RE: Change Order No. 16 - Wastewater Treatment Plant Secondary Treatment
Improvements —Project No. 114-053
Dear Mr. Steele:
The Board of Public, Works, at its meeting held on December 21, 2017, approved the above
referenced Change Order for an increase of $19,353, bringing the current contract amount to
$13,939,218.47.
Enclosed is a copy of the Change Order for your records.
If you have any -further questions regarding this matter, please call this office at (574) 235-
9251.
Sincerely,
Linda M. Mal -tin, Clerk
Enclosure
c: Jacob Klosinski, Environmental Services
Al Greek, Utilities
Carol Kurzhal, Environmental Services
GAR A. GILOT SUZANNA M. Fii'rzBE'Rcj EuZABF,11i A. MAR ADIK - _JAMFsA.MUEJA.,ER THEIUSE J. DO AU
INTER -OFFICE MEMORANDUM
DEPARTMENT OF PUBLIC WORKS
DIVISION OF UTILITIES
TO: Members of the Board of Public Works
Eric Horvath, Director of Public Works
Clara McDaniels, Board of Public Works Attorney
FROM: Al Greek, Director of Utilities
Jacob M. Klosinski, Assistant City Engineer
SUBJECT: Agenda Request Form — Change Order No. 16
Project No. 114-053: Wastewater Treatment Plant Secondary Treatment
Improvements
DATE: December 18, 2017
The Division of Utilities is requesting the Board of Public Works approval of Change Order No.
16 for Project No. 114-053 Wastewater Treatment Plant Secondary Treatment Improvements.
Refer to attached documents for supporting details for the subject work.
Change Order No. 16 addresses the following changes:
COP 98 — Enviromix and Stop Log Plates
COP 99 — Additional 12' Crack Repair
COP 100 —Add Three (3) Concrete Bridges at Aeration Gallery
COP 101 — Shutdown 11 Additional Sludge Removal
COP 102 — Remove 24" Aeration Tank 1 Valve
COP 103 — Change Order No. 15 Scrivener's Error Correction
COP 104 — PCO #12 Link Seal Credit
NET INCREASE FOR CHANGE ORDER NO. 16 ITEMS
Original Contract Sum
Net change by previously authorized change orders
The contract sum prior to this change order
By this change order, the project amount increases by
The new contract sum including this change order is
This Change Order represents a total change of
Total change for the entire project
Time Extensions resulting from Change Order No. 16:
Substantial Completion:
Final Completion:
$ 5,939.00
$ 840.00
$ 4,483.00
$ 6,926.00
$ 4,471.00
($ 30.00)
$____3,276.00)
$ 19,353.00
$11,885,000.00
$ 2,034,865.47
$13,919,865.47
$ 19,353.00
$13,939,218,47
+0.16%
f 17.28%
0 days
0 days
DATE: 12115/2017
PROJECT NO: 114-053
PROJECT NAME: WWTP - Secondary Treatment Improvements
CONTRACT DATE: 09/03/2015 Contract Award, 10/05/201 5 Notice to Proceed
CHANGE ORDER NO. 016
SUBJECT OF CHANGE ORDER: Various modifications to the contract. See attached.
All items completed substantially as pllanned.
See attached! Comparison of Estimate for overruns and' underruns.
The original contract sum $ 11,885,000.00
Net change by previously authorized change orders $ 2,034,,865.47
The contract sum prior to this change order $ 13,919,895,47
By this Change Order, the project amount is Increased
Decreased $ 19,353.010
The new contract sum including this change order $ 13,939,218A7
This Change Order represents a total change of 0.16 %
Total change for entire project +17.28 %
Original contracted completion date/time 08/25/2017
Extension of date/time by previous change orders 225 days
Date/time extension by this change order 0 days
New completion date/time 04/07/2018
RECOMMENDED FOR APPROVAL
CONTRA VConstruction Manager
CITY OF SOUTH BEND
BOARD OF PUIBLI 1 RK
-S
Contractor Signatof6 Approved Date:
�Printed Name and Title Gary A. Gilot,"'President
Thieneman Construction, lhnc, 14
Company name -Jai t-s A. Mueller, Member
17219 Foundation Parkway
Address Suzanna M. Fritzberg, Member
Westfield, Indiana 46074
City, State, Zip, Elizabeth A. Maradik, Member
Therese J. IDorau, Memt(&f
Date
Name
BOARD OF PUBLIC WORKS
AGENDA ITEM REVIEW REQUEST FORM
December 18, 2017
Jacob M. Klosinski
Department Utilities Wastewater
❑ Agreement
Ll Contract Lj Proposal U Addendum
❑ Professional Services
❑
Resolution
❑ Bid Opening
❑]
Bid Award ❑ Req. to Advertise ❑ Title Sheet
❑ Quote Opening
❑ Quote Award
®
Change Order No. 16
❑ CIO & PCA No. ❑ PCA
❑
Ease/Encroach.
