HomeMy WebLinkAboutOpening of Bids - Jefferson & Twyckenham Signal Improvements Proj No 116-027 - Martell Electric LLCProject Name Jefferson and Twyckenham Signal Improvements
Project No. 116-027
For Bids Cue July- Z11—,2047- December 19,2017 at gam
(Must be completed for all bids. Please type or print)
Date: 12/19/2017 - Bidder (Firm): Martell Electric, LLC
Address: 4601 Cleveland Rd
City/State/Zip: South Bend, IIN 46628 Telephone Number: :)74)271-5000
Agent of Bidder (if Applicable):
Pursuant to notices given, the undersigned offers to furnish labor and/or mabe—dal necessary to complete the
public works project of:
Jefferson and Twyckenharn Signal improvernens Pro'ect No-1 16-027
the City of South! Bend, Indiana, in accordance with plans and specifications prepared by:
City of South Bend Department of Public Works
and dated _j I vernber 29, 2017 for the sum of (enter the Total Bid as shown on the Proposal)
One Hundred ninety-seven thousand one hundred fifty-seven dollars and 47/1010 ($ 197,157.47.
(Efi P-1-11 ... ... .....
tdr.ss '-f IQ Qld:`h;' 1) (Numerical)
40of-TOW.' aso.; .1. ,s..QWruQrR..,ropQsa1
The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in
the notice of the letting. If alternative bids, apply, the undersigned submits a proposal for each in accordance
with the notice. Any addendums attached will be specifically referenced at the applicable page,
If additional units of material included in the contract are needed, the cost of units must be the same as that
shown in the original contract if accepted by the City of South Bend. If the bid is to be awarded on a unit
basis, the itemization of the units shall be shown on a separate atta hment.
By
0*)
_A_44ZZ .
/ I , - (STbnature)
Je4i4r M. Brawn- President
L/ (Printed Name of Person Signing)
The above bid is accepted this
Subject to the following conditions:
Gary A. Gilot, President
ACCEPTANCE
ME
Suzanna M. Fritzberg, Member
20
Elizabeth A. Maradik, Member Therese J. Dorau, Member
-James A. Mueller, Member Attest: Linda M. Martin, Clerk
Version 10/17/2017 Contractor's Bid for Public Works - 2 Addendum #1
,r(mrr;
131DlPROPOSALLA
U
CITY OF SOUTH BEND
6
Project Name Jefferson and Twyckenham Signal Improvements
Project No. 116-027
For Bids Due July 26111y,1W December 19, 2017 at 9am
BIDDER Martell Electric LLC
BASE BID
Description
Quantity
Unit
Unit Price.
Total Amount
1
Mobilization & Demobilization
1
LS
$4,972.00
$4,972.00
2
Maintenance of Traffic
1
LS
$1,559.00
$1,559.00
3
Traffic Signal Equipment, Remove & Salvage
1
LS
$4,960.00
$4,960.00
4
Signal Cantilever Structure, Drilled Shaft
Foundation, T e A
4
EA
$1,563.00
$6,252.00
5
Signal Cantilever Structure, Single Arm 25 ft.
1
EA
$7,769.00
$7,769.00
6
Signal Cantilever Structure, Single Arm 30 ft.
