mishawaka, Indiana 46544
Office (574) 329-5191 Fax (574) 329-5471
March 15, 2018
72 HOUR NOTICE:
CBS Service's contract with City of South Bend includes completion dates. These dates have
been pushed back by no fault of CBS. These delays have continued to date. On 03/14/2018 a
letter was written to TWG stating that any further delay will cause additional burden as labor,
storage, and material prices rise. Additionally, the manpower and finance were secured per
contract schedule. CBS cannot continue to carry the burden of rising costs and shifting
manpower, or lengthened general conditions. We have notified TWG that our start date will be
Monday 3/19/2018. If we are told not to start, we will request additional compensation. If any re-
work or additional trips to finish work are required due to incomplete predecessor activities, we
will request additional compensation. If any re -work lis needed due to added framing or weather -
damaged product, we will seek compensation. If additional protection is needed due to weather
exposure, we will seek compensation.
Action Items that are causing delay and/or damages:
1. Framing on building is not complete. Items remaining but not inclusive are knee walls
kitchen islands and peninsulas, corrected framing including P-lam beam reframe, punch
framing, electrical panel and media panel box outs. Framing to have been completed 12-29-
17
2. The roof has not been installed on Building 2 along with several windows and doors. Any
work performed that is damaged by the building not being dried in will be at the cost of others.
Any additional protection on the work installed will be at the cost of others. Roofing to be
completed 2-26-18 Windows to be completed 1-12-18
This Notice does not waive any right of extension for delay, or compensation from previous
dates not being met.
P,M" smca ,
CBS Service LLC
An Equal Opportimity Employer
130ARD OF PU13LIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
Date
03/19/2018
Department
Public Works
Name
Toy Villa
Division/Bureau
Engineering
BPW Date
03/27/2,018
Phone Extension
5920
Legal
Controller
Purchasing
H Agreement
F Professional Services
F-1 Bid Opening
El Quote Opening
Z Change Order No. I
❑ Ease/Encroach.
Other:
F-1 Attorney Name:
❑ Controller review is required for all Contracts $5,000.00 or more and
greater than one year in length per the City Purchasing Policy
El
H Contract
F-1 Resolution
Bid Award
Quote Award
F] C/O & PCA No.
F-1 Traffic Control:
Company or Vendor Name
New Vendor
MBEANBE Contractor
MBENVBE Contractor Requested
Project Name
Project Number
Funding Source
Account No.
Amount
Terms of Contract
Purpose/Description
Amount of F-1 Increase
R Decrease
Previous Amount $
Current Percent of Change:
New Amount
Total Percent of Chanae:
Copy
Original
F-1
F-1
F-1
1-1
El
El
CBS Services, LLC
12=
FEME
F Title Sheet
Berlin Place B,P#2: Mechanical, Electrical, Plumbing
117-048P - R
RWDA TIF
324.1050,460�.31.02
90 Day Time Extension (See attached)
F-1 Required Contractor's Certification Forms Attached {Non
Collusion, Non -Discrimination, Non -Debarment, E-Verifv, Iran, etc.