HomeMy WebLinkAboutOpening of Bids - Old Clay Utilities Sewer Lining Proj No 117-087 - HRP Construction IncU Tit 0A C F� 1865 Project Name Old Clay Utilities Sewer Lining Project No. 117-087 For Bids Due December 19,2017 at 9:00 a.m. Local Time PART I (Must be completed for all bids. Please type or print) 12/19/17 Bidder (Firm): HRP CONSTRUCTION INC. Address: 5777 Cleveland Road, P.O. Box 266 City/State/Zip: South Bend, IN 46624 Telephone Number: ( 574 271-7800 Agent of Bidder (if Applicable): Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of: Old Clay Utilities Sewer Lining the Citv of South Bend, Indiana, in accordance with t p1aqsAqq d specifications prepared _ Department of Public Works Division of Engineering and dated December 2017 for the sum of (enter the Total Bid as shown on the Proposal) See Attached ($ (Enter sum: of Total Base Bid plus Alternates shown on Proposal) (Numerical) The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in the notice of the Ietting. If alternative bids apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the City of South Bend. If th—(!.-� is to be awarded on a unit :0 basis, the itemization of the units shall be show epar att By Matthew D. Cain, President (Pr1nted Name of Person Sigining) ACCEPTANCE The above bid is accepted this day of Subject to the following conditions: BOARD OF PUBLIC WORKS Gary A. Gilot, President Elizabeth A. Maradik, Member James A. Mueller, Member Suzanna M. Fritzberg, Member Therese J. Dorau, Member Attest: Linda M. Martin, Clerk Version 10/17/2017 Contractor's Bid for Public Works - 2 RT171MMM"T Project No. BIDIPROPOSAL CITY OF SOUTH BEND Old Clay Utilities Sewer Lining 117-087 December 19, 2017 at 9:00 a.m. Local Time Item No. Description Quantity Unit Unit Price Total Amount 1 Maintenance of Traffic 1 LS 2 Mobilization and Demobilization 1 LS �3 1)410. 3 Sanitary Sewer, 24" 90 LF 30. e9e) Y-), r-)I-) 4 Sanitary Manhole 2 EA 00 00, 00 5 Horizontal Directional Drilling and Piping 1 LS 17, C)ov'eyj 7cwe) , e) —o 6 Manhole Rehab ifitation, (ClayC00040) 1 LS 766, oe -7150, 6) 0 7 30" Pipe Rehabilitation (ClayC00040- ClayC00035) 170 LFT 4,1 q r e. 2-11, 44 Af), oo 8 Manhole Rehabilitation (ClayCO0040) 1 LS 6(), k, 7,-7,0, o 4) 9 Pipe Plug 2 EA R'so, - '-/ c)o' 0c) BASE BID TOTAL l e0 Bidder (Firm): HRP CONSTRUCTION INC. Address: 5777 Cleveland Road, P.O. Box 266 Telephone City/State/Zip: South Bend, IN 46624 Number: r-U..), 27.1_24PO (Signature) Matthew D. Cain, President (Printed Name of Person Signing) Version 3120/2017 Contractor's Bid for Public Works - 16 Addendum No.1 12/18/2017 08:38 HRP Construction fAX)574 2710524 Q�gotFTli g�M a �tt ., . FWACT . 1316 Cowry -CITY BU[LDINO SOUTH BEND PETS BUTTIolEG, PHONE 574/235.9231 227 W. JEFFERSON BOULEVARD FAA S74/ 235.9171 SOUTH BFND, INDIANA 46601.1830 OARD OF PUBLIC WORK grin 574/ 235-5567 Date: December 15, 2017 To: All Bidders From Linda M. Martin, Clerk Board of Public Works Subject Addendum Number: 1 Project Name: Old Clay Utilities Sewer Lining Project „ _.....,.,...., Number: 117-087 ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM Date Received: This addendum is being forwarded to you for the above referenced project. Please sign below and acknowledge receipt of this Addendum by faxing this sheet to the Board of Public Works at (574) 235-9171. A copy MUST also be included with your bid package upon submittal. THIS ADDENDUM MAY AFFECT YOUR. BID. Note: The attached documents are hereby added to the Specifications and Contract Documents and become a part of herein. Authorized Signature: Date: 1A // P / 1'7 Version 4/07/2015 Special Provisions A P.0011001 : I : 0 1 1 CONTRACTOR; SURETY: (Name, legal status and address) (Name, legal status and principal place HRP Construction Inc. of business) P.O. Box 266 Fidelity and Deposit Company of Maryland This document has important legal South Bend, IN 46624-0266 Baltimore, NM consequences. Consultation with OWNER: an attorney is encouraged with (Name, legal status and address) respect to its completion or City of South Bend Board of Public Works modification. County -City Building Room 1316, 227 West Jefferson Blvd Any singular reference to South Bend, IN 46601 Contractor, Surety, Owner or BOW AMOUNT: other party shall be considered Five Percent of the Total Bid 5% of Total Bid plural where applicable. PROJECT: (Name, location or address, and Project number, if any) Old Clay Utilities Sewer Lining; Project No, 117-087 The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, as provided herein. The conditions of this Bond are such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents, or within such time period as may be agreed to by the Owner and Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with the terms of such bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted in the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof, or (2) pays to the Owner the difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount for which the Owner may in good faith contract with another party to perform the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect, The Surety hereby waives any notice of an agreement between the Owner and Contractor to extend the time in which the Owner may accept the bid. Waiver of notice by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time for acceptance of bids specified in the bid documents, and the Owner and Contractor shall obtain the Surety's consent for an extension beyond sixty (60) days. If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor. When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the Project, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. When so furnished, the intent is that this Bond shall be construed as a statutory bond and not as a common law bond. Signed and sealed this I Ith day of (Witness) Nancy Kng_; Ik , Sec/Treasurer � I (Title) (Surety) (Witness (Title),j CAUTIOW You should sign art or,iglnaf AlA Contract Docurnent, on changes will not The obscUred. (Seal) (Seal) L, Kagznid, Attorney in Fact Ods text appearr. in