HomeMy WebLinkAboutOpening of Bids - Old Clay Utilities Sewer Lining Proj No 117-087 - HRP Construction IncU Tit
0A C F�
1865
Project Name Old Clay Utilities Sewer Lining
Project No. 117-087
For Bids Due December 19,2017 at 9:00 a.m. Local Time
PART I
(Must be completed for all bids. Please type or print)
12/19/17 Bidder (Firm): HRP CONSTRUCTION
INC.
Address: 5777 Cleveland Road, P.O. Box 266
City/State/Zip: South Bend, IN 46624 Telephone Number: ( 574 271-7800
Agent of Bidder (if Applicable):
Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the
public works project of:
Old Clay Utilities Sewer Lining
the Citv of South Bend, Indiana, in accordance with t p1aqsAqq d specifications prepared _
Department of Public Works Division of Engineering
and dated December 2017 for the sum of (enter the Total Bid as shown on the Proposal)
See Attached ($
(Enter sum: of Total Base Bid plus Alternates shown on Proposal) (Numerical)
The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in
the notice of the Ietting. If alternative bids apply, the undersigned submits a proposal for each in accordance
with the notice. Any addendums attached will be specifically referenced at the applicable page.
If additional units of material included in the contract are needed, the cost of units must be the same as that
shown in the original contract if accepted by the City of South Bend. If th—(!.-� is to be awarded on a unit
:0
basis, the itemization of the units shall be show epar att
By
Matthew D. Cain, President
(Pr1nted Name of Person Sigining)
ACCEPTANCE
The above bid is accepted this day of
Subject to the following conditions:
BOARD OF PUBLIC WORKS
Gary A. Gilot, President
Elizabeth A. Maradik, Member
James A. Mueller, Member
Suzanna M. Fritzberg, Member
Therese J. Dorau, Member
Attest: Linda M. Martin, Clerk
Version 10/17/2017 Contractor's Bid for Public Works - 2
RT171MMM"T
Project No.
BIDIPROPOSAL
CITY OF SOUTH BEND
Old Clay Utilities Sewer Lining
117-087
December 19, 2017 at 9:00 a.m. Local Time
Item
No.
Description
Quantity
Unit
Unit Price
Total Amount
1
Maintenance of Traffic
1
LS
2
Mobilization and Demobilization
1
LS
�3 1)410.
3
Sanitary Sewer, 24"
90
LF
30. e9e)
Y-), r-)I-)
4
Sanitary Manhole
2
EA
00
00, 00
5
Horizontal Directional Drilling and Piping
1
LS
17, C)ov'eyj
7cwe) , e) —o
6
Manhole Rehab ifitation, (ClayC00040)
1
LS
766, oe
-7150, 6) 0
7
30" Pipe Rehabilitation (ClayC00040-
ClayC00035)
170
LFT
4,1 q r e.
2-11, 44 Af), oo
8
Manhole Rehabilitation (ClayCO0040)
1
LS
6(),
k, 7,-7,0, o 4)
9
Pipe Plug
2
EA
R'so,
- '-/ c)o' 0c)
BASE BID TOTAL l e0
Bidder (Firm): HRP CONSTRUCTION INC.
Address: 5777 Cleveland Road, P.O. Box 266
Telephone
City/State/Zip: South Bend, IN 46624 Number: r-U..), 27.1_24PO
(Signature)
Matthew D. Cain, President
(Printed Name of Person Signing)
Version 3120/2017 Contractor's Bid for Public Works - 16 Addendum No.1
12/18/2017 08:38 HRP Construction fAX)574 2710524
Q�gotFTli g�M
a
�tt ., .
FWACT .
1316 Cowry -CITY BU[LDINO SOUTH BEND PETS BUTTIolEG, PHONE 574/235.9231
227 W. JEFFERSON BOULEVARD FAA S74/ 235.9171
SOUTH BFND, INDIANA 46601.1830 OARD OF PUBLIC WORK grin 574/ 235-5567
Date: December 15, 2017
To: All Bidders
From Linda M. Martin, Clerk Board of Public Works
Subject Addendum Number: 1
Project Name: Old Clay Utilities Sewer Lining
Project „ _.....,.,....,
Number: 117-087
ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM
Date Received:
This addendum is being forwarded to you for the above referenced project.
Please sign below and acknowledge receipt of this Addendum
by faxing this sheet to the Board of Public Works at (574) 235-9171.
A copy MUST also be included with your bid package upon
submittal.
THIS ADDENDUM MAY AFFECT YOUR. BID.
Note:
The attached documents are hereby added to the Specifications and Contract
Documents and become a part of herein.
Authorized Signature:
Date: 1A // P / 1'7
Version 4/07/2015 Special Provisions A
P.0011001
: I : 0 1 1
CONTRACTOR; SURETY:
(Name, legal status and address) (Name, legal status and principal place
HRP Construction Inc. of business)
P.O. Box 266 Fidelity and Deposit Company of Maryland
This document has important legal
South Bend, IN 46624-0266 Baltimore, NM
consequences. Consultation with
OWNER:
an attorney is encouraged with
(Name, legal status and address)
respect to its completion or
City of South Bend Board of Public Works
modification.
County -City Building Room 1316, 227 West Jefferson Blvd
Any singular reference to
South Bend, IN 46601
Contractor, Surety, Owner or
BOW AMOUNT:
other party shall be considered
Five Percent of the Total Bid 5% of Total Bid
plural where applicable.
PROJECT:
(Name, location or address, and Project number, if any)
Old Clay Utilities Sewer Lining; Project No, 117-087
The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the
Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and
severally, as provided herein. The conditions of this Bond are such that if the Owner accepts the bid of the Contractor
within the time specified in the bid documents, or within such time period as may be agreed to by the Owner and
Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with the terms of such
bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted
in the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful performance of such Contract
and for the prompt payment of labor and material furnished in the prosecution thereof, or (2) pays to the Owner the
difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount
for which the Owner may in good faith contract with another party to perform the work covered by said bid, then this
obligation shall be null and void, otherwise to remain in full force and effect, The Surety hereby waives any notice of
an agreement between the Owner and Contractor to extend the time in which the Owner may accept the bid. Waiver of
notice by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time for
acceptance of bids specified in the bid documents, and the Owner and Contractor shall obtain the Surety's consent for
an extension beyond sixty (60) days.
If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall
be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor.
When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the Project,
any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and
provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. When so
furnished, the intent is that this Bond shall be construed as a statutory bond and not as a common law bond.
Signed and sealed this I Ith day of
(Witness) Nancy Kng_; Ik , Sec/Treasurer � I
(Title)
(Surety)
(Witness
(Title),j
CAUTIOW You should sign art or,iglnaf AlA Contract Docurnent, on
changes will not The obscUred.