3
EA
$8,107.00
$24,321.00
7
Traffic Signal Head, 3-Section, LED
6
EA
$ 794.00
$4,764.00
8
Traffic Signal Head, 5-Section, LED
2
EA
$1,340.00
$2,680.00
9
Handhole, Signal, Type 1
4
EA
792.00
$3,168.00
10
Pedestrian Push Button wl R10-3e sign
8
EA
$ 901.00
$7,208.00
11
Pedestrian Signal Head with Countdown, 18-
inch
8
EA
$ 809.00
$6,472.00
12
Conduit, HDPE, 2-inch, Schedule 80
500
LF
$ 9.87
4 935.00
13
Conduit, HDPE, 3-inch, Schedule 80
50
LF
$10.74
537.00
14
Signal Cable, Control, Copper 7c/14GA
415
LF
$ 2.18
$ 904.70
16
Signal Cable, Control, Copper 5cl14GA
1574
LF
$ 2.03
$3,195.22
17
Signal Cable, Service, Copper 3ci8
25
LF
$ 2.55
$ 63.75
18
Vehicle Video Detection System
4
EA
$9,776.00
$39,104.00
19
Traffic Si nai Controller and Cabinet, P-1
1
EA
$24 931 00
$24,931.00
20
Controller Cabinet Foundation, P-1
1
EA
$ 694.00
694.00
21
TESCO Cabinet and Foundation
1
EA
$6,517.00
6 517.00
22
Soddin
70
SYS
$ 28.60
2 002.00
23
Sidewalk
106
SYS
$ 78.75
$8,347.50
24
Special Concrete Curb
150
LE
$ 42.00
$6,300.00
25
HMA Pavement Patch
35
SYS
$ 294.00
$9,450.00
26
Sidewalk Curb Ramp
36
SYS
$ 262.50
$9,450.00
Version 1011712017 Contractor's Bid for Public Works - 7 Addendum 1
Description
Quantity
Unit
Unit Price
Total Amount
27
Slqn, Sheet, with Legend 0.100 IN
26
SFT
$32.70
$ 850,20
28
Line Removal
390
LF
$ 5.25
$2,047.50
29 11
24" White Thermoplastic
110
LF
$ 7.88
$ 866.80
30
6" Solid White Thermoplastic Line
420
LF
$ 2.10
$ 882.00
31
4" Solid Yellow Thermo
226
LF
$1.30
$293.80
32
4" Solid White Thermoplastic Line
470
LF
$1.30
$611,00
33
Pavement Message Marking, Left Turn Arrow
2
EA
$105.00
$ 21 MO.
BASE BID TOTAL $197,157.47
Bidder (Firm): ._Martell Electric, LLC
Address: 4601 Oeveland Rd
CitylState/Zip: $DAh.8 IN 46628 Telephone Number: (_ 574) 271-5000
By
(Signature)
Jennifer M. Brown- President
(Printed, Narne of Person Signing)
Version 10/17/2017 Contractor's Bid for Pubfic, Works - 8 Addendum #1
CONTRACTOR:
(Name, legal status and address)
Martell Electric, LLC
4601 Cleveland Road
South Bend, IN 46628
Bond No
SURETY: Western Surety Company: South Dakota Corporation
(Name, legal status and principal place
of business)
333 S. Wabash Avenue
41 st Floor
Chicago, IL 6,0604
OWNER:
(Name, legal status and address)
City of South Bend, Indiana
Board of Public Works
County -City Building, Room 1316
227 W. Jefferson Blvd.
South Bend, IN 46601
BOND AMOUNT. Five percent (6%) of accompanying bid
This document has important legal
consequences. Consultation with
an attorney is encouraged with
respect to its completion or
modification.
Any singular reference to
Contractor, Surety, Owner or
other party shall be considered
plural where applicable.
PROJECT:
(Name, location or address, and Peject number, if any)
Jefferson and Twyckenham Signal Improvements
Project No. 11 6-027
E. Jefferson Blvd. and S. Twyckenham Cr., South Bend
The Contractor, and Surety are bound to the Owner in the amount set forth above, for the payment of which the
Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and
severally, as provided herein. The conditions of this Bond are such that if the Owner accepts the bid of the Contractor
within the time specified in the bid documents, or within such time period as may be agreed to by the Owner and
Contractor, and the Contractor, either (1) enters into a contract with the Owner in accordance with the terms of such
bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted
in the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful performance of such Contract
and for the prompt payment of labor and material furnished in the prosecution thereof; or (2) pays to the Owner the
difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount
for which the Owner may in good faith contract with another party to perform the work, covered by said bid, then this
obligation shall be null and void, otherwise to remain in full force and effect. The Surety hereby waives any notice of
an agreement between the Owner and Contractor to extend the time in which the Owner may accept the bid. Waiver of
notice by the Surety shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time for
acceptance of bids specified in the bid documents, and the Owner and Contractor shall obtain the Surety's consent for
an extension beyond sixty (60) days.
If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall
be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor.
When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the Project,
any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and
provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. When so
furnished, the intent is that this Bond shall be construed as a statutory bond and not as a common law bond.
Signed and sealed this 19th day of December 2017
. . ... .......
A
fitness)
(Witness)
Martell Electric, LL
(Pri Lp (Seal)
(ntl n fifer B wn, PresWent
West6 Sure Company
(Surety)
(Intl J. eviri Hughes, Attor -In-Fact
Printed in cooperation with the American Institute of Architects (AIA).
The language in this document conforms to the language used in AIA Document A310 - Bid Bond - 2010 Edition.