❑ Traffic Control
❑
Other:
':-'1:\G Nll 6.l4::1[1[VI[llii LAVAA ..
Company or Vendor Name Thieneman Construction,_ Inc.
New Vendor
❑ Yes ® No ❑ If Yes, Approved by Purchasing
MBEIWBE Contractor
❑ MBE ❑ WBE
MBEIWBE Contractor
Requested ❑ No ❑ Yes Name of Company
Project Name
Wastewater Treatment Plant Secondary Treatment Improvements
Project Number
114-053
Funding Source
2017 Wastewater Capital Account
Account No.
642-0630-415-43-66
Amount
$
Terms of Contract
lump Sum and Unit Prices
Purpose/Description
The Division of Utilities recommends the approval of Change Order
No. 16 which includes additions and deductions to the scope of
work as described in the attached Inter -Office Memordandum and
Change Order Documents,
❑ Required Contractor's Certification Form Attached (Non -
Collusion, Non -Discrimination, Non -Debarment, E-Verify, Iran, etc.
Required For Change Orders Only
Amount of ®
Increase $ 19,353.00
❑
Decrease $
Previous Amount
$ 13,919,865.47
Current Percent of Change: +0.16%
New Amount
$ 13,939,218.47
Total Percent of Change: +17.28%
Dispersal After Approval
Copy Original
® ❑
Al Greek, Director of Utilities
® ❑
Jacob M. Klosinski, Assistant City Engineer
® ❑
Carol Kurzhal, Director of Financial Services, Environmental Services
DOCUMENTS
Date ofIssuance: December l5'2017
Owner: City mfSouth Bend
Contractor: Thieneman Construction
Engineer: ArcodislJ8
Project- Secondary Treatment Improvements
Change Order No. 16
Effective Date:
Owner's Contract No,: 114-053
Contractor's Project No.:
Engineer's Project No.: 03029034.0000
Contract Name:
The Contract is modified as follows upon execution of this Change Order:
COP 98—EmvinomixPiping coordination ....................................................................................... _$5,939/0O
COP 99—Additional Crack Repair _.__............... _........... ................................. ........................ $840.00
COP 1OO-3 Additional Concrete Bridge Decks ............................................. ............................ .... $4,483.Q0
COP 101—Additional Sludge Removal ............................................................................................ $6,926lKl
COP 1OZ—Remove 24°Aeration Tank 1Valve .......................... ....................................................... 4,4710O
COP 1O8—CO1STypo Reconciliation ............................................................. ...... ...... ._...-.^.^.~^... ($]Q.0O)
Attachments: Contractor's Change Order Proposals
CHANGE IN CONTRACT PRICE
CHANGE IN CONTRACT TIMES
Original Contract Price:
Original Contract Times:
Substantial Completion: July 26, 2017
increase from previously approved Change Orders:
Increase from previously approved Change Orders:
Substantial Completion: 225 —
days
$ 2,03,4,8165.47
Ready for Final Payment: 225 —days
Contract Price prior to this Change Order,
Contract Times prior to this Change Order:
Substantial Completion: March 8, 2018
Increase of this Change Order:
Increase of this Change Order:
Substantial Completion: 0
days
$ 19,353.00
Ready for Final Payment: 0
Contract Times with all approved Change Orders:
days
Contract Price incorporating this Change Order:
Substantial Completion: Marc 8, 2018
�.k �W. )tZa44��' 2�T�
Engineer (Wr�equired) Vowiner (Authorized Signature) Contr4ctor (Authorized Signature)
Title: 1"'e-egg- Jitle Title
Date: 17_,o Date Date Z,
EJICoC'C-941, Change Order.
Prepared and published 2013bythe Engineers Joint CnwtractDocuments Committee.
Page 1mfI
CITY OF SOU TH BEND, INDIANA J.
W'VM'-'SV0 #r'NJ-AAT-TJL 1�4�'Vyf Uff -hfil! %A'-'VMV1 EN 1
CITY PROJECT NO. 114-053
CHANGE ORDER PROPOSAL
Change Order Proposal No.: 114-053-098 Date. 11/9/17
Submitted in Response to Proposal Request No,:
Contract Name and No.: 114-053. South Bond WW'1'111 SecondaryTreatment- ILI, m1yelnents
Contractor. Thicneman Construction, _Inc.
Subject: Design, furnish, and install custom aluminum frames and plates for 2 Enviromix Panels
and I Stop Log Surround.
The following changes to the Contract are proposed:
SCOPE OF WORK: (attach and list supporting information as required)
1. Item: TCl — See attached cost breakdown - $5,149.40
2. Item:
JUSTIFICATION:
1. Item: Owner request
CHANGES IN CONTRACT PRICE AND CONTRACT TIMES:
We propose that the Contract Price and Contract Times be changed as follows:
For Contract Price, when requested by Engineer, attach detailed cost breakdowns for Contractor and
Subcontractors, Supplier quotations, and other information required.
For the Contract Times, state increase, decrease, or no change to Contract Tunes for Substantial Completion,
readinessforfinalpayment, and Milestones, ifany: Ifincrease or decrease, state specific number ofdaysfor changes
to the Contract Times,
Changes to Milestones if any: N/A
The adjustment proposed is the entire adjustment to the Contract to which the proposer believes it
is entitled as a result of the vro-nosed change.
Change Order Proposal I
Signature of Proposer:
PRICING SIIFET
PAcm~
jj
1
I
I I OFi
1 PAGES
NAME:ARCH.
Olt CONTRAC I OR: L..... I
........ .......
South Rand STI Project
Areadis E
LOCATION:
I i
_.
TYPE OF WORK: j
South Bend WWTP ...
Do n, furnish & Install Enviromix Plates & Stolt Lod
ESTIMATED BY: Craig Steele
BY:
EXTENDED BY:
_.
CHECKED BY
':DATE:
(PRICED
CJS
;Cis
CIS
] J1912017
LABORIEQUIP
MATERIAL
I
DESCRJP'116
Q1JAN, I UNCP
UNITS TO'CAL
UNITS
TOTAI.
SUB
TOTAL
De ..
Carpenter hours
4 111R
$ 48,62 i $ 194.48
$194.As
Miilwrighl hours
i
20 �EA
$ 77.12 I $ 1,542,44
S
F1 542 90
314"LBfittings
6IEA
i
$ 25,00
$ 15000
$I5040
2" schedule 40 SS elbows
4 EA
$ 100,00
S 400 00
$400.00
18 x 48 alum frames and covers
..... ........ ......
2 1EA
I
$ 1,040.00
� S 2,08400
$2,080,00
.... .. ....
Contract Manager
I 3 _.....,
` 1 i
i
OD 140,00
I $ 140 ; $i
,
3
S 140 00
Project Mana cr
...
IHR
$ 125.00 $
I
Su crintcndcnl
_
1 IHR
; $ 110,00 € $ i1400 j
i
$I1000
Field Engineer
i 4 IHR
$ 75,00 € S 300.00 I
j
I $300,60
Projet Coordinator
] 'HR
$ 50.00 ' $ 54.00
I $50.00
.... .
i
3 Subtotal— 52,335.88 i
Subtotal=
$2 430.U0
_ _
! $4,906.88
........
!
Small Tools 3%)�
I $125,17
..... ..
.
Bond 1% `
S50.92
1I I
......
(?
1nslETBace (1%) h
$S J.43
` _ I
Markup on LICJM (15%)j
E S745.03
€
'TOTAL Adds...
I $5 939.43
.......
E
' K 7CHANGE
$5,939 43
CHANGE ORmn iu,qui.s,v i
_ I
$5,939.00
_ _
;
.... ...
i
1
ADDITIONAL CONTRACT 1 IAw.,10
Days
I
I
,
Notes / Clarincatlons
f
See attached Extra Work Orders
__. _. .., .... ..... ....
...... ..... ......
......... ..... ... ............. .... ....... .....
.... .. ........ ......... ..... ...
_i ..f
...
'r
l
'
_.. ii
jj([4[` .....
}............. ............
..
III 1
..
......................... ...
...
I .....
... ... .... ..
i
I
..
1
11
ror. t is t
THIENEMAN CONSTRUCTION, INC.
EXTRA WORK ORDER
JCS NAME: �c i1_ t3crnJO c.r?� C?a�+�l� JOB NO:. / 5'0 6 _ ....--. DATE: /.?, h-7._
DESCRIPTION: > f jr.flL Avv Lil ,=-Jrr-j.tr.-s
-iyUtav rvi-JA'
• iss ��� Q m� s
AUTHORIZED SIGNATURE
T'HIENEMAN B113NATURF
PRINTED NAME ! COMPANY
aLAErC--A) 4 &A) 7—
PRINTED NAME! POSITION
=%A)^ /fin,
I .
CO QUOTATION
DATE: 7120/17 --•_ �1.�• ..