(Seal)
(Seal)
L, Kagznid, Attorney in Fact
Ods text appearr. in RED, An odginal assuires Omit
AIA Document A31 OTM — 2010. Copyright 01963, 1970 and 2010 by The AmeridaKinstitute of Architects. All rights reserved. WAIRNINQ This MAO
Init. Doournont N protected by U& copyright Law and intemationW TveaUes. Unatahorized ireprodtiction or dWributlon ofthIs Ne Document, or
arly poirflon of It, may resullt Lin severe, 60 and cirknhiall penRlUes, and wHI be prosiocu4ed W the maxhnurn extent lsossVe under the law.
Purchasers are permitted to reproduce ten (10) coples of Ws document when completed. To report copyright vWations of AIA Contract Documents, e-malf
The American Institute of Architects' legal counsel, copydght@aia.org. 061110
ZURICH AMERICAN INSURANCE COMPANY
COLONIAL AMERICAN CASUALTY AND SURETY COMPANY
FIDELITY AND DEPOSIT COMPANY OF MARYLAND
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS: That the ZURICH AMERICAN INSURANCE COMPANY, a corporation of the State of New
York, the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, a corporation of the State of Maryland, and the FIDELITY
AND DEPOSIT COMPANY OF MARYLAND a corporation of the State of Maryland (herein collectively called the "Companies"), by
MICHAEL BOND, Vice President, in pursuance of authority granted by Article V, Section 8, of the By -Laws of said Companies, which
are set forth on the reverse side hereof and are hereby certified to be in full force and effect on the date hereof, do hereby nominate,
constitute, and appoint Barbara E. PEARSON, Nicole L. BICKNELL, Mark E. WOBBE, Debra K. HULL, Jennifer L. KASZNIA,
William J. CERNEY, III, Theresa M. BURNS and Megan E. RIESENBERG, all of South Bend, Indiana, EACH its true and lawful
agent and Attorney -in -Fact, to make, execute, seal and deliver, for, and on its behalf as surety, and as its act and deed: any and all bonds
and undertakings, and the execution of such bonds or undertakings in pursuance of these presents, shall be as binding upon said Companies,
as fully and amply, to all intents and purposes, as if they had been duly executed and acknowledged by the regularly elected officers of the
ZURICH AMERICAN INSURANCE COMPANY at its office in New York, New York., the regularly elected officers of the COLONIAL
AMERICAN CASUALTY AND SURETY COMPANY at its office in Owings Mills, Maryland., and the regularly elected officers of the
FIDELITY AND DEPOSIT COMPANY OF MARYLAND at its office in Owings Mills, Maryland., in their own proper persons.
The said Vice President does hereby certify that the extract set forth on the reverse side hereof is a true copy of Article V, Section 8, of
the By -Laws of said Companies, and is now in force.
IN WITNESS WHEREOF, the said Vice -President has hereunto subscribed his/her names and affixed the Corporate Seals of the said
ZURICH AMERICAN INSURANCE COMPANY, COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, and
FIDELITY AND DEPOSIT COMPANY OF MARYLAND, this 23rd day of October, A.D. 2017.
ATTEST:
.�.
Secretary
Michael McKibben
ZURICH AMERICAN INSURANCE COMPANY
COLONIAL AMERICAN CASUALTY AND SURETY COMPANY
FIDELITY AND DEPOSIT COMPANY OF MARYLAND
e 4 s G
�
04-1.2
Vice President
Michael Bond
State of Maryland
County of Baltimore
On this 23rd day of October, A.D. 2017, before the subscriber, a Notary Public of the State of Maryland, duly commissioned and qualified, MICHAEL
BOND, Vice President, and MICHAEL NICKIBBEN, Secretary, of the Companies, to me personally known to be the individuals and officers described in
and who executed the preceding instrument, and acknowledged the execution of same, and being by me duly sworn, deposeth and saith, that he/she is the said
officer of the Company aforesaid, and that the seals affixed to the preceding instrument are the Corporate Seals of said Companies, and that the said Corporate
Seals and the signature as such officer were duly affixed and subscribed to the said instrument by the authority and direction of the. said Corporations.
IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed my Official Seal the day and year first above written.
Constance A. Dunn, Notary Public
My Commission Expires: July 9, 2019
POA-F 044-4495
EXTRACT FROM BY-LAWS OF THE COMPANIES
"Article V, Section 8, Attorneys -in -Fact. The Chief Executive Officer, the President, or any Executive Vice President or Vice President
may, by written instrument under the attested corporate seal, appoint attorneys -in -fact with authority to execute bonds, policies,
recognizances, stipulations, undertakings, or other like instruments on behalf of the Company, and may authorize any officer or any such
attorney -in -fact to affix the corporate seal thereto; and may with or without cause modify of revoke any such appointment or authority at any
time."
CERTIFICATE
1, the undersigned, Vice President of the ZURICH AMERICAN INSURANCE COMPANY, the COLONIAL, AMERICAN
CASUAI.,"I'Y AND SURETY COMPANY, and the FIDELITY AND DEPOSIT COMPANY OF MA.RYI.,AND, do hereby certify that file
foregoing Power of Attorney is still in full force and effect on the date of this certificatc; and I do further certify that Article V, Section 8, of
the By -Laws of the Companies is still in force"
This Power of Attorney and Certificate may be signed by facsimile under and by authority of the following resolution of the Board of
Directors of the ZURICH AMERICAN INSURANCE COMPANY at a meeting duly called and held on the 15th day of December 1998,
RESOLVED: "That the signature of the President or a Vice President and the attesting signature of a Secretary or an Assistant Secretary
and the Seal of the Company may be affixed by facsimile on any Power of Attorney...Any such Power or any certificate thereof bcaring such
facsimile signature and seal shall be valid and binding on the Company."
This Power of Attorney and Certificate may be signed by facsimile under and by authority of the following resolution of the Board of
Directors of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at a meeting duly called and held on the 5th day of
May, 1994, and the following resolution of the Board of Directors of the FIDELffY AND DEPOSIT COMPANY OF MARYLAND at a.
meeting duly called and held on the I Oth day of May, 1990.
RESOLVED: "That the facsimile or mechanically reproduced seal of the company and facsimile or mechanically reproduced signature
of any Vice -President, Secretary, or Assistant Secretary of the Company, whether made heretofore or herealer, wherever appearing upon a
certified copy of any power of attorney issued by the Company, shall be valid and binding upon the Company with the same farce and effect
as though manually affixed.
1N TESTIMONY WHEREOF, I have hereunto subscribed my name and affixed the corporate seats of the said Companies,
this 1' day of n�1L2a " t 20 —
EAL
�'"iron �:r,�+•°"+ k�
David McVicker, Mice President
TO REPORT A CLAIM WITH REGARD TO A SURETY BOND, PLEASE SUBMIT ALL REQUIRED
INFORMATION TO:
Zurich American Insurance Co,
Attn: Surety Claims
1299 Zurich Way
Schaumburg, IL 60196-1056
CITY OF SOUTH BEiND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WOR
CHECKLIST FOR BIDDERS I
Project Name
Project No.