Western Surety Company
POWER OF ATTORNEY APPOINTING INDIVIDUAL, ATTORNEY -IN -FACT
Know All Men By These Presents, That WESTERN SURETY COMPANY, a South Dakota corporation, is a duly organized and existing corporation
having its principal office in the City of Sioux Falls, and State of South Dakota, and that it does by virtue of the signature and seal herein affixed hereby
make, constitute and appoint
Thomas J Me Govern, Harold E Everett, Elaine K Miller, J Kevin Hughes, Thomas
J Van Dyck, Melody S Hoerl, Jada M Karst, Melinda S Jagger, Tracie M Me Bride, Connie
J Messer, Individually
of Fort Wayne, IN, its true and lawful Attorney(s)-in-Fact with full power and authority hereby conferred to sign, seal and execute for and on its behalf
bonds, undertakings and other obligatory instruments of similar nature
- In Unlimited Amounts -
and to bind it thereby as fully and to the same extent as if such instruments were signed by a duly authorized officer of the corporation and all the acts of said
Attorney, pursuant to the authority hereby given, are hereby ratified and confirmed.
This Power of Attorney is made and executed pursuant to and by authority of the By -Law printed on the reverse hereof, duly adopted, as indicated, by
the shareholders of the corporation.
In Witness Whereof, WESTERN SURETY COMPANY has caused these presents to be signed by its Vice President and its corporate seal to be
hereto affixed on this 12th day of October, 2016.
WESTERN SURETY COMPANY
-*Paul T. Bruflat, Vice President
State of South Dakota I
55
County of Minnehaha
On this 12th day of October, 2016, before me personally came Paul T. Bruflat, to me known, who, being by me duly sworn, did depose and say: that
he resides in the City of Sioux Falls, State of South Dakota; that Ire is the Vice President of WESTERN SURETY COMPANY described in and which
executed the above instrument; that he knows the seal of said corporation; that the seal affixed to the said instrument is such corporate seal; that it was so
affixed pursuant to authority given by the Board of Directors of said corporation and that he signed his name thereto pursuant to like authority, and
acknowledges same to be the act and deed of said corporation.
My commission expires
J. MOHR
,�;r�NOrMYPa3aC
June 23, 2021 �irdkOaTNtl^xoT^ sir
J. Mohr, Notary Public
CERTIFICATE
I, L. Nelson, Assistant Secretary of WESTERN SURETY COMPANY do hereby certify that the I'ower.of AIIQrney hereinabove set forth is still in
force, and further certify that the By -Law of the corporation printed on the reverse hereon is still in ro; ce. frr te:timonywhereof I have hereunto subscribed
My name and affixed the seal of the said corporation this 19
t` h day of DeCemh r—_ , --2D-1-7
,.yuatrr�, WESTERN ,S TRETY COMPANY
. r........
Hy,HpP�„ iti -.
i L. on, Assistant Secretary
Farm F4280-7-2012
1316 COUNTY -CITY BU] LDINC; I A -IV , A /, , JJJD;� "
Now 5,74/ 235-9251
'VARD FAX 5741235-9171
227 W. JEFFERSoN Mum,
Souni BFND, INDIANA 46601-1830
TDD 5741235-5567
—1865,
CITY OF SOUTH BEND PETE BuTTicIEG, MAYOR
BOARD OF PUBLIC WORKS
Date: December 14,2017
To: All Planholders
From Linda M. Martin, Clerk, Board of Public Works
Subject Addendum Number: I
Project Name: Jefferson and Twyckenhain Signal Improvements
Project No.: 116-027
Date Received: December 15, 2017
This addendum is being forwarded to you for the above referenced project.
Please sign below and acknowledge receipt of this Addendum by
faxing this sheet to the Board of Public Works at (574) 235-9171
within 48 hours of receipt. A copy MUST also be included with your
bid package upon submittal.
Notes:
The attached documents are hereby added to the Specifications and Contract
Documents and become a part of herein.
("n n1lu,
,**.r
Authol
Date:
IkAnrtaH Portrin I I f.
0 0 1 : W=1111
wel LIN I= to] a" :.]III a*J ;A gli gq mffly
CHECKLIST FOR BIDDERS
Project Name Jefferson and Twyckenham Signal Improvements
Project No. 116-027
For Bids, Due JuJy4W11-,-2M December 19, 2017 at 9am
From, time to time the South Bend Board of Public Works finds it necessary to reject a bid because
it does not comply with statutory requirements. In preparing your bid, please use the: following
checklist in order to make sure that your bid is done in the proper manner.
