HomeMy WebLinkAboutOpening of Bids - Ironwood Dr. Pavement Rehabiliation Proj No 117-071A - Rieth Riley Construction Co IncCITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
Project Name ironwood Drive Pavement Rehabilitation and Intersection
Project No. 117-071A
Four Bids Due February 27, 2018
PART I
(Must be completed for all bids. Please type or print)
Date: February 27, 2018 Bidder (Firm): Rieth-Riley Construction Co,, Inc.
Address: 25200 State Road 23
City/State/Zip: South Bend, In. 46614 Telephone Number: ( 574 ) 288-8321
Agent of Bidder (if Applicable): Joshua A. McCormick
Pursuant to, notices given, the undersigned offers to furnish labor and/or material necessary to complete the
public works project of:
Ironwood Drive Pavement Rehabilitation ado Intersection Project No. 117-0171A
the City of South Bend, Indiana, in accordance with plans and specifications prepared by:
n/a
and dated n/a
for the sum of (enter the Total Base Bid as shown on the Proposal)
see itemized proposal ($see itemized proposal
(Enter sum of Total Base Bid shown on Proposal) (Numerical)
The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in the
notice of the letting, If alternative bids apply, the undersigned submits a proposal for each in accordance with
the notice. Any addendums attached will be specifically referenced at the applicable page,
If additional units of material included in the contract are needed, the cost of units must be the same as that
shown in the original contract if accepted by the City of South Bend. If the bid is to be awarded on a unit basis,
the itemization of the units shall be shown on a separate attachmqtJL,-,--.
101
By
Signature)
Jos C�6�,"—
&Me m, ales Manager
(Printed Name of Person Signing)
ACCEPTANCE
The above bid Is accepted this day of
Subject to the following conditions:
Gary A. Gilot, President
Elizabeth A. Maradik, Member
Suzanna M. Fritzberg,, Member
ThereseJ. Dorou, Member
James A. Mueller, Member Attest: Linda M. Mairtin,,Clerk
Version 10117/2017 Contractor's Bid for Public Works - 2
W
BID/PROPOSAL
CITY OF SOUTH BEND
Project Name Ironwood Drive Pavement Rehabilitation and Intersection
Project No, 117-071A
For Bids Due February 27, 2018
BASE BID
Item
No.
Description
Quantity
Unit
Unit Price
Total Amount
1
Construction Engineering
1
LSUM
$6,600.00
$6,600.00
2
Mobilization and Demobilization
1
LSUM
$60,000.00
$60,000.00
3
Clearing Right -of -Way
1
LSUM
$9,000.00
$9,000.00
4
Pavement Removal
4,215
SYS
$8.00
$33,720.00
5
Curb and Gutter, Remove
985
LFT
$3,00
$2,955.00
6
Sidewalk, Concrete, Remove
457
SYS
$6.00
$2,742.00
7
Pipe, Remove Existing Storm Sewer
856
LFT
$22.00
$18,832.00
8
Structure, Remove Existing Storm
Manhole
11
EACH
$626.00
$6,886.00
9
Pipe, Abandon Existing Storm Sewer
100
LFT
$44.00
$4,400.00
10
Excavation, Common
1,116
CYS
$17,79
$19,853.64
11
Borrow
25
CYS
$116.00
$2,900.00
12
Temporary Erosion and Sediment Control
1
LS
$1,000.00
$1,000.00
13
Temporary Drop Inlet Protection
29
EACH
$48.00
$1,392,00
14
Temporary Silt Fence
732
LFT
$2.25
$1,647,00
15
Subgrade Treatment, Type 1
4,495
SYS
$3,00
$13,485.00
16
Subgrade Treatment, Type II
125
SYS
$34.00
$4,250.00
17
Subbase for PCCP
1,116
CYS
$93.00
$103,788.00
18
HMA Patching, Type C
63
TON
$78,00
$51,714.00
19
Milling, Asphalt, Transition
355
SYS
$7.00
$2,485.00
20
Milling, Asphalt, 1.5 in.1,060
SYS
$2.25
$24,885.00
21
HMA Surface
98;
TON
$89.00
$88,021.00
22
HMA Wedge and Level
100
TON
$89.00
$8,900.00
23
Joint Adhesive, Surface
6,320
LFT
$1.00
$6,320.00
24
Asphalt for Tack Coat
3,5
TON
$1.00
$3.50
25
PCCP, 10-in.
4,254
SYS
$57.00
$242,478.00
26
D-1 Contraction Joint
2,050
LFT
$8.34
$17,097.00
Bidder (Firm): ', -t- vk,- � ; \ -e-
Version 10/17/2017 Contractor's Bid for Public Works - 7
Revised February 22, 2018 (Addendum 1)
BASE BID
Item
No.
Description
Quantity
Unit
Unit Price
Total Amount
27
Retrofitted Tie Bars
30
EACH
$52.50
$1,575.00
28
Sidewalk, Concrete, 4-in.
496
SYS
$44.00
$21,824.00
29
Sidewalk, Concrete, 6-in.
17
SYS
$68.00
$1,156.00
30
Curb Ramp, Concrete, 6-in.
115
SYS
$100.00
$11,500.00
31
Detectable Warning Surface
13
SYS
$240.00
$3,120.00
32
Curb, Integral, Concrete
839
LFT
$23.00
$19,297.00
33
PCCP for Approaches, 9-in.
58
SYS
$87.00
$5,046.00
34
HMA for Approaches, Type C
18
TON
$302.00
$5,436.00
35
Nursery Sodding
76
SYS
$15.00
$1,140.00
36
Underdrains
1,005
LFT
$28.00
$28,140.00
37
Pipe, 6-in.
8
LFT
$60.00
$480.00
38
Pipe, 12-in.
444
LFT
$59.00
$26,196.00
39
Pipe, 15-in.
314
LFT
$64.00
$20,096.00
40
Pipe, 18-in.
154
LFT
$89.00
$13,706.00
41
Connect to Existing Pipe or Structure
7
EACH
$1,400.00
$9,800.00
42
Manhole, C-4
6
EACH
$2,358.00
$14,148.00
43
Manhole, L-4
1
EACH
$6,093.00
$6,093.00
44
Inlet, B-15
10
EACH
$1,667.00
$16,670.00
45
Inlet, C-15
2
EACH
$2,044.00
$4,088.00
46
Casting, Adjust to Grade
5
EACH
$295,00
$1,475.00
47
Maintenance of Traffic
1
LSUM
$36,000.00
$36,000.00
48
Construction Sign, A
23
EACH
$79.00
$1,817.00
49
Construction Sign, B
5
EACH
$50.00
$250.00
50
Construction Sign, C
4
EACH
$125.00
$500.00
51
Road Closure Sign Assembly
2
EACH
$125.00
$250.00
52
Temporary Pavement Marking,
Removable, 4-in.
12,465
LFT
$0.75
$9,348.75
53
Temporary Pavement Marking, Paint,
4-in.
2,745
LFT
$0.50
$1,372.50
54
Temporary Pavement Marking,
Removable, Lane Indication Arrow
2
EACH
$70.00
$140.00
56
Temporary Pavement Marking,
Removable, 24-in.
60
LFT
$5.1.0
$306,00
56
Detour Route Marker Assembly
21
EACH
$89.00
$1,869.00
Bidder (Firm): �, 41X `
Version 10/17/2017 Contractor's Bid for Public Works - 8
Revised February 22, 2018 (Addendum 1)
BASE BID
Item
No.