For Bids Due
Old Clay Utilities Sewer Lining
117-087
December 19, 2017 at 9:00 a.m. Local Time
From time to time the South Bend Board of Public Works finds it necessary to reject a bid because
it does not comply with statutory requirements. In preparing your bid, Please use the following
checklist in order to make sure that your bid is done in the proper manner.
Proper bid security included. The bidder has the option of providing either a Certified Check
or Bid Bond.
Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely
executed.
Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments
With Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and
Certification of use of United States Steel Products or Foundry Products.
Proof of MBE/WBE Participation Goal Form [MWBE-1 .0]. If minimum participation goal is not
met, also provide Evidence of Good Faith Efforts Form [MWBE-2,O] and MBEIWBE Contacted
Form [MWBE-2.1].
Acknowledge Receipt of 1 Addendum(s) included with the bid.
All required additional information is included with the bid.
Proposal statements and other affidavits all signed by the proper party with name either
printed or typed underneath signature.
,,/" This checklist submitted with the Bid.
This checklist is provided for bidder's use in assuring compliance with required
documentation; however, it does not include all specifications requirements and does not
relieve the bidder of the need to read and comply with the specifications.
Bidder: HRP CONSTRUCTION INC.
By Authorized
Signature:
Print Name & Title: IMatthew D. Cain, President
Version 10/17/2017 Contractor's Bid for Public Works - 1
Date: 12/1 '9/1 7
PART II
(For projects of $100,000 or more — IC 36-1-12-4)
These statements to be submitted under oath by each bidder with and as part of his bid.
Attach additional pages for each section as needed.
SECTION I EXPERIENCE QUESTIONNAIRE
1. Attach information regarding projects your organization has completed for the period of one
(1) year prior to the date of the current bid.
2. Attach a listing of public works projects currently in process of construction by your
organization.
3. Attach information regarding any failure to complete any work awarded to you and the
location thereof.
4. Attach references from private firms for which you have performed work.
SECTION 11 PLAN AND EQUIPMENT QUESTIONNAIRE
1. Attach an explanation of your plan or layout for performing proposed work. (Examples could
include a narrative of when you could begin work, complete the project, number of workers,
etc. and any other information which you believe would enable the City of South Bend to
consider your bid.)
2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside
your own firm who have performed part of the work) that you have used on public works
projects during the past five (5) years along with a brief description of the work done by each
subcontractor.
3. If you intend to sublet any portion of the work, attach the name and address of each
subcontractor, equipment to be used by the subcontractor, and whether you will require a
bond. However, if you are unable to currently provide a listing, please understand a listing
must be provided prior to contract approval. Until the completion of the proposed project, you
are under a continuing obligation to immediately notify the City of South Bend in the event that
you subsequently determine that you will use a subcontractor on the proposed project.
4. Attach a listing of equipment you have available to use for the proposed project.
Have you entered into contracts or received offers for all materials which substantiate the
prices used in preparing your proposal? If not, attach an explanation for the rationale used
which would corroborate the prices listed.
SECTION III CONTRACTOR'S FINANCIAL STATEMENT
Attachment of bidder's financial statement is mandatory. Any bid submitted without said
financial statement as required by statute shall thereby be rendered invalid. The financial
statement provided hereunder to the City of South Bend awarding the contract must be specific
enough in detail so that said City of South Bend can make a proper determination of the bidder's
capability for completing the project if awarded.
Version 10/17/2017 Contractor's Bid for Public Works - 3
When the prospective Contractor is rumble to certify to any of the statements below, it shall attach an explanation to this Affrdak
CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION
REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON-
DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL
PRODUCTS OR FOUNDRY PRODUCTS
(Must be completed for all quotes and bids. Please type or print)
STATEOF Indiana )
) SS:
St;. Joseph COUNTY )
The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury
that:
1. Contractor has not, nor has any other member, representative, or agent of the firm, company,
corporation or partnership represented by him, entered into any combination, collusion or agreement with
...anyperson relative to. the price to be bid by anyone at such. letting. nor to prevent any person. from bidding
nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and
without any agreement, understanding or combination with any other person in reference to such bidding.
Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or
indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and
2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals
are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from
participation in this transaction by any Federal department or agency; and
3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in
investment activities in Iran.
a. For purposes of this Certification, "Iran" means the government of Iran and any agency
or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as
amended from time -to -time.
b. As provided by Ind. Code § 5-22-16.5-5, as amended from time -to -time, a Contractor
is engaged in investment activities in Iran if either:
i. Contractor, its successor or its affiliate, provides goods or services of twenty
million dollars ($20,000,000) or more in value in the energy sector of Iran;
or
ii. Contractor, its successor or its affiliate, is a financial institution that extends
twenty million dollars ($20,000,000) or more in credit to another person for
forty-five (45) days or more, if that person will (i) use the credit to provides
goods and services in the energy sector in Iran; and (ii) at the time the
financial institution extends credit, is a person identified on list published by
the Indiana Department of Administration,
Version 10/17/2017 Contractor's Bid for Public Works - 4
4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any
employee or contract with a person that the Contractor subsequently learns is an unauthorized alien.
Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's
newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's
documentation of enrollment and participation in the E-Verify Program is included and attached as part of
this bid/quote; and
5. Contractor shall require his/her/its subcontractors performing work under this public contract to
certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain
any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien,
and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees
to maintain this certification throughout the term of the contract with the City of South Bend, and understands
that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision
no later than thirty (30) days after being notified by the City.
6. Persons, partnerships, corporations, associations, or joint venturers awarded a contract by the City
of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or
applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions,
or privileges of employment, or any matter directly or indirectly related to employment because of race, sex,
religion, color, national origin, ancestry, age, gender expression, gender identity, sexual orientation or
disability that does not affect that person's ability to perform the work.
In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any
combination of the foregoing including, but not limited to, public works contracts awarded under public
bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards,
or commissions may consider the Contractor's good faith efforts to obtain participation by those Contractors
certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise
("WBE") as a factor in determining the lowest, responsible, responsive bidder.
In no event shall persons or entities seeking the award of a City contract be required to award a subcontract
to an MBE/WBE; however, it may not unlawfully discriminate against said WBE/MB). A finding of a
discriminatory practice by the City's MBE/WBE Utilization Board shall prohibit that person or entity from
being awarded a City contract for a period of one (1) year from the date of such determination, and such
determination may also be grounds for terminating the contact for which the discriminatory practice or
noncompliance pertains.
7. The undersigned contractor agrees that the following nondiscrimination commitment shall be made
a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its
agencies, boards or commissions.
Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the
performance of this contract with privileges of employment, or any matter directly or indirectly related to
employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation,
handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of
contract.
