Loading...
HomeMy WebLinkAboutAward Bid - Hibberd Plaza Improvements Proj No 117-063R - R Yoder Concrete1316 COUNTY -CITY BUILDING 227 W. JEFFIERSON BOULEVARD Som'n B[.,,'NC). INDIANA 46601-1830 CITY OF SOUTH BFND PETE BurTiGIEG, MAYOR BOARD OF PUBLIC WORKS March 13, 2018 Randall Yoder R. Yoder Construction, Inc, PO Box 69 Nappanee, IN 46550 RE: Award Bid — Hibberd Plaza Improvements — Project No. I 17-063R Dear Mr. Yoder: PHONr 574/235-9251 FAx 574/ 235-9171 The Board of Public Works, at its meeting held on March 13, 2018, awarded the above referenced project to you in the amount of $445,076 for the Base Bid plus Alternates 3, 4, and 9. Enclosed please find a signed Bid/Proposal form. Please forward the following documents in one submittal by March 27, 2013 to my attention for Board of Public Works approval: 1) One (1) original of the Public Works Conti -act (enclosed) 2) Labor & Material Payment Bond 3) Performance Bond (125% of Bid Amount) 4) Certificate of Insurance naming the City of South Bend as an additional insured 5) Item #4 for all subcontractors you use If you have any further questions regarding this matter, please call this office at (574) 235-925 1. Sincerely, Linda M. Martin, Clerk Enclosures C: Kyle Silveus, Engineering GARY A. GILOT SUZANNA M. FRITZBERc, ELIZABETI I A. MARADIK JAMEs A. MUELLER Ti IERFSE J. DoRAIJ INTER -OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING TO: Linda M. Martin, Clerk Board of Public Works FROM: Kyle Silveus SUBJECT: Hibberd Plaza and Streetscape, Project 117-063R DATE: March 8, 2018 On February 27t", 2018, the Board of Public Works opened and read bids for the above project. There was one bidder for the project: Total Bid Bidder Base Bid Alternate 3 Alternate 4 Alternate 9 with Alternates 3, 4 and 9 1. R. Yoder Construction, $441,828.00 $1,683.00 $7,197.00 -$5,632.00 $445,076.00 Inc. Engineering found three items on the bid proposal by R. Yoder Construction that were corrected: 1) Unit prices were not included on the Bid Proposal Sheet. 2) There was an addition error that changed the total amount of the base bid from $441,843.00 to $441,828.00. 3) There was a misunderstanding in listing the amount for Alternate No. 9 substitution for Limestone in lieu of crushed oyster shells that changed the Alternate No. 9 amount total from +$414.00 to-$5,632.00. Engineering contacted R. Yoder Construction and has confirmed the correction of all three items listed above, resulting in a corrected Base Bid plus Alternates 3, 4, and 9 of $445,076.00. Engineering recommends award of a contract for $445,076.00 to the lowest responsive 1 responsible bidder, R. Yoder Construction. The Department of Public Works has appropriated sufficient funds from the RWDA TIFF Fund (324-1050-460-42.01). Please call with your questions. Enclosure: Bid Tabulation Rid Tabulation Project: 227-06310bberd Building Site Demolition & Plaza Improvements For Bids Due: 2/27/2018 Item No. Description QTY Unit Unit Price Total Amount Unit Price Total Amount ->RASE RID PAYITEMS Engineer Estimate R. Yoder Construction, Inc. 1 Mobilization and Demobilization 1 LS $ 21,940.94 $ 21,940.94 $ 9,403.26 $ 9,403.26 $ 25,000.00 $ 25,0110.00 $ 2,700.00 $ 2,700.00 $ 6,000.00 $ 6,600.60 $ 20.00 $ 700.00 $ 10.00 $ 380,00 $ 60.00 $ 14,220.03 $ 245.00 $ 55,615,00 $ 185.00 $ 2,775.00 $ 250.00 $ 6,000,00 $ 275.00 $ 12,100.00 $ 275,00 $ 825,00 $ 60.00 $ 480.00 $ 90,00 $ 540,00 $ 9.00 $ 1,120.00 $ 13,000,00 $ 13,000,00 $ 25.00 $ 250.00 $ 65,00 $ 2,210,00 $ 450.00 $ 1,350.00 $ 75,00 $ 3,750,00 $ 85.00 $ 8,075.00 $ 850.00 $ 5,300.00 $ 125.00 $ 2,125.00 $ 110.00 $ 9,020.00 $ 35.00 $ 700.00 $ 600.00 $ 1,200.00 $ 250.00 $ 1,500.00 $ 65.00 $ 130.00 $ 5.50 $ 7,249.00 $ 3.50 $ 4,613.00 $ 25.00 $ 3,050.00 $ 65.00 $ 650.00 $ 55.00 $ 550.00 $ 60.00 $ 3,600.00 $ 8,500.00 $ 9,500.00 $ 80.00 $ 1,360.00 $ 120.B0 $ 9,360.00 $ 15,000.00 $ I5,000.00 $ 90.00 $ 2,250.00 $ 80.00 $ 2,400.00 $ 6,ODD.OD $ 6,000,00 $ 12,00D.OD $ 12,000.00 $ 800,00 $ 6,400,00 $ 20.00 $ 1,640.00 $ 25,00 $ 300,00 $ 15.00 $ 525.00 $ 35.03 $ 11190.00 $ 90.00 $ 3,420.00 $ 125,00 $ 10,625.00 $ 145.00 $ 12,615.00 $ 200,00 $ 5,200.00 $ 225.00 $ 1,125.00 $ 165.00 $ 3,465.00 $ 45.00 $ 270.00 $ 60.00 $ 4,080.00 $ 135.00 $ 1,890.00 $ 250.00 $ 3,150.00 $ 3,000.00 $ 3,000.00 $ 344,286.20 100.OD% $ 23,197.00 $ 23,197.00 $ 11,608.00 $ 11,608.00 $ 50,448.00 $ 50,448.00 $ 5,904.00 $ 5,804.00 $ 4,411.00 $ 4,411.00 $ 51.09 $ 1,788.00 $ 52.21 $ 1,984.00 $ 76.68 $ 18,172.00 $ 393,86 $ 89,406,00 $ 285.27 $ 4,279,00 $ 193,46 $ 4,643,00 $ 108.23 $ 4,76100 $ 2,015,33 $ 6,046,00 $ 135.63 $ 1,085,00 $ 176,50 $ 1,059,00 $ 6.68 $ 935.00 $ 15,090.00 $ 15,090.00 $ 46.90 $ 469.00 $ 153,65 $ 5,224.00 $ 1,741.33 $ 5,224.00 $ 4CS0 $ 2,225.00 $ 165.71 $ 15,742.00 $ 34817 $ 2,089.00 $ 170.71 $ 2,902.00 $ 104A6 $ 8,566.00 $ 42.10 $ 842.00 $ 800m $ 1,600.00 $ 245.83 $ 1,475.00 $ 208.50 $ 417.00 $ 1.39 $ 1,837.00 $ 1.76 $ 2,318.DD $ 16.99 $ 2,073.00 $ 29.00 $ 290.00 $ 87.00 $ 87B.0D $ 87.05 $ 5,223.00 $ 11,120.00 $ 11,120,OD $ 95.18 $ 1,618.00 $ 130.26 $ 10,160,OD $ 13,942.00 $ 13,842.00 $ 69.rA $ 1,741,00 $ 46.40 $ 1,392.00 $ 4,062.00 $ 4,062.00 $ 1,950.00 $ 1,950.00 $ 243,75 $ 1,950,00 $ 51.07 $ 4,189.00 $ 46,50 $ 558.00 $ 52.23 $ 1,828.00 $ 59.06 $ 2,008.00 $ 459.00 $ 17,442.00 $ 223.99 $ 19,039.00 $ 215.93 $ 18,786.00 $ 313.38 $ 8,148.00 $ 377.20 $ 1,886.00 $ 348.24 $ 7,313.00 $ 75.33 $ 452.00 $ 69.25 $ 4,709.00 $ SB3.21 $ 1,445.00 $ 61.87 $ 928.00 $ 1,160.00 $ 1,160.00 $ 441,828.00 128.33% _ 27 Coustrucllon Engineering 1 IS _..._.�,,.....,,_.. 3 ._,..__._,,,,,.......... ..�_ C_om_m_on_Fxcavatlon 1 L5 _ 4 Erosion C_ontral i LS _ 5 Maintenance of Traffic 1 LS 6 _ Concrete Removal 35 SYS 7 ..,............... _._ Curb Demolition ..... 38 IF 8 _ 4" Concrete Plaza V..._ 237 SYS 9 Plaza Pemars, Permeable 227 SYS 10 Concrete Steps(Plaza) 1S SYS 11 Handrail(Plaza) mm24 LF 12 Planter Walls 44 LF_ 33 _ _ Crushed Oyster Shells (Bocce Area) 3 CYS 14 35 Granular Sand(Bocce Area) _ Crushed Stone Base (Bocce Area) _ 8 6 CYS __ CYS 16 2"x6" Treated Wood "Bumper Board" 140 LF 17 Grease Trap �...................._,,,----- 1.,,,..