February 13, 2018
Robert Lingenfelter
Gibson -Lewis, LLC
1001 W 11 "' Street
Mishawaka, IN 46544
NIONiz, 574/23,5-9251
1"'AX 574/ 235-9171
RE: Change Order No„ 2 — Charles Black Center Renovations — Project No. 116-073
Dear Mr. Lingenfelter:
The Board of Public Works, at its meeting held on February 13, 2018, approved the above
referenced Change Order for an increase of $73,726, bringing the current contract amount to
$3,886,246.
Enclosed is a copy of the Change Order for your records.
If you have any fuither questions regarding this matter, please call this office at (574) 235-
9251.
Sincerely,
Linda M. Martin, Clerk
Enclosure
C : Toy Villa, Engineering
GAILY A. Gii,o'r SUZANNA M. FR1'1'ZW.--.'RC1 EiJ7.ABF1'Ej A. MARADIK JAW",s A. MUELLER THL!'RESE J. DORAU
KIM=
PROJECT: (Name and Address)
Charles Black Center
3419 W, Washington
Sout Bond, IN 46619
TO CONTRACTOR: (Name and Address)
Gibson Lewis
1001 W 111h St
Mishawaka, IN 46544
CHANGE ORDER NUMBER: CO2
OWNER
F-1
DATE: 1126118
ARCHITECT
0
ARCHITECT'S PROJECT NO, 2015-0200
CONTRACTOR
0
FIELD
El
CONTRACT DATE: 26-Sep-17
OTHER
El
CONTRACT FOR: CBC
The Contract is changed as follows:
(Include, where aj)plicable, any undisputed ainount attributable to previously executed Constniction Change Directives)
Remove gym floor repair, floor protection, and gym noor allowance ($1,000) and Add full new gym floor
The original Contract Sum was $ $3,796,000.00
The net Change by previously authorized Change Orders $ $16,520.00
'file Contract Sum prior to this Change Order was $ $32812,520.00
The Contract Sum will he increased _ by this Change Order in
the amount of $ $73,726.00
The new Contract Surn including this Change Order will be $ $3,880,246.00
The Contract rime will be unchanged by <enter days in words? ( zero ) days %
The date of Substantial Completion as of the date ofthis Change Order therefore is WuZ4,v, I .
(Note: This Change Order does not include changes in the Contract Sum, Contract Time or, Guaranteed Alaxintion Price which have been
authorized by Constniction Change Directive until the cost and tinre have been agreed upon by both the Owner and Contractor, in which case
a Change Order is executed to super,%edethe Construction Change Directive)
NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER.
Jones Petrie Rafinski
Gibson Lewis
South Bend Parks and Venues
ARCHITECT (Firm name)
CONTRACTOR (Firm name)
OWNER (Firm name)
325 S. Lafayette Blvd,
1001 W 1 Ith St
321 E Walter St
.South Benda IN 466W
Mishawaka, IN' 46544
South Cie IN 46614
ADDRESS
ADORE5
AM
By (STo_na
By (Whature)
Edward J. KqwqlczyCc�
Typed name
Typed sane
Typed name
DATE
DATE I
DATE
"IJAUAD
011rArd of Pt&),k, 1worikfi
Jones Petrie Rafinski
Attention: Ed Kowalczyk
GIBSON-LEWIS, LLC CONTRACTORS
1001 West 11th Street, Mishawaka IN 46544
Phone (574) 259-8581 Fax (574) 258-0932
CHANGE PROPOSAL - REVISED
Date: 1 /30/2018
Job: Charles Black Center Renovation
Location: South Bend, IN
Phone Change Proposal - New Wood Floor at Existing Gym
Fax
Gibson -Lewis, LLC Is pleased to offer the following Change Proposal for your review:
w Wood Floor at UlslingG - Remove existing wood floor in existing gym, and install a new wood floor to
match the floor which will be Installed in the new gym addition. Price includes a credit for not protecting the existing
wood floor.
Quantit
Unit
Cost Per Unit
Total
Carpenter Foreman
HRS
$ 55.49
$ -
Carpenter Journeyman - Delete Floor Protection
(48.00)
HRS
$ 53.43
$ (2,564.64)
Carpenter I
HRS
$ 55.49
$ Y
.Foreman
Carpenter Journeyman - Remove Existing Wood Floc
272.00
HRS
$ 53.43
$ 14,532.96
$ -
Subtotal tabor
$ 11,968.32
Overhead & Profit Labor
15.00%1
1 $ 1,795.25
Total Labor
$ 13,763.57
Material Quantity Unit Cost Per Unit
Total
Delete Floor Protection (1,00) LS $ 1,362,00
$ (1,362.00)
Dumpsters 3.00 EA $ 300.00
$ 900.00
Sales Tax
N/A
Subtotal Material
$ 462.00
Overhead & Profit Material 15.00%
$ 69.30
Total Materials
$ 531.30
Subcontractors_!!!!1
Quantity
Unit
Cost Per Unil
Total
Foster - Credit for Original Gym Addition Floor Work
1.00
LS
$ (55,000,00)
$ (55,000.00)
Foster - New Wood Floor Throughout (See Attached)
1.00
LS
$ 129,850.00
$ 129,850.00
Foster - 7/16" OSB & Third and Better Maple (See A
1.00
LS
$ (20,000-00)
$ (20,000.00)
LMC - Remove & Reinstall Bleachersi
1.00
LS
$ 2,600.00
$ 2,600.00
Martell - Disconnect & Reconnect Bleachers
1.00
L5
1 $ 162.00
1
$ 162.00
Subtotal Subcontractors
$ 57,512.00
Overhead & Profit Subcontractors
5.00%
$ 2 876,60.