I, the undersigned bidder or agent as contractor on a public works project, understand my statutory
obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1).1 hereby
certify that I and all subcontractors employed by me for this project will use steel products or foundry
products made in the United States on this project if awarded. I understand I have an affirmative duty to
notify the City in my bid that my proposal does not include the use of steel products or foundry products
made in the United States. I understand it is my sole obligation and responsibility to provide ajustifcation
to the City, subject to review and approval, why the cost of United States made steel or foundry products is
unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry
products made in the United States, the City, through its director of public works, shall make a determination
if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder
Version 10/17/2017 Contractor's Bid for Public Works - 5
may result in forfeiture of contractual payments.
I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid
for public works are true and correct.
Dated this 1 9 t h day of Dec 20 17
HRP CONSTRUCTION INC.
Signature of Contractor/Bidder or Its Agent
Matthew D. Cain, President
Printed Name and Title
Subscribed and sworn to before me this 19th day of Dec. _,20 17
My Commission Expires 3/6/ 2 4
Notary�rubii'c / Cindy Vanheste
County of Residence St. Joseph
Version 10/17/2017 Contractor's Bid for Public Works - 6
9
a
z
Db
(D
C0
C:
17
CL
—I-,
z
0)
E3
(D
9.
CL
CL
cx
cDa
UI
O
cu
cu
w
co
IM
-10
O
(D
D CID
=r
to
0
'oC)
0 CD
0
CL(D
r :�E
CID
Cy
;3 (D
CL ID
CO0
CL
M
ar
En
CID
m
O Ca
CD
R (D
0-,9
o :3
'o
0
(h
CID
I
-0
—0.
z
I-i
o ;:; -1
in
Co =r o
L (D 0
cr Cr j3
CS
U)
0
(D
U) 0
M a
0
:3 CL
(D
y)
q a
V
0
< m
CID CL
::r (n
(D
l<
r4l
(D
R. o
= 0
0 —
o
0
0
0
U3
(D
r r
a
U). -u
_.._CID
ID
(1)
U) 0
9 *
(D 0
(D
Dd +
U)
0 Lin
h
m
0 ICU
im
0 0
0
9
z
0
;u
z
m 0
3: 0
n
Z m m
1000 0
m cu 0
a -n
> MW cn
—
X Z-1 m r-
o z
:� tv , cnin -1
cam -=
() m ou
> G) Z m
1
X
z a
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY
DEVELOPMENT PROGRAM ITMp
FORM MWBE-2.0
EVIDENCE OF GOOD FAITH EFFORTS
This completed form should be included as part of the Bids documents related to City of South Bond Public
Works Projects requiring Good Faith Efforts to obtain, IMBEMBE participation. It is the bidder's sole
responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority
or Women's owned business as defined by the Indiana Department of Administration (NDOA").
Project Number:
Project Name:
Bidder:
Contact Person:
Address:
City:
Email:
117-087
Old_Clay Utilities Sewer Lining
HRP CONSTRUCTION INC.
Date: 12/19/17
Matthew D_.Cain, President _ Telephone: (574) 271-7800
5777 Cleveland Road, P.O. Box 266
South Bend State: IN
mattc@hrDconstruction.com
To determine whether a bidder has demonstrated good faith efforts to reach the MBE/WBE utilization goals set
forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or
commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below*:
EVIDENCE OF GOOD FAITH EFFORTS
MBEIWBE LIST(S): The bidder reviewed the City of South Bend's Minority and Women Business
Enterprise Diversity Development Program, which uses the IDOA approved list of Minority and Women
Owned Business as found on their website (http://www.in.gov/idoa).
ACTION (ADVERTISEICONTACT): In order for your bid to be deemedresponsive, the City of South
Bend requires that all perspective bidders complete no less than 2 of the following:
Attend all pre -bid meetings scheduled by the City to inform MB,EANBEs of contracting and
subcontracting opportunities.
Advertise in general circulation and/or trade association publications concerning subcontracting
opportunities, and allow MBE1WBEs reasonable time to respond.
3. Perform any and all necessary steps to provide written notice in a manner reasonably calculated
to inform MBENVBEs of subcontracting opportunities and allowed sufficient time for them to
participate effectively,
4. Utilize pre-existing services of available community organizations, small and/or disadvantaged
business assistance offices and other organizations that provided assistance in the recruitment
and placement of MBENVBE firms,
"Bidder must circle or otherwise notate which of the two (2) required actions were performed.
GOOD FAITH NEGOTIATIONS: The bidder negotiated In good faith with interested MBIEIWBEs,
including providing such MBEANBE's with adequate information about the plans, specifications and other
requirements of the subcontract and did not reject MBEANBEs as unqualified without sound business
✓
reasons based on a thorough, investigation of their capabilities.
SMALL CONTRACT(S): The bidder selected specific portions of the work to be performed by
MBEMBEs in order to increase the likelihood of meeting the MBEANBE goals (including: breaking down
contracts into smaller units to facilitate MBEMBE participation)
CONTRACT RECORDS: The bidder has maintained the following records for each MBEIWBE that has
bid on the subcontracting opportunity:
1. Name, address, and telephone number;
2. A description of information provided by the bidder or subcontractor; and
3. A statement of whether an agreement was reached. and if not, why not, including any reasons for
concluding that the MB,ENVBE was unqualified to, parform the job.
*Proper demonstration of Good Faith Effort requires your initials next to all of the above boxes. Any
omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of
South Bend reserves the right to request additional information.
Version 10117/2017 Contractor's Bid for Public Works - 9
CITY OF SOUTH BEND MINORITY AND AND WOMEN BUSINESS ENTERPRISE DIVERSITY <F% ,fh
DEVELOPMENT PROGRAM ��1 Y11('Y ls_3•
FORM MWBE-2.1
MBEIWBE CONTACTED
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects
requiring contacted MBEfWBE to obtain Good Faith Efforts. It is the bidder's sole responsibility to verify
whether any listed minority or woman business meets the qualifications of a Minority or Women's owned
business.
PAGE 1 OF
Project Number: 117-087 MBENVBE Participation Goal I
Project Name: Old Clay Utilities Sewer Lining
Bidder: HRP CONSTRUCTION INC.
By: President 12/19/17
(Signature) Matthew D . Cain, (Title) (Date)
MBE/WBE Firm SEE ATTACHED
Owner or Contact at MBEIWBE Firm
Telephone: Fax: Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
RESULTS OF CONTACT WITH THE MBE/WBE FIRM:
MBE/WBE Firm
Owner or Contact at MBEIWBE Firm
Telephone: Fax: Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
RESULTS OF CONTACT WITH THE MBEIWBE FIRM:
Version 10/17/2017 Contractor's Bid for Public Works - 10
SECTION I EXPERIENCE QUESTIONNAIRE
What public works projects has your organization completed for the period of one (1) year prior to the date
of the current bid?
When
Contract Amount
Class of Work
Completed
Name and Address of Owner
1,937,254.00
Utility &Excavation
2016
CSO 6 & 7 Storage and Pump Facility,Grand River Construction
3,460,410.00
UtilitylExcavation &
Site Work
2016
Watson CSF Phase II, City of
Mishawaka
2,031,349.00
Road & Utility
Replacement
2016
Goshen 5' Street Phase ll, City of
Goshen
4,036,839.00
Sewer/Tank
Construction
2016
CSO 31 Storage Facility, City of Elkhart
What public works projects are now in process of construction by your organization?
