HomeMy WebLinkAbout04/09/1929 Board of Public Works Minutesc � Tuesday, April. 9th. , I929.
Board met in regular session at 9 A. It. All members present. Minutes
Of meetings held April 2nd. , 1929, read and approved.
City Engineer, H. ^..Wray, filed the following tabulations. of bids:
Tabulation of bids for,,the pavement of Bissell Street from eddy Street to
East line of 2nd. , Plat Park Place Addition under Improvement Resolution No.2I85:
' Concrete pavement Sheet asphalt Asphaltic Concrete
Hoban and Roach I5,8590-90 no bid no bid
C. H. Eldred 15,830480 no bid no bid
Aieth Riley Co. no bid I7,43890 16,747.10
.filbert Const. 'Co. ,16,382000 1711347.10 16*758.60
'Williston Const. Co. 15*884.66 I7V080.29 T69504.75
Tabulation of bids for t he pavement of Broadway fro #m High Street to Tisiami ':
Street under Improvement Resolution No.2I87
Concrete ravement Sheet Asphalt Asphaltic Concrete
Keith Riley Co no bid II,,5I5.40 iI,I2I.80
.filbert Const. Co. 11,137.75 ����54,,� ���;�$�:�� •
Williston Const. Co. 11,090.05 I1,867.75 II,503.55
. Barnes Informal no bid no bid
kk%kk7kkk=k?kk7kk�k�ksk�kkkkk�kkkkkkykk*kak�kkkkkkkkkktckk�kxk�k*kkk�kkk�kkkk*�kkkkkkk�kkkikkkxcsr�
Tabulation of bids for the -pavement of Carlisle Street from Washington
Avenue t4 T:inden Avenue under Improvement Resolution No.2I88:
Concrete Pavement Sheet Asphalt Asphaltid Concrete
Keith Riley Co. no bid 6,724..96 Informal 6,460.24 Informal;
Albert Const. Co. 6,314.50 6,728.84 6,503.74
Williston Const. Co. 69047.00 6,668.65 6,448.95
Tabulation of bids for the pavement of Poland Street from Harris Street
to New York Central Railroad under Improvement Resolution No.2I89:
Concrete pavement Sheet Asphalt Asphaltic Concrete
Keith Riley Co. *9 ='bld 4,353.38 4,180.22
Albert Const. Go. 49051.50 49897.52. 4,150.22
Williston Const. Co. 5*884.60 41,259.85 4,II6.I5 .
H. N. Barnes 8;7 9 25 no bid $o bid
Bids having been received for the ravement of Bissell Street under Impro-
vement Resolution No.2I85, the Board this 9th., day of April 1929, hereby makes a
preliminary order for concrete pavement heavy traffic' as the type of pavement with which
said street shall be improved and sets the 23rd. , day of April I929, as the time when
said Board shall either sass on pettUnn fora change in,the type of pavement other
than that specified in the preliminary order,, award the contract or reject all bids.
Bids having been received for the pavement of Broadway from High Street •
to Viami Street under Improvement Resolution No.2I87, the Board this 9th. , day. of
April I92.9,, hereby makes a preliminary order for sheet asphalt pavement heavy traffic
as the type- of pavement with which said street shall be improved and sets the 23rd. ,
day of April 1929, as the time when said Board. shall either pass on petitions for a .
change in the type of pavement other than that specified in the -xeliminary order,
award the contract or reject all bids.
Bids saving been received for the pavement of 8arlisIq Street from
Washina ton Avenue to Linden Avenue under Improvement Resolution No.2I88, the Board this k
9th., day of April 1929, hereby makes a preliminary order for sheet asphalt heavy
traffic pavement as the type of pavement with which said street shall be improved and
set! the 23rd. , day of April 1929, as the time when said Board shall either pass on 1
petitions for a change in the type of -pavement other than that specified in the prelimn' •
ary order, award the contract or reject all bids.
Bids having been Teceived for the pavement of Poland Street from Harris
Street to the New York Central Railroad under Improvement Resolution yo.2I89, the Board
this 9th. , day of April I929, hereby makes a preliminary order for sheet asphalt heavy
traffic pavement as the type of pavement with which said street- shall be improved and
sets the 23rd. , day of April 1929, as the time when said Board shall either pass on
petitions for a change in the #typ- b_ efnpayement other than that specified in the prelim-
inary order, award the contract or reject all bids.
The Board signed the contract with the Albert Construction Company for the
pavement -of Franklin Street from Calvert Street to {Ewing Avenue under Improvement
Resolution Noi2178 in the amount of 14,636.50. The Board approved the bond of same
for 50% of the contract price signed by Inland Bonding Company.
i�
•
•
•
0
Tuesday, -arril 9th., 1929.
The Board'si�ri ed the contract with the Albert Construction Company for
the pavement of Van Buren Street from Portage Avenue to Cushing Street under Improve--
merit Resolution No.2I75 in the amount of 2,007.00. The Board also approved the
u
construction bond of same in the amont of 50 of the contract price signed by
Inland 'Bonding 00.
This being the date set, continued hearing was had on Improvement
Resolution No.I790 for the local sewer Improvement on Chalfant Street from Walsh
Street to a r,oint IO feet east of the west line of Lot .150 in repla t of Park Place
.2nd. , Addi'tion.
In the above named improvement resolution, no remonstrators appeared
and no written remonstrance was filed and the Board being fully advised in, the premise
finds that the benefits to the several lots and parcels of land liable to "be, assessed
for said improvement will be equal to the estimated cost of same as submittdd by
the City Engineer. The Board, therefore, decides to ta'Ke final action on said improve
went resolution and declares same in all things ratified, confirmed and approved
without modification,
The Board now orders that on the 23rd. , day of A.�,ril 19.29, this Board
will receive, open and read sealed proposals for the construction of said sewer under
improvement resolution No.I7909 up- to I0:00 A. T,. The Board further orders that
notices of said proposals shall be published on the IIth., day of April and on the
I8th. , day of April I929, in the South Bend News Times and Tribune according to law.
City Engineer, Ti. G.. /ray, filed plans', specifications and estimates
and the Board adopted said plans and specifications to-gether with the following j
improvement resolutions: i
Improvement Resolution Fo.2208 for the grade, ,curb and wale on
Bella Street from Portage Avenue to Fedora Street. (See files for copy of resolution.)!
Improvement Resolution No.2207 for the grade, curb and walk on Anderson
Street from ing Street too Bulla Street. ( See files for copy of resolutiln. )
In both of the above named improvement resolutions, the 73oard hereby
orders that on the 30th., day of April I929, t'zis Board will meet in heir office in ;i,
the City Hall at I0:00 A. 1%, to hear and receive remonstrances from all persons whose,{
property is liable to be assessed for said improvements and will.decide whether the
benefits to the several _lots and parcels of land liable to be assessed for said impro
vements will be equal to the estimated costs of same as reported by the City Etigineer.
The Board further orders that notices of said hearings be published in the South Bend
News Times and Tribune on the I2th., day of April and on the I9th. , day of April' 1929
according to law and that notices be mailed to property' owners according to law. a
i
City engineer, H. G. ",fray, filed plans and the Board adopted said plans
together with the following Vacation Resolution:
Vacation Resolution No.2209 for the vacation of _the .alle7 south of
Altgeld Street from Clyde Street to the east line of Miami Heights Addition. (See Files
for copy of resolution.)
In the above. named vacation resolution, the Board hereby orders that on
the 30th.-, day of April I929, this Board will meet in their office in the City Hall
at I0:00 Ab M., to hear and receive remonstrances from all persons whose property is
is liable to be affected by such vacation. The Board further orders that notices of
such hearing shall be published on the I2th. , day of April and on the I9th.9 day of
April 1929 in the South Bend News Times and Tribune according to law.
The Board signed the following contract with the Indiana and Itichigan
Electric Company for lighting Chapin, Miami, Angella, and College Streets as follows:
CONTRACT PLANS M1 SPF^IFI^ATIONS FOR
LIGHTING ^-TRTATN STRUTS, ALL'�'i'S, BOTH,'�"TA-RDS
ANT PTTBT,I^ PL Cv.S IN TT174 CITY 071 SOUTH 91?'TD INDIANA.
TTIIS AfTRE , 771T, made and entered into this 9th. , day of April 1929,
between the City of South Bend, a municipal corporation of the State of Indiana, by
and through its Board of Public `7or'<s, party of the first part, hereinafter referred
to as the City, and Indiana and Michigan L'lectric Company., an Indiana corporation,
party of the second part, hereinafter referred to as the Contractor, pursuant .to a
resolution of the. Board of Public `fforlm, ps.ssed at a meeting held on the 30th. , day
of October 1928,
W I T N E S SV, T H i
That the parties hereto, each in consideration of the agreements on the
part of the other, herein contained, have mutually agreed and hereby mutually agree
as follows : -
I. ('a) The Cit-F shall provide and the Contractor shall maintain and
operate, subject- to the conditions hereinafter set forth, the cables,. conduits .and o
other sub -surface equipment and apparatus and the Contractor shall provide, maintain i
and operate the standards, lamps, refractors and all other equipment and apparatus, ��
Tuesday, April 9th., 1929.
.:
all constituting a street lighting system on" Chapin. Street_ from Washington avenue to
Monroe Street in the dit-r of South ''Send, Indiana, consisting of thirty-s$x (36) street:;
i • lamps supplied through sacld underground system. from the electrical circuits of the
Contractor., s-ach lamps shall be as follows.
36 - 13 foot R-iverside Standards, complete with
' Egyptian Senior; Lighting Units and Vogul
Multiple Sockets and each equipped with I-
5000 lumen street lighting lamp. The burning
i hours of said lamps shall be as follows:
Twenty-four (24) of said lamps shall be
burned from one half hour after sunset until
one-half hour before sunrise, every and all
night, burning approxiamtely four thousand
(4000) hours per sinnum.
Twelve -(12) of .said lamps shall barb from one-
half hour after sunset each and every night
uiktil midnight only.
(b) The City shall provide and the Contractor shall maintain and operate
i� subject 'to the conditions hereinafter set forth, the•eables, conduits and other sub- sur
face equipment and apparatus., and the Contractor shall provide, maintain and operate,
standards, lamps, refractors and all other equipment and apparatus, all constttntfng
a street lighting system on Yiami Street from Lincoln Way East to Ewing Avenge in
South Bend, Indiana, consisting of forty-one (41'J street lamps supplied through'said
underground system . from the _eleifftri cal circuits of the Contractor, such lamps.. shall
.
be as follows-
2 8 - I2 foot Sheridan Hollow Spun, Concrete
■
Lighting Standards. complete with Octagonal
Junior .Lighting Tops with &"pikes and Medium ,
Rrongul T!'uitiple Sockets, each egj ipped with
I- I000 Lumen Street lighting lamp.
I3 -* I2 foot Sheridan-Tolio-:; Spun, concrete
Lighting Standards complete with Octagonal
Junior Lighting Tops with Spikes and ITedium
` Trongul Yultiple Sockets, each equipped with
I- 2500 lumen street lighting lamp. Said
` forty-one (41) lamps on Miami street herein
provided for shall be burned from one -half
hour after sunset until onehalf hour 6.2fore
sunrise, every night and all night, burning
I approximately four thousand (4000). hours per
annum.
•
(c) The ity shall provide and` the Contractor shall maintain and
operate, subject. to conditions hereinafter set forth, the cables, conduits and other
sub. -surface equipment and apparatus, and the, Contractor shall provide,amaintain and
operate standards, lamps, refractors and all other equipment and apparatus, all
I constituting a street lighting system on Angella Avenue from Leeper Avenge to Notre
Dame Avenue in the City of South Bend, Indiana, consisting of twenty-nine (29)
. Street lamps supplied through said ,.underground system from the electrical circuits of ;
the Contractor, such lamps shall be as follows:
29 - IO foot Sheridan Hollow Spun, concrete
Lighting Standards with Octagonal Junior
Tops, each equipped with I-I000 lumen -
II Lamp. Said twenty-nine (29) lamps on
Angella Avenue herein provided for shall
f, be burned from one half hour after sunset
�i until one half hour 'iefore sunrise, every
I� night and all night burning approximately
four thousand (40001 hours ver annum.
11 -
(d) The Contractor shall provide maintain and operate a street
Lvenue
II• lighting system on College Street from Elwood to Keller Street in the City
!j of South Bend, Indiana, consisting of seven (7) street lamps supplied from an under-
i ground distribution system of the contractor, such underground lamps shall be as
I follows:
•
7- Park View Poles with Octagonal Junior
Lighting Tops, each equi bed with I-I000
i Lumen Lamps, said seven � 7 ) underground
i lamps herein provided for shall be burned
from one half hour after sunset until one-
half hour before sunrise, every night and
all night burning approximately four
thousand t4000) hours.
I
As a part of the consideration to the Qontraotor for the services to be
furnished herein by it, the City Agrees that the Contractor shall have the exclusive u
use and control of the cables, conduits, bases and any and all other equipment and
,apparatus to be furnished and installed by the Cit•.y on Chapin Street, Viami Street
x
e351
Tuesday, April 9th. r929.
•
0
0
•
•
•
and Ingella lvenue as herein fa 64'ided air' �a') , (b) and (o) of Para aph I hereof, for
and during the period of this contract. During such period, the ontraetor shall
maintain and keep said cables, conduits, bases and other -apparatus and equipment
in a reasonable state of repair, provided, however, that any renewals or replacements -
of all or any part of said cables conduits, bases, apparatus or equipment which `may
be installed and paid for by the contractor, shall be and remain the property of
the &ontraator.
ill property used in the pe rfZrmanc e of this contract shall be and remain the
property of the Contractor. The ontraetor, shall at its cost, furnish all lamp
renewals and light all lamps herein provided for by electricity for a period terminat-
ing with the termination of the General Contract for Street Lighting.
All of the lamps herein provided to be maintained and operated Eby this Contractor
shall be so operated so that they.wJ11 give the maximum amount of illumination
obtainable under commercial conditions.
2. The number of lamps furnished and'lighted under this contract shall be the
number provided for in Paragraph I hereof, and shall be located as shown on the
blue print attached hereto and identified by the signatures of the Contractor and
membbrs „of the Board of Public Wor'os.
3. All 8utages. shall be reported daily in writing by the proper officers of the
City to the ,ontractor and the proper officers of the City may deduct from the total
monthly amount.which would have been paid for any lamp so reported had, no outage
occurred, the sum bearing -the ratio to such. total as the period of outage bears to
the total time the lamp would have.been lighted in any month.
4. Street lighting units herein contracted for shall be moved by the Contractor
:to such new location as the City may by writing direct, subject to the following
conditions: -
SVch moving of lamps shall be completed within -thirty (30) days after receipt
by' Contractor of written notice from the City, Sundays, legal Holidays and stormy
dajts not to be counted, provided that the number of such removals -shall not exceed one
per day and provided further that such removals shall not be required on Sundays, -
legal holidays and stormy days. Notice that the work of such removal of lamps has
been completed shall be given by the Contractor to the City within ten days after the
completion of the work..
The actual cost to the Contractor of makiijg such relocations shall be paidbythe
City to the Contractor frithin thirty days after said notice has been given.
5. The Cit7T shall accept such lamps and the services herein specified during thel
life of this contrast and pay as full compensation -therefor, at the rate and price
set out in the aecpeted bid to -wit: -
For underground street lighting units.
36 - 13 foot riverside Standards, complete with
VjKyptian Senior Lighting Units and Yogul
1 �ltiple Sockets and each equipped with
I - 5000 lumen street lighting lamp, for
Chapin Street.
43.00 per unit per annum.
28 - 12 foot Sheridan Hollow Spun, Concrete
Bighting Standards complete with Octagonal
Junior Lighting Tops with --'pikes and Medium
Tfogul Muttiple Sockets, each e1qu.ipped with
I - 1000 Lauren Street lighting lamp, for
Miami Street.
$32.50 per unit per annum.
13 - 12 foot Sheridan Hollow Spfln, Concrete
.Lighting Standards complete with Octagonal
Junior Lighting Tops with Spikes and Medium
Mogul Multiple Sockets, each equipped with
I - 2500 lame, street lighting lamp, for
Miami Street.
P7.50 per unit per annum.
29 - 10 foot Sheridan Rollo Spun, Concrete
Lighting Standards with Octagonal Junior
Tops, each equipped with I - I000 Lumen
Lamp, for Angella Atrenue.
132.50 per unit per annum.
a
li _
�«�'•`� Tuesday, April 9th. , 1929.
7 - Pare view Poles with Octagonal Junior
Lighting Tops each equipped with I 1000
Lumen Lamps, .for College ,Street.
30.00 per unit per annum.
i
?payment for all lighting services to be made in equal monthly install-
meets, each installment to be due and payable on or before the 20th. , of each month
succeeding that in which the service is rendered.
6. The Contractor shall have the right with the consent of the Board
of Public forks of the City; at any time during the life of this contract to install
operate and maintain in the place of the lamps herein provided for, and under the
same terms and conditions, other and more improved lamps 'in keeping with such advanceI
fA6,tt as may be made in the art of lighting, which lamps shall -be equivalent or great-
er illuminating power.
7. In authorizing or granting a -hermit to any person, firm or corpor-
ation to rexoair or cut into any street, alley nr sidewalk in which said street light-
ing units and lines and cables supplying current thereto are located, the Eity shall 1
require, as a cohdition to the granting of Tach permit, an agreement on the part
of the applicant that such lines and cables and street lighting units will not be
interferred with irr any manner wlikout notice to the Contractor.
8. All the covenants, expressions, terms, conditions, provisions and
I
agreements her6in shall extend to and be binding upon; 6r- enure to the benefit of, as'
the case may be, each and every one of the successors or assigns of each of the
parties hereto as if in every case so expressed.
9. This contract shall be in force and effect from and after its
approval by ordinance for a period terminating with the termination of the General
Contract for Street Lighting, which termination date is January Ist., 1935, at noon.
IN `7TTNFSS ',VH-TREOF', the said City of ''oath Bend, Indiana, has caused
its corporate seal to he hereunto affixed and this contract to be signed by the
Boardof Public 'corks of said City and said Indiana & Michigan Electric Company has
caused this contract to be duly executed, in duplicate, this day and year first above
written.
signed 11. R. Hinkle
John -,C. Smogor
Ralph H. Huss
BOARD OF P731I0 WORTHS OF THE CITY OF SOUTH BEND INDIANA
INDIANA ART") T!ITCHI r,,A�? 7,LFCT"RIC C.OVPA_NY
is
BY TROS. AT GLISH vI^E 'MT9TD T."
City -4�ngineer, 1-1. G. (fray, filed plans and the Board adopted saidlrplans
t:ogetherw#�hthe� following Condemnation Resolution:
Vondemnation Resolution No.22II.
Resolved by the Board of Public "or'ks of the Oity of Mouth Bemd, Indian,
That the following described property be appropriated for t:qe ase of said City:
Beginning at the intersection of the northerly line of Lincoln Way
East with the east line of Lot I in �lapp's subdivision projected, thence north alon6
said east line of Lot 18lapps subdivision projected to the &it. Joseph giver, thence
westerly along the St. Joseph River to the wrest line of lot 5 in irline's Addition
projected, thence soAth along said west line of lot 5 in Klines Addition projected
to the north line of Lincoln '-'day East, thence southeasterly along the north line of
Lincoln :day Fast to the place of beginning.
The following described property may be injuriously or beneficially
affected by such appropriation:
Beginning at the intersection of the northerly line of Lincoln Way
East with the east line of Lot I in Clapps subdivision projected, thence north along
said east line of Lot I in Clapps subdivision projected to the St. Joseph River,
thence westerly along the 6t. dos eph River to the west line of lot 5 in Kline'.s
Addition projected, thence soli. ha,along said west line of lot 5 in Kline$ Addition
projected to the north line of Lincoln Way East, thence so-ttheasterly along the
north line of Lincoln Way ..'ast to the rlace of beginning; also
x"u.nicipal City of South Bend, Indiana.
W. T-Z. Hinkle
John K, Smogor
Ralph H. ?fuss
BOARD OF PUBTaI c "TOR Ls n
W1
0
•
0-
.10
•
•
Tuesday, 4ril 9th., 1929.
�! In the above named gondemnaion Resolution No.22II, the Board hereby orders
- that on the 30th., day of Aril 1929, this Board will meet in their office in the
!,City Hall at 10 :00 A. Y. to hear and receive r` emonstrances from all persons whose
property may be affected by such condemnation. 'The -Board further orders that notices i
iof such hearings shall -be published on the I2th. day of April and on the I9th., day
of April I929, in the `youth Bend yews Times and tribune, according to law.
TTron the recommendation of Wm. F. walls, the Board approved: the installation +I
of a 4000 lumen light, mast arm construction, from over '_read service, on Indiana �renuer ;;
lat lebanan Street, at a cost of 145.00 per year.
I; The Board approved the petition of the Chamber of Commerce hang signs across �
;:the streets as outlined 'n their letter of April Oth., 1929, in connection with the
,Industrial Finance Fund rive.
The Board approved claims in the amount of :I8,300.6'7 which were signed and approTT!
!ed.
The Board approved two bills in the amount of 426.17 in connection with track
elevation expense and hereby orders City controller to pay same out of track elevation
fund.
The Board approved pay rolls for various departments in the amount of 38,558.68.
Yeeting adjourned at II-30 A. IT.
it
i'
f
,,Attested: 2
ClWrk
l