Description
Quantity
Unit
Unit Price
Total Amount
57
Flashing Arrow Sign
5
EACH
$900.00
$4,500.00
58
Barricade, Type III -A
456
LFT
$15.00
$6,840.00
59
Overhead Sign Structure, Cable Span,
5
EACH
$3,393.04
$16,965.20
Remove and Salvage
60
Traffic Signal Installation, Remove and
1
LSUM
$3,300.00
$3,300.00
Salvage
61
Sign Post, Square, 1, Unreinforced
84
LFT
$10.00
$840.00
Anchor Base
62
Sign, Sheet with Legend, 0.080"
95
SFT
$14.00
$1,330.00
63
Sign, Sheet with Legend, 0.100"
42
SFT
$22.00
$924.00
64
Signal Cantilever Structure, Drilled Shaft
4
EACH
$5,900.00
$23,600.00
Foundation, Type B
65
Signal Cantilever Structure, Single Arm,
4
EACH
$14,700.00
$58,800.00
40 ft.
66
Traffic Signal Head, 3 Section, 12-in.
4
EACH
$720.00
$2,880.00
67
Traffic Signal Head, 5 Section, 12-in.
4
EACH
$1,200.00
$4,800.00
68
Pedestrian Signal Head, Countdown,
8
EACH
$610.00
$4,880,00
18-i n.
69
Pedestrian Push Button
8
EACH
$640.00
$5,120.00
70
Controller and Cabinet, TS-2
1
EACH
$18,700.00
$18,700.00
71
Controller Cabinet Foundation, P-1
1
EACH
$1,200.00
$1,200.00
72
Thermal Video (FLIR) Detector
4
EACH
$9,321.00
$37,284,00
73
Signal Handhole, Type 1
7
EACH
$1,100.00
$7,700.00
74
Signal Cable, Service, Copper, 3C 8GA.
60
LFT
$3.00
$180.00
75
Signal Cable, Control, Copper, 5C
1,320
LFT
$1.00
$1,320.00
14GA.
76
Signal Cable, Control, Copper, 7C
325
LFT
$2.00
$650.00
14GA.
77
Signal Cable, Control, Copper, 9C
515
LFT
$3.00
$1,545.00
14GA.
78
Conduit, HDPE, Schedule 80, 2-in.
500
LFT
$13.00
$6,500.00
79
Conduit, HDPE, Schedule 80, 3-in.
250
LFT
$14.00
$3,500.00
80
TESCO Cabinet with Single Service
1
EACH
$6,600.00
$6,600.00
81
Line, Remove
4,090
LFT
$0.50
$2,045.00
82
Grooving for Pavement Markings
16,155
LFT
$0.60
$9,693.00
83
Line, Thermoplastic, Solid, White, 4-in.
3,850
LFT
$0.40
$1,540.00
84
Line, Thermoplastic, Broken, Yellow, 4-
1,765
LFT
$0.40
$706.00
in.
Bidder (Firm):; e y
Version 10/17/2017 Contractor's Bid for Public Works - 9
Revised February 22, 2018 (Addendum 1)
BASE BID
Item
No.
Description
Quantity
Unit
Unit Price
Total Amount
85
Line, Thermoplastic, Solid, Yellow, 4-in.
8,565
LFT
$0.40
$3,426.00
86
Transverse Marking, Thermoplastic,
100
LFT
$2.00
$200.00
Crosswalk Line, White, 6-in.
87
Transverse Marking, Thermoplastic,
64
LFT
$10.00
$640.00
Crosswalk Line, White, 24-in.
88
Pavement Message Marking,
14
EACH
$80.00
$1,120.00
Thermoplastic, Lane Indication Arrow
89
Line, Multi -Component, Broken, White,
145
LFT
$2.00
$290,00
4-in.
90
Line, Multi -Component, Solid, White, 4-
845
LFT
$2.00
$1,690.00
in.
91
Line, Multi -Component, Solid, Yellow, 4-
985
LFT
$2.00
$1,970.00
in.
92
Transverse Marking, Multi -Component,
155
LFT
$9.00
$1,395.00
Stop Line, White, 24-in.
93
Transverse Marking, Multi -Component,
560
LFT
$3.00
$1,680.00
Crosswalk Line, 6-in.
94
Transverse Marking, Multi -Component,
330
LFT
$9.00
$2,970.00
Crosswalk Line, 24-1n.
95
Pavement Message Marking, Multi-
5
EACH
$105.00
$525.00
Component, Lane Indication Arrow
BASE BID TOTAL $1,248,041.59
ALTERNATE A
Item
No.
Description
Quantity
Unit
Unit Price
Total Amount
A-1
Milling, Asphalt, 1.5 in..
1,615
SYS
$2.29
$3,698.35
A-2
Subgrade Treatment Type 1
388
SYS
$1.57
$609.16
A-3
HMA Surface
173
TON
$89.00
$15,397.00
A-4
HMA Patching, Type C
364
TON
$85.00
$30,940.00
A-5
Joint Adhesive, Surface
1,190
LFT
$1.00
$1,190.00
A-6
Grooving for Pavement Markings
800
LFT
$0.60
$480.00
A-7
Line, Thermoplastic, Broken, White, 4-in.
60
LFT
$0.40
$24.00
A-8
Line, Thermoplastic, Solid, White, 4-in.
290
LFT
$0.40
$116.00
A-9
Line, Thermoplastic, Solid, Yellow, 4-in.
450
LFT
$0.40
$180.00
A-10
Pavement Message Marking,
Thermoplastic, Lane Indication Arrow
1
EACH
$80.00
$80.00
ALTERNATE�)A TOTAL $52,714.51
Bidder (Firm): i 0-�4 - V %- � t
Version 10/17/2017 Contractor's Bid for Public Works - 10
Revised February 22, 2018 (Addendum 1)
ALTERNATE B
Item
No.
Description
Quantity
Unit
Unit Price
Total Amount
B-1
Pavement Removal
560
SYS
$8.00
$4,480.00
B-2
Curb and Gutter, Remove
160
LFT
$3.00
$480.00
B-3
Subgrade Treatment Type 1
560
SYS
$3.00
$1,680.00
B-4
Subgrade Treatment Type 11
35
SYS
$34.00
$1,190.00
B-5
Subbase for PCCP
144
CYS
$93.00
$13,392.00
B-6
PCCP, 10-in.
560
SYS
$57.00
$31,920.00
B-7
D-1 Contraction Joint
336
LFT
$7.26
$2,439.36
B-8
Curb, Integral, Concrete
160
LFT
$23.00
$3,680.00
B-9
PCCP for Approaches, 9-in.
35
SYS
$87.00
$3,045.00
B-10
Underdrains
160
LFT
$28,00
$4,480.00
B-11
Pipe, 12-in.
139
LFT
$59.00
$8,201.00
B-12
Manhole, C-4
1
EACH
$2,358.00
$2,358.00
B-13
Inlet, B-15
2
EACH
$1,667.00
$3,334.00
ALTERNATE B TOTAL
$80,679.36
NOTE: Bidder shall provide Bids for the Base Bid and all Alternates provided.
BID SUMMARY:
BASE BID TOTAL
$1,248.0411.59
ALTERNATE A TOTAL
$52,714.51
ALTERNATE B TOTAL
$80,679.36
SUBMITTED TOTAL
1 381 435_.46
By signature below, Bidder acknowledges receipt of Addendum No. 1 and agrees to abide by the
Terms and Conditions included within:
Bidder (Firm): -Rieth-Riley Construction Co..lnc.
Address: 25200 SR 23
City/State/Zip: South Bend, IN 46614 Telephone Number: 574 288-8321
By
(Signature)
J s ua A. McCormick, Sales Manager
(Printed Name of Person Signing)
Version 10/17/2017 Contractor's Bid for Public Works -11
Revised February 22, 2018 (Addendum 1)
No. 1028
BID BOND TRAVELERS CASUALTY AND, SURETY COMPANY OF AMERICA
Hartford, Connecticut 06183
KNOW ALL MEN BY THESE PRESENTS,
That we, RIETH-RILEY..CQNSTRUCTION CO- IMQ. . as Principal, hereinafter called
the Principal, and TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA, Of Hartford, Connecticut, a
corporation duly organized under the laws of the State of Connecticut, as Surety, hereinafter called the Surety, are held
and firmly bound unto., City of South Bend, Indiana
Five Percent (5%) of totes bid as Obligee, hereinafter called the Obligee, in the sum of
Dollars
($--5-9L-..-of bid for the payment of which sum, well and truly to be made, the said Principal and the said
Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these
presents.