- _ LS 18 Underdraln, socked, 4" 10 LF 19 Trench Drain _ Drain Inlets Storm Sewer Pipe, 6" Sanitary Sewer, PVC SDR 35,4" 34 LF 20 3 EA 21 50 LF 22 95 LF 29 Clean -Out, Sanitary 6 EA 24 Gas Une 37 IF 25 6"x6"Timber Wall 82 IF 26 _ Concrete Curb 20 IF 27 Canopy Trees, 2,5"-3" 2 EA 28 Canopy Trees, 2.5" -3" (owner Provided) 6 FA 29 _Shrub$, 24"-30" 2 EA 30 Lidope groundcover, plug 1318 EA _ 31 Daffodil Bulbs 1318 EA 32 Perennials 122 EA 33 Topsoil, 18" (Planters) 10 CYS 34 Sand Fill (Planters) 10 CYS 35 TapwJl, 12" (Planters) 60 CYS 36 Irrigation 1 LS 37 Mulch 17 CYS 38 Concrete, 8" 78 SYS 39 Dumpster Enclosure, Chainlink, Vinyl Slats, and Posts 1 IS 40 Electric Line Connection 25 LS 41 Telephone Line Connection 30 LS 42 Asphalt Pavemnot Patching 1 LS 43 Concrete Light Wells (3) 1 LS 44 Pipe Bollards 8 EA 45 Concrete Removal Paver Removal/Salvage Curb Demolition Concrete Curb and Gutter Sanitary Sewer, PVC SDR 35, 8" Domestic Water Line, Class 52, 4" DIP Fire Protection Water Line 4" DIP Streetscape pavers, Permeable (From City) HMA Surface, 1.5" _ 82 12 35 34 38 85 87 26 5 _ SYS_ SYS IF LF U` _„LF - LF SYS TONS 46 47 48 49 50 51 52 53 54 HMA Rase, 6.5" 21 TONS 55 Compacted Aggregate, No. 53, Base (ROW) 6 CYS W� 56 _. Concrete Sfdewalk, 4" aSYS 57 Concrete ADARamp 14 SYS 58 Decorative Railing and Panels 15 LF 59 Televising Sewer Laterals 1 LS BASESIDTOTAL`: .. - ALTERNATE PAY ITEMS Engineer Estmate $ 2,300.00 $ 4,600.00 ft. Yoder Construction, $ 3,091.00 $ Inc, 6,182.00 60 '.`-Alt. N1-Utter Container. .'.. .. 2 ` LS :. :. 61.... i:Alt. #2-Decorative Planter � � ` 8 �- � LS $ 1,200,00 $ 9,600.00 $ 1,007,00 $ 8,056,00 Alt.43- Modular Block Wall System and Cap 44 LF '. $ 222.00 $ 9,766.00 $ 36.25 $ .`.j 1,6I33.00. 63 '(Alt, 04- Modular Block Stairs System -. .15 ..-SYS - $ 222.00 $ 3,330.00 $ 479,80 $ -::7,197.00. 64 . A1t.115 -Permeable Pavers in Ueu of Concrete (Upper Plaza Only) . 237 :: SYS : $ 190.00 $ 45,030.00 $ 320.80 $ 76,029.00 65 Alt, p6-Railing, DecotatlYe (Plaza .Oply) 24..`LF ' $ 175,00 $ 4,200.00 $ (11604) $ (2,785,00) 66 .::Alt. 117-Sewer Lateral 3lning- 76 ::-LF $ 175.00 $ 13,300.00 $ 261.17 $ 19,849.00 67 ::: Alt. 88- Sewer. Lateral Replacement `.'76 - .LF '. $ 425.00 $ 32,300.00 $ 790.20 $ 22,055,00 68 Alt.h9-Llmestone Fines In Lleu of Crushed oyster Shells iBocce Area) 3 - CYS `: $ 125.00 $ 375.00 $ 122,503.00 100.00% $ (1,877.33) $ $ 108.27% S:(5,632.00) 132,634,00 - ..ALTERNATE TOTALS - I hereby Certify that the above truly and accurately represenntttss bids received for this project on February 27, 2018 Kyrie Wilveus-� AWAW Project Name Hibberd Plaza and Streetscape Project No. 117-063R For Bids Due February 22, 2018 PART I (Must be completed for all bids. Please type or print) Date: 02/27/21018 Bidder (Firm) R. Yoder Construction, Inc. City/State/Zip: Nappanee, IN 46550 Telephone Number: ( 574 ) 773-3502 Agent of Bidder (if Applicable): Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of: Hibbard Plaza and Streetscape the City of South Bend, Indiana, in accordance with plans and specifications prepared by: Troyer Group, Inc. and dated February 2, 2018 for the sum of (enter the Total Bid as shown on the Proposal) Five Hundred Eighty Thousand Five Hundred Twenty Five 16/100 ($ 580,525.16 (Enter sum of Total Base Bid plus Alternates shown on Proposal) (Numerical) The undersigned further agrees, to furnish a bond or certified check with this bid for an amount specified in the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance with the notice. Any addendiums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the City of South Bend, If the bid is to be awarded on a unit basis, the itemization of the units shall be shown pr'a- �sepa e attachment. By (Printed ACCEPTANCE (S I=.