HomeMy WebLinkAbout12122017 Board of Public Works MinutesAGENDA REVIEW SESSION DECEMBER 7, 2017 377
in that respect. Ms. Villaire stated this has a broader reach than any other tool they have
available.
- Award Bid — Wastewater Treatment Plant Headworks Influent Gate Improvements
Mr. Jacob Klosinski, Wastewater, stated when they bid this project they recognized that a foreign
sourced product could reduce costs significantly so they gave both options. He noted that per IC
5-16-8 it has to be a 15% or greater savings to not use domestic steel. He stated the lowest
globally sourced bid was not lower enough to justify the award, so he is recommending the
award to HRP Construction for American made steel. Mr. Klosinski stated their domestic steel
bid was the lowest in the amount of $966,500, and Thieneman Construction's foreign steel bid
was the lowest at $917,000. He stated the cost savings is $49,000, only 5.12% savings, so he is
recommending the award to HRP. Ms. Maradik asked if the specs were clear on local steel
versus foreign. Mr. Klosinski stated they were, the vendors were given both options. Ms. Dorau
questioned the line item cost difference. Ms. Kara Boyles, City Engineer, noted the 15% savings
applies to the overall project cost, not the products used. Mr. Gilot stated he supports the
recommendation, noting Mr. Klosinski has always done a good job on very large projects.
- Special Purchase — JP Morgan Bank
Mr. Michael Schmidt, Director of Purchasing, stated the city is intending to establish a
purchasing card program. He explained it will roll out slowly starting with Parks. He noted that
will allow them to see what works and what doesn't. Mr. Gilot questioned if there will be
training on the rules and use of the cards. Mr. Schmidt stated there will be some rules and
training. He informed the Board that there has been some back and forth with legal to make sure
the State QPA is the right QPA and the City can access it. He added if not, it will be removed
from the agenda. Mr. Schmidt stated this will qualify for the dollars back program applicable to
the city's credit card with JP Morgan. He noted the goal is to reduce the credit card usage. Ms.
Fritzberg asked if they will be able to do anything with these cards they can do with the credit
card. Mr. Schmidt stated there will be specific items that are allowed and not allowed, and the
City can determine those restrictions.
- Professional Services Agreement — EmNet, LLC
Mr. Gilot noted this agreement in the amount of $280,581 saves the City more than
$100,000,000 in capital.
No other business came before the Board. Upon a motion by Ms. Dorau, seconded by Ms.
Maradik and carried, the meeting adjourned at 11:29 a.m.
BOARD OF PUBLIC�VO S
A",
Gary A. Gilot, President
Elizabeth A. Maradik, Member
Therese J. Dorau, ember
/I---
Jam A. Mueller, Member
Suzanna M. Fritzberg, Member
ATTEST:
Linda M. Martin, Clerk
REGULAR MEETING DECEMBER 12, 2017
The Regular Meeting of the Board of Public Works was convened at 9:34 a.m. on December 12,
2017, by Board President Gary A. Gilot, with Board Members Elizabeth Maradik and Therese
Dorau present. Board Members James Mueller and Suzanna Fritzberg were absent. Also present
was Attorney Benjamin Dougherty.
1
REGULAR MEETING
DECEMBER 12, 2017 378
1
1
APPROVE MINUTES OF PREVIOUS, MEETING
Upon a motion made by Ms. Maradik, seconded by Ms. Dorau and carried, the Minutes of the
Agenda Review Session, Regular Meeting and Claims Review Meeting of the Board held on
November 22, November 28, and December 5, 2017, were approved.
OPENING OF BIDS — ONE (1) OR MORE, 2017 OR NEWER, TANDEM AXLE MULTI -USE
DUMP TRUCK — SPEC AD (STREET DEPARTMENT CAPITAL LEASE)
This was the date set for receiving and opening of sealed bids for the above referenced
equipment. The Clerk tendered proofs of publication of Notice in the South Bend Tribune and
the Tri-County News, which were found to be sufficient. The following bids were opened and
publicly read:
SELKING INTERNATIONAL
4849 W. Western Ave.
South Bend, IN 46619
Bid was signed by: Kenneth Waite
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
$36,000 Bid Bond was submitted (1 Tandem Multi -Use Dump Truck for Street Dept. + 1
Tandem Axle Dump Truck for Sewer).
Indiana Local Business Preference Claim Form submitted.
Description
Year/Make/Model
I Unit Price
2019 International Model 7400
1 $172,423.26
Alternate #
Description
Cost
Total
1
Front Snow Plow
$9,478.00
$9,478.00
2
CNG Fuel System
No bid
No bid
Estimated number of days for delivery from award date: 180 days
TRUCK CENTERS, INC. DB/A HILL TRUCK SALES
1011 W. Sample Street
South Bend, IN 46619
Bid was signed by: Rich Stopczynski
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
Ten percent (10%) Bid Bond was submitted.
Indiana Local Business Preference Claim Form submitted.
P
Description
Year/Make/Model
Unit Price
Complete Unit
Bid
2019 Freightliner Model 114SD with equipment
by W.A. Jones Truck Bodies & Equipment
$175,218.00
Alternate #
Description
Cost
Total
1
Front Snow Plow
$9,478.00
$9,478.00
2
CNG Fuel System
$43,220.00
$43,220.00
Estimated number of days for delivery from award date: 180 to 210 days
TRANS CHICAGO TRUCK GROUP
2333 W. 25 h Ave.
Gary, IN 46404
Bid was signed by: Dustin Waters
REGULAR MEETING
DECEMBER 12, 2017 379
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
Ten percent (10%) Bid Bond was submitted.
me
Description
Year/Make/Model
Unit Price
Tandem Axle
2019 Freightliner 108-SD
$171,094
Alternate #
Description
Cost
Total
1
Front Snow Plow
$10,306
$181,400
2
CNG Fuel System
$43,205
$224,605
Estimated number of days for delivery from award date: 270
Upon a motion made by Ms. Maradik, seconded by Ms. Dorau and carried, the above bids were
referred to Central Services for review and recommendation.
OPENING OF BIDS — ONE (1) OR MORE 2017 OR NEWER TANDEM AXLE DUMP
TRUCK — SPEC AF (SEWER DEPARTMENT CAPITAL)
This was the date set for receiving and opening of sealed bids for the above referenced
equipment. The Clerk tendered proofs of publication of Notice in the South Bend Tribune and
the Tri-County News, which were found to be sufficient. The following bids were opened and
publicly read:
SELKING INTERNATIONAL
4849 W. Western Ave.
South Bend, IN 46619
Bid was signed by: Kenneth Waite
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
$36,000 Bid Bond was submitted (1 Tandem Multi -Use Dump Truck for Street Dept. + 1
Tandem Axle Dump Truck for Sewer).
Indiana Local Business Preference Claim Form submitted.
I: 8
Descri tion
Year/Make/Model
Unit Price
2019 International Model 7400 Equipment by W.A.
Jones
$147,962.26
Year
Make/Model — Trade In
Unit Price
2000lVfN#IFVXJFBBIYHG10099
Unit SN464, Freightliner Dump Truck,
$5,000.00
Alternate #
Description
Cost
Total
1
Quick Hitch for Front Plow
$4,398.00
$4,398.00
2
Front Snow Plow
$9,478.00
$9,478.00
3
CNG Fuel System
No bid
No bid
4
Stainless Steel Monroe Tailgate Spreader
Model #MS966
$3,982.00
$3,982.00
Estimated number of days for delivery from award date: 150 days
TRUCK CENTERS, INC. D/B/A HILL TRUCK SALES
1011 W. Sample St.
South Bend, IN 46619
Bid was signed by: Rich Stopczynski
1
REGULAR MEETING
DECEMBER 12, 2017 380
1
1
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
Ten percent (10%) Bid Bond was submitted.
Indiana Local Business Preference Claim Form submitted.