When to be
Contract Amount
Class of Work
Completed
Name and Address of Owner
3,894,289.00
Water Main
2017
Monroe St., Logan St., WM
Replacement, City of Goshen
1,701,438.00
Road & Utility
2017
4 St LTCP Improvements, City of
Replacement
Mishawaka
8,142,841.00
Combined Sewer
2018
Nappanee LTCP Div A, City of
Nappanee
5,662,029.00
Storm/Sewer
2018
R-37480-A McKinley and Ash, INDOT
3. Have you ever failed to complete any work awarded to you? No If so, where and why?
4. List referenced from private firms for which you have performed work.
Shiel Sexton: Indianapolis. IN
JJ White Incorporated: Philadelphia, PA
Edward Rose of Indiana,• Kalamazoo MI
Skillman Corporation, Indianapolis, IN
Pepper Construction; Dublin, OH __
HRP CONSTRUCTION INC.
responses to
SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE
1. Our intent would be to start the work after receiving a contract and Notice to Proceed per project
documents. We would perform our work per a schedule approved by the owner and/or owner's
representative.
2. A partial listing of subcontractors used in the past five (5) years. Further information will be
submitted if deemed necessary.
Asphalt and Concrete
Brooks Construction
E&B Paving
Premium Concrete
Pioneer Associates
Rieth-Riley Construction
Walsh & Kelly, Inc.
Bores & Directional Drilling
H&G Underground Utilities
Lowe Construction
Midwest Mole
Electrical & Traffic Controls
Bender Electric
Current Electric
J&J Electric of Indiana
Michiana Construction
State Barricading
Traffic Control Specialists
Hauling
Bettcher Trucking
J&R Trucking
Nowacki Trucking
Nowatzke Farms Trucking
Radabaugh Truck Service
V&R Trucking
Landscaping
Fuerbringer Landscaping
Hydra-Tek Seeding Inc.
Slusser's Green Thumb
Acorn Landscaping
Dewatering
Contract Dewatering Service
Griffin Dewatering
Kelly Dewatering
Mersino Dewatering
3. We do intend to sublet various portions of this work. However, at this time, we are not certain
who the subcontractors would be. If we are awarded this contract, we would furnish you with the
names of all subcontractors.
4. We intend to first use equipment from our fleet of fourteen excavators, eight front-end loaders,
etc. To the extent necessary, we would rent, lease, or purchase any other equipment needed.
5. We have received offers for all materials within pricing used in preparing for bid.
Crowe Horwathe
INDEPENDENT AUDITOR'S DEPORT
Board of Directors and Shareholder
HRP Construction Inc.
South Bend, Indiana
Report on the Financial Statements
Crowe Horwalh LLP
Independent Member Crowe Homath Inlernallonal
We have audited the accompanying balance sheet of HRP Construction Inc. as of December 31, 2016, and the
related notes to the financial statement.
Management's Responsibility for the Financial Statements
Management is responsible for the preparation and fair presentation of this financial statement in accordance with
accounting principles generally accepted in the United States of America; this includes the design, implementation,
and maintenance of internal control relevant to the preparation and fair presentation of the financial statement that is
free from material misstatement, whether due to fraud or error.
Auditor's Responsibility
Our responsibility is to express an opinion on the financial statement based on our audit. We conducted our audit in
accordance with auditing standards generally accepted in the United States of America. Those standards require
that we plan and perform the audit to obtain reasonable assurance about whether the financial statement is free from
material misstatement.
An audit involves performing procedures to obtain audit evidence about the amounts and disclosures in the financial
statement. The procedures selected depend on the auditor's judgment, including the assessment of the risks of
material misstatement of the financial statement, whether due to fraud or error. In making those risk assessments,
the auditor considers internal control relevant to the entity's preparation and fair presentation of the financial
statement in order to design audit procedures that are appropriate in the circumstances, but not for the purpose of
expressing an opinion on the effectiveness of the entity's Internal control. Accordingly, we,express no such opinion.
An audit also includes evaluating the appropriateness of accounting policies used and the reasonableness of
significant accounting estimates made by management, as well as evaluating the overall presentation of the financial
statement.
We believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis for our audit
opinion.
Opinion
In our opinion, the financial statement referred to above presents fairly, in all material respects, the financial position
of HRP Construction Inc. as of December 31, 2016, in accordance with accounting principles generally accepted in
the United States of America.
Crowe Horwath LLP
South Bend, Indiana
April 3, 2017
HRP
CONSTRUCTIOW
EXCAVATING•SEWERS•WATERMAINS
9, LSE Of 'Sezvies»
REQUEST FOR QUOTE
FROM: Jeff Wells PHONE: 574-271-7800
EMAIL: L'effw hrpconstruction.com FAX: 574-271-0524
Please quote any work in your field associated with the following project.
PROJECT:
TYPE OF PROJECT:
LOCATION:
ENGJARCH:
QUOTES DUE:
BIDS:
Old Cla Sewer Utilities Sewer Lining
Rehabilitate existing sewer line
South Bend, IN
Address questions before 12/14/17 at 4:30 pm to Sue Ellen
Doudrick, South Bend Engineering, sdoudric@southbendin.gov
Monda , December 18 by 10:00 AM
December 19, 2017
Plans and specs may be downloaded from Dropbox. Click HERE for access, or call/email our
office for download instructions.
DBE 1 WBE 1 MBE participation is encouraged
Notes/Comments: Please review Special Provisions Section XXI starting on Page 17 of the Specs, Also,
review the 117-087 color Fiaure 1. List of Bid Items attached.
IF YOU ARE RECEIVING THIS RFQ VIA FAX AND WOULD PREFER EMAIL, PLEASE
INDICATE YOUR EMAIL ADDRESS BELOW
PLEASE COMPLETE INFORMATION BELOW AND FAX OR EMAIL BACK ASAP.
COMPANY: PHONE:
CONTACT: FAX:
EMAIL:
❑ We plan on bidding the following on this project:
Please provide a scope sheet as soon as possible.
We will NOT be bidding on this project.
We are a state qualified ❑ MBE ❑ WBE ❑ DBE
Shipping: 5777 Cleveland Road South Bend, W 46628-9418 Phone 574-271-7800
Mailing: P.O. Box 266 South Bend, IN 46624-0266 FAX 574-271-0524
Old Clay Utilities RFQ Tracking
12/12/2017
D M -WsiWs COMPANY
PHONE
BBB
EE`E
Abonmarche Consultants, Inc.
__._. _ .
574-232-8700
Aco€n Landscaping
574-288-6950
'AWP Area Wide Protective
269-683-1499
Bertsch -Frank & Associates, LLC
260-459-9393
I Conco Spray Solutions, LLC
317-428-6543
Contech Engineered Solutions
800 338 1122
Contract Dewatering Service
616-642-9415
Care &Main
574-231-8739
L..,.. , I C-Tech Corporation
317-835-2745
DBL Services
574-968-2028
Dewind Dewatering, Inc.