Proper bid security included. The bidder has the option of providing either a Certified Check
x or Bid Bond.
Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely
X executed.
Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments
with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and
x CertiflcaUon of use of United States Steel Products or Foundry Products.
Proof of MBEANBE Participation Goal Form [MWBE-1,O]. If minimum parficip,ation goal is not
met, also provide Evidence of Good Faith Efforts Form [MWBE-2,O] and MBEANBE Contacted
x Form [MWBE-2,1],
x Acknowledge Receipt of 1, Addendum(s) included with the bid,
x All required additional information is included with the Ibid.
Proposal statements and other affidavits all signed by the proper party with name either
printed or typed underneath signature,
X This checklist submitted with the Bid..
This checklist Is provided for bidders use in assuring compliance with required
documentation; however, it does not include all specifications, requirements and does not
relieve the bidder of the need to read and comply with the specifications.
Bidder: Martell, Electric, LLC_ Date: December 19, 2017.
By Authorized
Signature:
Print Name & I
Version 10/17/2017 Contractor's Bid for Public Works - 1 Addendum #1
PART 11
(For projects of $100,000 or more -- IC 36-1-12-4)
These statements to be submitted under oath by each bidder with and as part of his bid.
Attach additional pages for each section as needed.
SECTION I EXPERIENCE QUESTIONNAIRE
1. Attach information regarding projects your organization has completed for the period of one
(1) year prior to the date of the current bid.
2. Attach a listing of public works projects currently in process of construction by your
organization.
3. Attach information regarding any failure to complete any work awarded to you and the
location thereof.
4. Attach references from private firms for which you have performed work.
SECTION It PLAN AND EQUIPMENT QUESTIONNAIRE
1. Attach an explanation of your plan or layout for performing proposed work. (Examples could
include a narrative of when you could begin work, complete the project, number of workers,
etc. and any other information which you believe would enable the City of South Bend to
consider your bid.)
2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside
your own firm who have performed part of the work) that you have used on public works
projects during the past five (5) years along with a brief description of the work done by each
subcontractor.
3. If you intend to sublet any portion of the work, attach the name and address of each
subcontractor, equipment to be used by the subcontractor, and whether you will require a
bond. However, if you are unable to currently provide a listing, please understand a listing
must be provided prior to contract approval. Until the completion of the proposed project, you
are under a continuing obligation to immediately notify the City of South Bend in the event that
you subsequently determine that you will use a subcontractor on the proposed project.
4. Attach a listing of equipment you have available to use for the proposed project.
5. Have you entered into contracts or received offers for all materials which substantiate the
prices used in preparing your proposal? if not, attach an explanation for the rationale used
which would corroborate the prices listed.
SECTION III CONTRACTOR'S FINANCIAL STATEMENT
Attachment of bidder's financial statement is mandatory. Any bid submitted without said
financial statement as required by statute shall thereby be rendered invalid. 'The financial
statement provided hereunder to the City of South Bend awarding the contract must be specific
enough in detail so that said City of South Bend can make a proper determination of the bidder's
capability for completing the project if awarded.
Version 10/17/2017 Contractor's Bid for Public Works - 3 Addendum #1
R ELL
ELECTRIC LLC 4601 CLEVELAND, ROAD SOUTH BEND, IN 46628 PHONE: 574-271-5000 FAX: 574-271-5400
&6;WF_qZC'5 'ii Z�' EERS
PART II
Section 1: Experience Questionnaire
1. Projects completed for the period of one (1) year prior to the date of current bid':
--- Contract
Amount
Mass of
Work
Completion
Date
Name & Address of Owner
783,270
Electrical
Q1 2017
City of South Bend, County City Building Room 1316, 227 W
Jefferson, South Bend, IN 46601
487,0 0-0
-Electrical
_Q3 2017
School City of Mishawaka, 1402 S Main St, (Mishawaka, IN 46544
5221,410
Electrical
. 042017
Ambrose Property Grou, 1540 Trinity..Place, Mishawaka, IN 46545
2. Public works projects currently in process:
_Contract
Amount
Class of
Work
Completion
Date
Name & Address of Owner
664,654
Electrical
Q1 2018 _
City of Plymouth, 900 Oakhill Awe, .Plymouth, IN
333,700
Electrical
Q3 2018 _
City of South Bend, 131i6 County City Building
226,412
Electrical
Q2 2018
INDOT, 100 N Senate Ave, Indiana alis, IN...�
3. Failure to complete work:
Martell Electric, LLIC has never failed to complete any work awarded to us.