WHEREAS, the Principal has submitted a bid' for Ironwood Drive Pavement Rehabilitation
and Intersection Project No. 117-071A
NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract with
the Obligee in accordance with the terms of such bid, and give such bond" or bonds as may be specified in the bidding or
Contract Documents with good and sufficient surety for the faithful performance of such, or in the event of the failure of
the Principal to enter such: Contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference
not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the Obligee
may in good faith contract with another party to perform the Work covered by said bid, then thiis obligation shall be null
and void, otherwise to remain in full force and effect.
Signed and sealed this 27th
.2"
itness Daw E. Armstrong
z
Witness Debra Doyle
of February 2018
RIETH-RILEY CONSTRUCTION' CO., INC,
(Principal) (Seal)
,.5,0w,,;11hw7Name
u C
cCormick, Sales Manager
TRAVELERS CASUALTY AND INSURANCE COMPANY
Sandra M, Nowak, Attorney -in -Fact
ACKNOWLEDGEMENT BY SURETY
STATE OF ILLINOIS
COUNTY OF COOK
On this 4,960
before me, Dianc M. O'Learv,,a
Notary Public, within a for said County and State, personally -'
appeared
Sandra M. Nowak to me personally known to be the Attorney -in -Fact of and
for Travelers Casualty and SqKety Company of America and acknowledged
that she executed the said instrument as the free act and deed of said
Company.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed my
official seal, at my office in the aforesaid County, the day and year in this
certificate first above written.
W o F OFFICIAL SEAL
Notary Public-, in the St of Illinois DIANE M 01EARY
County of Cook NOTARY PUBLIC, STATE OF ILLINOIS
My COMMISSION EXPIRES 01/04/2021
6i&
WARNiNG; THIS POWER OF
� 211 no I. ME 10 a
4100, POWER OF ATTORNEY
TRAVELERSJFarmington Casualty Company St. Print Mercury Insurance Company
Fidelity and Guaranty Insurance Company Travelers Casualty and Surety Company
Fidelity and Guaranty Insurance Underwriters, Inc. Travelers Casualty and Surety Company of America
St. Paul Fire and Marine Insurance Company United States Fidelity and Guaranty Company
St. Paul Guardian Insurance Company
Attorney -In Fact No. 230983 Certificate No. 007359040
KNOW ALL MEN BY THESE PRESENTS: That 1,annington Casualty Collipany, S,t. Paul Fire and Marine Insurance Company, St. Paul Guardian Insurance
Company, St. Paul Mercury Insurance Company, Travelers Casualty and Surety Company, Travelers Casualty and Surety Company of America, and United States
Fidelity and Guaranty Company are corporations duly organized Water the laws of the State of Connecticut, that Fidelity and Guaranty Insurance Company is a
corporation duly organized under tile laws of the State of Iowa, and that Fidelity and Guaranty Insurance Underwriters, hic., is a corporation duly OrgalliZCLI under the
laws, of the State of Wisconsin (herein collectively called the "Companies"), and that the Companies do hereby make, constitute and appoint
Debra J. Doyle, Diane M. O'Leary, James B. McTaggart, Jennifer L. Jakaitis, Judith A. Lucky-Eftimov, Sandra M. Winsted, Sandra M. Nowak,
Susan A. Welsh, Christina L. Sandoval, Linh Eck, and Jessica B. Dempsey
of the City of Chica To — State of_m Blinois ----- - their true and lawful Attorneys) -in -Fact,
each in their separate capacity if more than one k trained above, to sign, execute, seal and acknowledge any and all bonds, recognizances, conditional undertakings and
other writings obligatory in the nature thereof on behalf of the Compartics, in their business of guaranteeing the fidelity of persons, guaranteeing the performance of
contracts and executing or guaranteeing bonds and undertakings required or pern-fitted in any actions or proceedings allowed by law.
IN WITNESS WHEREOF, the Companies have caused this instrument to be signed and their corporate seats to be hereto affixed, this 28th
day of August 1 2017 1
Stale of Connecticut
City of Hartford as.
Farmington Casualty Company
Fidelity and Guaranty Insurance Company
Fidelity and Guaranty Insurance Underwriters, Tire.
St, Paul Fire and Marine Insurance Company
St. Paul Guardian Insurance Company
St. Paul Mercury Insurance Company
Travelers Casualty and Surety Company
Travelers Casualty and Surety Company of America
United States Fidelity and Guaranty Company
"IY4",
74 "HARTFORD,i
S E JLL., * WK
By;
Robert L. Rancy, Smior Vice Presideut
On this the 28th day of August 2017
before Trie personally appeared Robert L. Rancy, who acknowledged himself to
be the Senior Vice President of Fanningt011 Casualty Company, Fidelity and Guaranty Insurance Company, Fidelity and Guaranty histarance Underwriters, file., St. Paul
Fire and Marine insurance Company, St. Paul Guardian Insurance Company, St. Paul Mercury II)SUlatICC Company, Travelers Casualty and Surety Company„ Travelers
Casualty and Surety Company of America, and United States Fidelity and Guaranty Corripany, and that lie, ,is such, being authorized so to do, executed the foregoing
instillment for the purposes therein contained by signing on behalf of The corporations by himself as a duty authorized officer,
In Witness Whereof, I hereunto set my hand and official sea].
My Corninission expires the 30th clay of Dune, 202 1,
VA, A 0, -
__ -
N- Maric C. Telreault, Notary Public
58440-5-16 Prtnted in U.S.A.
"MIA
CITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
CHECKLIST FOR BIDDERS
Project Name Ironwood Drive Pavement Rehabilitation and Intersection
Project No, 117-071A
For Bids Due February 27, 208
From time to time the South Send Board of Public Works finds it necessary to reject a bid because
it does not comply with statutory requirements. In preparing 'your bid, please use the following
checklist In order to make sure that your bid is done in the proper manner.
Proper bid security included, The bidder has the option of providing either a Certified Check
X or Bid Bond,
Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely
X executed.
Contractor's Non-Colilusion and Non -Debarment Affidavit, Certification Regarding Investments
with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and
X Certification of use of United States Steel Products or Foundry Products.
Proof of MBENVBE Participation Goal Form [MWBE-1,01, If minimum participation goal is not
met, also provide Evidence of Good Faith Efforts Form [MWBE-2.01 and MBENVBE Contacted
X Form [VWBE-2.1].
X Acknowledge Receipt of __L_ Addendum(s) included with the bid.
X All required additional information is included with the bid.
Proposal statements and other affidavits all signed by the proper party with name either
X printed or typed undemeath signature,.
X This checklist submitted with the Bid.
This checklist is provided for bidder's use In assuring compliance with required
documentation; however, it does not include all specifications requirements and does not
relieve the bidder of the need to read and comply with the specifications.
Bidder: Rieth-Riley Construction Co,, Inc. Date: February 27, 2018
By Authorized Representative:
Signature:
Print Name & Title: Joshua A. McCormick, Sales Manager
Version 10117/2017 Contractor's Bid for Public Works - 1
SEE ATTACHED 96 FORM
PART 11
(For projects of $100,000 or more -- IC 36-1-12A)
These statements to be submitted under oath by each bidder with and as part of his bid.
Attach additional pages for each section as needed.
SECTION I EXPERIENCE QUESTIONNAIRE
1. Attach information regarding projects your organization has completed for the period of one (1)
year prior to the date of the current bid.
2. Attach a listing of public works projects currently in process of construction by your organization.
3. Attach information regarding any failure to complete any work awarded to you and the location
thereof.