_.
616-875 7580
DiCicco Concrete
708-754-5691
I I Dyer Vault Co., Inc
219-865-2521
I Earth Images, Inc.
800-325-2543
Ferguson Waterworks
574-282 2323
Fuerbringer Landscaping
574-271 9714
I Global Land Surveying, LLC
219-872-4444
:Godwin Pumps (Xylem)
708-889-1560
Great Lakes Property Maintenance
574-257-8002
Griffin Dewatering
219-931 1662
Hard Rock HDD
517-764-6020
I , Highway Safety Service, Inc.
765-474-1000
Highway Technologies
317-891-8065
IMI Irving Materials
260-356-7214
I I ;Indiana Sign & Barricade
317-377-8000
;Inland Waters Pollution Control, Inc.
313-899-3014
Insituform Technologies, Inc.
317-408-7136
,lames H. Drew Corporation
317-876-3739
JPR Jones Petrie Rafinski Corp
574-232 4388
i Karen Haan, Inc.
260-740-8876
KC Tree, Inc.
574-674-7722
3 Kelley Dewatering & Construction Co.
616-538-8010
Klink Trucking, Inc
574-287-9000
Layne Inliner, LLC
812-865-3232
Liquil orce Services Inc.
734-231-6691
Lowe Construction Co.
517-529-9406
;Lowell Concrete Products
219-696-3339
MacAllister Underground Shoring
317-875-7867
Marbach Palm Inc. (aka Palm & Assoc)
574-654-3450
Mersino Dewatering
865 637-7466
Michiana Aggregates Inc
! 269-695-7669
Mi-Con (Michels U.S.)
920-583-3132
!Midwest Mole
317-545-1335
FAX Email
574-251-4440 :
mrozvcki(o)abonmarche.com
574-289-1096
j_effritschard(cDyahoo.com; l'g318@sbcglobal.net
269-683-1494
tandreottiO)awptraffic.com
260-459-9303 -
mbertsch(a)bertschfrank.com
888-791-2220
ihool2@concosi)ray.com
513-645 7865 :
CMiskowicz@conteches.com,
616-642-9909
574-231-8794
dan,traeger@coreandmain.com
317-835-2781
dshenaood@c-techinc.net
574-255-8406
dave@dbiservicesinc.com
616-875 7334
chad(@clewindonepass.com
708-754-5132
lgalvan aOdiciccoconcrete.com
219-865-1505
graciadyervaultQsbcglobal.net
317-885-1529
davidsc@earthimagesino.com;
laurayurs@gmail.com .
574-287-9523
iohn.walterPfemuson.com
574-271-2861
jamie@fuerbringerlandscaping.com
219-879-9920
708-889-1561
perre.krizanekOxylemine.com
gIpm247(&hotmail come
219-931 7877 ,
hardrockhdd(abahoo.com
mike.madric1Phss-mmco.com
317-891 8248
260-356 6032
kim.coffield0_jrvmat.com
317-377-8008 ;
kfaulkner@IndianaSB.com
313-899-3011
mirish teami r.com
317-489-3872 ;
iferguson@aegion.com
E.574-232-4333 , _
kbowman@jarlsource.com
260-435-1617 :
khaaninc(ofrontier.com
574-674-7721
kannon .kctree.com
E 616- 538-0708
574-287-2300
NShanahan@klinktrucking.com
612-865-3075
tvson,crandall(a)lavne.com
724-955-2508 ;
hspurlino _ liqui€orce.com
517-529-4504
scott@lowecon.net
219-696 3937
le 9Qamsn.com
macallister.com
mikesix@macallister.com
dbolles(a)marbach.us
219-210-3385
chuck ramirezna mersino.com
269-695-1229
;Midwest Tile & Concrete Products
260-749-5173
:Midwestern Electric
219-397-4444
'Milestone Fence
574-259 3101
Moretrench
',Neenah Foundry
317-875-7245
Nicholson Construction Co.
412-221-4500
Northern .concrete Pipe Inc
989-892 3545
Phoenix Services
219-787-0010
Pipevision Products, Inc.
815 220-1919
--
I :Premium Concrete Services, Inc.
574-264-0196
;Precision Boring, Inc
847-782-0672
i Rain for Rent
815-744-3947
Rieth-Riley Construction
574-288-8321
RoadSafe Traffic Systems
765-471-8891
Robert Henry Corporation
574-232 2091
S & S Directional Boring, Ltd
419-630-0726
ihockber@michels.us
317-545-1558 ':
landesk midwestmole.com;
info(a7midwestmole.com
260-493-2477 ;
natha nhart(amidwestti le. net
219-397-8888 ';
rwerth@midwesternelectricinc.com
574-259-3104
admin@milestonefence.com
sjaques@moretrench.com
317-875-8637 ;
ason.bMon@neenahenterprises.com
roger. baldwin(a)nicholson construction. com
9897892 3533
bharman@ncp inc.comi jimwCa,.,ncp-inc.com
219-787-0010 .
Chad.Biggs@phxslaq.com
815-220-1918 .
rickopipevisioninc.com
574-266-5392
max(a)premiumconcreteonline.com;
rbecker(opremiumoonereteonline.com:
847-782-0673
procisionboring(q sbc-global.net
815-744-4820 :
tljndsley@rainforrent.com
574-233-3464
rieth-riley.com
mccormick@rieth-riley.com
765-471-8892
rsmith roadsafetraffic.com
574-232-3979
jhiss@roberthenrycorp.com
419-636-7437
toclPssdirectionalboring.com
Page 1 of 2
Old Clay Utilities RFQ Tracking 12/12/2017
D M W COMPANY PHONE FAX Email
B B B
E E E
SAK Construction LLC
636-385-1000
; 636-385-1100
Schuell Fence
574-272-9200
574-271-8156 ,
gabe.moore@schuellfence com
;Slussers Green Thumb
800-762-7442
574-722-2993
idw(7slussers.com: info(o)slussers.com
Snyder Construction
812-732-4831
812-732-4398
dave roadbore.com
;Soil Solutions Company
574-320-2825
574-389-0668
mbaum@soilsolutionsco.com
:South Lake Stone
574-532-2353
suzy.hankins@southiakestone.com
Spartan Specialties
586-826 8811
586-826 8699
steve(&spartanspecialties.com
Specialties Company LLC
317-594-0291
317-594-0271
ioe.hile(a)specialtiescomoanv.com
I I State Barricading, Inc
574-287-2078
574-287-1744
statebarrica.deleaol.com
'Sunbelt Rentals
<317-572-1180
317-572-1181
ioe.mcintosh( sunbeltrentals.com
Territorial Engineering
574-586-3448
574-586-2992
mike(a-)te-Ilc.com
I Toppert Jetting Service, Inc.