ME
Description
Year/Make/Model
Unit Price
Complete
Unit Bid
2019 Freightliner Model 114SD with equipment by
W.A. Jones Truck Bodies & Equipment
$151,167.00
Year
Make/Model — Trade In
I Unit Price
2000
Unit SN464, Freightliner Dump Truck,
VIN#1 FVXJFBB I YHG10099
($5,000.00)
Alternate #
Descri tion
Cost
Total
1
Quick Hitch for Front Plow
$4,398.00
$4,398.00
2
Front Snow Plow
$9,478.00
$9,478.00
3
CNG Fuel System
$43,220.00
$43,220.00
4
Stainless Steel Monroe Tailgate Spreader
Model #MS966
$3,982.00
$3,982.00
Estimated number of days for delivery from award date: 180 to 210 days
TRANS CHICAGO TRUCK GROUP
2333 W. 25t' Ave.
Gary, IN 46404
Bid was signed by: Dustin Waters
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
Ten percent (10%) Bid Bond was submitted.
no
Description
Year/Make/Model
Unit Price
Tandem Axle
2019 Freightliner 108 SD
$153,894
Year
Make/Model — Trade In
Unit Price
2000
Unit SN464, Freightliner Dump Truck,
($7,500)
VIN#1FVXJFBBIYHG10099
Total
$146,394
Alternate #
Description
Cost
Total
1
Quick Hitch for Front Plow
$4,455.86
$150,850
2
Front Snow Plow
$10,306.00
$161,156
3
CNG Fuel System
$43,205
$204,361
4
Stainless Steel Monroe Tailgate Spreader
Model #MS966
$3,840.44
$208,201
Estimated number of days for delivery from award date: 270
Upon a motion made by Ms. Maradik, seconded by Ms. Dorau and carried, the above bids were
referred to Central Services for review and recommendation.
OPENING OF BIDS — TWO (2) MORE OR LESS 2018 OR NEWER 1/2 TON CREW CAB
FOUR WHEEL DRIVE PICKUP TRUCKS — SPEC AG (FIRE DEPARTMENT CAPITAL)
This was the date set for receiving and opening of sealed bids for the above referenced
equipment. The Clerk tendered proofs of publication of Notice in the South Bend Tribune and
the Tri-County News, which were found to be sufficient. The following bids were opened and
publicly read:
REGULAR MEETING
DECEMBER 12, 2017 381
MARTIN COUNTRY CHEVROLET, INC.
2705 N. Michigan St., PO Box538
Plymouth, IN 46563
Bid was signed by: Jennifer D. Martin
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
Ten percent (10%) Bid Bond was submitted.
Indiana Local Business Preference Claim Form submitted.
IC M
Description
I Year/Make/Model
Unit Price
RAM 1500
12018 RAM 1500 Crew Cab Long Bed
1 $27,255.00 each
Alternate #
Description
Unit Price
1
Bi-Fuel Conversion. Gasoline/CNG Conversion
N/A No Bid
with state of the art components and minimum
20 G.G.E. tanks
2
Utility type truck cap with 3 doors, no windows
N/A No Bid
painted to match truck
3
Roll type tonneau cover
N/A No Bid
Estimated number of days for delivery from award date: 90 Days — 03/31/18
Description
Year/Make/Model
Unit Price
Chev Silverado 1500
2018 Chev Silverado 1500 Crew Cab Long
Bed
$30,223.00 each
Alternate #
Description
Unit Price
1
Bi-Fuel Conversion. Gasoline/CNG Conversion with
N/A No Bid
state of the art components and minimum 20 G.G.E.
tanks
2
Utility type truck cap with 3 doors, no windows
N/A No Bid
painted to match truck
3
Roll type tonneau cover
N/A No Bid
Estimated number of days for delivery from award date: 90 Days — 03/31/18
ALTERNATIVE
Description
Year/Make/Model
Unit Price
RAM 1500
2018 RAM 1500 SSV Crew Cab 4x4 ShortBed
1 $27,760.00 each
Alternate #
Description
Unit Price
1
Bi-Fuel Conversion. Gasoline/CNG Conversion
N/A No Bid
with state of the art components and minimum 20
G.G.E. tanks
2
Utility type truck cap with 3 doors, no windows
N/A No Bid
painted to match truck
3 1
Roll type tonneau cover
N/A No Bid
Estimated number of days for delivery from award date: 90 Days — 03/31/18
JORDAN FORD
609 E. Jefferson Blvd.
Mishawaka, IN 46545
Bid was signed by: Debra Starkweather
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
1
I
REGULAR MEETING
DECEMBER 12, 2017 382
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
Ten percent (10%) Bid Bond was submitted.
Indiana Local Business Preference Claim Form submitted.
M.
Description
Year/Make/Model
Unit Price
4x4 Crew Cab
2018 Ford F150 XL
1 $30,945.00 each
Alternate #
Description
Unit Price
1
Bi-Fuel Conversion. Gasoline/CNG Conversion
$11,150.00 each
with state of the art components and minimum 20
G.G.E. tanks
2
Utility type truck cap with 3 doors, no windows
$1,884.00 each
painted to match truck ALUMINUM
3
Roll type tonneau cover SOFT
$448.00 each
COVER
Estimated number of days for delivery from award date: 84 to 98 days
Upon a motion made by Ms. Maradik, seconded by Ms. Dorau and carried, the above bids were
referred to Central Services for review and recommendation.
OPENING OF BIDS — ONE (1) OR MORE NEW FOUR WHEEL DRIVE COMPACT
TRACTOR WITH QUICK RELEASE LOADER BUCKET — SPEC AH (DEPARTMENT OF
COMMUNITY INVESTMENT CAPITAL)
This was the date set for receiving and opening of sealed bids for the above referenced
equipment. The Clerk tendered proofs of publication of Notice in the South Bend Tribune and
the Tri-County News, which were found to be sufficient. The following bid was opened and
publicly read:
BOBCAT OF FORT WAYNE
3630 Goshen Rd.
Fort Wayne, IN 46818
Bid was signed by: Todd Shepherd
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
Bid Bond was not submitted.
Indiana Local Business Preference Claim Form submitted.
1
Description Year/Make/Model Unit Price
XR3135HC 2016/LS/XR3135HC $26,000
Alternate #
Description
Cost
Total
1
Largest compatible brushog
$1,500.00
$1,500.00
2
Front grapple bucket 60" 621,
$3,400.00
$3,400.00
3
Front ballast box with ballast
$600.00
$600.00
4
2500 RPM Mid PTO
2000 RPM Mid PTO
Included
Included
Estimated number of days for delivery from award date: 10 days
Upon a motion made by Ms. Maradik, seconded by Ms. Dorau and carried, the above bid was
referred to Central Services for review and recommendation.
OPENING OF BIDS — ONE (1) OR MORE 2018 OR NEWER STANDARD 4X4 FOUR
DOOR UTILITY VEHICLE — SPEC Al (POLICE DEPARTMENT CAPITAL LEASE)
This was the date set for receiving and opening of sealed bids for the above referenced
equipment. The Clerk tendered proofs of publication of Notice in the South Bend Tribune and
REGULAR MEETING DECEMBER 12, 2017 383
the Tri-County News, which were found to be sufficient. The following bid was opened and
publicly read:
JORDAN FORD
609 E. Jefferson Blvd.
Mishawaka, IN 46545
Bid was signed by: Debra Starkweather
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
Ten percent (10%) Bid Bond was submitted.
Indiana Local Business Preference Claim Form submitted.
on
Description
Year/Make/Model
Unit Price
4x4 4 DR. SUV
12018 Ford Explorer XLT
$28,825.00 each
Estimated number of days for delivery from award date: 85 to 100
Upon a motion made by Ms. Maradik, seconded by Ms. Dorau and carried, the above bid was
referred to Central Services for review and recommendation.