RED, An odginal assuires Omit AIA Document A31 OTM — 2010. Copyright 01963, 1970 and 2010 by The AmeridaKinstitute of Architects. All rights reserved. WAIRNINQ This MAO Init. Doournont N protected by U& copyright Law and intemationW TveaUes. Unatahorized ireprodtiction or dWributlon ofthIs Ne Document, or arly poirflon of It, may resullt Lin severe, 60 and cirknhiall penRlUes, and wHI be prosiocu4ed W the maxhnurn extent lsossVe under the law. Purchasers are permitted to reproduce ten (10) coples of Ws document when completed. To report copyright vWations of AIA Contract Documents, e-malf The American Institute of Architects' legal counsel, copydght@aia.org. 061110 ZURICH AMERICAN INSURANCE COMPANY COLONIAL AMERICAN CASUALTY AND SURETY COMPANY FIDELITY AND DEPOSIT COMPANY OF MARYLAND POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That the ZURICH AMERICAN INSURANCE COMPANY, a corporation of the State of New York, the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, a corporation of the State of Maryland, and the FIDELITY AND DEPOSIT COMPANY OF MARYLAND a corporation of the State of Maryland (herein collectively called the "Companies"), by MICHAEL BOND, Vice President, in pursuance of authority granted by Article V, Section 8, of the By -Laws of said Companies, which are set forth on the reverse side hereof and are hereby certified to be in full force and effect on the date hereof, do hereby nominate, constitute, and appoint Barbara E. PEARSON, Nicole L. BICKNELL, Mark E. WOBBE, Debra K. HULL, Jennifer L. KASZNIA, William J. CERNEY, III, Theresa M. BURNS and Megan E. RIESENBERG, all of South Bend, Indiana, EACH its true and lawful agent and Attorney -in -Fact, to make, execute, seal and deliver, for, and on its behalf as surety, and as its act and deed: any and all bonds and undertakings, and the execution of such bonds or undertakings in pursuance of these presents, shall be as binding upon said Companies, as fully and amply, to all intents and purposes, as if they had been duly executed and acknowledged by the regularly elected officers of the ZURICH AMERICAN INSURANCE COMPANY at its office in New York, New York., the regularly elected officers of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at its office in Owings Mills, Maryland., and the regularly elected officers of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at its office in Owings Mills, Maryland., in their own proper persons. The said Vice President does hereby certify that the extract set forth on the reverse side hereof is a true copy of Article V, Section 8, of the By -Laws of said Companies, and is now in force. IN WITNESS WHEREOF, the said Vice -President has hereunto subscribed his/her names and affixed the Corporate Seals of the said ZURICH AMERICAN INSURANCE COMPANY, COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, and FIDELITY AND DEPOSIT COMPANY OF MARYLAND, this 23rd day of October, A.D. 2017. ATTEST: .�. Secretary Michael McKibben ZURICH AMERICAN INSURANCE COMPANY COLONIAL AMERICAN CASUALTY AND SURETY COMPANY FIDELITY AND DEPOSIT COMPANY OF MARYLAND e 4 s G � 04-1.2 Vice President Michael Bond State of Maryland County of Baltimore On this 23rd day of October, A.D. 2017, before the subscriber, a Notary Public of the State of Maryland, duly commissioned and qualified, MICHAEL BOND, Vice President, and MICHAEL NICKIBBEN, Secretary, of the Companies, to me personally known to be the individuals and officers described in and who executed the preceding instrument, and acknowledged the execution of same, and being by me duly sworn, deposeth and saith, that he/she is the said officer of the Company aforesaid, and that the seals affixed to the preceding instrument are the Corporate Seals of said Companies, and that the said Corporate Seals and the signature as such officer were duly affixed and subscribed to the said instrument by the authority and direction of the. said Corporations. IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed my Official Seal the day and year first above written. Constance A. Dunn, Notary Public My Commission Expires: July 9, 2019 POA-F 044-4495 EXTRACT FROM BY-LAWS OF THE COMPANIES "Article V, Section 8, Attorneys -in -Fact. The Chief Executive Officer, the President, or any Executive Vice President or Vice President may, by written instrument under the attested corporate seal, appoint attorneys -in -fact with authority to execute bonds, policies, recognizances, stipulations, undertakings, or other like instruments on behalf of the Company, and may authorize any officer or any such attorney -in -fact to affix the corporate seal thereto; and may with or without cause modify of revoke any such appointment or authority at any time." CERTIFICATE 1, the undersigned, Vice President of the ZURICH AMERICAN INSURANCE COMPANY, the COLONIAL, AMERICAN CASUAI.,"I'Y AND SURETY COMPANY, and the FIDELITY AND DEPOSIT COMPANY OF MA.RYI.,AND, do hereby certify that file foregoing Power of Attorney is still in full force and effect on the date of this certificatc; and I do further certify that Article V, Section 8, of the By -Laws of the Companies is still in force" This Power of Attorney and Certificate may be signed by facsimile under and by authority of the following resolution of the Board of Directors of the ZURICH AMERICAN INSURANCE COMPANY at a meeting duly called and held on the 15th day of December 1998, RESOLVED: "That the signature of the President or a Vice President and the attesting signature of a Secretary or an Assistant Secretary and the Seal of the Company may be affixed by facsimile on any Power of Attorney...Any such Power or any certificate thereof bcaring such facsimile signature and seal shall be valid and binding on the Company." This Power of Attorney and Certificate may be signed by facsimile under and by authority of the following resolution of the Board of Directors of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at a meeting duly called and held on the 5th day of May, 1994, and the following resolution of the Board of Directors of the FIDELffY AND DEPOSIT COMPANY OF MARYLAND at a. meeting duly called and held on the I Oth day of May, 1990. RESOLVED: "That the facsimile or mechanically reproduced seal of the company and facsimile or mechanically reproduced signature of any Vice -President, Secretary, or Assistant Secretary of the Company, whether made heretofore or herealer, wherever appearing upon a certified copy of any power of attorney issued by the Company, shall be valid and binding upon the Company with the same farce and effect as though manually affixed. 