1l�� �trt1i1�
PRICE IS VALID �r
1415 FAIRVIEW STREET • ANDERSON, IN 46016 FOR 30 DAYS
PHONE: (765) 649-5577 - FAX; (766) 641-1567
E-MAIL; ESTIMAT(NG@MOFABINC.COM ADD/-NDUMS REVIEWED: NIA
CUSTOMER; Thieneman Construction ESTIMATED BY: Max W. Hains 11
South Bend Secondary Trtrnnt
ADDRESS; 521 W. 84th Drive Suite A PROJECT NAME. Additional Covered Plates with Hales
P CITY, STATE, ZIP: Merrillville, IN 46410 PROJECT LOCATION: South Bend, IN
E
ATTENTION: Jason DavidsonY �.� QUOTE NUMBER; 72017
?STIMATED DELIVERY TIME: T.B.D. F.O.B.: OUR TRUCK JOgSITE TERMS: NET 30
—
QUANTITY DESCRIPTION UNIT PRICE EXTENDED PRICE
ONE LOT IWORK
MISC. METAL FABRICATIONS PER OUR ATTACHED SCOPE OF
AND LIST OF EXCLUSIONS,
FURNISHED AND DELIVERED ONLY, FOR THE SUM OF:
THANK YOU FOR THE OPPORTUNITY TO QUOTE. IF YOU
HAVE ANY QUESTIONS OR NEED FURTHER ASSISTANCE
PLEASE DO NOT HESITATE TO CALL.
THIS IS AN ESTIMATE ONLY, NOT A CONTRACT FOR SERVICES. THIS ESTIMATE IS FOR
COMPLETING THE JOB AS DESCRIBED ABOVE. IT IS BASED ON OUR EVALUATION OF THE CONTRACT
)OCUMENTS AND DOES NOT INCLUDE MATERIAL PRICE INCREASES AND/OR ADDITIONAL LABOR
kND MATERIALS WHICH MAY BE REQUIRED SHOULD UNFORSEEN PROBLEMS ARISE AFTER THE
NORK HAS STARTED.
MaxW. �taWAIS2
BY: ACCEPTED:
Max W. Hains 11, Estimator
DATE;
$ 2, 080.00
PLUS TAX
IF APPLICABLE
$ 2,080.00
PAGE 1 OF 2
1416 FAIRVIEW STREET • ANDERSON, IN 46016
PHONE: (765) 649-5577 • FAX: (765) 641-1567
QTY
DESCRIPTION
2 sets 1/2" cherkered plate for an area of 18" x 42"
each !Wade up of two pieces of checkered plalg
w/ embed angle
M6FAB, INC :S.
PROJECT: South Bend Secondary Trtmnt
Additional Coveted Plates with Holes
LOCATION: South Bend, IN ��
I BID DATE] 7120117 TIME: 12:00 AM �
ADDENDUMS REVIEWED:
REF.DWG I QTY,
NIA
DESCRIPTION
NOTE:
1.) GTEEL MATERIALS OUOI ED AO PRIME PAINTED w/ (!) ONE COAT,
2.) STEEL MATERIALS NOTED AS IGALV) QUOTED AS HOT -DIPPED
GALVANIZED ONLY, NO FAINT, U,N.O.
3.) ALUMINUM & STAINLESS STEEL QUO -FED AS MILL FINISH, U.N,O.
To Deliver with Other Items
ING NOT SPEC!
.DWG
2. UNLOADING & INSTALLATION OF MATERIAL
13. SAFETY RAILING OR CABLF FOR OTHERA
�•. SHOP LAYOUT & DRILLING OF HOLES FOR
14. EXPANSION JOINT COMERS, NUSINGS &
ATTACHMENT OF FLAILING & CONC. FORMS
CASTINGS, U.N.O.
C PIPE SUPPORTS, HANGERS & BRACKETS.
15. RAILING, GRATING, & SUPPORTS AT
E. ALL F'RP MATERIAL, U.N.O.
BRIDGES, U.N.O.
7'. ACCESS HATCHES E FLOOR DOORS
1r, BOLTS AND/OR ANCHORS NOT SPECIFIC
B. NEOPRENEI"TEFLON" GASKETS & SEALS
FOR MAT'L SUPPLIED BY MOFAB, INC.
B. EMBED ITEMS IN PRE0AST
iT TESTING, SURVEYS, ENGINEER'S STAMP
10. PIPE SLEEVES FOR RAILING
AND FIELD MEASURING.
11. EPDXY FOR ANCHORS, GROUT&GROUTING
1B.ANYTHING PLOT SPECIFICALLY IN SCOPE
ONCE MOFAB, INC. HAS BEEN DETERMINED TO BE THE SUCCESSFUL METALS PROVIDER, WE ASK THAT MOFAB, INC.'S
SCOPE OF WORK AND LiS 1 OF EXCLUSIONS BE INCORPORATED INTO ANY CONTRACT OR PURCHASE ORDER DIRECTING
US TO PROCEED. WE WILL REQUIRE (1) ONE COMPLETE SET OF CONTRACT DOCUMENTS, SPECIFICATIONS, AND ADDENDUMS
AT THE TIME OF PURCHASE.
PLEASE CrtN T ACT US A.S.A.P. IF ANY ADDITIONS/DEDUCTIONS, OR CHANGES NEED TO BE MADE TO THE ABOVE SCOPE.
SINCERELY,
Mnx W. �+n bVI-
Max W. Ha€ns n
Estimating
k1oFs5, line.
= File
PAGE 2 OF 2
�^1--�~--�--[---T--T--(--l--'!---
CITY OF SOUTH BEND, INDIANA
WWTP SECONDARY TREATMENT IMPROVEMENTS
CITY PROJECT NO. 114®053
Change Order Proposal No.: 114-053-099 Date: 111/9/17
Submitted in Response to Proposal Request No.:
Contract Narne and No.: 114-053 -South Bend WWTP Secog "Jar jt
Contractor: Thieiiemati Construction, Inc,
Subject: Additional 121f of concrete crack repair per contract unit costs,
The following changes to the Contract are proposed,
SCOPE OF WORK: (attach and list supporting information as required)
1. Item: TCl — See attached cost breakdown - $840.00
2. Item:
JUSTIFICATION:
1. Item: Owner request
CHANGES IN CONTRACT PRICE AND CONTRACT TIMES:
We propose that the Contract Price and Contract Times be changed as follows:
For Contract Price, when requested by Engineer, attach detailed cost breakdowns for Contractor and
Subcontractors, Supplier quotations, and other information required.
For the Contract Times, state increase, decrease, or no change to Contract Times for Substantial Completion,
readiness formal payment, and Milestones, if any. If increase or decrease, state specific number ofdays for changes
to the Contract Times.
Changes to Milestones if any: N/A
The adjustment proposed is the entire adjustment to the Contract to which the proposer believes it
is entitled as a result of the proposed change.
Change Order Proposal By: Craig Steele �v
Signature of Proposer:
PRICING SHEET
I PAGE)
I_l
OPI
11PAGES
0R CONTRACTOR:J.
Bend STY Project
South.. _.
Arread3
LOCATION: T ION.
TYPE ON WORK:.......
.. .
South Bend W WTP
J
Additional 1211' of Concrete Crack Repair
i
f STIMATED BY: Craig Stcele
PRICED BY: .. ....
EXTENDED BY: I rC61 Ii,('1:IiU 11Y: DA 1 L':
I
cis
cis.. 3.... 3 cis
11i912017
i J
LABOft1EQUIP MATERIAL
DESCRIPTION
Ql1AN, UNIT
UNITS TOTAL U€ 3'I'5 I0'I'A1, SUB
TOTAL
Additional 121f of Concrete Crack Repair
I
i
Cerponter hours
12 iLP
5 I S 70.00 ; S 840,00 1
Mom
i
...._
Contract Maria sr
B
,
IHR
f} S 140,00 I $
Project114anager
...... ,FIR
S 125.00 5
Superintendent _
J ;HR
3HR
S 110,OD S
Field Engineer
$ 75.00 $
!
Project Cuordinntor
HR
S 50.00 S
Ji
€
_._
3
subtotal i, subtotal $840.001
E
$940.00
[[[ I
I Small Tools
E
Bond (1%)
_
Insurance (1%)I
. .
f Markuan Sup bs (5%d),
E`_ _.
. .... ..
I
.... i44aE i; NI) oil L/E/M (15%)!
!1
�TOTAI-Adds
i
$840.ti0
.. ... ...... ..... _ ___. _.._.
_ _
............
NET CHANGE
$840,OD
ICHANGE ORDER REQUEST
$840 00 �
I I
I
IADDITIONAL CONTRACT T1MC:0
i
Days ;
Notes / Clarifications:
I
`
Sec unit costs
COmlrlcted in October but tenable to bill because total qty to date
.........
exceeded the current estimated
qusnnity. j
I
___ _.... ...... ..................
........ ....... ..... .......... ......
:
......... ....
i
I
3
I
,
f
I
,
<
E
I
Page I or I
CITY OF SOUTH BEND, INDIANA
CITY PROJECT NO. 114-0,53
CHANGE ORDER PROPOSAL
�- 11
Change Order Proposal No.: 114-053-100.1 Date: 12/12/17
Submitted in Response to Proposal Request No.:
Contract Name and No.: 114-053 South Bend WWTP Secondary I I I reatnient lin venients
Contractor: Thienen
Subject; Incorporate 3 additional bridge decks (FC 1/2/3) into RFP #3. Revised/Negotiated per
John Huston's email dated 12/8/17, see pricing sheet for a summary of the revisions.
The following changes to the Contract are proposed:
SCOPE OF WORK: (attach and list supporting information as required)
1. Item: TCI — See attached cost breakdown - $4,254.59
2. Item:
JUSTIFICATION:
1, Item: Owner request
CHANGES IN CONTRACT PRICE AND CONTRACT TIMES:
We propose that the Contract Price and Contract Times be changed as follows:
For Contract Price, when requested by Engineer, attach detailed cost breakdowns for Contractor and
Subcontractors, Supplier quotations, and other information required.