4. Attach references from private firms for which you have performed work.
SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE
1. Attach an explanation of your plan or layout for performing proposed work, (Examples could
include a narrative of when you could begin work, complete the project, number of workers, etc,
and any other information which you believe would enable the City of South Bend to consider
your bid.)
2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside
your own firm who have performed part of the work) that you have used on public works projects
during the past five (5) years along with a brief description of the work done by each
subcontractor.
3. If you intend to sublet any portion of the work, attach the name and address of each
subcontractor, equipment to be used by the subcontractor, and whether you will require a bond.
However, if you are unable to currently provide a listing, please understand a listing must be
provided prior to contract approval. Until the completion of the proposed project, you are under
a continuing obligation to immediately notify the City of South Bend in the event that you
subsequently determine that you will use a subcontractor on the proposed project.
4. Attach a listing of equipment you have available to use for the proposed project.
5. Have you entered into contracts or received offers for all materials which substantiate the prices
used in preparing your proposal? If not, attach an explanation for the rationale used which would
corroborate the prices listed,
SECTION Ili CONTRACTOR'S FINANCIAL STATEMENT
Attachment of bidder's financial statement is mandatory. Any bid submitted without said
financial statement as required by statute shall thereby be rendered invalid. The financial statement
provided hereunder to the City of South Bend awarding the contract must be specific enough in detail
so that said City of South Bend can make a proper determination of the bidder's capability for
completing the project if awarded.
Version 1011712017 Contractor's Bid for Public Works - 3
When the prospective Contractor is unable to certify to any of tire statements below, it shall attach an explanatlon to this Affrdt,,...
CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION
REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITV VERIFICATION, NON-
DISCRIMINATION CONIM ITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL
PRODUCTS OR FOUNDRY PRODUCTS
(Must be completed for all quotes and bids. Please type or print)
STATEOF Indiana )
)SS-.
St. Joseph COUNTY )
The undersigned Contractor, being duty sworn upon histher/its oath, affirms under the penalties of perjury
that.,
I. Contractor has not, nor has any other member, representative, or agent of the firm, company,
corporation or partnership represented by him, entered into any combination, collusion or agreement with any
person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to
induce anyone to refrain from bidding, and that this bid is made without reference 10 any other bid and without
any agreement, understanding or combination with any other person in reference to such bidding. Contractor
further says that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any
rebate, fee, gift, commission or thing of value on account of such sale; and
2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are
presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from
participation in this transaction by any Federal department or agency, and
3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in
investment activities in Iran.
a. For purposes of this Certification, "Iran" means the government of Iran and any agency
or instrumentality of [ran, or as otherwise defined at Ind. Code § 5-22-16,5-5, as amended
from time -to -time.
b. As provided by Ind. Code § 5-22-16.5-9. as amended from time -to -time, a Contractor is
engaged in investment activities in [ran if either:
i. Contractor, its successor or its affiliate, provides goods or services of twenty
million dollars ($20,000,000) or more in value in the energy sector of Iran; or
ii. Contractor, its successor or its affiliate, is a financial institution that extends
twenty million dollars ($20,000,000) or more in credit to another person for
forty-five (45) days or more, if that person will (i) use the credit to provides
goods and services in the energy sector in Iran; and (ii) at the time the financial
institution extends credit, is a person identified on list published by the Indiana
Department of Administration.
4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee
or contract with a person that the Contractor subsequently learns is an unauthorized alien. Contractor agrees
that he/shelit shall enroll in and verify the work eligibility status of all of Contractor's newly hired employees
Version 10/1712017 Contractor's Bid for Public Works - 4
through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's documentation of enrollment and
participation in the E-Verify Program is included and attached as part of this bid/quote; and
5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify
that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee
or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the
subcontractor has enrolled in and is participating in the E-Verify Program, The Contractor agrees to maintain
this certification throughout the term of the contract with the City of South Bend, and understands that the City
may terminate the contract for default ifthe Contractor fails to cure a breach of this provision no later than thirty
(30) days after being notified by the City.
6. Persons, partnerships, corporations, associations, or joint venturers awarded a contract by the City of
South Bend through its agencies, boards, or commissions shall not discriminate against any employee or
applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions,
or privileges of employment, or any matter directly or indirectly related to employment because of race, sex,
religion, color, national origin, ancestry, age, gender expression, gender identity, sexual orientation or disability
that does not affect that person's ability to perform the work.
In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any
combination of the foregoing including, but not limited to, public works contracts awarded under public bidding
laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or
commissions may consider the Contractor's good faith efforts to obtain participation by those Contractors
certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise ("WBE")
as a factor in determining the lowest, responsible, responsive bidder.
In no event shall persons or entities seeking the award of a City contract be required to award a subcontract to
an MBE/WBE; however, it may not unlawfully discriminate against said WBE/MBE. A finding of a
discriminatory practice by the City's MBE/WBE Utilization Board shall prohibit that person or entity from
being awarded a City contract for a period of one (I) year from the date of such determination, and such
determination may also be grounds for terminating the contact for which the discriminatory practice or
noncompliance pertains.
7. The undersigned contractor agrees that the following nondiscrimination commitment shall be made a
part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its
agencies, boards or commissions.
Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the
performance of this contract with privileges of employment, or any matter directly or indirectly related to
employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation,
handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract.
I, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations
to the use of steel products or foundry products made in the United States (LC. 5-16-8-1). I hereby certify that I
and all subcontractors employed by me for this project will use steel products or foundry products made in the
United States on this project if awarded. I understand 1 have an affirmative duty to notify the City in my bid that
my proposal does not include the use of steel products or foundry products made in the united States. I
understand it is my sole obligation and responsibility to provide a justification to the City, subject to review and
approval, why the cost of United States made steel or foundry products is unreasonable. Prior to award and
upon submission of bid which does not use steel products or foundry products made in the United States, the
City, through its director of public works, shall make a determination if the price of United States made steel or
foundry is unreasonable. I understand that violations hereunder may result in forfeiture of contractual payments.
I hereby affirm under the penalties of penury that the facts and information contained in the foregoing bid for
Version 10/17/2017 Contractor's Bid for Public Works - 5
public works are true and correct,
Dated this 27th day of Feb. '20 18
Subscribed and sworn to before me this 27th
My Commission Expires 4/18/23
County of Residence
Rieth-Riley Construction Co, Inc.
Contrnetor/Bidder (Firm)
1
Signature of Contr Bil�d Its Agent
Joshua A. M'cCormi:�k Sales Mna 9 e r
Printed Name and Title
f F ruar
7t/
Notary Public OawnE Armstroffig
LaPorte
rr
Aukll IV V
665696
A 2 112 3
Version 10MR2017 Contractor's Bid for Public Woft - 6
ADDENDUM No. 1
Ironwood Drive Pavement Rehabilitation and Intersection
Project No. 117-071A
OWNER: City of South Bend
ENGINEER: Lawson -Fisher Associates P.C.
Benjamin P. Holden, P.E.
Professional Engineer No. PE10100265
SUBJECT: Additions to Contract
DATE: February 22, 2018
This Addendum to the Contract Documents shall supplement, amend, and shall become a part
of, and be incorporated as an Addendum to the Contract.
The following is a summary and description of the revisions to the Contract by this Change
Order:
1. Plan sheets 2, 12, 31, 32, 34 have been revised to extend pavement rehabilitation
at the south end of the project.
2. Plan sheets 11A and 11 B have been added to extend pavement rehabilitation at
the south end of the project.
The following sections of the Contract Documents are revised as a result of the above changes:
BID/PROPOSAL:
REPLACE Pages 7-11, with the attached revised pages 7-11.
SPECIFICATIONS:
XXIII. Plans
REVISE B.1. The Plans consist of 46 Sheets.
XXXIV. Subgrade Treatment
ADD B.2. No. 53 Recycled Concrete may be used for subgrade treatment.