219-525-4114
219-525-4089
cbabbitt(cr�toppert.com
( I :Traffic Control Spec�al�sts, Inc.
574-772-7001
i 574-772-7002 ,
bar tcs ecialists.net tcs tcs ecialists.net
United Rentals Trench Safety
317-375-1483
;
gmartin5@ur.com
US Aggregates -Delphi
765-564-2580
765-564-2509
caleb.brown(ausagg com
Walsh & Kelly, Inc.
574-28BA811
574-289-7174 :
dustinh _ walshkellx.com info(a)-walshkelly.com
Watson's Tree Service
269-683 5305
269-683-7333
watsonstreeserviceCoNmail.com
Xylem D.ewatering Systems (Godwin)
708-889 1560
708-889-1661
perre.krizanek@xyleminc.com
Page 2 of 2
Julie Jackson
From: Microsoft Outlook
To: rbecker@premiumconcreteonline.com'; 'procisionboring@sbcglobal.net;
'rick@pipevisioninc.com'; 'max@premiumconcreteonline.com';
'tlindsley@rainforrent.com'; jhiss@roberth enrycorp.coW;
'tod@ssdirectionalboring.com'; jmccormick@rieth-riley.com';
'rsmith@roadsafetraffic.com'; 'chad.biggs@phxslag.com
`rwerth@midwesternelectricinc.com'; 'admin@milestonefence.com
'info@ midwestmole.com'; 'nathanhart@midwesttile.net; 'sjaques@moretrench.com;
bharman@ncp-inc.com; jimw@ncp-inc.com'; Jason, barton@neenahenterprises.com';
' roger. baldwin@nicholsonconstruction.com'; 'barry@tcspecialists.net'
(barry@tcspecialists.net); 'tcs@tcspecialists.net' (tcs@tcspecialists. net); 'mike@te-
Ilc.com'; cbabbitt@toppert.com; 'gmartin5@ur.com'; 'info@walshkelly.com
watsonstreeservice@gmail.com; 'caleb.brown@usagg.com'; 'dustinh@walshkelly.com';
Joe. mcintosh@sunbeltrentals.com; 'info @sIussers.com'; 'dave@roadbore.com';
'gabe.moore@schuellfence.com'; John Williamson Slusser's Green Thumb;
'mbaum@soilsolutionsco.com;'joe.hile@specialtiescompany.com'; 'statebarricadel
@aol.com;'suzy.hankins@southlakestone.com; 'steve@spartanspecialties.com'; Earth
Images, Inc.; 'laurayurs@gmail.com; Luis Galvan DiCicco Concrete; Dyer Vault Gracia
(graciadyervault@sbcglobal.net); john.walter@ferguson.com'; 'glpm247@hotmail.com';
'HARDROCKHDD@YAHOO.COM';'jamie@fuerbringerlandscaping.com';
'perre.krizanek@xyleminc.com'; 'shad@dewindonepass.com'
(chad @dewindonepass.com); Linda J Gilroy (Ijg318@sbcglobal.net);
'tandreotti@awptraffic.com'; 'mbertsch@bertschfrank.com'; 'jeffritschard@yahoo.com';
Conco Spray Solutions, LLC; 'dsherwood@c-techinc.net' (dsherwood@c-techinc.net);
'dave@dblservicesinc.com'; 'cmiskowicz@conteches.com';
'dan.traeger@coreandmain.com'; 'scott@lowecon.net'; 'Icp90@msn.com';
'tyson.crandall@layne.com'; 'hspurlino@liquiforce.com'; 'mikesix@macallister.com';
jhockber@michels.us'; Plandesk (plandesk@midwestmole.com); Marbach-Palm, Inc.;
'chuck.ramirez@mersino.com'; 'nshanahan@klinktrucking.com;
'kfaulkner@indianaSB.com; 'mirish@teamipr.com'; Highway Safety Service, Inc.;
'kim.coffield@irvmat.com'; Jay Ferguson (JFerguson@aegion.com);
'khaaninc@frontier.com'; 'kannon@kctree.com'; 'cfrye@jameshdrew.com;
'kbowman@jprlsource.com'
Sent: Tuesday, December 12, 2017 4:17 PM
Subject: Relayed: Old Clay Utilities Sewer Lining - Request for Quote
Delivery to these recipients or groups is complete, but no delivery notification was sent by the
destination server:
'rbecker(@premiumconcreteonline.com' (rbecker@premiumconcreteonline.com)
'procisionboring@sbcglobal.net` (procisionboring(-@sbcglobal.net)
'rick pipevisioninc.com' (rick@pipevisioninc.com)
'max(&premiumconcreteonline.com' (max@premiumconcreteonline.com)
'tlindsleMrainforrent.com' (tlindsley(&rainforrent.com)
'ihiss roberthen cor .com' hiss roberthen cor .com
'tod ssdirectionalboring.com' (tod@ssdirectionaIboring com)
''mccormick rieth-riley. com' (imccormick@rieth-riley.com
'rsmith roadsafetraffic.com' rsmith roadsafetraffic.com
'chad.bi s hxsla .com' (chad.biqqs@phxslaq.com
'rwerth midwesternelectricinc.com' rwerth midwesternelectricinc.com
'admin milestonefence.com' admin milestonefence.com
'info@midwestmole.com' (info(&midwestmole.com)
'nathanhart@midwesttile.net' (nathanhart@midwesttile.net)
'siaaues@moretrench.com' (siaaues@moretrench.com)
bharman@ncp-inc.com (bharman@ncp-inc.com)
jimmIncp-inc.com' (jimw@ncp-inc.com)
''ason.barton neenahenter rises.com' (iason.,ba.rton@neenahenterprises.com
'roger. baldwin(&nicholsonconstruction.com' (roger.baidwin(@nicholsonconstruction.com)
'bar tcs ecialists.net` (barEyOtcspecialists.net bar tcs ecialists.net
'tcs tcs ecialists.net' tcs tcs ecialists.net tcs tcs ecialists.net
'mike0)te-Ilc.com' (mike@te-ilc.com)
cbabbitt(&toppert.com (cbabbitt@toppert.com)
'gmartin5(&ur.com' (gmartin5@ur.com)
'info@waishkelly.com' {info(&walshkelly.com)
watsonstreeservice mail.com watsonstreeservice mail.com
'caleb.brown usa .com' (caleb.brown@usacig.com
'dustinh walshkeil .com` (dustinh@walshkel.1y.com
joe.mcintosh@sunbeitrentals.com'(ioe.mcintosh(&sunbeltrentals.com)
'info@slussers.com' (info@slussers.com�.