OPENING OF BIDS — REPAIR AND INSTALLATION OF OVERHEAD DOORS FOR ALL
CITY DEPARTMENTS SPEC AJ (VARIOUS DEPARTMENTS OPERATING BUDGETS)
This was the date set for receiving and opening of sealed bids for the above referenced
equipment. The Clerk tendered proofs of publication of Notice in the South Bend Tribune and
the Tri-County News, which were found to be sufficient. The following bids were opened and
publicly read:
OVERHEAD DOOR COMPANY OF SOUTH BEND/MISHAWAKA
58745 Executive Drive
Mishawaka, IN 46544
Bid was signed by: Richard Love
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
Bid Bond not required
:n
Hourly Labor Rate Requirements
Cost
Service Call Hourly Rate
$145.00 (One Man Labor)
Labor Rate — Standard Commercial Garage Door
Hourly Rate
$165.00 (Two Man Labor)
Labor Rate — Concession Roll -Up Window
$145.00-165.00
24 Hour Emergency Rate
$145.00-165.00
Holiday Hourly Rate
$145.00-165.00
INDUSTRIAL DOOR OF NORTHERN INDIANA
3839 S. Main St.
South Bend, IN 46614
Bid was signed by: Rick Hunter
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
Bid Bond not required
j
I
REGULAR MEETING
DECEMBER 12, 2017 384
1
1
an
Hourly Labor Rate Requirements
Cost
Service Call Hourly Rate
$125.00
Labor Rate — Standard Commercial Garage Door Hourly
Rate
$125.00
Labor Rate — Concession Roll -Up Window
$125.00
24 Hour Emergency Rate
$175.00
Holiday Hourly Rate
$175.00
Upon a motion made by Ms. Maradik, seconded by Ms. Dorau and carried, the above bids were
referred to Central Services for review and recommendation.
OPENING OF BIDS — TWO (2) MORE OR LESS, 2018 OR NEWER, 18,000 LB. FOUR
WHEEL DRIVE CHASSIS WITH DUMP BEDS — SPEC AK (STREET DEPARTMENT
CAPITAL LEASE)
This was the date set for receiving and opening of sealed bids for the above referenced
equipment. The Clerk tendered proofs of publication of Notice in the South Bend Tribune and
the Tri-County News, which were found to be sufficient. The following bids were opened and
publicly read:
JORDAN FORD
609 E. Jefferson Blvd.
Mishawaka, IN 46545
Bid was signed by: Debra Starkweather
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
Ten percent (10%) Bid Bond was submitted.
Indiana Local Business Preference Claim Form submitted.
.n
Description
I Year/Make/Model
Unit Price
With l l' Dump
12018 Ford F550 4x4 Regular
1 $64,460.00 each
Alternate #
Description
Cost
Total
1
Plow Package: Front mounted western
$5,584.00 each
81/2' pro -plus or equal power angling
left and right. Plow to come equipped
with safety approved lights and
markers, and snow deflector
2
Front mounted 81/2' Western PVP Plus
$6,085.00 each
or equal. Plow to come equipped with
safety approved lights, markers, and
snow deflector
3
Dedicated CNG package with
$17,433.00
minimum 34 GGE tanks
each
4
10' flatbed mounted behind CNG tank
(DUMP
-$21,038.00
cabinet on an 84" CA chassis
$26,972
each
LESS 5845
FLATBED)
Estimated number of days for delivery from award date: Chassis & Dump Body 140 to
154 days
LAKE SHORE FORD
244 Melton Rd.
Burns Harbor, IN 46304
Bid was signed by: Don Hadley
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
REGULAR MEETING
DECEMBER 12, 2017 385
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
Ten percent (10%) Bid Bond was submitted.
.M
Description
Year/Make/Model
Unit Price
11' Dump
2018 Ford F550 4x4 18,OOOGWD
$64,589 ea. 84CA
Alternate #
Description
Cost
Total
1
Plow Package: Front mounted western
$5,835 ea.
$70,425 ea.
8 1/2 ' pro -plus or equal power angling
84CA
left and right, Plow to come equipped
with safety approved lights and
markers, and snow deflector
2
Front mounted 8 %2' Western PVP Plus
$6,250 ea.
$70,839 ea.
or equal. Plow to come equipped with
84CA
safety approved lights, markers, and
snow deflector
3
Dedicated CNG package with
$19,954 ea.
$84,543 ea.
minimum 34 GGE tanks
108CA
4
10' flatbed mounted behind CNG tank
$39,550
$77,526 ea.
cabinet on an 84" CA chassis
Includes
108CA
CNG option
Estimated number of days for delivery from award date: (not filled in)
Upon a motion made by Ms. Maradik, seconded by Ms. Dorau and carried, the above bids were
referred to Central Services for review and recommendation.
OPENING OF BIDS — SALE OF CITY OWNED PROPERTY — 111 S. DUNDEE STREET
This was the date set for receiving and opening of sealed bids for the above referenced property.
The Clerk tendered proofs of publication of Notice in the South Bend Tribune and the Tri-
County News, which were found to be sufficient. The following bid was opened and publicly
read:
EUNICE DELACRUZ
3102 W. Washington St.
South Bend, IN 46619
BID: $830.00
Mr. Michael Schmidt, Purchasing, asked Ms. Maradik if she had any financial gain from this bid
award, as a member of the review and award team. Ms. Maradik stated she did not. Therefore,
upon a motion made by Ms. Maradik, seconded by Ms. Dorau and carried, the above bid was
referred to Community Investment for review and recommendation.
OPENING OF BIDS — SALE OF CITY OWNED PROPERTY —117 S. DUNDEE STREET
This was the date set for receiving and opening of sealed bids for the above referenced property.
The Clerk tendered proofs of publication of Notice in the South Bend Tribune and the Tri-
County News, which were found to be sufficient. The following bid was opened and publicly
read:
EUNICE DELACRUZ
3102 W. Washington St.
South Bend, IN 46619
BID: $830.00
Mr. Schmidt, Purchasing, asked Ms. Maradik if she had any financial gain from this bid award,
as a member of the review and award team. Ms. Maradik stated she did not. Therefore, upon a
motion made by Ms. Maradik, seconded by Ms. Dorau and carried, the above bid was referred to
Community Investment for review and recommendation.
1
17Z a "Ilk
DECEMBER 12, 2017 386
i OF BIDS — IRON'%
1267:v7
i�VtiL GJ - rl\VJL'l.l 1V lJ. 11 I-VJJti k-L Is'Oti)
This was the date set for receiving and opening of sealed bids for the above referenced project.
The Clerk tendered proofs of publication of Notice in the South Bend Tribune and the Tri-
County News, which were found to be sufficient. The following bids were opened and publicly
read:
EDWARD & JONES CONCRETE
PO Box 502811
Indianapolis, IN 46250
Bid was signed by: Clayton Merriweather
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
Ten percent (10%) Bid Bond was submitted.
BID: Total Base Bid: $303,367.50
PREMIUM CONCRETE SERVICES, INC.
712 Richmond Street
Elkhart, IN 46516
Bid was signed by: Becky Yeakey
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
Five percent (5%) Bid Bond was submitted.
BID: Total Base Bid: $184,945.00
WALSH & KELLY, INC.
24358 SR 23
South Bend, IN 46614
Bid was signed by: Dustin Hilary
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
Five percent (5%) Bid Bond was submitted.
BID: Total Base Bid: $182,984.50
NORTHERN CONSTRUCTION SERVICES, CORP
PO Box 1299
Niles, MI 49120
Bid was signed by: Daniel Kulwicki Jr.
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
Five percent (5%) Bid Bond was submitted.
BID: Total Base Bid: $249,680.00
INDIANA EARTH, INC.