1N TESTIMONY WHEREOF, I have hereunto subscribed my name and affixed the corporate seats of the said Companies, this 1' day of n�1L2a " t 20 — EAL �'"iron �:r,�+•°"+ k� David McVicker, Mice President TO REPORT A CLAIM WITH REGARD TO A SURETY BOND, PLEASE SUBMIT ALL REQUIRED INFORMATION TO: Zurich American Insurance Co, Attn: Surety Claims 1299 Zurich Way Schaumburg, IL 60196-1056 CITY OF SOUTH BEiND, INDIANA CONTRACTOR'S BID FOR PUBLIC WOR CHECKLIST FOR BIDDERS I Project Name Project No. For Bids Due Old Clay Utilities Sewer Lining 117-087 December 19, 2017 at 9:00 a.m. Local Time From time to time the South Bend Board of Public Works finds it necessary to reject a bid because it does not comply with statutory requirements. In preparing your bid, Please use the following checklist in order to make sure that your bid is done in the proper manner. Proper bid security included. The bidder has the option of providing either a Certified Check or Bid Bond. Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely executed. Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments With Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and Certification of use of United States Steel Products or Foundry Products. Proof of MBE/WBE Participation Goal Form [MWBE-1 .0]. If minimum participation goal is not met, also provide Evidence of Good Faith Efforts Form [MWBE-2,O] and MBEIWBE Contacted Form [MWBE-2.1]. Acknowledge Receipt of 1 Addendum(s) included with the bid. All required additional information is included with the bid. Proposal statements and other affidavits all signed by the proper party with name either printed or typed underneath signature. ,,/" This checklist submitted with the Bid. This checklist is provided for bidder's use in assuring compliance with required documentation; however, it does not include all specifications requirements and does not relieve the bidder of the need to read and comply with the specifications. Bidder: HRP CONSTRUCTION INC. By Authorized Signature: Print Name & Title: IMatthew D. Cain, President Version 10/17/2017 Contractor's Bid for Public Works - 1 Date: 12/1 '9/1 7 PART II (For projects of $100,000 or more — IC 36-1-12-4) These statements to be submitted under oath by each bidder with and as part of his bid. Attach additional pages for each section as needed. SECTION I EXPERIENCE QUESTIONNAIRE 1. Attach information regarding projects your organization has completed for the period of one (1) year prior to the date of the current bid. 2. Attach a listing of public works projects currently in process of construction by your organization. 3. Attach information regarding any failure to complete any work awarded to you and the location thereof. 4. Attach references from private firms for which you have performed work. SECTION 11 PLAN AND EQUIPMENT QUESTIONNAIRE 1. Attach an explanation of your plan or layout for performing proposed work. (Examples could include a narrative of when you could begin work, complete the project, number of workers, etc. and any other information which you believe would enable the City of South Bend to consider your bid.) 2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside your own firm who have performed part of the work) that you have used on public works projects during the past five (5) years along with a brief description of the work done by each subcontractor. 3. If you intend to sublet any portion of the work, attach the name and address of each subcontractor, equipment to be used by the subcontractor, and whether you will require a bond. However, if you are unable to currently provide a listing, please understand a listing must be provided prior to contract approval. Until the completion of the proposed project, you are under a continuing obligation to immediately notify the City of South Bend in the event that you subsequently determine that you will use a subcontractor on the proposed project. 4. Attach a listing of equipment you have available to use for the proposed project. Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing your proposal? If not, attach an explanation for the rationale used which would corroborate the prices listed. SECTION III CONTRACTOR'S FINANCIAL STATEMENT Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial statement as required by statute shall thereby be rendered invalid. The financial statement provided hereunder to the City of South Bend awarding the contract must be specific enough in detail so that said City of South Bend can make a proper determination of the bidder's capability for completing the project if awarded. Version 10/17/2017 Contractor's Bid for Public Works - 3 When the prospective Contractor is rumble to certify to any of the statements below, it shall attach an explanation to this Affrdak CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON- DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (Must be completed for all quotes and bids. Please type or print) STATEOF Indiana ) ) SS: St;. Joseph COUNTY ) The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that: 1. Contractor has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with ...anyperson relative to. the price to be bid by anyone at such. letting. nor to prevent any person. from bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. a. For purposes of this Certification, "Iran" means the government of Iran and any agency or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from time -to -time. b. As provided by Ind. Code § 5-22-16.5-5, as amended from time -to -time, a Contractor is engaged in investment activities in Iran if either: i. Contractor, its successor or its affiliate, provides goods or services of twenty million dollars ($20,000,000) or more in value in the energy sector of Iran; or ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for forty-five (45) days or more, if that person will (i) use the credit to provides goods and services in the energy sector in Iran; and (ii) at the time the financial institution extends credit, is a person identified on list published by the Indiana Department of Administration, Version 10/17/2017 Contractor's Bid for Public Works - 4 4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently learns is an unauthorized alien. Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's documentation of enrollment and participation in the E-Verify Program is included and attached as part of this bid/quote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees to maintain this certification throughout the term of the contract with the City of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. 6. Persons, partnerships, corporations, associations, or joint venturers awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of employment, or any matter directly or indirectly related to employment because of race, sex, religion, color, national origin, ancestry, age, gender expression, gender identity, sexual orientation or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions may consider the Contractor's good faith efforts to obtain participation by those Contractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder. In no event shall persons or entities seeking the award of a City contract be required to award a subcontract to an MBE/WBE; however, it may not unlawfully discriminate against said WBE/MB). A finding of a discriminatory practice by the City's MBE/WBE Utilization Board shall prohibit that person or entity from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact for which the discriminatory practice or noncompliance pertains. 7. The undersigned contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. I, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1).1 hereby certify that I and all subcontractors employed by me for this project will use steel products or foundry products made in the United States on this project if awarded. I understand I have an affirmative duty to notify the City in my bid that my proposal does not include the use of steel products or foundry products made in the United States. I understand it is my sole obligation and responsibility to provide ajustifcation to the City, subject to review and approval, why the cost of United States made steel or foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry products made in the United States, the City, through its director of public works, shall make a determination if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder Version 10/17/2017 Contractor's Bid for Public Works - 5 may result in forfeiture of contractual payments. I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public works are true and correct. Dated this 1 9 t h day of Dec 20 17 HRP CONSTRUCTION INC. Signature of Contractor/Bidder or Its Agent Matthew D. Cain, President Printed Name and Title Subscribed and sworn to before me this 19th day of Dec. _,20 17 My Commission Expires 3/6/ 2 4 Notary�rubii'c / Cindy Vanheste County of Residence St. Joseph Version 10/17/2017 Contractor's Bid for Public Works - 6 9 a z Db (D C0 C: 17 CL —I-, z 0) E3 (D 9. CL CL cx cDa UI O cu cu w co IM -10 O (D D CID =r to 0 'oC) 0 CD 0 CL(D r :�E CID Cy ;3 (D CL ID CO0 CL M ar En CID m O Ca CD R (D 0-,9 o :3 'o 0 (h CID I -0 —0. z I-i o ;:; -1 in Co =r o L (D 0 cr Cr j3 CS U) 0 (D U) 0 M a 0 :3 CL (D y) q a V 0 < m CID CL ::r (n (D l< r4l (D R. o = 0 0 — o 0 0 0 U3 (D r r a U). -u _.._CID ID (1) U) 0 9 * (D 0 (D Dd + U) 0 Lin h m 0 ICU im 0 0 0 9 z 0 ;u z m 0 3: 0 n Z m m 1000 0 m cu 0 a -n > MW cn — X Z-1 m r- o z :� tv , cnin -1 cam -= () m ou > G) Z m 1 X z a CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY DEVELOPMENT PROGRAM ITMp FORM MWBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS This completed form should be included as part of the Bids documents related to City of South Bond Public Works Projects requiring Good Faith Efforts to obtain, IMBEMBE participation. It is the bidder's sole responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority or Women's owned business as defined by the Indiana Department of Administration (NDOA"). Project Number: Project Name: Bidder: Contact Person: Address: City: Email: 117-087 Old_Clay Utilities Sewer Lining HRP CONSTRUCTION INC. Date: 12/19/17 Matthew D_.Cain, President _ Telephone: (574) 271-7800 5777 Cleveland Road, P.O. Box 266 South Bend State: IN mattc@hrDconstruction.com To determine whether a bidder has demonstrated good faith efforts to reach the MBE/WBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below*: EVIDENCE OF GOOD FAITH EFFORTS MBEIWBE LIST(S): The bidder reviewed the City of South Bend's Minority and Women Business Enterprise Diversity Development Program, which uses the IDOA approved list of Minority and Women Owned Business as found on their website (http://www.in.gov/idoa). ACTION (ADVERTISEICONTACT): In order for your bid to be deemedresponsive, the City of South Bend requires that all perspective bidders complete no less than 2 of the following: Attend all pre -bid meetings scheduled by the City to inform MB,EANBEs of contracting and subcontracting opportunities. Advertise in general circulation and/or trade association publications concerning subcontracting opportunities, and allow MBE1WBEs reasonable time to respond. 