HomeMy WebLinkAbout6.B.(6) Interlocal Agreementc~~~~~
INTERLOCAL AGREEMENT BY AND AMONG
THE SOUTH BEND PARKS BOARD,
THF, SOUTH BF,ND BOARD OF PUBLIC WORKS
AND THE SOUTH BEND REDEVELOPMENT COMMISSION
(Animal Shelter Project)
THIS AGREEMENT is entered into and made effective the day of ,
2010, by and among the South Bend Department of Parks and Recreation, by and through the
South Bend Parks Board, the South Bend Department of Public Works, by and through the South
Bend Board of Public Works, and the South Bend Department of Redevelopment, by and
through the South Bend Redevelopment Commission.
RECITALS
WHEREAS, the South Bend Department of Parks and Recreation ("Parks") and the
South Bend Department of Public Works ("Public Works") are each departments within a
municipal corporation existing and operating as a political subdivision of the State of Indiana as
defined by Ind. Code § 36-I-2-13 and are authorized enter into an interlocal agreement pursuant
to Ind. Code § 36-1-7-4; and
WHEREAS, the South Bend Department of Redevelopment ("Redevelopment") is a
public corporate body created by Indiana law; and
WHEREAS, the South Bend Parks Board ("Parks Board") is the governing body of
Parks; and
WHEREAS, the South Bend Board of Public Works ("BPW") is the governing body of
Public Works; and
WHEREAS, the South Bend Redevelopment Commission ("Commission") is the
governing body of Redevelopment; and
WHEREAS, Parks is the owner of the real estate and facility generally known as
Kennedy Park located in South Bend; and
WHEREAS, Parks desires to remodel the building located at 521 Eclipse Place to
become the new state of the art animal shelter for South Bend Animal Care and Control (the
"Project"); and
WHEREAS, Redevelopment has the resources to fund the Project; and
WHEREAS, Public Works has the expertise and procedures in place to contract for and
administer the Project; and
WHEREAS, Parks Board, BPW and Commission desire to enter into an agreement
providing for the funding and contract administration of the Project.
NOW, THEREFORE, in consideration of the mutual promises and obligations in this
Agreement, the adequacy of which is hereby acknowledged, the Parties agree as follows:
I. PURPOSE
Kennedy Park is a public facility located in South Bend, Indiana and benefiting the
citizens of South Bend and Parks Board determines that it is necessary and in the public's best
interests to remodel the building located at 521 Eclipse Place to become the new state of the art
animal shelter for South Bend Animal Care and Control. The Project is generally depicted at
Exhibit "A"attached hereto and incorporated herein.
BPW has considerable experience in contracting for and administering similar public
works construction projects. The parties wish to utilize the expertise and experience of BPW in
letting and overseeing any such contracts reasonably necessary to carry out and accomplish the
Project and BPW is willing to provide its expertise and experience.
Commission has resources that can be used for funding the Project. The parties wish to
use the Commission resources to fund the Project.
II. PROJECT FUNDS AND DUTIES
a. Budget.
The Project will be completed for a sum not to exceed $1,500,000.00 ("Project Funds")
These costs shall be funded by Commission.
b. Duties of Parks.
Parks hereby agrees as follows:
i. Parks shall make available and provide free access to the Project site to Public
Works and Redevelopment and to each of their agents and designated
contractors.
ii. Parks shall review for approval all proposed improvements to Kennedy Park
before Public Works begins the contract bidding process.
c. ~ Duties of Public Works.
Public Works hereby agrees as follows:
Subject to the Project Funds identified for the Project, Public Works shall
enter into each contract for the project and make decisions necessary to
complete the Project.
ii. Public Works shall supervise and administer all necessary contracts with the
design consultant and the construction contractor.
d: Duties of Redevelopment.
Redevelopment hereby agrees as follows:
i. Redevelopment shall have the duty of receiving, discharging, and accounting
for all the monies of this joint undertaking and shall make payments upon
authorization from Public Works.
e. Ownership of Project
i. Upon completion of each respective aspect of the Project, the ownership of
the Project shall remain with Parks.
III. ADMINISTRATION
This Agreement shall be administered by a joint board consisting of the Parks
Superintendent, the City Engineer and the Director of Redevelopment. Upon completion of the
Project, a final audit shall be performed by Redevelopment.
IV. DURATION
This Agreement shall go into effect when it has been approved by each of the parties,
approved by proper resolution of the governing body of the City of South Bend and has been
recorded with the St. Joseph County Recorder. The Agreement shall terminate on December 31,
2013 unless extended or sooner terminated by the parties.
(.Signature Page Follows)
Date: , 2010 Date: , 2010
CITY OF SOUTH BEND,
DEPARTMENT OF PARKS AND
RECREATION
ignalure
rinse ame an it e
Date: , 2010
CITY OF SOUTH BEND,
DEPARTMENT OF REDEVELOPMENT
ignalure
rinse Rame an it e
CITY OF SOUTH BEND, DEPARTMENT OF
PUBLIC WORKS
ignalure
rime Name an Tit e
(Signature page to Interlocal Agreement)
Exhibit "A"
South Bend Animal Shelter Project
Project: South Bend Animal Shelter Project
Project Description: Remodeling of the building located at 521 Eclipse Place to
become the new state of the art animal shelter for South Bend Animal Care and Control.
The remodeling will be done according to design and specifications done by Grinsfelder
Associates Architects of Ft. Wayne, Indiana, complementing the surrounding park land
(Kennedy Park).
Scope of Work: The Board of Public Works, acting on behalf of the Redevelopment
Commission per the proposed Agency Agreement, will adapt the Grinsfelder design, bid
the project per applicable statutes, award the project, and monitor construction
activities. The hoard of Public Works will consult with the South Bend Park Board, as
owner, and Catherine Toppel (Director of Code Enforcement), as operator of the new
facility and Dave Relos (representative of the Redevelopment Commission) for
approval of bidding specifications and change orders.
Budget: Project is not to exceed $1,500,000.00 in cost.
Source of Funds: Airport Economic Development Area Tax Increment Finance
District.
Timeline: Completion Date of the Project will be contingent upon various approvals
from area agencies.
Leal Description:
A parcel of land located in the West one half of the Southwest Quarter of Section 3, Township
37 North, Range 2 East, Portage Township, City of South Bend, St. Joseph County, Indiana and
being a part of Kennedy Park and is more particularly described as follows:
Beginning at the North right of way line of Bendix Drive and the East right of way line of
Goodland Avenue; thence North 360 feet, more or less, to a line of utility poles; thence East
along said pole line a distance of 245 feet, more or less, to a fence; thence South along said
fence line a distance of 175 feet to a point where the fence turns East; thence East along said
fence line a distance of 230 feet, more or less to a City sidewalk; thence South along said
sidewalk and another fence line a distance of 163 feet, more or less to the North right of way
line of Bendix Drive; thence West along said North right of way line a distance of 450 feet to
the place of beginning. Containing 2.776 acres, more or less subject to all legal highways and
easements of records.
Every year, the staff at the SBACC Shelter manages over 4,000 animals. The officers, who are available 24/7, 365 days of the
year, do their best to answer all calls regarding stray animals, lost animals, abused animals and neglected animals. The kennel
staff, that is available 7 days a week, year round, does its best to provide compassionate care for all the animals that find their
temporary home at the shelter. Unfortunately, for the staff and for the animals, the current facility is extremely inadequate for
the work that they do. The current facility is a century-old building that was converted from a vacated fire station into a shelter
in 1996. The 3,100 square foot facility is severely limited in space. Bearing in mind that on any given day SBACC provides a
temporary home for up to 100 animals; the current facility only allows for 17 kennel runs, 12 dog cages and 23 cat cages. As
well as the space limitations, the building has several structural issues as a result of its age. For example, the building has
appalling drainage problems due to the aging plumbing.
Another issue with the building is the lack of adequate ventilation and air flow. Air flow and ventilation become a particular
problem when there is a sick animal in the shelter. Several of the common pathogens that affect animals are airborne
pathogens. Wrthout adequate airflow and /or the space to quarantine the sick animals, these diseases spread rapidly amongst
all the animals.
The new facility would nearly quadruple the size of the existing facility and will increase adoptions and volunteerism. Unlike the
current 3,100 square-foot facility, the new 9,378 square-foot shelter would give SBACC ample room for additional kennels and
cages as well as room for: Its own spay-neuter clinic, an expanded lobby and reception area, an adoption preparation area for
bathing and grooming of animals, interaction room for families to meet with prospective pets, a confined area to unload animals
from vehiGes, a secure area for the quarantine of bite case 8~ dangerous animals, a treatment area for sick and injured animals,
a secured area that is protected from the elements for after-hours drop-offs.
In 2009 South Bend Animal Care &~ Control responded to 4,558 calls for service, 712 after hour calls and handled 3,852
Domestic animals. Of those animals 357were adopted out, 414 were returned to their owners and sent 344 to other rescue
organizations. SBACC also assisfed 249 wild animals.
SBACC hosted the Neuter Scooter, a mobile spay/neuter clinic, on 9 visits allowing more than 500 families and 7 rescue groups
get 1,008 cats spayed or neutered.
CARE (Community Animal Rescue Effort) of South Bend held several fund raisers/adoption events, Friend raiser ~ SB
Chocolate Cafe, No Spay no Neuter No Service with Hacienda, Run Ten Ten (10 K & Mutt March), Curl up with a critter book
sale with Borders, Howl-O-Ween costume party ~ Howard Park, Skating Party with Parks Department, Santa Paws ~
PetSmart, PetSmart Spring and Fall National Adoption Event.
SBACC has begun a partnership with Brown Mackie College Veterinary Technology Program. Thru this program we have been
able to have nearly 100 animals health checked, treated, vaccinated, diagnosed and tested for certain diseases. Additionally
more than 40 animals were spayed/neutered and no cost to the City of South Bend. This partnership benefds the students by
providing experience in animal care in a kenneling environment, valuable animal handling skills, practical medical skills, as well
as education/insight they can take into practice obtained from shelter experience including the- end result of animal
overpopulation and animal abuse 8~ neglect issues. SBACC animals benefit by receiving vaccinations, medical screening tests,
medical treatment, grooming, human interaction and care and spay 8 neuter surgery.
Existing shelter cLD 105 S. Olive
.... ~ --
f
~~ Two floors are not handicapped accessible
~~ Building is land locked so expanding is not an option
N
~~ Sits right next to the railroad tracks so noise and vibrations are an issue
Wood framed walls make it impossible to control rodent infestation
~~i
No storage space for animal capture equipment or animal care supplies
~~ Floors are not properly sloped, drained or sealed making cleaning tedious and inefFcient
~~ New arriving animals need to be brought in thru the lobby endangering the public
~~~
No separate quarantine area for bite cases and aggressive dogs.
~~ No way to control odor.
_~~
Outdated kenneling system requires excessive labor to clean
-~ _ -
'~ ---~ -
Architectural rendering of new facility in Kennedy Park
F~dsting vacant building in Kennedy Park to be rehabilitated into new animal shelter
Front view
Existing vacant building in Kennedy Park to be rehabilitated into new animal shelter
Rear view _ / l
~G-1
~y(
r~ y ~ ~ x \~Y3~ ~ x~
`'~ Y <
t.-.
Architectural rendering of new facility in Kennedy Park
~"X,~ t~~' 3..
~ti~ _~
- -- _ -
--.,~-,~ ~Y- _
~s
.~~ ~ g~
~~ ~' ~ $ ~ 4
$~ a ~ ~ ~
-~,
~_ 619H4 ave~~. - ~~~A~
1~
~o~i~° ~y~os
~~~~ ~enoua8 S~iP~ea
i~
~ ~ S O
~ O W ~ U
c>
4a- po K
~ w-
SQUARE FOOTAGE COMPARISON
ORIGINAL FLOOR PLAN 11,804 5Q. FT.
REVISED FLOOR PLAN -OPTION 4 9,378 50. FT
50UAREFOOTAGEELIMINATED 2,426 S0. FT ~
III o
VEST.
124
DOG
ISO.
139
FOOD PREP/
STORAGE
120 LAUNDRY
119
HALL
116 BREAK
ROOM
143
MECHANICAL
116
NOTABLE FEATURES
00 0
TRIAGE/
0 0 0 E-ROOM
127
I
L
~ I I
TO
1
J \
~
'~
"'~~~
GARAGE
123
ACO
AN WORK
.