XXXVI. HMA Patchin
ADD B.10. HMA Base used for full depth HMA Patching shall be 25.0 mm.
XXXVIII. Hot Mix Asphalt
REVISE B.3. The PG Binder used in surface mixture shall be PG 70-22. The PG Binder
used in intermediate and base mixtures shall be PG 64-22.
REVISE B.4. The maximum binder replacement for all su'4aee t s�""Enurr�c-�ra°�v
and fGF a4 intermediate and base courses shall be 25%.
Sheet 1 of 2
ADDENDUM No. 1
Ironwood Drive Pavement Rehabilitation and Intersection
Project No. 117-071A
DRAWIN
The following sheets have been revised and are issued as noted as a part of this Addendum:
REPLACE
Sht. 2:
Added Revision Table
ADD
Sht. 11A:
Added Plan and Profile Sheet
ADD
Sht. 11 B:
Added Plan and Profile Sheet
REPLACE
Sht. 12:
Revised Milling Limits
REPLACE
Sht. 31:
Revised Approach Table
REPLACE
Sht. 32:
Revised Patching Details
REPLACE
Sht. 34:
Revised Structure Data Table
This Addendum forms part of the Contract Documents and modifies the original bidding
documents. Bids shall be submitted with the revised Proposal Sheet as acknowledgement of
receipt of Addendum No. 1.
A signed copy of this Addendum No. 1 must accompany Bid Proposal.
f
Contractor
Date
Any questions please contact:
Roger T. Nawrot, P.E.
Assistant City Engineer
City of South Bend
Division of Engineering
Department of Public Works
1316 County -City Bldg.
South Bend, IN 46601
rnawrot@southbendin.gov
END OF ADDENDUM NO. 1
Sheet 2 of 2
4. overlay of the existing asphalt pavement south of S.R. 23 in South Bend, according
to the intent of the Plans and Specifications.
5. The Contractor shall preserve and protect all surrounding property, structures,
tenants, visitors and their property from damage caused by the Contractor's
operations.
XXII. MUNICIPAL OPERATIONS
A. Prevailing Specifications: None
B. Additions:
The Contractor shall be responsible for trash, yard waste, and recycling collection
within the project limits. The Contractor shall coordinate with the City of South
Bend Solid Waste, Waste Management, and other pickup services as requested
to ensure collection services are maintained. The Contractor shall be required to
collect bins, place them in a common point for easy access by automated truck
services, and redistribution after pickup as requested.
2. The Contractor shall be responsible for snow removal within the project limits and
shall coordinate with City of South Bend Public Works. The Contractor is
responsible for protecting his project site from excessive wear and tear during
snow removal.
XXIII. PLANS
A. Prevailing Specifications: City of South Bend Design and Construction Standards
B. Additions:
1. The plans consist of 46 Sheets.
2. The work shall conform to the plans.
3. The drawings are schematic in nature.
4. The CONTRACTOR is responsible for estimating dimensions and quantities of
materials.
5. In the event that the Special Provisions and the Plans conflict, the Special
Provisions shall govern.
XXIV. CONSTRUCTION ENGINEERING
A. Prevailing Specifications: 2018, INDOT Standard Specification Sections 105.08(b),
105.08(c)
B. Additions:
1. The Contractor will provide all work required under this item.
2. The Engineer will be responsible for the horizontal and vertical control points as
shown on the plans.
Version 7/01/2018 SP - 12
Revised February 22, 2018 (Addendum 1)
12. Concrete wastewater shall not be disposed of on the ground or allowed to leak
onto the ground. Otherwise, the provisions of 205-R-636, included in the Erosion
Control Permit, will be in effect.
13. Product for temporary drop inlet protection for erosion and sediment control shall
be FlexStorm Inlet Filter by Inlet & Pipe Protection, Inc. or approved equal.
14. The cost of Temporary Erosion and Sediment Control, Drop Inlet Protection shall
include the removal and disposal of sediment, as directed by the project
representative. If the FlexStorm Inlet Filter is damaged during construction of this
project either by normal use, remaining sediment or vandalism, it shall be
replaced at no cost to the City.
15. Payment shall be made at the Unit Prices as specified in the Proposal as follows:
Temporary Erosion and Sediment Control ........... LS
Temporary Drop Inlet Protection .......................... EACH
Temporary Silt Fence ........................................... LFT
16. The cost of erosion control items not provided separately shall be included in the
contract LSUM costs.
XXXIV. SUBGRADE TREATMENT
A. Prevailing Specifications: 2018 INDOT Standard Specifications Section 207.
B. Additions:
1. Payment shall be made at the Unit Prices as specified in the Proposal as follows:
Subgrade Treatment, Type I ................................ SYS
Subgrade Treatment, Type I I ............................... SYS
2. No. 53 Recycled Concrete may be used for subgrade treatment.
XXXV. SUBBASE FOR PCCP
A. Prevailing Specifications: 2018 INDOT Standard Specification Sections 302.
B. Additions:
1. Payment shall be made at the Unit Prices as specified in the Proposal as follows:
Subbase for PCCP............................................... CYS
XXXVI. HMA PATCHING
A. Prevailing Specifications: 2018 INDOT Standard Specification Sections 304
B. Additions:
Pavement to be removed as shown on the plans shall be saw cut to neat lines at
removal limits for full depth prior to removal. Saw cutting for removal shall not be
measured for payment but shall be considered incidental to the unit cost of this
item.
Version 7/01/2018 SP - 18
Revised February 22, 2018 (Addendum 1)
1. The cost of milling, excavation and disposal of existing materials, including existing
composite or asphalt pavement, required for compacted aggregate or HMA
patching material shall be included in the cost of the HMA patching.
2. Replacement of pavement damaged by the Contractor's operations shall be at no
additional payment.
3. Patching and pay limits will be paid to the neat lines as shown on the plans unless
approved or directed by the Owner.
4. HMA Patching for partial depth patches shall be placed the same day as the
existing asphalt pavement was removed. Liquidated Damages will be assessed
for each day that a patch remains unpaved.
5.
6.
7.
8.
9.
XXXVII. MILLING
Full depth HMA Patching shall be complete by noon on Friday of the week existing
pavement was removed. Liquidated Damage will be assessed beginning at that
time.
Drums will be required around patching areas until the pavement is within 2 in. of
the surface.
Patching shall be performed with lifts to the existing pavement surface prior to mill
and resurface of adjacent pavement to establish a uniform milled surface.
Payment shall be made at the Unit Price as specified in the Proposal as follows:
HMA Patching, Type C.........................................TON
HMA Base used for full depth HMA Patching shall be 25 mm.
A. Prevailing Specifications: 2018, INDOT Standard Specifications Section 306
B. Additions:
1. Payment shall be made at the Unit Prices as specified in the Proposal as follows:
Milling, Asphalt, 1.5 in .......................................... SYS
Milling, Transition ................................................. SYS
XXXVIII. HOT MIX ASPHALT
A. Prevailing Specifications: City of South Bend, Indiana, Department of Public Works,
Prevailing Specifications, Section 402.
B. Additions:
1. Original weight tickets shall be provided to the Owner for each day on which
asphalt is placed. The Owner reserves the right to require certified scales be used
for measurement.
2. No vehicular traffic of any kind shall be permitted on any lift until the mixture has
hardened sufficiently to not be unduly distorted.
Version 7/01/2018 SP - 19
Revised February 22, 2018 (Addendum 1)
3. The PG Binder used in surface mixture shall be PG 70-22. The PG Binder used
in base mixture shall be PG 64-22.
4. The maximum binder replacement for all suFfaee mixtures shall be 16%
all• intermediate and base courses shall be 25%.
5. All references to the MAF shall be deleted.
6. Longitudinal joint adhesive shall be applied between adjacent HMA Courses in
accordance with Section 401.15.