10343 McKinley Hwy.
Osceola, IN 46561
REGULAR MEETING
DECEMBER 12, 2017 387
Bid was signed by: Keith Stevens
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
Five percent (5%) Bid Bond was submitted.
BID: Total Base Bid: $208,699.50
RIETH-RILEY CONSTRUCTION CO., INC.
25200 SR 23
South Bend, IN 46614
Bid was signed by: Joshua McCormick
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
Five percent (5%) Bid Bond was submitted.
BID: Total Base Bid: $184,915.00
Upon a motion made by Ms. Maradik, seconded by Ms. Dorau and carried, the above bids were
referred to Engineering for review and recommendation.
OPENING OF BIDS — LEIGHTON DECK COATINGS PHASE II — PROJECT NO. 117-092
(RWDA TIF)
This was the date set for receiving and opening of sealed bids for the above referenced project.
The Clerk tendered proofs of publication of Notice in the South Bend Tribune and the Tri-
County News, which were found to be sufficient. The following bids were opened and publicly
read:
STRUCTURAL WATERPROOFING & RESTORATION LLC
335-B Cumberland Street
Memphis, TN 38112
Bid was signed by: Michael Kennedy
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
Five percent (5%) Bid Bond was submitted.
BID: $226,901.00
THE BLAKLY CORPORATION
8060 East 88 h Street
Indianapolis, IN 46256
Bid was signed by: Jack Blakley
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
Five percent (5%) Bid Bond was submitted.
BID: $190,868.00
PULLMAN SST, INC.
280 W. Jefferson Ave.
Trenton, MI 48183
REGULAR MEETING DECEMBER 12, 2017 388
Bid was signed by: J. Pete Wallace
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
Five percent (5%) Bid Bond was submitted.
BID: $189,552.60
RAM CONSTRUCTION SERVICES OF MICHIGAN, INC.
13800 Eckles Rd.
Livonia, MI 48150
Bid was signed by: Robert Mazur
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
Five percent (5%) Bid Bond was submitted.
BID: $189,000.00
Upon a motion made by Ms. Maradik, seconded by Ms. Dorau and carried, the above bids were
referred to Engineering for review and recommendation.
OPENING OF BIDS — 2017 DEMOLITIONS. PHASE 2 — PROJECT NO 117-121 (V&A
INITIATIVE)
This was the date set for receiving and opening of sealed bids for the above referenced project.
The Clerk tendered proofs of publication of Notice in the South Bend Tribune and the Tri-
County News, which were found to be sufficient. The following bids were opened and publicly
read:
INDIANA EARTH, INC.
10343 McKinley Hwy.
Osceola, IN 46561
Bid was signed by: Keith Stevens
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
Five percent (5%) Bid Bond was submitted.
IC �
DIVISION A TOTAL
$207,900
DIVISION B TOTAL
$166,700.00
DIVISION C TOTAL
$145,800
BID TOTAL (ALL DIVISIONS)
$520,400.00
R&R EXCAVATING. INC.
705 S. Beiger St.
Mishawaka, IN 46544
Bid was signed by: William Loudin
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
Five percent (5%) Bid Bond was submitted.
:m
REGULAR MEETING
DECEMBER 12, 2017 389
DIVISION A TOTAL
$171,900.00
DIVISION B TOTAL
$147,000.00
DIVISION C TOTAL
$129,900.00
BID TOTAL (ALL DIVISIONS)
$448,800.00
RITSCHARD BROS., INC.
1204 W. Sample Street
South Bend, IN 46619
Bid was signed by: Rachelle Dolniak
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
Five percent (5%) Bid Bond was submitted.
.m
DIVISION A TOTAL
$164,811.00
DIVISION B TOTAL
$132,697.00
DIVISION C TOTAL
$123,580.00
BID TOTAL (ALL DIVISIONS)
$421,088.00
GREEN DEMOLITION CONTRACTORS
523 Northbrook Dr.
Michigan City, IN 46360
Bid was signed by: Michael Brough
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
Five percent (5%) Bid Bond was submitted.
no
DIVISION A TOTAL
$168,965
DIVISION B TOTAL
$135,710
DIVISION C TOTAL
$139,410
BID TOTAL (ALL DIVISIONS)
$444,085.00
Upon a motion made by Ms. Maradik, seconded by Ms. Dorau and carried, the above bids were
referred to Engineering and Code Enforcement for review and recommendation.
OPENING OF QUOTATIONS — SOUTH BEND POLICE DEPARTMENT FORENSIC LAB
UPGRADE (POLICE DEPARTMENT GENERAL FUND)
Mr. Gilot advised that this was the date set for the receiving and opening of sealed quotations for
the above referenced project. The following quotation was opened and read:
ZIOLKOWSKI CONSTRUCTION, INC
4050 Ralph Jones Drive
South Bend, IN 46628
Quotation was submitted by Bill Favors
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
QUOTATION: $32,398
Upon a motion made by Ms. Maradik, seconded by Ms. Dorau and carried, the above Quotation
was referred to Engineering and Police Department for review and recommendation.
REGULAR MEETING DECEMBER 12, 2017 390
OPENING AND AWARD OF QUOTATIONS -. 2017 BRICK COLUMN REPAIRS —
PROJECT NO. 117-126 (EDIT)
Mr. Gilot advised that this was the date set for the receiving and opening of sealed quotations for
the above referenced project. The following quotations were opened and read:
C&S MASONRY RESTORATION
3725 N. Foundation Court, Suite AB
South Bend, IN 46628
Quotation was submitted by Steve Fields
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
QUOTATION: $11,493.00
ZIOLKOWSKI CONSTRUCTION INC.
4050 Ralph Jones Drive
South Bend, IN 46628
Quotation was submitted by Bill Favors
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
QUOTATION: $18,947.00
Upon a motion made by Ms. Maradik, seconded by Ms. Dorau and carried, the above Quotations
were referred to Engineering and Community Investment for review and recommendation. After
reviewing those quotations, Mr. Toy Villa, Engineering, recommended that the Board award the
contract to the lowest responsive and responsible bidder, C&S Masonry in the amount of
$11,493. Therefore, Ms. Maradik made a motion that the recommendation be accepted and the
quotation be awarded as outlined above. Ms. Dorau seconded the motion, which carried.
OPENING OF QUOTATIONS — MORRIS PERFORMING ARTS CENTER MAROUEE
DISPLAY INSTALLATION — PROJECT NO. 117-070A (MORRIS CAPITAL
IMPROVEMENT FUND)
Mr. Gilot advised that this was the date set for the receiving and opening of sealed quotations for
the above referenced project. The following quotations were opened and read:
NORTH AMERICAN SIGNS, INC.
3601 W. Lathrop
South Bend, IN 46628
Quotation was submitted by Sean Denison
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
QUOTATION: $29,800.00
U.S. SIGNCRAFTERS, INC.
216 Lincolnway East
Osceola, IN 46561
Quotation was submitted by Jeffrey Trenery
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
QUOTATION: $5,800.00
REGULAR MEETING
DECEMBER 12, 2017 391
BURKHART SIGN SYSTEMS
1247 Mishawaka Ave.
South Bend, IN 46615
Quotation was submitted by Richard Johnson
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
QUOTATION: $19,000.00
Upon a motion made by Ms. Maradik, seconded by Ms. Dorau and carried, the above quotations
were referred to Venues, Parks, and Arts for review and recommendation.
OPENING OF QUOTATIONS — SOUTH BEND FIRE DEPARTMENT OBSOLETE HELMET
REPLACEMENTS (FIRE OPERATING SUPPLIES)
Mr. Gilot advised that this was the date set for the receiving and opening of sealed Quotations for
the above referenced project. The following Quotation was opened and read:
PHOENIX SAFETY OUTFITTERS, LLC
1619 Commerce Road
Springfield, OH 45504
Quotation was submitted by Dennis Grogan
Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding
Investment with Iran, Employment Eligibility Verification, Non -Discrimination
Commitment for Contractors and Certification of Use of United States Steel Products or
Foundry Products was submitted.