Total Subcontractors
1 $ 60,387.60
Subtotal (Overaill
$ 73,620.00
Bond
1.00%
$ 737.00
$ 369.00
General LiabilityInsurance
0.50°1°
Grand Total ADO
74 726.00
Brian Palmer
Project Manager
Specialty Floors
30681 Wixom Rd P.O. Box 930382 Wixom, MI 48393
6409 Fayetteville nd Suite 123]-303 Durham, NC 27713
248.669.5311 Fax: 248 669,4426 sporisftoor.org PROPOSAL
November 16, 2017
Charles Black Center
Wood Gym Flooring - Full Replacement
Foster Specialty Floors is pleased to provide a proposal to replace the entire wood gym floor as part of
the Charles Black Center Renovation.
Section 96466 Wood Gym Flooring
We will furnish and install Robbins Bio Cushion utilizing 25/32 x 2'/4 Second and better maple
over 2 layers of 15/32 subfloor over % closed cell resilient foam. Our price is complete and includes
sanding, finishing, game lines, wall base and thresholds adjacent to the floor.
Your price for this work shall be $129,850.00
Price does not include any concrete work, athletic equipment or demo. Foster Specialty Floors is a WBE
Merit Shop and Equal Opportunity Employer, if you have any questions regarding this proposal please
don't hesitate to call.
Sincerely,
Ben Vanaman - Vice President
248-669-5311 x111
Signalcre I rile .... _ .. ... _..Dale , ....... _. _ ......
Nurchasee agrees to conditions and prirr,.s as stated, This proposal is suoiect to acceptance within twenty days berm date and s void theieallei at
Ole option of the undersigned The conditions listed an reverse sheti 4e a'%Weyral part cif this proposal and its acceptance wNl consiitutn a rontfacl
srian Palmer
From: Ed Kowalczyk <ekowalczyk@jprlsource.com>
Sent: Tuesday, January 23, 20181A0 PM
To: Brian Palmer
Subject: FW: Charles Black Center
From; Benjamin Vanaman[maiito:bvanaman@sportsfloor.org]
Sent: Wednesday, January 17, 2018 9:38 AM
To: Ed Kowalczyk <ekowalczyk@jprlsource.com>
Subject: Re: Charles Black Center
Ed,
Here are some of the Deducts that I would recommend for the wood floor system at Charles Black:
To furnish and Install 7/16 053 in lieu of 1/2 plywood and Third and better maple in lieu of Second and better, Please
DEDUCT $20,000.00 form the new floor price of $129,850.00.
Price does not include demo of the existing floor.
All warranties from Robbins and Foster are honored if these deducts are accepted.
Let me know if you have any questions.
Thank you,
Ben
On Sue, Jan 16, 2018 at 2:36 PM, Ed Kowalczyk <ekowalczyk@j r lsaurce,com> wrote:
Good afternoon,
Pleasure to meet you. Here is our sketch of the approx. floor repair in the Charles Black Center gym.
As discussed at the site, we would love to have your write up by tomorrow 10;00 am if possible before our next
meeting. I hope you made it back ok
Thanks
Ed
Edward J. Kowalczyk I Senior Staff Architect
South Bend I Fort Wayne I Elkhart
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW It QUEST FORM
Date 02/05/2018
Name Toy Villa Department Engineering
BPW Date 02/13/2018 Phone Extension 5920
Required Prior to Submittal to Board
Legal F1 Attorney Name
Controller ❑ Controller review is required for all Contracts $5,000.00 or more and
greater than one year in length per the City Purchasing Policy
Purchasing ❑
H Agreement H Contract LJ Proposal Ll Addendum
F1 Professional Services n Resolution
❑ Bid Opening El Bid Award Req. to Advertise ❑ Title Sheet
Quote Opening El Quote Award
Change Order No. 2 ❑ C/O& PCA No. ❑ PCA
Ease/Encroach. Traffic Control
El Other:
F Required Information
Company or Vendor Name
Gibson -Lewis, L,LC
New Vendor
El Yes M No El If Yes, Approved by Purchasing
MBENVBE Contractor
[:] MBE [:] WBE
MBEANBE Contractor RequestedE]
No [:] Yes Name of Company
Project Name
Charles Black Center Renovation
Project Number
116-073
Funding Source
Park Bond
Account No.
Park Bond: 751.1101.452.39.,89
Amount
$
Terms of Contract
Purpose/Description
Approval of C.O. #2
F-1 Required Contractor's Certification Form Attached (Non -
Collusion, Non -Discrimination, Non -Debarment, E-Verify, Iran, etc.),
Required For Change Oroers,Only
Amount of Increase $73,726,00
F] Decrease $
Previous Amount
$ 3,812,520.00
Current Percent of Change:
1.93%
New Amount
$ 3,886,246.00
Total Percent of Change: