HomeMy WebLinkAbout04/19/1932 Board of Public Works MinutesTuesday, Apri I 19th 1932.
Calvert ar)4 Randolph. Streets from .Samp Eon Street to the a 11ey west of "IrnsperLzer St. II
p
Also in the alley j�et�ueen Dowman "_Itreet and Calvert Street from Cro line to Simpson Stre'et
,
to tie in with the cable on Sampson Street covered in Print No.4. A few anchors will
have to be placed..
Print No. 7. Cn.I.Is for the removal of open ,T,,i-re lead on Ernsberger Street. The ne vT
cable referred to above will relieve the open wire lead.
Pr
int ho.8. Shows small reconstruction jobs. A total of five poles and. six anchors
are to be placed. All are in locations of good_ clearance.
Print
Nlo.9.
Shaxi s und. er V ,,round cable to be -placed. on Sample Street in conduits elready
in. This w ill
relieve aerial wires now in n use and. which w ill be, removed.
Print
1,Yo.10.
New cable to be -nleced on existing poles in the alley between Virginia
and D.1eq from
Indiana to Broadway. This is to mlieve open w,, :ire nmr used..
Print
N0.11.
This c overs rener, inp of present plant, . Eight old poles will be replaced
by new poles.
Print
No.12.
This covers renewal of plant, replacing, old poles and anchors with new
e qu ipmen t .
Print
No.13.
This i s replp c in p --r esent old ewu i-pmen t v,, it h new.
Pint
Mo.14.
A section of 250 feet of cable is to be ad ded to existing cable in the
a Iley
I:P
betviee -n Living Pn(9 -I'-ltpeld. Streets and between IMI-daigen and. St. Joseph Streets.
Print
No.15.
-Replacing present old equipment.
Print
!ao.16.
RepLacing present old equiprrEnt.
Print
Nlo.17.),
These prints cover the installation of 700 feet of new cable to re -place
Print
IT o . 18
open wire.
Print No.19.epl.3cing seven poles.
Pri
nt No.20. Repl-,cing ten poles.
Print No.21. "his calls for rebuilding present distribution in the block between
Western Avenue e.b(',' I-onreo Street, 3`-16chigan Street and. St.' Joseph Street, by placing
cable on buildings and reinoving old drop wire.
Print No. 22. Cable to be attached to buildings in rear of south side,of Wnshinpton
Street between lv�ain end LafI7.-
-yette Ztreets and remove old dxop wires ,now unsightly.
Print No. 23. This calls for reconstruction of present distribution. Changes,
indicated by penc'l, have been recommended by this Department and agreed to by the
Petitioner.
Print No.24. This job calls - for setting eight poles a& four anchors. in the 'alley
between 11onroe and South Street anB- newteen Fellous and Rush Streets. hll locations
have been inspected for interference.
Print Ho.25. This job is a complete rebuilOinp of construction in the alley between
Jefferson and Iffayne Street s, from St. Louis to Edd.y Street An and erground dip
is to be brought out of rrnnhole at alley on Jefferson between St. Louis and 6t.
Peter and at Frances Street. This will cross Jefferson �`treet iij both places. All
the rest of the work is aerial cable construction.
Print N10.26. This calls for installation cf cable and removal of aerial open wires
in the alley between Ford and Orchard Street from Scott Street to Chapin Street. -
Print Elo.27. This is a cable installation, replacing- three poles with new, and re-
moval of open wire, in the alley between Orchard_ and Dunham Streets from boott Street
to Chapin Street.
Print No.28. This is en insti7illation of 100 feet of aerial cable to remove old drop
wire,
Print No.29. Repla-cinp three poles and extending aerial cable 135 feet.
Print No.30. Installing ,aerial cable to remove open wire..
Print No.31. Installing aerial cable to remove open wire.
Print No*32. Underground dip across Rex Street between Ashlan(I and Leland Avenues,
to serve this triangle and. remove present unsightly open wires.
Print No.33. Underground dip across Leeper Avenue to alley west fttween Peashway
and Poka.pon Streets and extending aerial cable north to Anpella, Avenue.
Print Mo.34. Out .
Print No.35. Calls for cable construction on Private Right of Way along west border
of Leeper Park.
0
0
•
E
0
Tuesday, .&pril 19th. , 1932.
,15
•
U
•
Print No.36. Calls for cable construction on Private Right of way along river bank
north of Riverside Drive.
Print No.37. Calls for cable construction in alleys wrest of Irquois Street between
Parkovash end Angella Avenue.
All of this construction is for the betterment of Plant conditions by
replacing old poles that are decayed., removing open r;Tire and installing cable. There
are on]-tr a few instances where the street surface will have to be broten for under-
ground install<tions and these are on streets where the surface is badly in need
of repairs an, a,
I recommend tna t these petiti orts be granted..
hespectfully submitted,
Vim. F . Oua lis .