QUOTATION:
Pricing for 200 units, more or less, throughout 2018. Unit colors specified at time of
purchase
Line 2 includes optional pricing for additional headband, ratchet and earlap per helmet
Item No
Est.
Item
Manufacturer
Unit Price
Qt.
HT-TRA-
200
EV 1 Traditional Firefighting
Honeywell
$220.00
EVO-W
Helmet, with internal EZ Touch
Face/Eye protection
HR-EEC-B
200
Black Normex Ear Cover
Honeywell
$15.00
Upon a motion made by Ms. Maradik, seconded by Ms. Dorau and carried, the above Quotation
was referred to the Fire Department for review and recommendation.
OPENING OF PROPOSALS — MORRIS PERFORMING ARTS CENTER WATER
SOFTENER SYSTEM (MORRIS IMPROVEMENTS FUND)
Mr. Gilot advised that this was the date set for the receiving and opening of sealed proposals for
the above referenced project. He stated the proposals will be reviewed and scored based on a
matrix system, by a team made up of City representatives. Mr. Gilot read the names of the
following vendors submitting proposals:
CANNEY'S WATER SOLUTIONS, INC.
1205 Mishawaka Avenue
South Bend, IN 46615
WATCON INDUSTRIAL WATER TREATMENT
2215 South Main Street
South Bend, IN 46613
CULLIGAN WATER
56861 Ferrettie Court
Mishawaka, IN 46545
1
C
REGULAR MEETING DECEMBER 12, 2017 392
Upon a motion made by Ms. Maradik, seconded by Ms. Dorau and carried, the above proposals
were referred to Venues, Parks, and Arts for review and recommendation.
OPENING OF PROPOSALS — VENUES, PARKS, AND ARTS EXPERIENTIAL
RECREATIONAL VEHICLE (PARKS GENERAL FUND
Mr. Gilot advised that this was the date set for the receiving and opening of sealed proposals for
the above referenced project. He stated the proposals will be reviewed and scored based on a
matrix system, by a team made up of City representatives. Mr. Gilot read the names of the
following vendors submitting proposals:
SPEVCO
8118 Reynolds Road
Pfafftown, NC 27040
XIBITZ
430 E 6ch Street
Dayton, OH 45402
CRAFTSMAN INDUSTRIES, INC.
3101 Elm Point Industrial Drive
Saint Charles, MO 63301
Upon a motion made by Ms. Maradik, seconded by Ms. Dorau and carried, the above proposals
were referred to Venues, Parks, and Arts for review and recommendation.
AWARD BID — STUDEBAKER MUSEUM ROOFTOP UNIT REPLACEMENT — PROJECT
NO. 117-081 (LIABILITY INSURANCE FUND)
Ms. Tara Weigand, Engineering, advised the Board that on November 28, 2017, bids were
received and opened for the above referenced project. After reviewing those bids, Ms. Weigand
recommended that the Board award the contract to the lowest responsive and responsible bidder
B.C. Mechanical, Inc., 882 Anderson Road, Niles, MI, 49120, in the amount of $157,000.
Therefore, Ms. Maradik made a motion that the recommendation be accepted and the bid be
awarded as outlined above. Ms. Dorau seconded the motion, which carried.
AWARD BID — WASTEWATER TREATMENT PLANT HEADWORKS INFLUENT GATE
IMPROVEMENTS — PROJECT NO. 117-026 (UTILITIES WASTEWATER CAPITAL)
Mr. Jacob Klosinski, Environmental Services, advised the Board that on November 28, 2017,
bids were received and opened for the above referenced project. After reviewing those bids, Mr.
Klosinski recommended that the Board award the contract to the lowest responsive and
responsible bidder HRP Construction, Inc., 5777 Cleveland Road, South Bend, IN 46624, in the
amount of $966,500. Therefore, Ms. Maradik made a motion that the recommendation be
accepted and the bid be awarded and the contract approved as outlined above. Ms. Dorau
seconded the motion, which carried.
AWARD BID — 100 WAYNE STREET PLAZA AND STREETSCAPE — PROJECT NO. 116-
047R (RWDA TIF)
Ms. Kara Boyles, Engineering, advised the Board that on November 14, 2017, bids were
received and opened for the above referenced project. After reviewing those bids, Ms. Boyles
recommended that the Board award the contract to the lowest responsive and responsible bidder
Premium Concrete Services, 712 Richmond Street, Elkhart, IN 46516, in the amount of $224,110
for the Base Bid and Alternate No. 2. Therefore, Ms. Maradik made a motion that the
recommendation be accepted and the bid be awarded and the contract approved as outlined
above. Ms. Dorau seconded the motion, which carried.
AWARD QUOTATION — ELECTRICAL VEHICLE CHARGER INSTALLATION —
(GRANTS AND SUBSIDIES)
Mr. Adam Parsons, Sustainability, advised the Board that on November 14, 2017, quotations
were received and opened for the above referenced project. After reviewing those quotations,
Mr. Parsons recommended that the Board award the contract to the lowest responsive and
responsible bidder, Martell Electric, LLC, 4601 Cleveland Road, South Bend, IN 46628, in the
REGULAR MEETING DECEMBER 12, 2017 393
amount of $3,210. Therefore, Ms. Maradik made a motion that the recommendation be accepted
and the quotation be awarded as outlined above. Ms. Dorau seconded the motion, which carried.
AWARD QUOTATION — COLLEGE AVENUE & SUNNYMEDE AVENUE TRAFFIC
CALMING — PROJECT NO. 117-113 (LRSA�
Mr. Roger Nawrot, Engineering, advised the Board that on November 28, 2017, quotations were
received and opened for the above referenced project. After reviewing those quotations, Mr.
Nawrot recommended that the Board award the contract to the lowest responsive and responsible
bidder, Selge Construction Co., Inc., 2833 S. IIth Street, Niles, MI 49120, in the amount of
$37,400. Therefore, Ms. Maradik made a motion that the recommendation be accepted and the
quotation be awarded as outlined above. Ms. Dorau seconded the motion, which carried.
AWARD QUOTATION — SOLAR RADAR SPEED DISPLAY SIGNS — PROJECT NO 117-
113A (LRSA)
Mr. Roger Nawrot, Engineering, advised the Board that on November 28, 2017, quotations were
received and opened for the above referenced project. After reviewing those quotations, Mr.
Nawrot recommended that the Board award the contract to the lowest responsive and responsible
bidder, Pemberton Davis Electric, 916 E McKinley, Mishawaka, IN 46545, in the amount of
$25,420. Therefore, Ms. Maradik made a motion that the recommendation be accepted and the
quotation be awarded as outlined above. Ms. Dorau seconded the motion, which carried.
AWARD QUOTATION — YORK ROAD SEWER REPAIRS — PROJECT NO 115-139R
LRSA
Ms. Tara Weigand, Engineering, advised the Board that on October 24, 2017, quotations were
received and opened for the above referenced project. After reviewing those quotations, Ms.
Weigand recommended that the Board award the contract to the lowest responsive and
responsible bidder, C&E Excavating, Inc., 53767 County Road 9, Elkhart, IN 46514, in the
amount of $63,388.20 for Division A, Division B, and Alternate 1. Therefore, Ms. Maradik made
a motion that the recommendation be accepted and the quotation be awarded as outlined above.
Ms. Dorau seconded the motion, which carried.
AWARD QUOTATION — CENTURY CENTER VESTIBULE HEATER — PROJECT NO 117
044 (HOTEL/MOTEL TAX)
Ms. Tara Weigand, Engineering, advised the Board that on November 28, 2017, quotations were
received and opened for the above referenced project. After reviewing those quotations, Ms.