4, References from private firms which Martell Electric has performed work:
a. Panzica Building Corporation, 416 E Monroe St, Suite 320, South Bend, IN 46601
b., Washington Square Development, 213 W Washington St, South Bend, IN 46601
c. Indiana Toll Road Concession Company, 52551 Ash Road, Granger, IN 46530
Section II: Plan & Equipment Questionnaire
1. Explanation plan/layout for performing proposed work:
Martell Electric, LLC intends to utilize our pre -construction services department and pre-
fabrication division in the proposed schedule and execute accordingly.
2. Subcontractors that have been used:
a. Core Bore, 110 Ullery Rd, Niles, MI 49120 — Directional Boring
b, Schenk Lightning Rod, Inc, 53140 Poppy Rd, South Bend, IN 46628 — Lightning
Protection
c. Premium Concrete, 712 Richmond St, Elkhart, IN 46516 — Concrete
d. Traffic Control Specialists, 1810 W Pacific Ave, Knox, IN 46534 — MOT
PAA
3. Intended sublet work:
A listing of intended subcontractors will be provided prior to contract approval.
4. Equipment available for use:
Martell Electric, LLC owns, maintains and operates all necessary tools and equipment.
This includes but is not limited to, Bucket Trucks, Scissor Lifts, Scaffold, Mini Excavator,
Trenchers and Line Trucks. Anything not owned, will be rented.
5. Contracts or offers for all materials:
We have received quotations for material, but have not entered into any contracts
related to thiis project.
N
When the prospective Contractor is unable to certify to any of the statements below, It shall attach an explanation to this Affidavit.
CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION
REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGXBIUITY VERIFICATION, NON-
DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL
PRODUCTS OR FOUNDRY PRODUCTS
(Must be completed for all quotes and bids. Please type or print)
STATE OF INDIANA )
) SS:
ST. JOSEPH COUNTY )
The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of peijuiy
that:
1. Contractor has not, nor has any other member, representative, or agent of the firm, company,
corporation or partnership represented by hint, entered into any combination, collusion or agreement with
any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding
nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and
without any agreement, understanding or combination with any other person in reference to such bidding.
Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or
indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and
2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals
are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from
participation in this transaction by any Federal department or agency; and
3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in
investment activities in Iran.
a. For purposes of this Certification, "Iran" means the government of Iran and any agency
or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as
amended from time -to -tune.
b. As provided by Ind. Code § 5-22-16.5-5, as amended from time -to -time, a Contractor
is engaged in investment activities in Iran if either:
i. Contractor, its successor or its affiliate, provides goods or services of twenty
million dollars ($20,000,000) or more in value in the energy sector of Iran;
or
ii. Contractor, its successor or its affiliate, is a financial institution that extends
twenty million dollars ($20,000,000) or snore in credit to another person for
forty-five (45) days or more, if that person will (i) use the credit to provides
goods and services in the energy sector in Iran; and (ii) at the time the
financial institution extends credit, is a person identified on list published by
the Indiana Department: of Administration.
Version 10/17/2017 Contractor's Bid for Public Works - 4 Addendum #1
q. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any
employee or contract with a person that the Contractor subsequently learns is an unauthorized alien,
Contractor agrees that helshe/it shall enroll in and verify the work eligibility status of all of Contractor's
newly hired employees through the E-Verify Program as defined by LC, 22-5-1.7-3. Contractor's
documentation of enrollment and participation in the E-Verify Program is included and attached as part of
this bid/quote; and
5. Contractor shall require his/her/its subcontractors performing work under this public contract to
certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain
any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien,
and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees
to maintain this certification throughoutthe term of the contract with the City of South Bend, and understands
that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision
no Iater than thirty (30) days after being notified by the City.
6. Persons, partnerships, corporations, associations, or joint venturers awarded a contract by the City
of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or
applicant for employment in the perfomiance of a City contract with respect to hire, tenure, terms, conditions,
or privileges of employment, or any matter directly or indirectly related to employment because of race, sex,
religion, color, national origin, ancestry, age, gender expression, gender identity, sexual orientation or
disability that does not affect that person's ability to perform the work.