- The above bid is accepted this /15 day of 20 Subject to the following conditions: 1�'elq 5'. 0'/ I/Gary Woe, Presi ent Elizabeth A. Maradik, Member / 4 Jam l A. Mueller, Member PART 11 Suzinna-Wil't/itzberg."Member e se J. Ddau, Member A— "AtYest: Linda M. Martin, Ciek Version 10/17/2016 Contractors Bid for Public Works - 2 BOARD OF PUBLIC WORKS CITY OF SOUTH BEND, INDIAN PUBLIC WORKS CONTRACT THIS AGREEMENT, made and entered into this 13th day of March, 2018, by and between, R. Yoder Construction, Inc., PO Box 69, Nappanee, IN 46550, HEREINAFTER called the "Contractor", and the Board of Public Works herein called the "Board". WITNESSETH: That the Contractor covenants and agrees to make the following improvement, as fully set out in the Notice to Bidders, Standard Specification, Special Provisions, Plans, and Bid Proposal, all of which are set forth as a part of this Contract, for: PROJECT NO.: DESCRIPTION: COMPLETION DATE: AMOUNT - FUNDING: 117-063R HIBBERD PLAZA AND STREETSCAPE SEE SPECIFICATIONS $445,076; BASE BID PLUS ALTERNATES 3, 4, and 9 RWDA TIF The total bid for this improvement were those prices as received and accepted by the Board on the February 27, 2018, The Contractor further agrees to notify the Engineer when this improvement is completed. This notification shall be in the form of Completion Affidavit, signed by the Contractor. Upon final acceptance of the improvement by the Engineer, the Contractors final estimate will be presented to the Board for final Payment with one (1) copy of the Completion Affidavit and one (1) copy of a Waiver of Lien. BOARD OF PUBLICtAjPXS Gary A. 6ilot, President Eliza et AMaradik, Member --S'uz tin ri zb, Ja A. Mueller, Member Me Therese J. Dor'a'u, M t- st: Linda *actin, Clerk R. YODER CONSTRUCTION, INC, Printed Name Signature CERTIFICATION (To be completed if Contractor is a Corporation) - 1, , certify that I am Secretary of the Corporation named as Contractor herein; that who signed this Agreement on behalf of the Contractor was then of said Corporation; that said agreement was duly signed for and in behalf of said Corporation by authority of its governing body, and is within the scope of its corporate powers. Secretary Corporate ADDENDUM NO. 2 To the Contract Document and Project Specifications for the HIBBERD PLAZA AND STREETSCAPE (1 17-063R) CITY OF SOUTH BEND, INDIANA Project No.; &wzmRdA—xXm Date: FEBRUARY 21, 2018 on V071 J- A= M I WAM MA-olls 1 20 1 :01 Hibberd Plaza and Streetscape February 22, 2018 Description Totalo Unit Price Amunt I General Items/Entire Site Mobilization I Demobilization =I-Constructi on Engineering - Common Excavation Erosion Control maintenance of Traffic Curb Demolition 4" Concrete Plaza Plaza Pavers, Permeable Mi I Concrete Steps (Plaza) — Handrail (Plaza) i-�Ianterwalls Crushed Oyster Shells (Bocce Area) Granular Sand (Bocce Area) Crushed Stone Base (Bocce Area) Treated Wood "Bumper "Board" Page 5 of 7 17 Grease Trap 1 LS o, 00 18 Underdrain, Socked, 4" 10 LF yam. d 0 19 Trench Drain 34 LF Szzy.no 20 Drain Inlets 3 EA 7,2y..90 21 Storm Sewer Pipe, 6" 50 LF z, zzs, a8 22 Sanitary Sewer, PVC SDR 35, 4" 95 LF t5 ��• �'� 23 Clean -out, Sanitary 6 EA 0. 59 aa, 24 Gas Line 17 LF z, fV? mo 25 6"x6" Timber Wall 82 LF g GG .r0 26 Concrete Curb 20 LF en. 0 e 27 Canopy Trees, 2.5" — 3" 2 EA 28 Canopy Trees, 2.5" — 3" (Owner Provided) 6 EA i N 74. oo 29 Shrubs, 24" — 30" 2 EA y / - o 0 30 Liriope groundcover, plug 1318 EA 33 , 00 31 Daffodil Bulbs 1318 EA Z, 1 . as 32 Perennials 122 EA Z, a 73. 0 33 Topsoil, 18" (Planters) 10 CYS Z90 ao 34 Sand Fill (Planters) 10 CYS $70. 00 35 Topsoil, 12" (Planting Beds) 60 CYS 5 zL3, &CP 36 Irrigation 1 LS //, /Z�. ve, 37 Mulch 17 CYS Alley and Dumpster Areas 38 Concrete, 8" 78 SYS 39 Dumpster Enclosure, Chainlink, Vinyl Slats, and Posts 1 LS ! Z d 40 Electric Line Connection 25 LS 41 Telephone Line Connection 30 LS Z CPO 42 Asphalt Pavement Patching 1 LS y abZ mo 43 Concrete Light Wells (3) 1 LS 95n. ao 44 Pipe Bollards 8 EA ro, od Right of Way Area 45 Concrete Removal 82 SYS 46 Paver Removal/Salvage 12 SYS o , 47 Curb Demolition 35 LF Set?. o 0 48 Concrete Curb and Gutter 34 LF Z von so 49 Sanitary Sewer, PVC SDR 35, 8" 38 LF /7 Z mo 50 Domestic Water Line, Class 52, 4" DIP 85 LF i90 and Page 6 of 7 51 Fire Protection Water Line 4" DIP 87 LF I $ 52 Streetscape Pavers, Permeable From City) 26 SYS 9 I" S. OC 53 HMA Surface 1.5" 5 Tons S?s 54 HMA Base 6.5" 21 Tons 7 o� 55 Compacted Aggregate, No. 53, Base(ROW)6 CYS ySZ v� 56 Concrete Sidewalk, 4" 68 SYS 709 00 57 Concrete ADA Ramp 14 SYS 41 y an 58 Decorative Railing and Panels 15 LF 9?-$ 0. 59 Televising Sewer Laterals 1 LS 1160.00 BASE BID TOTAL YV gyre. OJ ALTERNATES item No.60 Description Quantity Unit Unit Price Amount Total Alt. #1 — Litter Container 2 LS G, / 82-, o'D 61 Alt. #2 — Decorative Planter 8 LS 9, 6:5-4, na 62 Alt. #3 — Modular Block Wall 44 LF ! System and Ca 63 Alt. #4 — Modular Block Stairs 15 SYS 7 System - Alt. #5 — Permeable Pavers in 64 Lieu of Concrete (Upper Plaza 237 SYS 74 oz9. ,n Only) 65 Alt. #6 — Railing, Decorative 24 LF Plaza Only) 7-705, &e 66 Alt. #7 — Sewer Lateral Lining 76 LF oQ 67 Alt. #8 — Sewer Lateral 76 LF Replacement ZZ oss, 00 Alt. #9 — Limestone Fines In Lieu 68 of Crushed Oyster Shells (Bocce 3 CYS Area ALTERNATES TOTAL l 3S.46 8/. 00 ALTERNATES PLUS BASE BID TOTAL END OF ADDENDUM # Author: JSG Page 7 of 7 BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date 3/06/2018 Department Name Kyle Silveus Division/Bureau Public Works Engineering U Agreement ❑ Contract ❑ Proposal ❑ Addendum ❑ Professional Services ❑ Resolution ❑ Bid Opening ® Bid Award ❑ Req. to Advertise ❑ Title Sheet ❑ Quote Opening ❑ Quote Award ❑ Change Order No. ❑ C/O & PCA No. ❑ PCA ❑ Ease/Encroach. ❑ Traffic Control: n Other: Company or Vendor Name New Vendor MBE/WBE Contractor MBE/WBE Contractor Requested Project Name Project Number R. Yoder Construction, Inc. Hibberd Plaza Improvements 117-063R Previous Amount $ Current Percent of Change: % New Amount $ Total Percent of Chan e: % Dispersal After Approval Copy Original ❑ ❑ ❑ ❑ ❑ ❑