HomeMy WebLinkAbout01/18/1928 Board of Public Works Special Meeting MinutesWednesday 1"orning January I8th.. , 1928. • 11 r 1 U Board met in special session at 10:00 A. M. All members present. Ij C Tvr. H. G. Wray, City Engineer, presented the following report of the ommittee of Vngineers on the Northwest Sewer; uvhich was signed and approved by the Board: REPORT OF C0I1MITTEE OF .;ENGINEERS ON EV,7OOB AVENUE SL BIER FOUNJDATION. "To The Hon. Board of Public Works, South Bend, Indiana. i Gentlemen: We$ the undersigned committee of engineers appointed under your resolution of January IOth., I9289 to report upon the necessity for a conrete. cradle under the Elwood Avenue sewer, report as follows: ' The question submitted to us is best stated by quoting from your li resolution as follows: "The construction of the Northwest sewer along Elwood Avenue has disclosed -some very unstable soil condition. Sections of quicksand of variable length are frequently encountered. In order that the reinforced concrete pipe may have 1the-advantage of trenen support, and any assistance afforded by proper bedding and back filling, a concrete cradling has been provided for the reinforc-ed concrete p pipt throughout the sections where the bad soil conditions exist, to safeguard the pipe from failure by crushing. It was anticipated that concrete cradling would be used in the construction of this sewer, but not to the extent that it has been used, or possibly will ne necessary, in as much as extended underground examinations of the soil conditions was not possible". And quoting further This committee of engine advising withrthe-Board of Public Works and the City Civil Lngineer, is requested to submit, after proper investigation, a report as to whether or not, in it's opinion, the use of boncrete cradling through the quicksand sections along Elwood Ivenue, in connection with the construction of the North-west Trunk Sewer, is necessary to the safe construction of the sewer." in response to your request we have examined the plans and specification for this sewer, Vie have questioned the City Civil Engineer and other connected with th work, and we have made an examination of the construction work on the graund, examing the sewer where now under construction, and the nature of the soil under excavation, ii gs a result of this investigation, we are of the opinion that the concre cradling, as shown upon the plans, is justified particularly in the support of a sewer of the size and depth, and involving the important expenditures required in the North- west sewer system. Respectfully dubmitted, signed Charles B. Burdick Wm. S. Moore Charles W. Cole by 177. H. Gartner South Bend, Indiana. January I7th., 1928." Meeting adjourned at II-30 A. ?;.. Attested: le oft e Board