7. Only limestone will be allowed for the coarse aggregate.
8. The use of RAP or asphalt shingles will not be allowed.
9. Payment for HMA Surface will be made based upon neat lines at the thickness(s)
shown in Plans.
10. Payment shall be made at the Unit Price as specified in the Proposal as follows:
HMA Surface........................................................ TON
HMA Wedge and Level ........ .............. :................. TON
Joint Adhesive, Surface ........................................ LFT
11. An undistributed quantity of 100 Tons has been included in the proposal for HMA
Wedge and Level, to be used as determined by the Contractor and approved by
the Owner for profile or cross slope adjustments so that a uniform thickness of
HMA Surface, may be applied.
A. Prevailing Specifications: 2018, INDOT Standard Specifications Section 406
B. Additions:
1. Previously laid HMA courses, as well as any pavement that has become dirty,
shall be cleaned and tacked prior to the placement of additional HMA courses.
2. Payment shall be made at the Unit Price as specified in the Proposal as follows:
Asphalt for Tack Coat ........................................... TON
XL. CONCRETE PAVEMENT
A. Prevailing Specifications: 2018, INDOT Standard Specifications Section 502, 503
B. Additions:
1. Coarse aggregate shall only be limestone, Class AP, Size No. 5. The use of slag
or local aggregate will not be permitted.
2. The bid items shall include, but not be limited to, all cost for labor, materials, tools,
equipment, excavation, backfilling, compaction, forming, saw cutting, joint
construction, joint sealing, curing, smoothness, tining, etc. per current INDOT
standard details for concrete pavement.
Version 7/01/2018 SP - 20
Revised February 22, 2018 (Addendum 1)
L
■
w
w
>
�
LU
IL
Ir
aIt
ca§S
mm
7
0uj u
(n
0MIL
�2>
ou
■0
O
z
«
�
�
0
z
■
■
■
2 °�
0
o lr--
_%
EL
2
�—M
k
E
z
7
CL _
ak
�
a §
%k
�
%§k�
�
/
7
2)
k�
�i
a
k�
as
�\
)E
2
\
§_
g
k�
�e
)�
B
�
k
7
�
E
2
�
ON
2
E
0
�
»
k
@
2
0
�
�
f
E
�
k
\
q
§
�
CITY OF SOUTH BEND ogs0uTn1`41
MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY S
DEVELOPMENT PROGRAM
FORM MWBE-2.0 ,
EVIDENCE OF GOOD FAITH EFFORTS
This completed form should be included as part of the Bids documents related to City of South Bend Public
Works Projects requiring Good Faith Efforts to obtain MBE/WBE participation. It is the bidder's sole
responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority
or Women's owned business as defined by the Indiana Department of Administration ("IDOA").
Project Number: 117-071A (gate:
Project Name: Ironwood Drive Pavement Rehabilitation and Intersection
Bidder, Rieth-Riley Construction Co., Inc.
Contact Person: Joshua A. McCormick
Address:
City:
25200 State Road 23
South Bend state: Indiana
Telephone: 574-288-8321
zip: 46614
Email: 'mccormick rieth-riley. com
To determine whether a bidder has demonstrated good faith efforts to reach the MBEIWBE utilization goats set
forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or
commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below':
EVIDENCE OF GOOD FAITH EFFORTS
MBEIWBE LIST($): The bidder reviewed the City of South Bend's Minority and Women Business
Enterprise Diversity Development Program, which uses the IDOA approved list of Minority and Women
Owned Business as found on their website (http,1Avww.in.gov/idoa).
ACTION (ADVERTISEICONTACT), In order for your bid to be deemed responsive, the City of South
Bend requires that all perspective bidders complete no less than 2 of the following:
1. Attend all pre -bid meetings scheduled by the City to inform MBEANBEs of contracting and
subcontracting opportunities.
2. Advertise in general circulation and/or trade association publications concerning subcontracting
opportunities, and allow MBEIWBEs reasonable time to respond.
3. Perform any and all necessary steps to provide written notice in a manner reasonably calculated
to inform MBENVBEs of subcontracting opportunities and allowed sufficient time for them to
participate effectively.
4. Utilize pre-existing services of available community organizations, small and/or disadvantaged
business assistance offices and other organizations that provided assistance in the recruitment
and placement of MBENVBE firms.
"Bidder must Circle or otherwise notate which of the two (2) required actions were performed.
GOOD FAITH NEGOTIATIONS: The bidder negotiated In good faith with interested MBEIWBEs,
including providing such MBE/WBE's with adequate information about the plans, specifications and other
requirements of the subcontract and did not reject MBEIWBEs as unqualified without sound business
reasons based on a thorough investigation of their capabilities.
SMALL CONTRACT($): The bidder selected specific portions of the work to be performed by
MBEIWBEs in order to increase the likelihood of meeting the MBENVBE goals (including breaking down
contracts into smaller units to facilitate MBENVBE participation)
CONTRACT RECORDS: The bidder has maintained the following records for each MBEIWBE that has
bid on the subcontracting opportunity:
1. Name, address, and telephone number;
2. A description of information provided by the bidder or subcontractor; and
3. A statement of whether an agreement was reached, and if not, why not, including any reasons for
concluding that the MBENVBE was unqualified to perform the job.
Proper demonstration of Good Faith Effort requires your initials next to all of the above boxes. Any
omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of
South Bend reserves the right to request additional information.
Version 10/17/2017 Contractor's Bid for Public Works - 13
CITY OF SOUTH BEND 045OUTIJ
MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY ox
DEVELOPMENT PROGRAM
r - V.
FORM MWBE•2,1 ,
MBEIWBE CONTACTED ryas
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects
requiring contacted MBEIWBE to obtain Good Faith Efforts. It Is the bidder's sole responsibility to verify
whether any listed minority or woman business meets the qualifications of a Minority or Women's owned
business.
PAGE OF
Project Number. 117-071A MBENVBE Participation Goal
Project Name: Ironwood Drive Pavement Rehabilitation and Intersection
Bidder:
By:
(Signature) (Title) (Date)
MBENVBE Firm
Owner or Contact at MBENVBE Firm
Telephone: Fax: Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
RESULTS OF CONTACT WITH THE MBENVBE FIRM:
MBE/WBE Firm
Owner or Contact at MBENVBE Firm
Telephone: Fax: Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
RESULTS OF CONTACT WITH THE MBE/WBE FIRM:
Version 10/1712017 Contractor's Bid for Public Works - 14
M
G
N
b
m
N
3
K
co
m
N_
N
�t7
a
LL
u�
0
ro
a
I
IT
Z
O
H
U
0
LL'
U)
Z
O
U
W
t�
W
ci-
N
M
O
w
LU
C7
Co
Ln
N
co
It
►I
0
LL
U)
F-
U
W
'—a
[L
0..
0
,-1
EY1
fl.
LL.
O
AJ
O
N
a
�
O
�
U
�
N
C
�
�
�
U
CONTRACTOR'S BID FOR PUBLIC WORK - FORM-96
State Form 52414 (11212.43) / Form 98 (Revised 2013)
Prescribed by State Board of Accounts
PARS' 1
(To be completed for all bids. Please type or print)
Date (month, day, year): February 27, 2018
1, Governmental Unit (owner): City of South Bend, Indiana
2. County: St Joseph
3. Bidder (Firm): Rieth-Riley Construction Co., Inc.
Address: 25200 State Road 23
City/State/ZlPcode: South Bend, In. 46614
4. Telephone Number: (574) 288-8321
5. Agent of Bidder (if applicable): Joshua A. McCormick
Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete
the public works project of Ironwood Drive Pavement Rehabilitation and Intersection
Project No. 117-071A
(Governmental Unit) In accordance with plans and specifications prepared by n/a
see itemized proposal
and dated n/a
$ see itemized proposal
for the sum of
The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in the
notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance with the
notice. Any addendums attached will tie specifically referenced at the applicable page.
If additional units of material included in the contract are needed, the cost of units must be the same as
that shown in the original contract if accepted by the governmental unit. If the bid is to be awarded on a unit
basis, the itemization of the units shall be shown on a separate attachment.
The contractor and his subcontractors, if any, shall not discriminate against or intimidate any employee,
or applicant for employment, to be employed In the performance of this contract, with respect to any matter
directly or indirectly related to employment because of race, -religion, color, sex, national origin or ancestry.
Breach of this covenant may be regarded as a material breach of the contract.
CERTIFICATION OF USE OF UNITED STATES STEEL. PRODUCTS
(If applicable)
I, the undersigned bidder or agent as a contractor on a public works project, understand my statutory
obligation to use steel products made in the United States (I.C. 6-16-8-2). 1 hereby certify that I and all
subcontractors employed by me for this project will use U.S. steel products on this project if awarded.
understand that violations hereunder may result in forfeiture of contractual payments.
ACCEPTANCE
The above bid is accepted this day of , subject to the
following conditions:
Contracting Authority Members:
PART II
(For projects of $150,000 or more !C 36-1-12-4)
Governmental Unit: City of South Bend„ Indiana
Bidder (Firm) RIETH-RILEY CONSTRUCTION CO., INC.
Date (month, day, year): February 27, 2018
These statements to be submitted under oath by each bidderwith and as a part of his bid.
Attach additional pages for each section as needed.
1.
SECTION I EXPERIENCE QUESTIONNAIRE
What public works projects has your organization completed for the period of one (1) year prior to the
date of the current bld7
Contract Amount
Class of Work
Completion
Date
Name and Address of Owner
$8 947 369.00
HVY HWY
2017
INDOT, Indianapolis, Indiana
$16,131,908.00
HVY HWY
2017
INDOT, Indianapolis, Indiana
$3,228,358.00
HVY HWY
2017
City of South Bend Indiana
$4,043,323.00
HVY HWY
2017
St. Joseph County,Indiana
2. What public works projects are now in process of construction by your organization?
Contract Amount
Class of Work
Exo&cted.. .
Completion
Date
Name and Address of Owner
$2 950 000.00
HVY HWY
2018
INDOT, Indianapolis, Indiana
$1,399,625.00
HVY HWY
2018
City of South Bend, Indiana
$11,264,460.00
HVY HWY
12018
INDOT Indianapolis, Indiana
$8,700,680,00
HVY HWY
2018
Elkhart County, Indiana
9
Have you ever failed to complete any work awarded to you? NO
4. List references from private firms for which you have performed work.
If so, where and why?
AM General Mishawaka Indiana 574-284-2728
Navistar South Bend Indiana 574-654-2400
ITR Concessons LLC Granaer . Indiana 574-674-5836
University of Notre Dame South Bend, Indiana 574-631-7356
SECTION 11 PLAN AND EQUIPMENT QUESTIONNAIRE
Explain your plan or layout for performing proposed work. (Examples could include a narrative of when
you could begin work, complete the project, number of workers, etc. and any other information which you
believe would enable the governmental unit to consider your bid.)
"According to plan specifications"
2. Please list the names and addresses of all subcontractors (i.e. persons orfirms outside your own firm
who have performed part of the work) that you have used on public works projects during the past five (5)
years along with a brief description of the work done by each subcontractor.
Roadsafe Traffic Systems 3519 Harding St., Indianapolis, 1N Traffic Maint/Markings
V&R Truckin 1845 North Elmer Street, South Bend, IN, Trucking
Hawk Enterprises 1850 E. North St., Crown Point, IN Electrical/Signage
Slussers Green Thumb P.O. Box 33 Logansport, IN Landscaping/Erosion Control
C-Tech Cor oration 5300 W. 100 North, Boggstown, IN. Guard rail/Fencing
3. If you intend to sublet any portion of the work, state the name and address of each subcontractor,
equipment to be used by the subcontractor, and whether you will require a bond. However, if you are
unable to currently provide a listing, please understand a listing must be provided prior to contract
approval. Until the completion of the proposed project, you are under a continuing obligation to
immediately notify the governmental unit In the event that you subsequently determine that you will use a
subcontractor on the proposed project.
"Subcontractor list will be provided upon award"
4. What equipment do you have available to use for the proposed project? Any equipment to be used by
subcontractors may also be required to be listed by the governmental unit.
"As required"
5. Have you entered into contracts or received offers for all materials which substantiate the prices used
preparing your proposal? If not, please explain the rationale used which would corroborate the prices
listed.
"As necessa "
SECTION III CONTRACTOR'S FINANCIAL STATEMENT
Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial
statement as required by statute shall thereby be rendered invalid. The financial statement provided hereunder to
the governing body awarding the contract must be specific enough in detail so that said governing body can make
a proper determination of the bidder's capability for completing the project if awarded.
SECTION IV CONTRACTORS NON —COLLUSION AFFIDAVIT
The undersigned Ibidder or agent, being duly sworn on oath, says that he has not, nor has any other
member, representative, or agent of the firm, company, corporation or partnership represented by him, entered
Into any combination:, collusion or agreement with any person relative to the price to be bid by anyone at such
letting nor to prevent any person from bidding nor to include anyone to refrain from bidding, and that this bid is
made without reference to any other bid and without any agreement, understanding or combination with any other
person in reference to such bidding.
He further says that no person or persons, firms, or corporation has, have or wiff receive directly or
indirectly, any rebate, fee, gift, commission or thing of value on account of such sale.
SECTION V OATH AND AFFIRMATION
I HEREBY AFFIRM UNDER THE PENALTIES FOR PERJURY THAT THE FACTS AND INFORMATION
CONTAINED IN THE FOREGOING BID FOR PUBLIC WORKS ARE -TRUE AND CORRECT.
Dated at South Bend, In. this 27th day of February 2018
Rieth-Riley Construction Co., Inc.
(Name of Organization)
By
Joshua 0�rrrick,,,,$' Manager
(Tide of Person Signing)
ACKNOWLEDGEMENT
STATE OF Indiana
ss
COUNTY OF St. Joseph�
Before me, a Notary Public, personally appeared the above -named Joshua A. McCormick and
swore that the statements contained in: the foregoing document are true and correct.
Subscribed and sworn to before me this 27th day 0 'ry 201
My Commission Expires: 4/18/23
County of Residence: LaPorte
Dawn E. Armstrong
)Af IN A tvl S p,j
un
"Wm
4 0
100% Quality - 100% Employee Owned
Over 100 Years
KNOW ALL MEN BY THESE PRESENTS, that the undersigned President of Rieth-Riley Construction Co., Inc., a corporation duly organized and
existing under the laws of the State of Indiana, hereby represents and confirms that Joshua A. McCormick, Sales Manager, has full! power and
authority to make, execute, seal, if required by law, and deliver for and on its behalf, and as its act and deed any and all bids, proposals or contracts,
said bids, proposals or contracts not to exceed $2,000,000.00 which bids, proposals, or contracts call for work, services, or materials to be furnished by
Rieth-Riley Construction Co., Inc., whether such bids, proposals or contracts are being submitted to an individual or entity, public or private, and to bind
Rieth-Riley Construction Co., Inc. thereby as fully and to the same extent as if such bids, proposals or contracts were signed by an Executive Officer of
Rieth-Riley Construction Co., Inc., and sealed, if required by law, and attested by one of such officers, and hereby ratifies and confirms WI that the above
named designee may do in pursuance hereof.
