Loading...
HomeMy WebLinkAbout01/18/1937 Board of Public Works Minutes266 - --- --- - -- -- -- - - --- - - --- - - MEETING Janupry 18 19 37 ---- ---- Regular meeting of the Board. of Public Works was held Monday, January 18, 1937, at 10:30 A. M. Mr. Woodward was absent Minutes of the previous meeting were read and approved. Claims in the amount of s5,065.50, from the following suppliers, were approved and ordered paid. J. C. Lauber & Company $5.37 C. H. DeFrees, Inc. $16.30 Fort Pitt Bridge Works 476.00 C. H. DeFrees, Inc. 65.20 Lontz Bros. 399.56 Jr- James L. Wilson, 1vI." D. 3.00 St. Joseph Agency, Inca 8.89 Michiana Flour, Feed, Supply Co. 3.40 Tltb. Studebaker Corporation 20.50 Strome Motor Co. 8.13 Peter A. Beczkiewicz, County Strome Motor Co. 10.12 Treasurer 262.7'7 Elgin Sweeper Company 1,814.66 Ferranti Electric, Inc. 74.03 Austin -Western Road Machinery Co. 1,722.50 Willette Service Station 31.37 Indiana Lumber & Mfg. Co. 22.66, Willette Service Station 18.94 Indiana. Lumber & Mfg. Co. 100.00 Willette Service Station 2.10 The City Attorney reported that he had carefully investigated the damage to car owned by Peter J. Barkowski, who struck_a manhole on East Calvert Street, and that adjustment had been made in this matter by having Mr. Barkowski's car fixed in the Street Department. The Board gave instructions to have Lushion Carter, one of the janitors, appear before the Board. next Monday, as some had been received regarding his work in the City Hall. complaints MEW Bids were considered to repair the No. 2 boiler in the City Hall by the replace- ment of a full set of boiler tubes and cleaning out boiler, repairing brick work and repairing end hand plates from Edwards Iron Works of $250.00 and Bock Welding & Boiler Works $244.50. The contract was awarded to Bock Welding & Boiler Works and instruc- tions given to proceed with the work immediately. Pursuant to advertising in the newspapers, under dates of January 7th and 14th, • bids were received for the installation of a new boiler in the Central Fire Station and the removal of the old boiler, as per specifications submitted by the Mayor. These bids were -as follows: John G. Kessler $2,170.73 J. H. Hawblitzel & Son 21521.00 j Harry Nicodemus, Inc. 1,995.81 j Fredericks Plumbing & Heating Co. 1,925.00 After considering all bids and a consultation with the Mayor, it was decided to award this i!�iork to the Fredericks Plumbing & Heating Company, and the City Attorney was • requested to draw up the contract, and work to be begun immediately. Certification of plans and specifications filed with the Administrative Building Council of Indiana at Indianapolis by Maurer & Maurer, Architects, was approved by the State Inspecting Architects and this certificate is placed on file in the Board of Public Works. Application for work as janitor for work in the City Hall was received from Leslie Morning, 1122 Bissell Street, who has lived in South Bend since 1914. Continuation certificate covering excavation bond in favor of C. S. Randolph was filed with original bond. The following re -spread of assessment was offered by the City Civil Engineer and approved by the Board, and ordered delivered to the Controller: January 18, 1937 DIVER PARK DISTRICT ` 3 TRUNK SEVIER Roll No. 1763 , Reso No. 1283 Dup . No. 23786 Clarence Vie. Hyde Beginning on north line of Jefferson Blvd 33 ft east of West line of E of N E a of ISec 7, Twp 37 N, R 3 E, thence N 975 ft to a prop. street, thence E 356 