3. Perform any and all necessary steps to provide written notice in a manner reasonably calculated to inform MBENVBEs of subcontracting opportunities and allowed sufficient time for them to participate effectively, 4. Utilize pre-existing services of available community organizations, small and/or disadvantaged business assistance offices and other organizations that provided assistance in the recruitment and placement of MBENVBE firms, "Bidder must circle or otherwise notate which of the two (2) required actions were performed. GOOD FAITH NEGOTIATIONS: The bidder negotiated In good faith with interested MBIEIWBEs, including providing such MBEANBE's with adequate information about the plans, specifications and other requirements of the subcontract and did not reject MBEANBEs as unqualified without sound business ✓ reasons based on a thorough, investigation of their capabilities. SMALL CONTRACT(S): The bidder selected specific portions of the work to be performed by MBEMBEs in order to increase the likelihood of meeting the MBEANBE goals (including: breaking down contracts into smaller units to facilitate MBEMBE participation) CONTRACT RECORDS: The bidder has maintained the following records for each MBEIWBE that has bid on the subcontracting opportunity: 1. Name, address, and telephone number; 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached. and if not, why not, including any reasons for concluding that the MB,ENVBE was unqualified to, parform the job. *Proper demonstration of Good Faith Effort requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Version 10117/2017 Contractor's Bid for Public Works - 9 CITY OF SOUTH BEND MINORITY AND AND WOMEN BUSINESS ENTERPRISE DIVERSITY <F% ,fh DEVELOPMENT PROGRAM ��1 Y11('Y ls_3• FORM MWBE-2.1 MBEIWBE CONTACTED This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring contacted MBEfWBE to obtain Good Faith Efforts. It is the bidder's sole responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority or Women's owned business. PAGE 1 OF Project Number: 117-087 MBENVBE Participation Goal I Project Name: Old Clay Utilities Sewer Lining Bidder: HRP CONSTRUCTION INC. By: President 12/19/17 (Signature) Matthew D . Cain, (Title) (Date) MBE/WBE Firm SEE ATTACHED Owner or Contact at MBEIWBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MBE/WBE FIRM: MBE/WBE Firm Owner or Contact at MBEIWBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MBEIWBE FIRM: Version 10/17/2017 Contractor's Bid for Public Works - 10 SECTION I EXPERIENCE QUESTIONNAIRE What public works projects has your organization completed for the period of one (1) year prior to the date of the current bid? When Contract Amount Class of Work Completed Name and Address of Owner 1,937,254.00 Utility &Excavation 2016 CSO 6 & 7 Storage and Pump Facility,Grand River Construction 3,460,410.00 UtilitylExcavation & Site Work 2016 Watson CSF Phase II, City of Mishawaka 2,031,349.00 Road & Utility Replacement 2016 Goshen 5' Street Phase ll, City of Goshen 4,036,839.00 Sewer/Tank Construction 2016 CSO 31 Storage Facility, City of Elkhart What public works projects are now in process of construction by your organization? When to be Contract Amount Class of Work Completed Name and Address of Owner 3,894,289.00 Water Main 2017 Monroe St., Logan St., WM Replacement, City of Goshen 1,701,438.00 Road & Utility 2017 4 St LTCP Improvements, City of Replacement Mishawaka 8,142,841.00 Combined Sewer 2018 Nappanee LTCP Div A, City of Nappanee 5,662,029.00 Storm/Sewer 2018 R-37480-A McKinley and Ash, INDOT 3. Have you ever failed to complete any work awarded to you? No If so, where and why? 4. List referenced from private firms for which you have performed work. Shiel Sexton: Indianapolis. IN JJ White Incorporated: Philadelphia, PA Edward Rose of Indiana,• Kalamazoo MI Skillman Corporation, Indianapolis, IN Pepper Construction; Dublin, OH __ HRP CONSTRUCTION INC. responses to SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE 1. Our intent would be to start the work after receiving a contract and Notice to Proceed per project documents. We would perform our work per a schedule approved by the owner and/or owner's representative. 2. A partial listing of subcontractors used in the past five (5) years. Further information will be submitted if deemed necessary. Asphalt and Concrete Brooks Construction E&B Paving Premium Concrete Pioneer Associates Rieth-Riley Construction Walsh & Kelly, Inc. Bores & Directional Drilling H&G Underground Utilities Lowe Construction Midwest Mole Electrical & Traffic Controls Bender Electric Current Electric J&J Electric of Indiana Michiana Construction State Barricading Traffic Control Specialists Hauling Bettcher Trucking J&R Trucking Nowacki Trucking Nowatzke Farms Trucking Radabaugh Truck Service V&R Trucking Landscaping Fuerbringer Landscaping Hydra-Tek Seeding Inc. Slusser's Green Thumb Acorn Landscaping Dewatering Contract Dewatering Service Griffin Dewatering Kelly Dewatering Mersino Dewatering 3. We do intend to sublet various portions of this work. However, at this time, we are not certain who the subcontractors would be. If we are awarded this contract, we would furnish you with the names of all subcontractors. 4. We intend to first use equipment from our fleet of fourteen excavators, eight front-end loaders, etc. To the extent necessary, we would rent, lease, or purchase any other equipment needed. 5. We have received offers for all materials within pricing used in preparing for bid. Crowe Horwathe INDEPENDENT AUDITOR'S DEPORT Board of Directors and Shareholder HRP Construction Inc. South Bend, Indiana Report on the Financial Statements Crowe Horwalh LLP Independent Member Crowe Homath Inlernallonal We have audited the accompanying balance sheet of HRP Construction Inc. as of December 31, 2016, and the related notes to the financial statement. Management's Responsibility for the Financial Statements Management is responsible for the preparation and fair presentation of this financial statement in accordance with accounting principles generally accepted in the United States of America; this includes the design, implementation, and maintenance of internal control relevant to the preparation and fair presentation of the financial statement that is free from material misstatement, whether due to fraud or error. Auditor's Responsibility Our responsibility is to express an opinion on the financial statement based on our audit. We conducted our audit in accordance with auditing standards generally accepted in the United States of America. Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statement is free from material misstatement. An audit involves performing procedures to obtain audit evidence about the amounts and disclosures in the financial statement. The procedures selected depend on the auditor's judgment, including the assessment of the risks of material misstatement of the financial statement, whether due to fraud or error. In making those risk assessments, the auditor considers internal control relevant to the entity's preparation and fair presentation of the financial statement in order to design audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the entity's Internal control. Accordingly, we,express no such opinion. An audit also includes evaluating the appropriateness of accounting policies used and the reasonableness of significant accounting estimates made by management, as well as evaluating the overall presentation of the financial statement. We believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis for our audit opinion. Opinion In our opinion, the financial statement referred to above presents fairly, in all material respects, the financial position of HRP Construction Inc. as of December 31, 2016, in accordance with accounting principles generally accepted in the United States of America. Crowe Horwath LLP South Bend, Indiana April 3, 2017 HRP CONSTRUCTIOW EXCAVATING•SEWERS•WATERMAINS 9, LSE Of 'Sezvies» REQUEST FOR QUOTE FROM: Jeff Wells PHONE: 574-271-7800 EMAIL: L'effw hrpconstruction.com FAX: 574-271-0524 Please quote any work in your field associated with the following project. PROJECT: TYPE OF PROJECT: LOCATION: ENGJARCH: QUOTES DUE: BIDS: Old Cla Sewer Utilities Sewer Lining Rehabilitate existing sewer line South Bend, IN Address questions before 12/14/17 at 4:30 pm to Sue Ellen Doudrick, South Bend Engineering, sdoudric@southbendin.gov Monda , December 18 by 10:00 AM December 19, 2017 Plans and specs may be downloaded from Dropbox. Click HERE for access, or call/email our office for download instructions. DBE 1 WBE 1 MBE participation is encouraged Notes/Comments: Please review Special Provisions Section XXI starting on Page 17 of the Specs, Also, review the 117-087 color Fiaure 1. List of Bid Items attached. IF YOU ARE RECEIVING THIS RFQ VIA FAX AND WOULD PREFER EMAIL, PLEASE INDICATE YOUR EMAIL ADDRESS BELOW PLEASE COMPLETE INFORMATION BELOW AND FAX OR EMAIL BACK ASAP. COMPANY: PHONE: CONTACT: FAX: EMAIL: ❑ We plan on bidding the following on this project: Please provide a scope sheet as soon as possible. We will NOT be bidding on this project. We are a state qualified ❑ MBE ❑ WBE ❑ DBE Shipping: 5777 Cleveland Road South Bend, W 46628-9418 Phone 574-271-7800 Mailing: P.O. Box 266 South Bend, IN 46624-0266 FAX 574-271-0524 Old Clay Utilities RFQ Tracking 12/12/2017 D M -WsiWs COMPANY PHONE BBB EE`E Abonmarche Consultants, Inc. __._. _ . 574-232-8700 Aco€n Landscaping 574-288-6950 'AWP Area Wide Protective 269-683-1499 Bertsch -Frank & Associates, LLC 260-459-9393 I Conco Spray Solutions, LLC 317-428-6543 Contech Engineered Solutions 800 338 1122 Contract Dewatering Service 616-642-9415 Care &Main 574-231-8739 L..,.. , I C-Tech Corporation 317-835-2745 DBL Services 574-968-2028 Dewind Dewatering, Inc. _. 616-875 7580 DiCicco Concrete 708-754-5691 I I Dyer Vault Co., Inc 219-865-2521 I Earth Images, Inc. 800-325-2543 Ferguson Waterworks 574-282 2323 Fuerbringer Landscaping 574-271 9714 I Global Land Surveying, LLC 219-872-4444 :Godwin Pumps (Xylem) 708-889-1560 Great Lakes Property Maintenance 574-257-8002 Griffin Dewatering 219-931 1662 Hard Rock HDD 517-764-6020 I , Highway Safety Service, Inc. 765-474-1000 Highway Technologies 317-891-8065 IMI Irving Materials 260-356-7214 I I ;Indiana Sign & Barricade 317-377-8000 ;Inland Waters Pollution Control, Inc. 313-899-3014 Insituform Technologies, Inc. 317-408-7136 ,lames H. Drew Corporation 317-876-3739 JPR Jones Petrie Rafinski Corp 574-232 4388 i Karen Haan, Inc. 260-740-8876 KC Tree, Inc. 574-674-7722 3 Kelley Dewatering & Construction Co. 616-538-8010 Klink Trucking, Inc 574-287-9000 Layne Inliner, LLC 812-865-3232 Liquil orce Services Inc. 734-231-6691 Lowe Construction Co. 517-529-9406 ;Lowell Concrete Products 219-696-3339 MacAllister Underground Shoring 317-875-7867 Marbach Palm Inc. (aka Palm & Assoc) 574-654-3450 Mersino Dewatering 865 637-7466 Michiana Aggregates Inc ! 269-695-7669 Mi-Con (Michels U.S.) 920-583-3132 !Midwest Mole 317-545-1335 FAX Email 574-251-4440 : mrozvcki(o)abonmarche.com 574-289-1096 j_effritschard(cDyahoo.com; l'g318@sbcglobal.net 269-683-1494 tandreottiO)awptraffic.com 260-459-9303 - mbertsch(a)bertschfrank.com 888-791-2220 ihool2@concosi)ray.com 513-645 7865 : CMiskowicz@conteches.com, 616-642-9909 574-231-8794 dan,traeger@coreandmain.com 317-835-2781 dshenaood@c-techinc.net 574-255-8406 dave@dbiservicesinc.com 616-875 7334 chad(@clewindonepass.com 708-754-5132 lgalvan aOdiciccoconcrete.com 219-865-1505 graciadyervaultQsbcglobal.net 317-885-1529 davidsc@earthimagesino.com; laurayurs@gmail.com . 574-287-9523 iohn.walterPfemuson.com 574-271-2861 jamie@fuerbringerlandscaping.com 219-879-9920 708-889-1561 perre.krizanekOxylemine.com gIpm247(&hotmail come 219-931 7877 , hardrockhdd(abahoo.com mike.madric1Phss-mmco.com 317-891 8248 260-356 6032 kim.coffield0_jrvmat.com 317-377-8008 ; kfaulkner@IndianaSB.com 313-899-3011 mirish teami r.com 317-489-3872 ; iferguson@aegion.com E.574-232-4333 , _ kbowman@jarlsource.com 260-435-1617 : khaaninc(ofrontier.com 574-674-7721 kannon .kctree.com E 616- 538-0708 574-287-2300 NShanahan@klinktrucking.com 612-865-3075 tvson,crandall(a)lavne.com 724-955-2508 ; hspurlino _ liqui€orce.com 517-529-4504 scott@lowecon.net 219-696 3937 le 9Qamsn.com macallister.com mikesix@macallister.com dbolles(a)marbach.us 219-210-3385 chuck ramirezna mersino.com 269-695-1229 ;Midwest Tile & Concrete Products 260-749-5173 :Midwestern Electric 219-397-4444 'Milestone Fence 574-259 3101 Moretrench ',Neenah Foundry 317-875-7245 Nicholson Construction Co. 412-221-4500 Northern .concrete Pipe Inc 989-892 3545 Phoenix Services 219-787-0010 Pipevision Products, Inc. 815 220-1919 -- I :Premium Concrete Services, Inc. 574-264-0196 ;Precision Boring, Inc 847-782-0672 i Rain for Rent 815-744-3947 Rieth-Riley Construction 574-288-8321 RoadSafe Traffic Systems 765-471-8891 Robert Henry Corporation 574-232 2091 S & S Directional Boring, Ltd 419-630-0726 ihockber@michels.us 317-545-1558 ': landesk midwestmole.com; info(a7midwestmole.com 260-493-2477 ; natha nhart(amidwestti le. net 219-397-8888 '; rwerth@midwesternelectricinc.com 574-259-3104 admin@milestonefence.com sjaques@moretrench.com 317-875-8637 ; ason.bMon@neenahenterprises.com roger. baldwin(a)nicholson construction. com 9897892 3533 bharman@ncp inc.comi jimwCa,.,ncp-inc.com 219-787-0010 . Chad.Biggs@phxslaq.com 815-220-1918 . rickopipevisioninc.com 574-266-5392 max(a)premiumconcreteonline.com; rbecker(opremiumoonereteonline.com: 847-782-0673 procisionboring(q sbc-global.net 815-744-4820 : tljndsley@rainforrent.com 574-233-3464 rieth-riley.com mccormick@rieth-riley.com 765-471-8892 rsmith roadsafetraffic.com 574-232-3979 jhiss@roberthenrycorp.com 419-636-7437 toclPssdirectionalboring.com Page 1 of 2 Old Clay Utilities RFQ Tracking 12/12/2017 D M W COMPANY PHONE FAX Email B B B E E E SAK Construction LLC 636-385-1000 ; 636-385-1100 Schuell Fence 574-272-9200 574-271-8156 , gabe.moore@schuellfence com ;Slussers Green Thumb 800-762-7442 574-722-2993 idw(7slussers.com: info(o)slussers.com Snyder Construction 812-732-4831 812-732-4398 dave roadbore.com ;Soil Solutions Company 574-320-2825 574-389-0668 mbaum@soilsolutionsco.com :South Lake Stone 574-532-2353 suzy.hankins@southiakestone.com Spartan Specialties 586-826 8811 586-826 8699 steve(&spartanspecialties.com Specialties Company LLC 317-594-0291 317-594-0271 ioe.hile(a)specialtiescomoanv.com I I State Barricading, Inc 574-287-2078 574-287-1744 statebarrica.deleaol.com 'Sunbelt Rentals <317-572-1180 317-572-1181 ioe.mcintosh( sunbeltrentals.com Territorial Engineering 574-586-3448 574-586-2992 mike(a-)te-Ilc.com I Toppert Jetting Service, Inc. 219-525-4114 219-525-4089 cbabbitt(cr�toppert.com ( I :Traffic Control Spec�al�sts, Inc. 574-772-7001 i 574-772-7002 , bar tcs ecialists.net tcs tcs ecialists.net United Rentals Trench Safety 317-375-1483 ; gmartin5@ur.com US Aggregates -Delphi 765-564-2580 765-564-2509 caleb.brown(ausagg com Walsh & Kelly, Inc. 574-28BA811 574-289-7174 : dustinh _ walshkellx.com info(a)-walshkelly.com Watson's Tree Service 269-683 5305 269-683-7333 watsonstreeserviceCoNmail.com Xylem D.ewatering Systems (Godwin) 708-889 1560 708-889-1661 perre.krizanek@xyleminc.com Page 2 of 2 Julie Jackson From: Microsoft Outlook To: rbecker@premiumconcreteonline.com'; 'procisionboring@sbcglobal.net; 'rick@pipevisioninc.com'; 'max@premiumconcreteonline.com'; 'tlindsley@rainforrent.com'; jhiss@roberth enrycorp.coW; 'tod@ssdirectionalboring.com'; jmccormick@rieth-riley.com'; 'rsmith@roadsafetraffic.com'; 'chad.biggs@phxslag.com `rwerth@midwesternelectricinc.com'; 'admin@milestonefence.com 'info@ midwestmole.com'; 'nathanhart@midwesttile.net; 'sjaques@moretrench.com; bharman@ncp-inc.com; jimw@ncp-inc.com'; Jason, barton@neenahenterprises.com'; ' roger. baldwin@nicholsonconstruction.com'; 'barry@tcspecialists.net' (barry@tcspecialists.net); 'tcs@tcspecialists.net' (tcs@tcspecialists. net); 'mike@te- Ilc.com'; cbabbitt@toppert.com; 'gmartin5@ur.com'; 'info@walshkelly.com watsonstreeservice@gmail.com; 'caleb.brown@usagg.com'; 'dustinh@walshkelly.com'; Joe. mcintosh@sunbeltrentals.com; 'info @sIussers.com'; 'dave@roadbore.com'; 'gabe.moore@schuellfence.com'; John Williamson Slusser's Green Thumb; 'mbaum@soilsolutionsco.com;'joe.hile@specialtiescompany.com'; 'statebarricadel @aol.com;'suzy.hankins@southlakestone.com; 'steve@spartanspecialties.com'; Earth Images, Inc.; 'laurayurs@gmail.com; Luis Galvan DiCicco Concrete; Dyer Vault Gracia (graciadyervault@sbcglobal.net); john.walter@ferguson.com'; 'glpm247@hotmail.com'; 'HARDROCKHDD@YAHOO.COM';'jamie@fuerbringerlandscaping.com'; 'perre.krizanek@xyleminc.com'; 'shad@dewindonepass.com' (chad @dewindonepass.com); Linda J Gilroy (Ijg318@sbcglobal.net); 'tandreotti@awptraffic.com'; 'mbertsch@bertschfrank.com'; 'jeffritschard@yahoo.com'; Conco Spray Solutions, LLC; 'dsherwood@c-techinc.net' (dsherwood@c-techinc.net); 'dave@dblservicesinc.com'; 'cmiskowicz@conteches.com'; 'dan.traeger@coreandmain.com'; 'scott@lowecon.net'; 'Icp90@msn.com'; 'tyson.crandall@layne.com'; 'hspurlino@liquiforce.com'; 'mikesix@macallister.com'; jhockber@michels.us'; Plandesk (plandesk@midwestmole.com); Marbach-Palm, Inc.; 'chuck.ramirez@mersino.com'; 'nshanahan@klinktrucking.com; 'kfaulkner@indianaSB.com; 'mirish@teamipr.com'; Highway Safety Service, Inc.; 'kim.coffield@irvmat.com'; Jay Ferguson (JFerguson@aegion.com); 'khaaninc@frontier.com'; 'kannon@kctree.com'; 'cfrye@jameshdrew.com; 'kbowman@jprlsource.com' Sent: Tuesday, December 12, 2017 4:17 PM Subject: Relayed: Old Clay Utilities Sewer Lining - Request for Quote Delivery to these recipients or groups is complete, but no delivery notification was sent by the destination server: 'rbecker(@premiumconcreteonline.com' (rbecker@premiumconcreteonline.com) 'procisionboring@sbcglobal.net` (procisionboring(-@sbcglobal.net) 'rick pipevisioninc.com' (rick@pipevisioninc.com) 'max(&premiumconcreteonline.com' (max@premiumconcreteonline.com) 'tlindsleMrainforrent.com' (tlindsley(&rainforrent.com) 'ihiss roberthen cor .com' hiss roberthen cor .com 'tod ssdirectionalboring.com' (tod@ssdirectionaIboring com) ''mccormick rieth-riley. com' (imccormick@rieth-riley.com 'rsmith roadsafetraffic.com' rsmith roadsafetraffic.com 'chad.bi s hxsla .com' (chad.biqqs@phxslaq.com 'rwerth midwesternelectricinc.com' rwerth midwesternelectricinc.com 'admin milestonefence.com' admin milestonefence.com 