For the Contract Times, state increase, decrease, or no change to Contract Times for Substantial Completion,
readiness for finalpayment, and Milestones, if any. Ifincrease or decrease, state specific number ofdays for changes
to the Contract Times.
Contract Times da s
Description Amount Substantial Final
1. Item — Direct Costs $4,255 0 0
2. Item — Markups: 5% Subs / 15% TO $228 0 0
$4,4? 0 0
Changes to Milestones if any: N/A
The adjustment proposed is the entire adjustment to the Contract to which the proposer believes it
is entitled as a result of the proposed change.
Change Order Proposal By: Craig S cle
Signature of Proposer:
a..
i
ti o
o
n
11i
i E
f i
In.�
i6
QUh
` t
C.
C�
pit,Eo€
N I i
V13
69 69 Oq
I
!�
ctl
3
E
i
10N0rl
F.1 E
id
LO
L,46q
i. .
Vir
O
C, j C 0000f
�f'
00 i
a
iMi t
s9
IA FA
�
66
w
1 a
i
}
E i
.....
i
...........E
.....
�.
..
i.
U U
i
r .�.._..
..`....
1
�. .
I
I
1
Y
ro
LO
to
a
M vj i
j
I.T.
c!o� € z�€
��cqEi
i
CITY OF SOUTH BEND, INDIANA
WWTP SECONDARY TREATMENT IMPROVEMENTS
CITY PROJECT NO. 114-053
CHANGE ORDER PROPOSAL
Change Order Proposal No.: 1 14-053-101.1 Date: 12/4/17
Submitted in Response to Proposal Request No.:
Contract Name and No.: 114-053 South Bend W WTP Secondary Treatment Improvements
Contractor: J'hienenran Construction, lnc,
Subject: Shutdown I1 sludge removal allowance reconciliation. Revision 1 removed sales taxes
applied to Badger.
The following changes to the Contract are proposed:
SCOPE OF WORK: (attach and list supporting information as required)
1. Item: TCI — See attached cost breakdown - $1,854.74
2. Item: Badger — See attached cost breakdown - $4,749.18
JUSTIFICATION:
1. Item: Owner request
CHANGES IN CONTRACT PRICE AND CONTRACT TIMES:
We propose that the Contract Price and Contract Times be changed as follows:
For Contract Price, when requested by Engineer, attach detailed cost breakdowns for Contractor and
Subcontractors, Supplier quotations, and other information required.
For the Contract Times, state increase, decrease, or no change to Contract Times for Substantial Completion,
readiness for finalpayment, and Milestones, if any. If increase or decrease, state specific number of days for changes
to the Contract Times.
Description
Amount
Contract Times (days)
Substantial
Final
1. Item — Direct Costs
$5,456
0
0
2. Item Marku s: 5%Subs / 15% TCI
$470
0
0
Total This Change Order Proposal
$6,926
0
0
Changes to Milestones if any: N/A
The adjustment proposed is the entire adjustment to the Contract to which the proposer believes it
is entitled as a result of the proposed change//.)
Change Order Proposal By: Craig Steele
Signature of Proposer:
CITY OF SOUTH BEND, INDIANA
W WTP SECONDARY TREATMENT IMPROVEMENTS
CITY PROJECT NO. 114-053
CHANGE ORDER PROPOSAL
Change Order Proposal No.: 114-053-102 Date: 12/4/17
Submitted in Response to Proposal Request No.:
Contract Name and No.: 114-053 South Bend WWTP Secondary Treatment Improvements
Contractor: Thieneman Construction, Inc,
Subject: Remove AT] 24in valve and replace with a blind flange provided by the owner.
The following changes to the Contract are proposed:
SCOPE OF WORK: (attach and list supporting information as required)
1, Item: TCl — See attached cost breakdown - $3,912.12
2. Item: — See attached cost breakdown - $0
JUSTIFICATION:
1, Item: Owner request
CHANGES IN CONTRACT PRICE AND CONTRACT TIMES:
We propose that the Contract Price and Contract Times be changed as follows:
For Contract Price, when requested by .Engineer, attach detailed cost breakdowns for Contractor and
Subcontractors, Supplier quotations, and other information required.
.For the Contract Tunes, state increase, decrease, or no change to Contract Times for Substantial Completion,
readiness for final payment, and Milestones, ifany. If increase or decrease, state specific number ofdays far changes
to the Contract Times.
Description
Amount
Contract Times (days)
Substantial
Final
1. Item — Direct Costs
$3,912
0
0
2, Item — Markups: 5% Subs 1 15% TC1
$559
0
0
Total This Change Order Pro osal
$4,471
0
0
Changes to Milestones if any: NIA
The adjustment proposed is the entire adjustment to the Contract to which the proposer believes it
is entitled as a result of the proposed change)
Change Order Proposal By:
Signature of Proposer:
.T.HIENEMAN CCNST UCTIQN, INC.