3 131
HALL
136
HALL
137
STRAY
COURTYARD
HALL
141
/~
RECEPTION/
OPEN OFFICE
142
ADOPTABLE
COURTYARD
HALL
112
ADOPTION ADOPTION
OFFICE INTERACTION
111 109
-RETAINS BOTH ONE ADOPTION INTERACTION ROOM AND THE ADOPTION OFFICE
-DOES NOT INCLUDE A TEMPORARYHOLDING ROOM
-INCLUDES TWO LARGE COURTYARDS, ONE FOR STRAYANIMALS AND ONE FOR
ADOPTABLEANIMALS
-RETAINS THE CAT COLONY
-RETAINS TWO CAT ROOMS, ONE FOR STRAY CATS AND ONE FOR ADOPTABLE CATS
-DOG KENNEL TO ACCOMMODATE BOTH STRAYAND ADOPTABLE DOGS
STRAY CATS
138
SUPERVISOR
OFFICE
132
LOBBY
101
COLONY
104
HALL
108 ADOPTION PREP/
GROOMING
1D6
MANAGER
OFFICE
106
SURGERY
113
TRAINING/
CONFERENCE
107
AE 1~
10 ~q
~aP
VEST.
100
I]
REVISED FLOOR PLAN v SOUTH BEND
ANIMAL SHELTER
NORTH 1 /1 6" = 1'-0" OPTION 4 Date: 02/01/10 Comm. No. 0717
Grinsfelder Associates Architects, inc.
CH INLINKFENCEW{ELECTRIC SLIDINGGA7E-T-0"
HIGH -ALTERNATE #X
PAVING TYPE A'~
,.
BUIOLD NG " .a ~ ~NEWLAWN/
EJ
BASE - SEE DTL
0
N
n
O
W
v
N
20'-0°
~ I
0
~ o
__ o
a
_ ~n ACCE:
0
~
= NEW LA
TREE TO REMAIN
4"THINK CONCRETE SIDEWALK
OVER COMPACTED STONE BASE -
TYP. UN- E 55 NOTED
I
R5 0 N R5 0
0
~ NEW LAWN
7 SPACE ~ 9-O"=63' 0"
SITE LAYOUT PLAN
1 SCALE: 1" = 40'-0"
NORTH
NEW LAWN R 5'-O"
9'-0"TYP
't _ PAVING TYPE'8'-
SIDEWALK TO REMAIN
1~.~
U
Q
.~
U
w
~0 -SEE DTL
R 9' 1 1 /4"
~\
The following photos show the difference between the new modem animal control facility and the old "dog pound" .
The top photos show the animal shelter in Hendricks County Indiana that was constructed in 2009. Tom Famy of
Grinsfelder Associates Architects designed the facility and supervised the construction. The new shelter for South
Bend Animal Care & Control will be constructed with similar materials and finishes.
& front desk area
Current
8~ entrance area
SUUrn.
Ty{.~....~.:'
..- _.aoi
~y . ~d'i
Tom:..;
w:^l- J
f~ _ r'
__.,, annr withOU1'
i
•' ~
~~
Modem kennel with sealed glazed block walls that are easily power
washed and disinfected. Prevents disease transmission.
E
t
. ~ ,~
Removable epoxy coated cot 8 flooring.
Block walls prevent dogs from attacking dog in next kennel
Current kennel has metal walls that are corroding, have gaps
between panels allowing water to spray debris into adjacent kennel.
Gaps are also difficult to scrub and keep clean. Very susceptible to
disease transmission.
Metal fixed cot is difficult to clean and susceptible to corrosion.
Chain link fence walls allow aggressive dogs to attack dog in
adjacent kennel.
Garage that will provide a secure enclosed area for unloading animals preventing them from escaping.
Additionally Animal Control Officers can clean and disinfect their vans in adverse weather.
0
Currently the vans are unloaded adjacent to the main shelter entrance. This poses two dangers to families entering the
shelter. One, of being bitten by a dog being unloaded from a van and being struck by the vans pulling in and out.
ti
~'
~ ~~s
~p v4e
+A~ A~ R
.~ . -:.~ .
"` `_ +.;
~, ' ~ k't
~-. ~ ..
.. . ~ M...
v~ X
~,> .,
The heating and cooling systems will be high efficiency and divided into zones to keep the air from one area of the shelter from
entering another area, This will dramatically decrease the disease transmission from incoming stray dogs 8 cats to
healthy ones awaiting adoption. This will also eliminate the °kennel odors" from the public areas of the shelter.
i~
2 current outdated 8~ inefficient furnace and air conditioning system serve the entire building.