In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any
combination of the foregoing including, but not limited to, public works contracts awarded under public
bidding laws or other contracts in which public bids are not required by Iaw, the City, its agencies, boards,
or commissions may consider the Contractor's good faith efforts to obtain participation by those Contractors
certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise
("WBE") as a factor in determining the lowest, responsible, responsive bidder.
In no event shall persons or entities seeking the award of a City contract be required to award a subcontract
to an MBE/WBE; however, it may not unlawfully discriminate against said WBE/MBE. A Ending of a
discriminatory practice by the City's MBE/WBE Utilization Board shall prohibit that person or entity from
being awarded a City contract for a period of one (1) year from the date of such determination, and such
determination may also be grounds for terminating the contact for which the discriminatory practice or
noncompliance pertains.
7. The undersigned contractor agrees that the following nondiscrimination commitment shall be made
a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its
agencies, boards or commissions.
Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the
performance of this contract with privileges of employment, or any matter directly or indirectly related to
employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation,
handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of
contract,
I, the undersigned bidder or agent as contractor on a public works project, understand my statutory
obligations to the use of steel products or foundry products made In the United States (I.C. 5-16-8-1).1 hereby
certify that I and all subcontractors employed by me for this project will use steel products or foundry
products made in the United States on this project if awarded. 1 understand I have an affirmative duty to
notify the City in my bid that my proposal does not include the use of steel products or foundry products
made in the United States. I understand it is my sole obligation and responsibility to provide a justification
to the City, subject to review and approval, why the cost of United States made steel or foundry products is
unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry
products made in the United States, the City, through its director of public works, shall make a determination
if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder
Version 10/17/2017 Contractor's Bid for Public Works - 5 Addendum #1
may result in forfeiture of contractual payrnents.
I hereby affirm tinder the penalties of perjury that the facts and information contained in the foregoing bid
for public works are true and correct.
Dated this 19th day of pecerne; 2017
Martell Electric, LLC
Conti torJBid
,
Si a" lre -okZontractor/13 idder or Its, Agent
Jennifer M. Brown- President
Printed Name and Title
Subscribed and sworn to before me this ----Jq1b— day of December 2017
My Commission Expires 2/28/2023
.Notary Public
County of Residence St.
R F N A BALDWIN
Notary
Pubtic, SUkO 0I IM113117
1101AQ % ��
12* _ --
S1 JOF�oph counly
,
SEM
Cormnis!Jon It 663664
My col-rlmisrion Exp4os
r-Obf(Jory 2.8, 2023
Version 10/1712017 Contractor's Bid for Public Works - 6 Addendum #1
CD
I
ID 0
(D
3
Cr
CD
rn -4 -0
z
E'
3
0)
z 0
(D
pa
0 (:>
0) =3 5
CL
>
R
o
U)
CY) -
(D (D
U)
(D
ou
(D
0
m
,41 0
is co
(D
0'> C)
77
0
(D
0
C)
0
(D
;>
*
o
(D
CD
CL
m
CL
to ca
L
maw.,
a� (D
0 O.
CJtCD
PO
0
ul
m
0
0 0
00
:3
(D
0
0
0
(D
0
z
m
3
(D
t-
CD
es
0
2
;T --i
oil
m
0
0
m
m
M
0
0
V 0
o 5.
CL
-.17
cr 0
r oCL
EL
0 0
0
M
,Z o
CAI
0
,3 m
r
Cr
m 0
m
r+ u
m
m
m
,0(0
,-% E
A) OU
m
0 w
4z m
v
0 w
9
ca
m
I -on
M, ;o
.0
X
0
>
:d
0
z
IS Qtvkt.�,
JoTil
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY
DEVELOPMENT PROGRAM
FORM MWBE-2.0
EVIDENCE OF GOOD FAITH EFFORTS
This completed form should be included as part of the Bids,documents related to City of South Bond Public
Works Projects requiring Good Faith Efforts to obtain MBEfWI3E participation. It Is the bidder's sole
responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority
or Women's owned business as defined by the Indiana Department of Administration (11IDOA").