EXTRA WORK ORDER
JOB NAME: rn,aDATE1 � -
DESCRIPTION'
�. �rr rr i.t . tr, lot
.AI)THORIZEO SIGNATURE THIENEMAN BICNATURE
PRINTED NAME i COMPANY
PIRfItD NAME 1 POSITION
1=VJn.hn�
CITY OF SOUTH BEND, INDIANA
WWTP SECONDARY TREATMENT IMPROVEMENTS
CITY PROJECT NO. 114-053
Change Order Proposal No.: 114-053-103 Date: 11/9/17
Submitted in Response to Proposal Request No.:
Contract Name and No,-, 114-053 South Bond WWTP Secondary Treatment Improvements
Contractor, Tbieneman Construction,, Inc.
Subject: Correct Owner Change Order #15 typo in the amount of ($30).
The following changes to the Contract are proposed:
SCOPE OF WORK: (attach and list supporting information as required)
1. Item: TC1 — See attached cost breakdown — ($30.00)
2. Item:
JUSTIFICATION:
1. Item: Owner request
CHANGES IN CONTRACT PRICE AND CONTRACT TIMES:
We propose that the Contract Price and Contract Times be changed as follows:
For Contract Price, when requested by Engineer, attach detailed cost breakdowns for Contractor and
Subcontractors, Supplier quotations, and other information required.
For the Contract Times, state increase, decrease, or no change to Contract Times for Substantial Completion,
readiness formal payment, and Milestones, i(any, If increase or decrease, state specific number ofdays for changes
to the Contract Times.
Contract Times (days)
Description
Amount
Substantial
Final
1 . Item — Direct Costs
0
0
2. !1Tte1mRZ—JMnarMk2s: 5% Subs / 15% TO
-Mq).
$0
0
0
Total This Chart g, Order P:T_qsal
0
Changes to Milestones if any: N/A
The adjustment proposed is the entire adjustment to the Contract to which the proposer believes it
is entitled as a result of the proposed change,,
Change Order Proposal By: Craig Steele
Signature of Proposer:
CITY OF SOUTH BEND, INDIANA
WWTP SECONDARY TREATMENT IMPROVEMENTS
CITY PROJECT NO. 114-053
CHANGE ORDER PROPOSAL
Change Order Proposal No.: 114-053-104 Date- 11/9/17
Submitted in Response to Proposal Request No.:
Contract Name and No.: 114-053 South Bend WWTII Secon� Jur3LTI-Catlnent I In prgygnoj�
Contractor: Th icneman Constr
Subject: Credit for link sea] previously included in PCO #12.
The following changes to the Contract are proposed:
SCOPE OF WORK: (attach and list supporting information as required)
1. Item: TCI — See attached cost breakdown — ($2,856.28)
2. Item;
JUSTIFICATION:
1. Item: Owner request
CHANGES IN CONTRACT PRICE AND CONTRACT TIMES:
We propose that the Contract Price and Contract Times be changed as follows:
For Contract Price, when requested by Engineer, attach detailed cost breakdowns for Contractor and
Subcontractors, Supplier quotations, and other information required
For the Contract Times, state increase, decrease, or no change to Contract Times for Substantial Completion,
readinessforfinal paym e nt, and Milestones, ifa qy: If incre ase or decrease, state specific number 0fdaysfor changes
to the Contract Times.
Changes to Milestones if any: N/A
The adjustment proposed is the entire adjustment to the Contract to which the proposer believes it
is entitled as a result of the proposed cha e,
Change Order Proposal By: (:r St, A
Signature of Proposer:
t'LIICING StlVIA'
_
I
i PAGE 1
3.
Or• I '.PAGES
NAME WO I OR CONTRACTOR
South Bend STJ Project iArcadis
{jl ..
LOCA NEON; 11 PLOP WORK:
South Bend NVWTP )IC0 912 Link Seal Credit
ESTIA4ATED BY. Cmig Steele PRICED BY; 4 } nl wlxm BY;
..........
JCHFCKED BY ! DATE:
C'JS iL'J.S ._
CJS 11/9/2017
LABOR! EQUIP
MATERIAL
SCRIPTION QUAN. UNIT UNITS "TOTAL DE
UNITS i'Oi'Al. SUB TOTAL
IICO 412 Link Seal Credit j
iLink Seal - 55 (aver sizes! (of 22" cores} -8 CEA E S
1
IS 350,0D_
....
S (2,800,00) ($2,8DU 00)
i
Cmnrncl Mnhn�orHR S 19D.D0 $
!'ro`u�t Mnnh er .LER ' S I25,40
j 8 _
....
I _..
I R 110,00 S
I'inidri'ntuie�lr..