Weigand recommended that the Board award the contract to the lowest responsive and
responsible bidder, Edward J. White, Inc., 1011 S. Michigan Street, South Bend, IN 46601, in
the amount of $32,205. Therefore, Ms. Maradik made a motion that the recommendation be
accepted and the quotation be awarded as outlined above. Ms. Dorau seconded the motion,
which carried.
APPROVE CHANGE ORDER NO. 3 — 2016 MANHOLE AND SEWER LINING — PROJECT
NO. 116-026 (SEWER CONTRACTUAL SERVICE)
Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted Change Order No. 3 on behalf
of Insituform Technologies USA, LLC, 17988 Edison Avenue, Chesterfield, MO 63005,
indicating the contract amount be increased by $2,698.50 for a new contract sum, including this
Change Order, in the amount of $2,996,336.05. Upon a motion made by Ms. Maradik, seconded
by Ms. Dorau and carried, the Change Order was approved.
APPROVE CHANGE ORDER NO. 1 — NEWMAN CENTER SITE DEVELOPMENT
DIVISION B AND C — PROJECT NO. 117-060R (REDA TIF)
Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted Change Order No. 1 on behalf
of HRP Construction, Inc., 5777 Cleveland Road, South Bend, IN 46624, indicating the contract
amount be increased by $22,403.42 for a new contract sum, including this Change Order, in the
amount of $206,756.54. Upon a motion made by Ms. Maradik, seconded by Ms. Dorau and
carried, the Change Order was approved.
APPROVE CHANGE ORDER NO. 16 — SOUTH BEND ONE-WAY TO TWO-WAY
CONVERSION —PROJECT NO. 116-001B (LOIT)
Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted Change Order No. 16 on behalf
of Rieth-Riley Construction, Inc., 25200 State Road 23, South Bend, IN 46614, indicating the
contract amount be increased by $41,040 for a modified contract sum, including this Change
REGULAR MEETING DECEMBER 12, 2017 394
Order, in the amount of $17,770,622.55. Upon a motion made by Ms. Maradik, seconded by Ms.
Dorau and carried, the Change Order was approved.
APPROVE CHANGE ORDER NO. 2 (FINAL) AND PROJECT COMPLETION AFFIDAVIT
— 2016 BUS SHELTERS — PROJECT NO. 116-046 (COIT)
Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted Change Order No. 2 (Final) on
behalf of Gibson -Lewis LLC, 1001 West 111h Street, Mishawaka, IN 46544 indicating the
contract amount be increased by $3,293.13 for a new contract sum, including this Change Order,
of $154,534.53. Additionally submitted was the Project Completion Affidavit indicating this new
final cost of $154,534.53. Upon a motion made by Ms. Maradik, seconded by Ms. Dorau and
carried, Change Order No. 2 (Final) and the Project Completion Affidavit were approved.
APPROVE PROJECT COMPLETION AFFIDAVIT — OLIVE/SAMPLE STREET OVERPASS
- PROJECT NO. 113-002
Mr. Gilot advised that Mr. Roger Nawrot, Engineering, has submitted the Project Completion
Affidavit on behalf of INDOT, recommending acceptance of the work after a final inspection,
effective November 14, 2017. Upon a motion made by Ms. Maradik, seconded by Ms. Dorau and
carried, the Project Completion Affidavit was approved.
APPROVE PROJECT COMPLETION AFFIDAVIT — 2017 TREE PLANTINGS — PROJECT
NO. 117-009B (MVH)
Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted the Project Completion
Affidavit on behalf of Fuerbringer Landscaping & Design, Inc., 22530 Brick Road, South Bend,
IN 46628, for the above referenced project, indicating a final cost of $19,000. Upon a motion
made by Ms. Maradik, seconded by Ms. Dorau and carried, the Project Completion Affidavit
was approved.
ADOPT RESOLUTION NO. 59-2017 — A RESOLUTION OF THE BOARD OF PUBLIC
WORKS APPROVING THE TRADE-IN OF CITY -OWNED PROPERTY ON PROPERTY OF
SIMILAR NATURE
Upon a motion made by Ms. Maradik, seconded by Ms. Dorau and carried, the following
Resolution was adopted by the Board of Public Works:
RESOLUTION NO.59-2017
A RESOLUTION OF THE SOUTH BEND BOARD OF PUBLIC WORKS
APPROVING THE TRADE-IN OF CITY -OWNED PROPERTY
ON PROPERTY OF SIMILAR NATURE
WHEREAS, it has been determined by the Board of Public Works of the City of South
Bend that the following described property is unfit for the purpose for which it was intended and
should be traded -in for property of a similar nature:
Five (5) Remington 700 Rifles
WHEREAS, I.C. 36-1-11-9 authorizes the Board of Public Works to trade in or
exchange City -owned property for partial or full reduction in the purchase price of property of
similar nature.
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF PUBLIC WORKS OF
THE CITY OF SOUTH BEND, AS FOLLOWS:
1. The following described property shall be traded -in for property of a similar
nature and shall be removed from the inventory of the City of South Bend:
Five (5) Remington 700 Rifles
ADOPTED this 12th day of December, 2017
CITY OF SOUTH BEND
BOARD OF PUBLIC WORKS
s/ Gary A. Gilot
s/ Elizabeth A. Maradik
s/ Therese J. Dorau
REGULAR MEETING
DECEMBER 12, 2017 395
ATTEST:
s/Linda M. Martin, Clerk
ADOPT RESOLUTION NO. 60-2017 — A RESOLUTION OF THE BOARD OF PUBLIC
WORKS APPROVING THE CHANGE IN THE EFFECTIVE DATE OF ANNUAL PAY
INCREASES
Upon a motion made by Ms. Maradik, seconded by Ms. Dorau and carried, the following
Resolution was adopted by the Board of Public Works:
RESOLUTION NO. 60-2017
A RESOLUTION OF THE BOARD OF PUBLIC WORKS FOR THE CITY OF SOUTH
BEND, INDIANA APPROVING THE CHANGE IN THE EFFECTIVE DATE OF
ANNUAL PAY INCREASES
WHEREAS, the City of South Bend, Indiana ("City") typically increases salary and hourly
payroll rates for bargaining employees, non -bargaining employees and elected officials effective
January 1" of each year; and
WHEREAS, the date of January 1 St often occurs during the middle of a scheduled bi-weekly
payroll period and, thus, make the calculation of gross pay cumbersome for the Human
Resources and Payroll Departments because of the need to use different hourly pay rates for
hours worked before January 1st and hours worked after January 1 ", and
WHEREAS, the City budgets for salaries and wages on a cash basis using the new payroll
amounts approved in the collective -bargaining, non -bargaining and elected official salary
ordinances, and
WHEREAS, under the current payroll procedure, some employees question the accuracy of
their gross and net pay amounts on their initial paycheck (and believe that they are understated)
because some of the hours earned are paid at the old payroll rate, and
WHEREAS, the City desires to be open and transparent with its employees and to process
payroll in an efficient and cost-effective manner.
NOW, THEREFORE, BE IT RESOLVED by the City of South Bend Board of Public Works
as follows:
The effective date of salary and hourly payroll increase will be the first pgy date of the new year
and will cover all hours earned during that pay period, including hours earned during the
preceding calendar year.
2. The cost of implementing this resolution is approximately $34,000 per year and will be paid for
by departmental salary budgets during 2018. The cost will be included in the salary budgets for
future years.
This Resolution shall be in full force and effect after its adoption by the City of South Bend
Board of Public Works and will cover the pay date of January 12, 2018 and cover the pay period
dated December 23, 2017 through January 5, 2018.
ADOPTED at a meeting of the Board of Public Works of the City of South Bend, Indiana
held on December 12, 2017, at 1308 County -City Building, 227 West Jefferson Boulevard,
South Bend, Indiana 46601.
CITY OF SOUTH BEND
BOARD OF PUBLIC WORKS
s/ Gary A. Gilot
s/ Elizabeth A. Maradik
s/ Therese J. Dorau
ATTEST:
s/Linda M. Martin, Clerk
F�
REGULAR MEETING DECEMBER 12, 2017 396
ADOPT RESOLUTION NO. 61-201.7;-.- A RESOLUTION OF THE BOARD OF PUBLIC
WORKS APPROVING THE EXCHANGE OF PERSONAL PROPERTY WITH THE BOARD
OF COMMISSIONERS OF ST. JOSEPH COUNTY, INDIANA
Upon a motion made by Ms. Maradik, seconded by Ms. Dorau and carried, the following
Resolution was adopted by the Board of Public Works:
RESOLUTION NO. 61-2017
A RESOLUTION OF THE BOARD OF PUBLIC WORKS OF THE CITY OF SOUTH
BEND, INDIANA APPROVING THE EXCHANGE OF PERSONAL PROPERTY WITH
THE BOARD OF COMMISSIONERS OF ST. JOSEPH COUNTY, INDIANA
WHEREAS, the City of South Bend Board of Public Works (the "BPW"), the contracting
body of the City of South Bend, Indiana (the "City"), which exists and operates under the
provisions of Ind. Code 36-9-6, holds certain personal property (the "City Property"); and
WHEREAS, the City, by and through the BPW, acting on behalf of the South Bend Fire
Department, desires to exchange the City Property with St. Joseph County (the "County"); and
WHEREAS, the County, acting by and through the Board of County Commissioners (the
"Commissioners"), holds certain personal property (the "County Property") and desires to
exchange the County Property with the City; and
WHEREAS, pursuant to Ind. Code § 36-1-11-8, the City and the County may transfer or
exchange property with one another upon terms and conditions agreed upon by the entities as
evidenced by the adoption of substantially identical resolutions of each entity; and
WHEREAS, the County and the City agree to exchange the County Property and City
Property described in the attached Exhibit A; and
WHEREAS, the Commissioners and the BPW must both adopt substantially identical
resolutions to perform the exchange of personal property under Indiana law.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY OF SOUTH BEND BOARD
OF PUBLIC WORKS AS FOLLOWS:
1. The City of South Bend's exchange with St. Joseph County of the personal property described in
Exhibit A is hereby authorized and approved.
2. This Resolution shall be in full force and effect upon its adoption
The performance of the exchange shall occur only upon adoption of a substantially identical
resolution by the St. Joseph County Board of County Commissioners.
ADOPTED at a meeting of the City of South Bend Board of Public Works held on
December 12, 2017, on the 13th Floor of 227 W. Jefferson Boulevard, South Bend, IN 46601.
CITY OF SOUTH BEND
BOARD OF PUBLIC WORKS
s/ Gary A. Gilot
s/ Elizabeth A. Maradik
s/ Therese J. Dorau
ATTEST:
s/Linda M. Martin, Clerk
ADOPT RESOLUTION NO. 62-2017 — A RESOLUTION OF THE BOARD OF PUBLIC
WORKS ON DISPOSAL OF UNFIT AND/OR OBSOLETE PROPERTY
Upon a motion made by Ms. Maradik, seconded by Ms. Dorau and carried, the following
Resolution was adopted by the Board of Public Works:
REGULAR MEETING DECEMBER 12, 2017 397
RESOLUTION NO.62-2017
A RESOLUTION OF THE SOUTH BEND INDIANA BOARD OF PUBLIC WORKS
ON DISPOSAL OF UNFIT AND/OR OBSOLETE PROPERTY
WHEREAS, it has been determined by the Board of Public Works that the following property is
unfit for the purpose for which it was intended and is no longer needed by the City of South
Bend:
SOUTH BEND FIRE DEPARTMENT MISCELLANEOUS COMPUTER EQUIPMENT AND
DEFIBRILLATORS
(SEE LIST)
WHEREAS, pursuant to Indiana Code § 36-9-6-1 et. seq., the Board of Public Works
("Board") has the duty and authority to have custody, control, use, and to dispose of all real and
personal property owned by the City of South Bend, Indiana; and
WHEREAS, the City, acting by and through the Board, desires to dispose of the personal
property that is more particularly described at Exhibit "A" attached hereto and incorporated
herein ("Property"); and
WHEREAS, in accordance with Indiana Code § 5-22-22-4, the Board may engage an
auctioneer to conduct a public auction in order to dispose of the City's surplus personal property
if the property to be sold is one (1) item with an estimated total value of $1,000 or more, or is
more than one (1) item with an estimated value of $5,000 or more; and
WHEREAS, the Board has determined that the Property has an estimated value of more
than $5,000,and the Board has further determined that the property is unfit for the purpose for
which it was intended, and is no longer needed by the City of South Bend; and
NOW, THEREFORE, the Board of Public Works of the City of South Bend hereby finds
that the Property listed at Exhibit "A" is no longer needed by the City; the Property is unfit for
the purpose for which it was intended, and has an estimated value of $5,000 or more.
BE IT RESOLVED that the Property may be transferred or sold at public auction.
However, if the Property is deemed to be worthless, such Property may be demolished or junked.
ADOPTED the 12th day of December, 2017.
CITY OF SOUTH BEND
BOARD OF PUBLIC WORKS
s/ Gary A. Gilot
s/ Elizabeth A. Maradik
s/ Therese J. Dorau
ATTEST:
s/Linda M. Martin, Clerk
APPROVAL OF AGREEMENTS/CONTRACTS/PROPOSALS/ADDENDA
The following Agreements/Contracts/Proposals/Addenda were submitted to the Board for
approval:
Type
Business
Description
Amount/
Funding
Motion/
Second
Agreement
Neighborhood
Support of Programs,
$100,000
Maradik/Dorau
Resources &
Training, and Education
(EDIT)
Technical
for Neighborhood
Services Corp.
Residents
d/b/a
Neighborhood
Resources
Connection
Second
Northern
Training Program for
$20,000
Maradik/Dorau
Amendment
Indiana
Under Skilled Workers to
(EDIT)
to Agreement
Workforce
Meet Critical Labor
1
1
1
REGULAR MEETING
DECEMBER 12, 2017 398
1
L�
1
Board, Inc.
Deficits
Lease
Shein Realty,
Renew Lease for the ATF
$10,480 (to be
Maradik/Dorau
Renewal
LLC
Project Disarm Taskforce
reimbursed by
for One (1) Year
ATF)
(Police Dept.
Continuing
Education
Fund)
Contract
LinkedIn
Recruiter for the City's
$19,025
Maradik/Dorau
continued Sourcing
(IT Operating)
Efforts, especially in
Targeting Diversity
Candidates for Key
Leadership and
Specialized Positions
Professional
Christopher B.
Mishawaka Avenue
NTE $58,100
Maradik/Dorau
Services
Burke
Traffic Signals Study and
(LRSA)
Agreement
Engineering,
Design, for proposed Fire
LLC
Station No. 9
Professional
EPOCH
Design of Fire
$35,000
Maradik/Dorau
Services
Architecture +
Department Training
(EMS Capital)
TABLED
Agreement
Planning
Center Classroom
Building
Amendment
Near Northwest
Extend Contract
No Change
Maradik/Dorau
No. 1 to
Neighborhood,
Timeframe for the
(CDBG)
Contract
Inc.
Rehabilitation Program at
829 Van Buren Street by
Twelve (12) Months
Amendment
Near Northwest
Extend Contract
No Change
Maradik/Dorau
No. 2 to
Neighborhood,
Timeframe for the
(CDBG)
Contract
Inc.
Rehabilitation Program at
754 Cottage Grove
Avenue by Twelve (12)
Months
Contract
466 Works
Construct One (1) Low to
$210,000
Maradik/Dorau
Community
Moderate Income Single-
(CDBG)
Development
Family Home at 209 E.