'dave road bore. corn' (dave@roa bore.com
'gabe.moore@schuellfence,com'(gabe.moo_re(5)schuellfence.com)
John Williamson Slusser's Green Thumb QDW@slussers.com)
'mbaum soilsolutionsco.com' (mbaum(d.)soilsolutionsco.com)
'ioe.hile specialtiescompany.com' (joe.hile@specialtiescompany.co )
'statebarricadel aol.com' (statebarricade1@aol.com)
'suz .hankins southlakestone.com' suz .hankins southlakestone.com
'steve spartanspecialties,com' (steve@spartanspecialties.com)
Earth Images, Inc. (dayids(&earthimagesinc com)
'laurayurs@gmail.com' (laurayurs@gmail.com)
Luis Galvan DiCicco Concrete (laalvan(&dlciccoconcrete.com)
Dyer Vault Gracia raciad ervault sbc loba1.net) raciad ervault sbc lobal,net
johnmalter fe[guson,com' (john.walter(&ferguson.com)
'glpm247@hotmaii.com' (gllpm247@hotmail.com)
'HARDROCKHDD@YAHOO.COM' (HARDROCKHDD@YAHOO.COM)
'Jamie fuerbrin eriandsca in .com' amie fuerbrin eriandsca in .com
'perre.krizanek xyleminc.com' (perre.krizanek@xyleminc.com)
'chad dewindone ass.com' chad dewindone ass.com) (chad@dew!ndonepass.com
Linda J Gilroy (ljg318(asbcglobal.net) (Ijg318@sbcalobal.net)
'tandreotti awptraffic.com' (tandreotti(dawptraffic.com)
'mbertsch@bertschfrank.com' (mbertsch@bertschfrank.coml
'ieffritschard_@yahoo.com' (jeffritschard@yahoo.com)
Conco Spray Solutions, LLC (jhoop@concospray.com)
'dsherwood c-techinc.net' dsherwood c-techinc.net dsherwood c-techinc.net
'dave@dblservicesinc.com' (dave@dbiservicesinc.com)
'cmiskowicz conteches.com' cmiskowicz conteches.com
'dan.trae er coreandmain.com` (dan.traeger@coreandmain.com
'scott@lowecon.net' (scott@lowecon.net)
'Icp9O@msn,com' (Icp90@msn.com)
'tyson.crandall@layne.com' (tyson.crandall alayne.com
'hs urlino li uiforce.com' (hspurlino@liquiforce.com
'mikesix macallister.com' mikesix macaIIister.com
Jhockber michels.us' 'hockber michels.us
Plandesk (plandesk(Omidwestmole.com)(plandesk(&midwestmole.com)
Marbach-Palm Inc. dbolles marbach.us
'chuck.ramirez@mersino.com` (chuck.ramirez(@mersino.com}
'nshanahan(Oklinktrucking.com' (nshanahariftlinktrucking.com
'kfaulkner indianaSB.com` kfaulkner indianaSB.com
'mirish teami r.com` (mirish@team!pr.com
Highway Safety Service Inc. mike.madrid hss-mmco.com
'kim.coffield irvmat.com' kim.coffield irvmat.com
Jay Ferguson (JFerguson@aegion.comJFer uson ae ion.com
'khaaninc frontier.com' khaaninc frontier.com
'kannon kctree.com` kannon kctree.com
'cf e ameshdrew.com' cf e 'ameshdrew.com
'kbowman@jprisource.com' (kbowman(@jprlsource.com�
Subject: Old Clay Utilities Sewer Lining - Request for Quote
Send result Report IRK901ERa
MFP
r-.;J<• ::{. fir. � 3: fi o• .,., »:m ciu .�5,• ;t
i L 'n. `' Hai ;r'.,,2 r'a�•a .x Fx� {;`r � ��':: �p
sf �F f'C:i .:C:f% � Ck a F x i,J: �v.¢i rp::� v...k h•.'F :i
12112/2017 16:47
Firmware Version 21V4 2000.005.105 2016.06.27 [2N4_1000.004.0011 [2N4_1100.001.0021 [2114_7000.005.1031
y'° '�bY' 3oR¢i•A:.,t:�' �r���r.%:. :.{.7`:F^.i:rc:•ii`:
Job No.: No.: 065936
Complete
Total Time: 0°10'30" Page: 002
Document: Old Clay Utilities Request for Quote.pdf
HRP
CONSTRUCTION1
EXCA VA T1NG-SE WERS•WATERMA1NS
REQUEST FOR QUOTE
lls
PHONE -FAX:
EMAIL:
I
jefiw@hrpco strff
ucHon.com
I 574-271-ti524 J
Please quote any wotk
in your field associated with the followng project.
PROJECT:
TYPE OF PROJECT:
ENGJARCH:
QUOTES DUE:
BIDS:
Old Clay Sewer Utilities Sewer Lining
Rehabilitate existing sewer line
Plans and specs may be downloaded from Dropbox. Click PFRF' for access_ or calllemail our
office for download instructions,
DBE I WBE 1 MBE participation is encouraged
NotesfComments: Please review Special Provislons Section XXI slartinq on Pane 17 of the Specs, Also
reviewft 117-097 colorFigure 1. List of Bid Items attached.
IF YOU ARE RECEIVING THIS RFQ VIA FAX AND WOULD PREFER EMAIL, PLEASE
INDICATE YOUR EMAIL ADDRESS BELOW
PLEASE COMPLETE INFORMATION BELOW AND FAX OR EMAIL RACK ASAP.
COMPANY: PHONE:
CONTACT: FAX:
EMAIL:
❑ We plan on bidding the following on lhls project:
Ple P. go ite a urfP thee: xt iw at ptaOM.
We will NOT be bidding an this project.
We are a state qualified MBE R WOE R DBE
Shipping: $777 Cleveland Road Souilt rend, iN 46628-9418 Phone 574-271-7800
Mailing: P.0, Box 266 Sandi Rend, IN 40624-(IM6 FAX 574.271-0514
No. Date and Time Destination
Times Type Result Resolution/ECM
001
12/12/17
16:30
Contract Dewatering
0e01'49"
FAX
OK
200x200
Fine/Off
002
12/12/17
16:32
Global Land Surveying
0001'16"
FAX
OK
200x2OO
fine/Off
003
12/12/17
16:34
Griffin Dewatering
0001'27"
FAX
OK
200x2OO
Fine/Off
004
12/12/17
16:36
Highway Technologies
0001'30"
FAX
OK
200x200
Fine/Off
005
12/12/17
16:38
Kelley Dewatering
0001'29°
FAX
OK
200x200
Fine/Off
1 [ L8H4401752 1
Send Result Report 19 K90EERa
MFP
TAS1,--','.a1fa 355161 12/12/2017 16:41
Firmware Version 2N42000.005.105 2016.06.27 [2N41000.004.0011 [2N41100.001.002) 04_7000.005.1031
Job No.: 065936 Total Time: 0010'30" Page: D02
Complete
Document: Old Clay Utilities Request for Quote.pdf
No. Date and Time Destination
006 12/12/17 16:40 Michiana Aggregates, Inc.
007 12112117 16:42 SAK Construction
Times Type Result Resolution/ECH
0001'16" FAX OK
0001'43" FAX OK
HUM Fine/Off
HUM fine/Off
2 C LBH4401752 I