$ THR 1 $ 75.00 . $
....
d
;
_
1
Projm CooMinator HR ! $ 56.60 i $
PRICING SIWrf
PAG
!
'C31°�
I'AU1:5
AR'I LORCON17{MAOR:
South 1kold STI Project
ATcahIS
1
I'VI'I i)F WORK:
Suulh Bend W WTP
Replace Air Pilling with New DI
Piping
lsi'l,MATED IRV. Mark Hull
PRI{'i.i) IiY.
EXTENDED BY:
(.-IIL<:KI'.D
BY 13h'I'li:
Ally
Ail;2712016
.AW ±tiU. 11,
IsIA1CRIA.,
DESCRIPTION
OUAN. UNIT
UNITS TOTAL
iNl75
TOTAL SUB
TOTAL
Ilynrnphl!]s: wntar>,cop
64 TV
S
500
`.$-
i 000 -
$320_(H1
6liply xyp— slurry ro Co—d mole
8 ,1 f3
$
IS,00
S
120.04k
Sl2U.thl
Farr- end Plnco Gzuul Around W,111 Pip-
8 'Lti
$
,35.00
5
20,clo
S'+80.Ik1
Plr+n t'-6^ Lunq - 1719 x PE
8'I:A
5
1YZ71
.5
21 vii
%2,*Ala
45 ]tend - i1q ld
8 I:A
5
)22 i8
; s
.;582"24
$2,582.24
37271
.5
bB
45 Bend - Fiy'd
0 �lA
-
S
)32711
S
258224 . -
- SX5822•1
li'E eir,v W-G"
B LA
5
65485
S
S,478,0
$$,4780fi.
F}C'riC Y-:r, 4Ja11 Pipe 1'-0" oA
B .hA
- S
1,30000
5
lVel(H).00
S10,400,00
-..
...
1W.1pip,. log-o" -
....E ....
8 liA
..
5
771.04
:
::S
6,ib812
..
S6,Ifi8.I
Lit", seal - ss (over sized Ear zz" core(
$ FA
$
150,00;.5
2,lS{10,(8F
5200.0i
xvUnr..hrnuneL siarvr.
-
- ..... ...
g. y,A
-5
405 0n
5
3 2-10,RC1
53 24f1.4iU
tiltfipc 6'-n"
8 VAS
705.G0
5
5,644:StR
S5,644.8(s
lirem=±:r cuul,l l,{is
161A
S
398;(Hl
.-$
6308.06
563E&:0A
iron Secs
48 SEA
s
96.0o
'S
VftC0
$4'608,00
Freight 01P
I I5
$
I,G00.Ou
5
I,00000
51,000,0:1
sdall Sleeve c 59 I.irEY. ss•el nt Diaider Wall
8 1:r1
s
375.00
5
3�000.00 -
' Testing
8 'EA
$
3«7bp
S
2,61400
52,416ac1
('alpcnlcr Foreman
`EIR
$ 79.70
Carperucf
HR
0,70
laborer Foreman
464.8 'HR
s st;,07 S 26,990.94
06,9li);94
Laborer
880.$ 'HR
$ -im 62 $ 42,824 50
57«.82'f 5fi
Clone Operaror
HIl
$ 76.2 S
Oparalor.
40'HR
a 73.17$ 1,{tE•{'8iI'
$3,01480
('nlisher Fnlcnlau
HR
s '19,88
€nislier
HR
S 47.'Al
(Ii:lmie It Foreman
1111
S 71.12
Mldwrr8hl
liR
S { 7 xii
Dlunlitt
40 `DAY
S 1U0,4V `S 4,(Hxinil
$4,000W
1: rL.Ilit
4U DAY
S $10.00 S. 4,•SIX1tIU
4.0 Backlloe
4 bAY
5 876;oo s ),mm 60
3),Spa 6o
}url
2 `i-5
S 42r1(8i $ 1840'00
$84000
1'rnjcg.mnn;1Ssi
i2 Illt
5 125,00 5 1,5{81,00
S1,llltl;iil7
supgrinit'niicra
it; IIR
S 110,00 s 1,740,04)
SI7l{tAl1)
field LnBincer
16 EIIN
5 75 IA.) 5 no
$750Fj0
VikljcctCtuodirlmoj
jIlit.
S 5000 . S mw.,Ni
530000
Sublr=1nl' sm),R-1:27
Snbinlalc
563,291.76
` t'18 775.9(1
OH
& Profil Do Labol ¢Ild Afalanul 1)5.%),
'
5rnalf'I'ovls ()°'bi,
54r463.2R
IWO1NO,
$I,53239
lmoriiIN',C{IT✓el
$11,54772
TOTAL Adds
5156,319.38
NET CHANGE
S156,319.38
CHANGE ORDER REQUEST
$156,319.00
ADDITIONAL CONTRACT TIME,:
56 Calendtir Days