Corporation,
Indiana Avenue
Inc.
Contract
466 Works
Construct One (1) Low to
$210,000
Maradik/Dorau
Community
Moderate Income Single-
(CDBG)
Development
Family Home at 203 E.
Corporation,
Indiana Avenue
Inc.
Professional
SmithGroup
Schematic Design for
$186,400
Maradik/Dorau
Services
JJR, Inc.
Seitz Park, Colfax Ave.
(Park Bond)
Agreement
Pedestrian Crossing, East
Race Pedestrian Crossing,
East Bank Trail, Seitz and
Howard Park Connector,
and Seitz and West Bank
Trail Connector
Agreement
Motorola
Upgrade Current 800 mhz
$600,000
Maradik/Dorau
Radios for the South Bend
(Police
Police Department
Equipment)
Professional
EmNet, LLC
Renewal of City's Smart
$280,581.60/Ye
Maradik/Dorau
Services
Sewers Agreement
ar; Three (3)
Agreement
Year Contract
(Wastewater
O&M)
Special
City of Venice,
Replace Pumper lost in
$63,500
Maradik/Dorau
Purchase
Florida
Fire with 2003 Pierce
(Fire Dept.
REGULAR MEETING DECEMBER 12, 2017 399
Contender Rescue
Capital)
Pumper; Loss resulted in
Impaired Functioning of
Fire Department
Professional
Incremental
South Bend Zoning
$41,675
Maradik/Dorau
Services
Development
Ordinance Compliance
(Community
Agreement
Alliance
Testing for New
Investment
Development Types
Administration)
Subdivision
Westview
Surety for Lafayette Falls
$29,775
Maradik/Dorau
Bond
Capital,
Development Phase IV,
LLC/Lexon
Section 1, for Sidewalk
Insurance Co.
Installation
Professional
SJC Minority
Research on
NTE
Maradik/Dorau
Services
Health
Neighborhood Housing
$24,573.24
Agreement
Coalitions d/b/a
Market and Economic
(DCI
Community
Capabilities of Target
Operations)
Wellness
Households
Partners
Software
Public Engines,
Crime Reporting and
$5,200
Maradik/Dorau
Renewal
Inc.
Tracking Software
(Police General
Agreement
Fund)
Subscription
ShotSpotter
Gun Shot Detection
$189,000
Maradik/Dorau
Renewal
Flex
Tracking
(Police General
Fund)
Professional
Virtual
Ninety (90) Day Trial On-
$1,475
Maradik/Dorau
Services
Academy
Line Training
(Police General
Agreement
Fund)
Special
JP Morgan
QPA Agreement for
No Cost
Maradik/Dorau
Purchase
Bank
Establishment of
Purchasing Card Program
Agreement
Transpo
Local Match Agreement
$75,000
Maradik/Dorau
to allow for Seventeen
(COIT)
TABLED
(17) Bus Shelters
APPROVAL OF REVOCABLE PERMIT FOR ENCROACHMENT — VELDMAN'S
SERVICE CENTER — 5222 W. WESTERN AVENUE
Mr. Gilot stated an application for a Revocable Permit has been received from Veldman's
Service Center, Inc., 5222 W Western Ave., South Bend, IN 46619 for the purpose of allowing
an existing sign at 5222 W. Western Avenue. The encroachment shall remain in the right of way
until the time as the Board of Public Works of the City of South Bend shall determine that such
encroachment is in any way impairing or interfering with the highway or with the free and same
flow of traffic. Upon a motion made by Ms. Maradik, seconded by Ms. Dorau and carried, the
Revocable Permit was approved.
APPROVE CONSENT TO ANNEXATION AND WAIVER OF RIGHTS TO
REMONSTRATE — 24647 ROLLING OAKS DRIVE — SEWER/WATER
Mr. Gilot stated that the Board is in receipt of a Consent to Annexation and Waiver of Right to
Remonstrate as submitted by Cooreman Real Estate Group Inc., 4404 Technology Drive, South
Bend, IN 46628. The Consent indicates that in consideration for permission to tap into public
water/sanitary sewer system of the City, to provide water/sanitary sewer service to the above
referenced property at 24647 Rolling Oaks Drive (Key #004-1010-016430), the applicant
waive(s) and release(s) any and all right to remonstrate against or oppose any pending or future
annexation of the property by the City of South Bend. Therefore, Ms. Maradik made a motion
that the Consent be approved. Ms. Dorau seconded the motion, which carried.
APPROVE CONSENT TO ANNEXATION AND WAIVER OF RIGHTS TO
REMONSTRATE — 25754 HUNT TRAIL/25768 HUNT TRAIL — SEWER
Mr. Gilot stated that the Board is in receipt of a Consent to Annexation and Waiver of Right to
Remonstrate as submitted by Miller Builders, 806 Green Pine Court, Mishawaka, IN 46545. The
Consent indicates that in consideration for permission to tap into public sanitary sewer system of
the City, to provide sanitary sewer services to the above referenced properties at 25754 Hunt
Trail.(Key # 021-1036-058908) and 25768 Hunt Trail (Key #021-1036-058909), the applicant
1
1
REGULAR MEETING DECEMBER 12, 2017 400
1
1
waive(s) and release(s) any and all right to remonstrate against or oppose any pending or future
annexation of the properties by the City of South Bend. Therefore, Ms. Maradik made a motion
that the Consent be approved. Ms. Dorau seconded the motion, which carried.
APPROVE RENEWAL OF WASTEWATER DISCHARGE PERMITS)
In a Memorandum to the Board, Ms. Lauren Trapp, Division of Environmental Services,
submitted the following Wastewater Discharge Permit(s) for renewal and recommended
approval:
H.B. Fuller, 2001 W. Washington Street
There being no further discussion, upon a motion made by Ms. Maradik, seconded by Ms. Dorau
and carried, the renewal of the permit was approved.
RATIFY APPROVAL AND/OR RELEASE CONTRACTOR AND EXCAVATION BONDS
Ms. Donna Hanson, Division of Engineering, recommended that the following Contractor and
Excavation Bonds be ratified pursuant to Resolution 100-2000 as follows
Business
Bond Type
Approved/Released
Effective Date
Richard Atkinson
Contractor
Approved
November 30, 2017
Hoosierland Excavating, LLC
Excavation
Approved
December 5, 2017
Ms. Maradik made a motion that the bonds approval as outlined above be ratified. Ms. Dorau
seconded the motion, which carried.
APPROVE CLAIMS
Ms. Maradik stated that a request to pay the following claims in the amounts indicated has been
received by the Board; each claim is fully supported by an invoice; the person receiving the
goods or services has approved the claims; and the claims have been filed with the City Fiscal
Officer and certified for accuracy.
Name
Amount of Claim
Date
City of South Bend
$1,078,040.92
11/30/2017
City of South Bend
$432,594.10
12/08/2017
City of South Bend
$3,726,114.68
12/12/2017
U.S. Bank National Association; 2015 EDIT/Parks Bond;
Requisition No. 58
$13,577.55
12/06/2017
MS-SB OP, LLC and Kite Realty Group, Draw #1, Eddy
St. Phase II Bond Draw
$6,000,000
12/21/17
Therefore, Ms. Maradik made a motion that after review of the expenditures, the claims be
approved as submitted. Ms. Dorau seconded the motion, which carried.
ADJOURNMENT
There being no further business to come before the Board, upon a motion made by Mr. Gilot,
seconded by Ms. Maradik and carried, the meeting adjourned at 10:41 a.m.
BOARD OF PUBLIC WOKS
Gary A. Gilot, President
Elizabeth A. Maradik, Member
Therese J. Dorau, Member
Jam14 A. Mueller, Member
Suzanna Fritzberg, Member
REGULAR MEETING
DECEMBER 12, 2017 401
ATTEST:
nda M. Martin, Clerk
ul
J
1