The authority granted to the above named designee is pursuant to Section 6,03 of the Restated By -Laws of Rieth-Riley Construction Co., Inc., as
amended, which Restated By -Laws were effective February 9, 2010, and which Restated By -Laws, as amended, and the authority granted to the above
named designee continue in full force and effect,
This Certificate of Authority is issued, signed and sealed, if required by law, by facsimile under and by authority of the following standing resolutions
adopted by the Board of Directors of Rieth-Riley Construction Co., Inc.. at a meeting held on the 16th day of February, 1996, at which a quorum was
present, and which resolutions have not been amended or repealed and continue in full force and effect:
"Resolved that for purposes of clarification and in furtherance of the intent of Section 6,03 of the By -Laws of the Company the
authority granted in Section 6.03 shall extend to the making, execution, sealing, if required by law, and delivery on behalf of the
Company of all documents required as part of any bid, proposal or contract, which is for work, services or materials to be furnished
by Company and which is being submitted to an individual or entity, public or private."
"Resolved that in carrying out the provisions of Section 6.03 of the By -Laws of the Company the signatures of such directors and
officers and, if required by law, the seal of the Company may be affixed to any such Certificate of Authority or any certificate relating
thereto by facsimile, and any such Certificate of Authority or certificate bearing such facsimile signatures or facsimile seal shall be
valid and binding upon the Company and any such Certificate of Authority so executed and certified by facsimile signature and
facsimile seal shall be valid and binding upon the Company, with respect to any bid, proposal or contract to which it is attached."
IN WITNESS WHEREOF, Rieth-Riley Construction Co.. Inc,, has caused these presents to be signed by its President and its corporate seal to be hereto
affixed, this 23th day of March, 2016,
C%)
SEAL
STATE OF INDIANA
)SS:
COUNTY OF ELKHART
RIETH-RILEY CONSTRUCTION CO., INC.
A. Keith Rose, President
On this 23th day of March, 2016, before me personally came A. Keith Rose, to me known, who, being by me sworn, did depose and say: that he is
President of Rieth-Riley Construction Co., Inc., the corporation described in and which executed the above instrument,, that he knows the seal of said
corporation; that the seal affixed to the said instrument is such corporate seal; and that he executed the said instrument on behalf of the corporation by
authority of his office pursuant to corporation's Restated By -Laws and standing resolutions.
My Commission Expires: May 8,2016
SEAL
PIZ:_
fAP
Paula K. Frizsell, Notary
Residing in Elkhart County, Indiana
1, Robert L. Konopinski, do hereby certify that I am the duly appointed and acting Secretary of Rieth-Riley Construction Co., Inc., a corporation duly
organized, validly existing and in good standing under the laws of the State of Indiana; that the foregoing Certificate of Authority has neither been
amended or rescinded and remains in full force and effect; and furthermore, that the Restated By -Laws and standing resolutions of the corporation, as
referred to and set forth in this Certificate of Authority, continue in full force and effect.
Sealed ii�gnd� atthe�Corpqr%p,±e of Rieth-Riley Construction Co., Inc., in the City of Goshen, State of Indiana. Dated thi day of
SEAL' Z.- K�"
Robert L. Konopinski, Secretary
P.O. Box 477. 3626 Elkhart Rd. - Goshen, IN 46527 Phone: (574) 875-5183 - wwwrieth-rileycom
CERMICATE OF QUALMCATIOY
to provide
CONSTRUCTION SERVICES
for
PUBLIC WORKS PROJECTS
to the
STATE OF INL DI&NA
This Certification Board, having duly considered application for quaUcation in terms of apparent experience and financial
resources; and under the applicable Indiana Code 4-13.6-4 and adopted rule-s of this Board, hereby issues a
Certificate of Qualification, to provide construction serrirzs to the Stale of Indiana for Public Works Projects to:
RIETH RILEY CONSTRUCTION CO INC
3625 ELKHART RD
PO BOX 477
GOSHEN IN 46527-0477
Phone 574-875-5183
Fax b74-875-8405
Company O#7cial
KEITH ROSE
far the tW.0ty-seven month period stated hernia, unless revoked by this Board for cause
and in the classi5cations of Services stated below. This certificate supercedcs any previous certificate.
1611.01 Concrete Construction of Roads & Curbing
1611.02 Asphalt Construction of Roads and Parking Lots
1622.01 Gen, Contr-hrdgs,vdcts,elvd hvvys,rhvy,tnls
1623.03 Sewers andlor'Watar Lines
1794.01 Earthmoving and Land Clearing
1794.02 Excavation
1795.02 Demolition or Pavements and Roads
CERTIFICATION DATE 112112M
EXPIRATION DATE 4121/2018
TIUS CERTIFICATE ISSUED BY THE STATE OF 1NDIANA, PUBLIC NNOR,KS DIVISION CERTIFICATION BOARD,
402 'Vy'EST WASRNUFON STREET, ROOiVi W467,1NDIA_nAPOLIS, MIA �i3 46204,
ALSO ACTS AS = OFFICIAL NONCE OF EXTak ON
Tracy L. Cross, Executive cratary
Certification Board
❑APW P02 Shia Fcm �83R Rye. 07I06
INDIANAPOLIS, IN July 11, 2017
081
RIETH RILEY CONSTRUCTION
twilMn "I
CrOSHEN, IN
who has filed with the department a Contractor's Statement of Experience and Financial Condition as
required under Indiana Code B-23-10, is hereby qualified to bid at any Department of Transportation
letting in Classes of Work and within the amount and other limitation of each classification as listed
below, for such period as the uncompleted work on hand from all sources does not exceed the Aggregate
amount. Classification references by name or symbol are in accordance with the definitions in the
Contractor's Statement of Experience and Financial Condition, This certificate supersedes any certificate
previously issued, but is subject to revision or revocation according to the law, if and when changes
in the financial condition of the contracting firm or other facts justify such revision or revocation.
Vaud August 1, 2017 Thn July 31, 2018
AGGREGATE......................................................................................... ....
...... $UIQLI,V1l. CED
0085
CLEAN/SEAL CRACKS/JOINTS: PCCP&F%4A PVM T.............................................................................
$5,000,000
0103
3-SIDED BOX STRUCTURE(S) W/SPA N > 20 FT ......................................................... ........................ .$UNLIMITED
0290
SEWER AND PIPE CLEANING AND LINING ..............................................
...... $5m0,000
0318
TRAFFIC CONTROL SNOW AND ICE REMOVAL .............. ................ ...................................................
$UNLIMITED
0390
UNDERSEAL.ING..... .....................................................
.SUNLIMITED
A(A)
CONCRETE PAVCMENT: GENERAL............................................................... -- ....... ..........................
.$UNLIMITED
B(A)
ASPHALT P'VMT:W/INDOT CERTIFIED ffMA PLANT ........ ............ ....................... ...............................
$UNLIMITED
C(A)
HEAVY GRADING .................................................... ....... --.......................... ...........................................
$UNLIMITED
D(A)
111GHWAY OR RAILROAD BRIDGE OVER WATER ...........- .......... ...........................................
.......... .SUNLUITED
D(B)
MORWAY OR RAILROAD BRIDGE OVER HIGHWAY .............. —........................................................
SUNLIMITED
D(C)
HWYIRR BRIDGE REQ RR TRACK PROTECTION ................................. ...............................................
$UNLIMITED
B(C)
BRIDGE DECK OVERLAY& MINOR BRIDGE REPAIR --- .........................................................$UNLIMITED
E(E)
SMALL STRUCTURES AND DRAINAGE ITEMS ................... —...... --.... ....................................
............. $UNLIMITED
E(F)
SURFACE MASONRY AND MISCELLANEOUS CONCRB................................. --.............................
StINI-Tw=D
R(H)
DEEP SEWER AND/OR EXCAVATION.............................................................. ................
.................... $UNLIMITED
E(R)
ASPHALT PAVEMENT MILLING .......................................... -.......................... ....................................... $UNIMUTED3
EMDEMOLITION
.............................................................................................................................................$UNLLMTI')aD
LA,,,, - , -
P REQUALIFICATIOR ENGINEER
State Form 20508 (R31 5-05)
g--AA�
COMMISSIONER