'info@midwestmole.com' (info(&midwestmole.com) 'nathanhart@midwesttile.net' (nathanhart@midwesttile.net) 'siaaues@moretrench.com' (siaaues@moretrench.com) bharman@ncp-inc.com (bharman@ncp-inc.com) jimmIncp-inc.com' (jimw@ncp-inc.com) ''ason.barton neenahenter rises.com' (iason.,ba.rton@neenahenterprises.com 'roger. baldwin(&nicholsonconstruction.com' (roger.baidwin(@nicholsonconstruction.com) 'bar tcs ecialists.net` (barEyOtcspecialists.net bar tcs ecialists.net 'tcs tcs ecialists.net' tcs tcs ecialists.net tcs tcs ecialists.net 'mike0)te-Ilc.com' (mike@te-ilc.com) cbabbitt(&toppert.com (cbabbitt@toppert.com) 'gmartin5(&ur.com' (gmartin5@ur.com) 'info@waishkelly.com' {info(&walshkelly.com) watsonstreeservice mail.com watsonstreeservice mail.com 'caleb.brown usa .com' (caleb.brown@usacig.com 'dustinh walshkeil .com` (dustinh@walshkel.1y.com joe.mcintosh@sunbeitrentals.com'(ioe.mcintosh(&sunbeltrentals.com) 'info@slussers.com' (info@slussers.com�. 'dave road bore. corn' (dave@roa bore.com 'gabe.moore@schuellfence,com'(gabe.moo_re(5)schuellfence.com) John Williamson Slusser's Green Thumb QDW@slussers.com) 'mbaum soilsolutionsco.com' (mbaum(d.)soilsolutionsco.com) 'ioe.hile specialtiescompany.com' (joe.hile@specialtiescompany.co ) 'statebarricadel aol.com' (statebarricade1@aol.com) 'suz .hankins southlakestone.com' suz .hankins southlakestone.com 'steve spartanspecialties,com' (steve@spartanspecialties.com) Earth Images, Inc. (dayids(&earthimagesinc com) 'laurayurs@gmail.com' (laurayurs@gmail.com) Luis Galvan DiCicco Concrete (laalvan(&dlciccoconcrete.com) Dyer Vault Gracia raciad ervault sbc loba1.net) raciad ervault sbc lobal,net johnmalter fe[guson,com' (john.walter(&ferguson.com) 'glpm247@hotmaii.com' (gllpm247@hotmail.com) 'HARDROCKHDD@YAHOO.COM' (HARDROCKHDD@YAHOO.COM) 'Jamie fuerbrin eriandsca in .com' amie fuerbrin eriandsca in .com 'perre.krizanek xyleminc.com' (perre.krizanek@xyleminc.com) 'chad dewindone ass.com' chad dewindone ass.com) (chad@dew!ndonepass.com Linda J Gilroy (ljg318(asbcglobal.net) (Ijg318@sbcalobal.net) 'tandreotti awptraffic.com' (tandreotti(dawptraffic.com) 'mbertsch@bertschfrank.com' (mbertsch@bertschfrank.coml 'ieffritschard_@yahoo.com' (jeffritschard@yahoo.com) Conco Spray Solutions, LLC (jhoop@concospray.com) 'dsherwood c-techinc.net' dsherwood c-techinc.net dsherwood c-techinc.net 'dave@dblservicesinc.com' (dave@dbiservicesinc.com) 'cmiskowicz conteches.com' cmiskowicz conteches.com 'dan.trae er coreandmain.com` (dan.traeger@coreandmain.com 'scott@lowecon.net' (scott@lowecon.net) 'Icp9O@msn,com' (Icp90@msn.com) 'tyson.crandall@layne.com' (tyson.crandall alayne.com 'hs urlino li uiforce.com' (hspurlino@liquiforce.com 'mikesix macallister.com' mikesix macaIIister.com Jhockber michels.us' 'hockber michels.us Plandesk (plandesk(Omidwestmole.com)(plandesk(&midwestmole.com) Marbach-Palm Inc. dbolles marbach.us 'chuck.ramirez@mersino.com` (chuck.ramirez(@mersino.com} 'nshanahan(Oklinktrucking.com' (nshanahariftlinktrucking.com 'kfaulkner indianaSB.com` kfaulkner indianaSB.com 'mirish teami r.com` (mirish@team!pr.com Highway Safety Service Inc. mike.madrid hss-mmco.com 'kim.coffield irvmat.com' kim.coffield irvmat.com Jay Ferguson (JFerguson@aegion.comJFer uson ae ion.com 'khaaninc frontier.com' khaaninc frontier.com 'kannon kctree.com` kannon kctree.com 'cf e ameshdrew.com' cf e 'ameshdrew.com 'kbowman@jprisource.com' (kbowman(@jprlsource.com� Subject: Old Clay Utilities Sewer Lining - Request for Quote Send result Report IRK901ERa MFP r-.;J<• ::{. fir. � 3: fi o• .,., »:m ciu .�5,• ;t i L 'n. `' Hai ;r'.,,2 r'a�•a .x Fx� {;`r � ��':: �p sf �F f'C:i .:C:f% � Ck a F x i,J: �v.¢i rp::� v...k h•.'F :i 12112/2017 16:47 Firmware Version 21V4 2000.005.105 2016.06.27 [2N4_1000.004.0011 [2N4_1100.001.0021 [2114_7000.005.1031 y'° '�bY' 3oR¢i•A:.,t:�' �r���r.%:. :.{.7`:F^.i:rc:•ii`: Job No.: No.: 065936 Complete Total Time: 0°10'30" Page: 002 Document: Old Clay Utilities Request for Quote.pdf HRP CONSTRUCTION1 EXCA VA T1NG-SE WERS•WATERMA1NS REQUEST FOR QUOTE lls PHONE -FAX: EMAIL: I jefiw@hrpco strff ucHon.com I 574-271-ti524 J Please quote any wotk in your field associated with the followng project. PROJECT: TYPE OF PROJECT: ENGJARCH: QUOTES DUE: BIDS: Old Clay Sewer Utilities Sewer Lining Rehabilitate existing sewer line Plans and specs may be downloaded from Dropbox. Click PFRF' for access_ or calllemail our office for download instructions, DBE I WBE 1 MBE participation is encouraged NotesfComments: Please review Special Provislons Section XXI slartinq on Pane 17 of the Specs, Also reviewft 117-097 colorFigure 1. List of Bid Items attached. IF YOU ARE RECEIVING THIS RFQ VIA FAX AND WOULD PREFER EMAIL, PLEASE INDICATE YOUR EMAIL ADDRESS BELOW PLEASE COMPLETE INFORMATION BELOW AND FAX OR EMAIL RACK ASAP. COMPANY: PHONE: CONTACT: FAX: EMAIL: ❑ We plan on bidding the following on lhls project: Ple P. go ite a urfP thee: xt iw at ptaOM. We will NOT be bidding an this project. We are a state qualified MBE R WOE R DBE Shipping: $777 Cleveland Road Souilt rend, iN 46628-9418 Phone 574-271-7800 Mailing: P.0, Box 266 Sandi Rend, IN 40624-(IM6 FAX 574.271-0514 No. Date and Time Destination Times Type Result Resolution/ECM 001 12/12/17 16:30 Contract Dewatering 0e01'49" FAX OK 200x200 Fine/Off 002 12/12/17 16:32 Global Land Surveying 0001'16" FAX OK 200x2OO fine/Off 003 12/12/17 16:34 Griffin Dewatering 0001'27" FAX OK 200x2OO Fine/Off 004 12/12/17 16:36 Highway Technologies 0001'30" FAX OK 200x200 Fine/Off 005 12/12/17 16:38 Kelley Dewatering 0001'29° FAX OK 200x200 Fine/Off 1 [ L8H4401752 1 Send Result Report 19 K90EERa MFP TAS1,--','.a1fa 355161 12/12/2017 16:41 Firmware Version 2N42000.005.105 2016.06.27 [2N41000.004.0011 [2N41100.001.002) 04_7000.005.1031 Job No.: 065936 Total Time: 0010'30" Page: D02 Complete Document: Old Clay Utilities Request for Quote.pdf No. Date and Time Destination 006 12/12/17 16:40 Michiana Aggregates, Inc. 007 12112117 16:42 SAK Construction Times Type Result Resolution/ECH 0001'16" FAX OK 0001'43" FAX OK HUM Fine/Off HUM fine/Off 2 C LBH4401752 I