HomeMy WebLinkAbout2018 PARC o4�uTx
.f
\PEA CE_
,
Y Y
OFFICE OF THE CLERK
KAREEMAH N. FOWLER, CITY CLERK
PARC COMMITTEE MARCH 12, 2018 4:58 P.M.
(ORGANIZATIONAL)
Committee Members Present: Sharon L. McBride, Oliver Davis, John Voorde, Erin
Patzkowsky(citizen member), John Mazurkiewicz(citizen
member)
Committee Members Absent: Dr. David Varner
Other Council Present: Regina Williams-Preston, Gavin Ferlic, Karen White, Jo
M. Broden, Tim Scott
Other Council Absent: None
Others Present: Kareemah Fowler, Bianca Tirado, Graham Sparks, Bob
Palmer
Presenters: Aaron Perri
Agenda: Organizational Meeting
Committee Chair Sharon L.McBride called to order the PARC Committee Organizational meeting
at 4:58 p.m. She introduced members of the Committee and proceeded to give the floor to the
presenter.
Organizational Meeting
Aaron Perri, Executive Director of Venues, Parks & Arts with offices at 321 E. Walter Street,
handed out a copy of the Venues,Parks&Arts 2017 Annual Report to members of the Committee
and Council. He stated, I'll just guide you all through a couple of things and I will certainly not
read through all of this with you. This _Year was actually our first year as a newly structured
Department. On our budget side of things,we are obviously heavily funded by tax dollars but also
depend on revenue and fees for services and otherwise to the tune of approximately$3.5 million.
We did have revenues exceed expenses primarily because we are building up that Capital Fund we
have talked about several times before. We have our cost-recovery goal of thirty-five percent
(35%)and we are currently at twenty-three(23%)percent. Johns Hopkins recognized us last•ye.
About six(6)weeks ago we were in Fort Wayne with the Indiana Parks and Recreation Association
and we were recognized for inclusion for the My SB Parks and Trails and the efforts we made for
that. The Best. Week. Ever. event won the most creative event award as well. We divided this
report into five (5) impact areas. As you go through each page, there is one (1) on social equity. I
always tell people it is more than swing-sets,jumping jacks and concerts. There are real reasons
INTEGRITY1 SERVICE1 ACCESSIBILITY
JENNIFER M.COFFMAN BLANCA L.TYRADo JOSEPH R MOINAR
CHIEF DEPUTY/DmwroR OF OPERATIONS DEFuTr/DIREC OR of POLICY ORDINANCE VIOIATION CLERK
EXCELLENCE I ACCOUNTABILITY I INNOVATION I INCLUSION I EMPOWERMENT
455 County-City Building 1 227 W.Jefferson Blvd.I South Bend,Indiana 466011 p 574.235.92211 f 574.235.9173 1 www.southbendin.gov
®CITY OF SOUTH BEND I OFFICE OF THE CLERK
why we do the work we do. The five (5) impact drivers are preached all day long and we try to
illustrate that in our Annual Report. Those areas are social equity, ecology, public safety,
neighborhood economic impact and health and wellness. I would love to come back in the next
four (4) to six (6) weeks to share with you our new five (5) year strategic plan. That will be
formatted and ready to go. As the Annual Report provides a look back, that plan will provide a
look forward.
He continued, Right now, there are a couple things we are working on. There is a lot of flooding
mitigation. Finally we are to the point where parks can be evaluated. People's homes were
obviously the first thing,then the water started to recede then streets were evaluated, and now it's
parks. There are still some areas we can't even get in to. There are twelve (12) park areas that
remain closed. If you see a closure, it is closed for a reason as we did not forget to remove it. Even
if there is no more water,there are two (2)primary safety risks that exist. One (1) is that there are
large sink holes and fissures. The other thing is that the benches and playground equipment that
got inundated with some of that water may not be clean. There was combined sewer overflow
during the flooding and so those things have yet to be sanitized. We will be following the proper
processes to get those open. The two main projects set to open this year is the Dog Park at Rum
Village and the Charles Black Recreation Center. Both are on time and on budget.
Committee Chair McBride opened the floor to questions from Council and Committee members.
Committeemember John Mazurkiewicz asked, Is there any idea as to when the closed off sections
will be cleaned?
Mr. Perri replied, If it is just a matter of cleaning, we are on it right away. Water is literally just
not out of all the areas right now. The trail system, however, is going to be a while. We need to
get some engineers in there to survey the erosion that is happening. The damage isn't even all done
yet as many think that just the water has to be gone.
Committeemember Oliver Davis asked, What is your planning process, now, after getting these
record floods?
Mr. Perri replied, I will answer that in two (2) ways. One (1), the parks also filter out all that
flooding water and actually stopped it from getting to a lot more homes than it did.We are thankful
to our forefathers of the City that planned the parks where they did. Secondly,we are taking a look
at all the plans. We want to beg the question of whether designing to the one hundred (100) year
standard is good enough. It is probably not. We are fortunate that we haven't worked on some of
these plans yet. But, that is what some of these parks are there for is to absorb the damage so that
homes and businesses don't. We have to take that with a grain of salt. Nothing we can do can
accommodate this level of flooding.
Councilmember Jo M. Broden asked, What are your plans for clean-up?
Mr. Perri replied, That has been tough too because we can't even access some of those trails yet.
The areas we can get into, we are trying to do it with a Bobcat. We scoop and truck it out. We do
have a River Clean-Up Day and I will circulate that date to Council. We will be in the river and
around the river. The river lights actually survived the flood which is great.
EXCELLENCE I ACCOUNTABILITY I INNOVATION I INCLUSION I EMPOWERMENT
455 County-City Building 1227 W.Jefferson Bvld I South Bend,Indiana 466011 p 574.235.9221 If574.235.91731TfD574.235.5567lwww.southbendin.gov
CITY OF SOUTH BEND I OFFICE OF THE CLERK
Councilmember Karen White asked, Can we get an update on the graffiti?
Mr. Perri replied, This past summer, we removed our 3000' piece of graffiti. Our standard is to
remove it within twenty-four (24) hours. It is a great way to deter the graffiti. If it keeps getting
eliminated,they won't keep doing it.
With no further discussion, Committee Chair McBride adjourned the PARC Committee
Organizational meeting at 5:14 p.m.
Respectfully Submitted,
S�A Dy, MqktA t,
Sharon McBride, Chairperson
EXCELLENCE I ACCOUNTABILITY I INNOVATION INCLUSION I EMPOWERMENT
455 County-City Building 1227W Jefferson Bvld j South Bend,Indiana 46601 p 574.235.92211 f574.235.9173 I TTD 574.235.5567 www.southbendin.gov