Project Number:
Project Name:
Bidder:
Contact Person:
Address:
City:
Email:
116-027
Date: December 19, 2017
Jefferson and Twyckenharn Signal liaprovements
M dell Electric, LLQ
Dan, CQnnlars. Telephone, (574) 271-rninn
4601 Cleveland Rd
.;South i Bend State: IN Zip: 46628
dconnors(a)martelielectric;com
To determine whether a bidder has demonstrated good faith efforts to reach the MBENVBE utilization goals set
forth in the City of South Blend Public Works Project Specifications, the City and its agencies, boards, or
commissions, REQUIRE, ALL of the following Good Faith Efforts as listed in the table below*:
EVIDENCE OF GOOD FAITHI EFFORTS
MBEIWBE LIST(S): The bidder reviewed the City of South Bend's Minority and Women Business
Enterprise Diversity Development Program, which uses the IDOA approved list of Minority and Women
Owned Business as found on their website (http://www,in.gov/idoa).
ACTION (ADVER'TISE/CONTACT): In order for your bid to be deemed responsive, the City of South
Ben quires that all perspective bidders complete no less than 2 of the following:
Me Attend MI pre -bid meetings scheduled by the City to inform MBEIWBEs of contracting and
subcontracting opportunities,
2. Advertise In general circulation and/or trade association publications concerning subcontracting
opportunities, and allow MBE/WBEs reasonable time to respond. CA reasonably calculated 3) Perform
to written notice in a manner bly
any and all necessary steps provide
to inform MBE/WBEs of subcontracting opportunities and allowed sufficient time for them to
participate effectively.
(4) Utilize pre-existing services of available community organizations, small and/or disadvantaged
business assistance offices and other organizations that provided assistance in the recruitment
and placement of MBE/WBE firms.
"Bidder must circle or otherwise notate which of the two (2) required actions were performed,
GOOD FAITH NEGOTIATIONS: The bidder negotiated in good faith with interested MBE,NVBEs,
providing such MBEMBE's with adequate information about the plans, specifications and other
cy�including
requirements of the subcontract and did not reject MBENVBEs as unqualified without sound business
reasons based on a thorough investigation of their capabilities.
SMALL CONTRACTS ): The bidder selected specific portions of the work to be performed by
MBENVB,Es in order to increase the likelihood of meeting the MBENVBE goals (including breaking down
contracts into smaller units to facilitate MBE/WBE participation)
CONTRACT RECORDS: The bidder has maintained the following records for each MBE/WBE that has
bid on the subcontracting opportunity:
1. Name, address, and telephone number;
2. A description of information provided by the bidder or subcontractor; and
3, A statement of whether an agreement was reached, and if not, why not, including any reasons for
concluding that the MBENVBE was unqualified to perform the job.
*Proper demonstration of Good Faith Effort requires your initials next to all Or trie aoove DOXeS. Any
omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of
South Bend reserves the right to request additional information.
Version 10/17/2017 Contractor's Bid for Public Works - 10 Addendum #1
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY
DEVELOPMENT PROGRAM
FORM MWBE-2.1
MBEIWBE CONTACTED
This completed form should be supplied with Bids that pertain to Cliy of South Bend Public Works Projects
requiring contacted MBE/WBE to obtain Good Faith Efforts. It is the bidder's sole responsibility to verify
whether any listed minority or woman business meets the qualifications of a Minority or Women's owned
business.
�PACE---L—OF.
Project Number;
116-027
A 1 ;F-rIM03111150 MIC me, I
Project Name: Jefferson and Twy"k vements
Bidder: MartdII Electric. LLC
0
President
(Date)
MBE/WBE Firm Premium Concrete Servic)s, Inc
Owner or Contact at MBEANBE Firm Rota Becker
Telephone: (574) 264-0196 Fax,. Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
Received commitment from Premium Concrete Services, Inc that they will participate if we are awarded
RESULTS OF CONTACT WITH THE MOE/WBE FIRM:
MBENVBE Firm
Owner or Contact at MBENVBE Firm
Telephone: Fax: Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
RESULTS OF CONTACT WITH THE MBE/WBE FIRM'
Version 10/17/2017' Contractors Bid for Public Works - 11 Addendum #1
Page 1 of 1
MARTELL QUOTE No.:
19-1217
:,MARTELL
RE;
116-027
JEFFERSON AND TWYCKENHAM
-C".C7N TI�ACT'L'7l=iS /S. L��IQ/IVEEAS
SIGNAL IMPROVEMENTS
TO;
4601 Cleveland Road
South Bend, IN 46628
PHONE: (574) 271-5000
DATE 12/19/17
FAX: (574) 271-5400
UNIT
ITEM NO.