ft, thence S 1060 ft to Jefferson Blvd, thence westerly 366.1-72 ft to beginning. Nov. 1932 1933 1934 605.92 605.92 605.92 54.53 36.36 18.18 36.36 18.18 696.81 660.46 624.10 01817.76 plus 163.61 - $1,981.37 9Q REDISTRIBUTION OF THE ABOVE ASSESSMENT All lot 97 Christman Place 2nd Addition H.G. Christman & Co. Inc. 112.85 ,t rt 98 tt n n ,t It IT 102.23 ,t rt 99 ,t It ,t IT It IT 94.31 100 it It Inland Bonding Co.' 95.40 tr ,► 101 it tr „ ,t IT 46.25 IT " 102 It It tt „ ►, 48.40 103 „ t► „ ►, ►r 62.73 • tr ,t rt „ 104 105 t, it IT tt IT IT. ,t it - t► . tr '77.05 91.49 t, It 106 it tt ,t it it 33.45 W.43ft 107 tt It IT ,t it 15.60 W.43ft 108 It it tt IT tt 16.39 W.43ft 109 ,t IT tt tr tt 16.39 W.43ft 110 IT it IT it It 16.39 W.43ft 111 It ,t it IT It 16.39 W.43ft 112 IT it tt ,t tt 16.39 All lot 113 it IT „ It ,t 48.41 " " 114 It rt ,t tt r► 48.41 it t, 115 it rt " rt " 48.41 • it tt it " 116 117 1, it IT It IT ,t IT ,t tt IT 48.40 - 48.40 It tr 118 It " Louise Bailey, 46.10 It t, 119 ,t rt IT tt 46.10 t, tr 120 It ,r It it 46.10 " " 121 IT IT Inland Bonding Co., 72.19 " " 122 IT " Albert & Caroline McGann, 81.64 rt „ 123 IT tt IT it It 45.61 " " 124 IT " Inland Bonding Co., 45.61 rr tt 125 IT it it i, ►t 45.61 rr +t 126 ►t IT It it IT 45.61 It tt 127 ,t It it it It 47.89 It " 128 It tt ,t ,t if 47.89 ,t tt 129 It IT T► It tt 47.89 It " 130 tt ►t it It tt 47.89 ,► tt 131 IT It It ,t t, 47.89 �1817.76 Interest 163.61 Total $1981.37 Respectfully submitted, Frederick J. Anderson • i City Civil Engineer Janes H. Pierce,who has the contract for garbage removal, gave his report for the work done during the year 1936, stating that he had removed 4,281 loads of garbage from the City. Communication was received from the Kosciuszko Civic Club petitioning the Board of Works to do all in its povs,er to bring about a speedy completion of the track elevation program as regards Arnold Street. This communication was ordered placed • on file. The meeting adjourned at 11:15 A. M. ATTEST: Clerk 0 Board of Public Works 268 Witnesseth„ theparty of the first part covenants and agrees to perform in a .workmanlike and in a Winer to be approved by party of the second part the work not out in the following bill of spee ficati€tns in the manner and form set out in sold spedifications as 'allows, t+a-vr3; s ' ' rr ' o mew ' softer and Removing Old Bailer ,New In tuli.dt M .the. Pro '�� :The. Central Fire Station South Bend# I diana `the 06btraotor` shall visit .,building and farm- liarize himself with t he eoniditions of the 'entire heating syatei� of the bu�lti«► in gs 0 that he can properly figure on the work to be done, and give no cause far not knowing the conditions as,theg are; as the entire job shall be first-class and of the highest s tendard. die shall furnish an ace a eptabl a bond to the full amount of his !r04trac The contrnet shall be of the standard form# Wpm TO, BE R2 The old boiler now in building shall be . removed, Now boil*r n ra df a lc n , new piping, to be changed;, shall be as horelu-, after spedfie making a complete first,.oiaa ebb u ever respect,. Piping, mere radiators and wall coils have the su l with pP : ceut, re'�rn# The nipple of r1turzi-end shall be removed and return pipe placed in same with trap in return 11ne, The "return lines from, the radiators shall be -welded into the main return at nearest paint 0 0 • 0 2694 • • • • • • 270 • • 0 • W. 0 0 2 71_ • 0 0 r i U 72 • 0 0. 0 • 27 • 0 • 0 • 74 PARTY OF THE 59GOID- 0 iA 032 �3 9