0
The Boarc approved the installeti.on of a 1000 lumen light at the corner
of " bert Court end 28ih . , Street, at a cost of-?22.00 per ;,7ear. Albert Court has
70
been chanted to ..me Court.
The hoard approved claims for carious departrrnts totaling, '?2,624.25.
The Board approved. the installption of the fbllcuing street lights:
4000 lumen light at the corner of Scott Street and Indiana Avenue �t a cost
of `345.00 per veer.
4000 lumen light at the corner of rv'ilber and Lawnd.ale avenue at a cost of
='?45. 0.0 per y mr .
2500 lurtien light at the corner of 2600 block on Necome Street at e. cost of
a35.00 per year.
1000 lumen light at the corner of Carroll and East Fox Street.at a cost of
22.00 per trear. This light was moved from alley east of Carroll on Fox to Carroll St.
1000 lumen light at the corner of Brookfield aid Longley ,Avenue at a cost
of �22.00 per y eer.
The Board ordered Building Commissioner, D. l,'ooma.w, to draw up specif'ice-
tions for the repair of the wall at the central fire station. Bids on same to be
re ce,' ved Tuesday, 11py 3rd ., 19321, at 10: 00 A. Y. The Board further orders that notices
of said bids shall be published on the 23rd. , day of April and on the 30th. ; day of
April, 1932, in the South Bend Nears Tiros and Tribune. Specifications for said work
are as follaas
SPEC IF ICAT TONS FOR RECONSTRUCTION OF PARAPET .TALL .nT CENTRAL
FIP E STATI ON.
The:: work to be done and er th is contra ct consis is of the re construction
of the parapet walls on the Central Fire Station of South Bend. .
The building is 100 feet long and the walls mentioned above extend along
the long dimension of the East and Vilest sides of the buiking with return walls about
3 feet , more or less, a t the south end of each wall. About one-th ird of the East Tall
is already doirn and the usable materia_1 salveM- d.
The bidders shall satisfy themselves as to the nature and amount of this
work and the amount of mate rial wh ich ma y be salvage d f Cr use under the condi. Lions
here in set for th .
In removing the pre sent gall, the stone coping and face brick shall be
salvaged.. The back up brick shall be removed and all soft and unsound brick shall be
• ! removed from the premises and disposed of by the contractor.
Any material stored or piled upon the roof shall be placed upon a platform
of 2 inch planks and such material d',all be distributed in such a manner as not to
owe rloa d the roof structure of the building,
Any breaks or abrasions of the roof -covering caused in the prosecution
Of this.work shall be covered to protect against leaking during the vrork and shall
be repaired in a satisfactory and workmanshiplike ma.kner as soon as the rasonry work
i s c omple t ed .
• The new well shall be built of the sane dimensions and outline as the
origim.1 wall. Where new face brick may be required they shall be furnished to match
the present brick as nearly as passible and shall be placed together in inconspicuous
i� locations as directed by the Fire Chief.
4-10 1 W�
0 O Toe s6a,�?-, April 19th., 1972.
Brick for becking up the face shall be herd bLwned and, 'of durable wuality,
free from kiln cracks, sand spots and calcined lime pebbles. Samples of back-up brick
shall .1ce submitted to the Buildinp Commissioner for, approval before delivery to the job.
Mot -,tar for laying up this brick work shall be of suci,, proportions of send, lime and
portla-And cement as will produce a mixture, which, upon hardenIng, will adhere firmly
to the brick and will be resistant to weathering action.
All joints shall conform to the *type of joints in the present wall and
all verti cal aid horizontal joints shall be filled with mortar.
The face and beck -up courses of 'brick shall be tied together with g9lv-,_,n-_ J
ized. or asphalted and Corrupated'wall ties spaced not more than twelve inches a-ncLrt
each Wa7T.
101here the stone cOpinp, is found to be broken, it shall be fitted top -ether
en cemented in a workmanlike nannemn the wall at thea South end of the east wall.
'Where new copinF, is required- it shall be of the same quality m-(9 design as the present
stone.
The return vial is a t the south, end of the building sh a, 11 be bu. i it integral
with the wal Is to v,,hich they join.
The
p resent brick chimney shall be removed to the leve'l o f the roof end
reconstructed to the same d imensions, it
After completion cf the work, the contractor shall clean up I the roof and
premises of all construction end unused Material in a mnner satisfFctory to the Chief
of the ± 'lire De7rtment
A
_C}ny work vhich may be required by the Board ofIffoaks and not anticipated
in these specifications shall 'be paid for at a price agreed upon with the Board before
the work is performed aail T] mch order end price s 'be given in writ ing.
The Board approved the instal I,.' tiOn Of 8 1000 lumen light at the corner
of
Sorin Street and Walsh Street at a cost of 22.00 per year.
1%rleetinp ac-51journed at 12 o'clock noon.