QTY
UNIT
DESCRIPTION
TOTAL COST
COST
1
1
LSUM
MOBILIZATION AND DEMOBILIZATION
4,972.00
4,972.00
2
1
LSUM
MAINTAINING TRAFFIC
1,559.00
1,559.00
3
1
LSUM
TRAFFIC SIGNAL EQUIPMENT, REMOVE & SALVAGE
4,960.00
4,960,00
4
4
EA
SIGNAL POLE FOUNDATION, 36 IN X 144 IN
1,563.00
6,252,00
5
1
EA
SIGNAL CANTILEVER STRUCTURE, SINGLE ARM, 25 FT.
7,769.00
7,769,00
6
3
EA
SIGNAL CANTILEVER STRUCTURE, SINGLE ARM, 30 FT.,
8,107.00
24,321.00
7
6
EA
TRAFFIC SIGNAL HEAD, 3 SECTION, LED
794.00
4,764.00
8
2
EA
TRAFFIC SIGNAL HEAD, 5 SECTION, LED
1,340.00
2,680.00
9
4
EA
HANDHOLE, SIGNAL, TYPE I
792.00
3,168.00
10
8
EA
PEDESTRIAN PUSH BUTTON W/ R10-3e SIGN
901.00
7,208.00
11
8
EA
PEDESTRIAN SIGNAL HEAD WITH COUNTDOWN, I8-INCH
809.00
6,472.00
12
500
LFT
CONDUIT, HDPE, 2 IN., SCHEDULE BO
9.87
4,935.00
13
50
LFT
CONDUIT, HDPE, 3 IN., SCHEDULE 80
10.74
537.00
14
415
LFT
SIGNAL CABLE, CONTROL, COPPER, 7C/146A,
2.18
904.70
16
1574
LFT
SIGNAL CABLE, CONTROL, COPPER, 50146A,
2.03
3,195.22
17
25
LFT
SIGNAL CABLE, SERVICE, COPPER, 3CIBGA.
2.55
63.75
18
4
EA
VEHICLE VIDEO DETECTION SYSTEM
9,776.00
39,104.00
19
1
EA
TRAFFIC SIGNAL CONTROLLER AND CABINET, P]
24,931.00
24,931.00
20
1
EA
CONTROLLER CABINET FOUNDATION, PI
694,00
694.00
21
1
EA
TESCO CABINET AND FOUNDATION
6,517,00
6,517.00
22
70
SYS
SODDING
28.60
2,002.00
23
106
SYS
SIDEWALK
78.75
8,347.50
24
150
LFT
SPECIAL CONCRETE CURB
42.00
6,300.00
25
35
SYS
HMA PAVEMENT PATCH
294.00
10,290.00
26
36
SYS
SIDEWALK CURB RAMP
262.50
9,450.00
27
26
SFT
SIGN, SHEET, WITH LEGEND 0.100 IN
32.70
850.20
28
390
LFT
LINE REMOVAL
5.25
2,047.50
29
110
LFT
24" WHITE THERMOPLASTIC STOP LINE
7.88
866.80
30
420
LFT
6" SOLID WHITE THERMOPLASTIC LINE
2.10
882.00
31
226
LFT
4" SOLID YELLOW THERMOPLASTIC LINE
1,30
293.80
32
470
LFT
4" SOLID WHITE THERMOPLASTIC LINE
1.30
611,00
33
2
EA
PAVEMENT MESSAGE MARKING, LEFT TURN ARROW
105.00
210.00
(VOTES:
1
THIS QUOTE INCLUDES REVISIONS/ADDENDA 1.
2
THIS QUOTE DOES NOT INCLUDE ELECTRICAL UTILITY CHARGES
OF ANY TYPE.
3
THIS QUOTE 15 BASED ON STRAIGHT TIME LABOR RATES UNLESS
OTHERWISE DEFINED IN SPECIFICATIONS
4
THIS QUOTE I$ CONTINGENT UPON MARTELL ELECTRIC GETTING
ADEQUATE TIME TO COMPLETE OUR WORK.
5
THE ABOVE ITEMS ARE QUOTED AS A COMPLETE PACKAGE, NO
ITEM MAY BE DELETED WITHOUT PRIOR APPROVAL.
TOTAL.
197,157.47