Loading...
HomeMy WebLinkAbout08/28/1928 Board of Public Works Minutes,gw0 i uesday, Iugust 28th., 1928. T • 0 L7 9 Board met in regularsession at 9 A. r,�. All members rr.esent. Minutes of meetings held Augus t 21st. , and August 23rd. , 1928, read and approved. No petitions having been filed for the change in the type of pavement other than that specified in the preliminary order.,for the pavement of the east one-half of Lake Street from the south line of Division ''treet -to the North line of Ford Street under Improvement Resolution No.2095, the Board this 28th.. , day of August., 1928, hereby makes a final order for light traffic concrete pavement as. the type of pavement with which said street shall be improved and awards the contrast for said improvement to the pdilliston Construction Company at their low bid of 6,616.00. No petitions having been filed for a change in the type of pavement other than that specified in the preliminary`order for the pavement of the north one half of ford Street from the east line of Lake Street to the west line of Iowa Street under Improvement Resolution No.2093,' the Board this 28th. , day of August,._ 1 28, hereby makes a final order for light traffic concrete pavement as the type of. pavement with which said street shall be improved and awards the contract to the `dilli,ston Construction Company at their low bid of I,513.50. '4 I 'T�?'ret':,ions having been filed for a change in the type of pavement other than that specified in the preliminary order for the pavement of the south one half of 'wTestmoor ''treet from the west line of Olive Street to the east line of Lincoln 1anor Third Additio-n under Improvement Resolution No.2094, the.Board this 28th. , day of August, I928, hereby ma =ces a final order for sheet asphalt light traffic as the type of raver;_ent with which said street shall be improved and awards the contract for said improvement to the Albert Construction Company at their low bid of 9,736.15. No petitions having been filed for a change in the type of pavement other than that specified in the preliminary order for the pavement of the west one half of Logan Street from T�`ishawaka revenue to Vie north end of the Ot. Josetkh River Bridge under Improvement Resolution 1.,To.2I00, the Board this 28th. , day of nugust, 1928, hereby makes a final ord-r for light traffic concrete pavement as the type of pavement with which said street shall be improved and awards the contract for said improvement to 71illiston Construction ompany at their low bid of I0,647.85. No petitions hav Ing been filed for a change in the type of pavement other than that specified in the preliminary order for the pavement of Twenty-'econd Street from the south ,line of the concrete mvement on Jeffe_-son Blvd., to the north end of 't:. Joseph `fiver Bridge under Improvement resolution No.2064, the Board this 28th. , day of Au; ust, I928, hereby miakes a final order for heavjg traffic concrete pavement as the t-rne of -avement with which said street shall be improved and awards the contract for. said improvement to Albert Construction Company at their low bid of 6613I5.35. No petitions having been filed for a change in the tyre of pavement other than that specified in the preliminary order for t1.e pavement of Altgeld Otreet from the west line of jtiarine Street to the east line of T'iami Heights Addition under Improvement ``esolution -�To.2087, the Board this 28th. , day of August, 1928, hereby makes a final order for sheet asrhalt heavy traffic as the type of pavement with which said strut shall be improved and awards the contract for said improvement to deith Riley Construction Company at their low bid of II,388.85. City :Engineer, 1. n. "fray, submitted the follosrving report on the petition for a change in the ty-^e o ipavement for the improvement on-Iinyon Street from the east line of Portage -eivenue to east line of T,ot 181 Nort'-,,west -ciddi tion under Imjm ovement resolution -'o.2I03.- TTThere are three resident freeholders residing along this improvement, two of whom has signed the petition asking for concrete paver:ient. This number constitutes a majority and I �rould therefore recommend that the final order be made for concrete -cave ment . n Petition having been filed by a majority of -resident property owners asking for a chang in the type of pavement from sheet asphalt to concrete for the improvement on T£inyon treet from Portage Avenue to east line of Lot I8I Nort lwest Addition under Improvement Resolution No.2I03. the Board this 2 8th., day of august, 1928, hereby ma?ces a final order for concrete light traffic as the type of ravement with irhi ch said street shall be improved and awards the contract for said improvement to N. N. Barnes at his lo,.i bid of 4,151.40 for concrete light traffic. City-6hgineer reports the -remonstrance against the grading improvement on ror the first alley south of DuBail Avenue fi Kemblel Avenue to Songlas Street under Impro vement Resolution No.2I0I, showing a majority against this improvement. The Board therefore takes final action on said improvement resolution No.2I0I rescinding all action taken on same and declaring same null and void and the proceedings closed. This bein:--- the date set, hearing was had on Improvement Resolution No.2I29 for the grade, curb and walk on ITichiagn Street from Donmoyer Avenye to Jennings ''treet and the west side only from Jennings to Dean. In the above named improvement resolution, the Board decides to Continue hearing on same until September 011. , 1928, F11- 204 Tuesday, emu: ust 28 th. , 1928. The Board signed, the contract with Rocco Simeri for. the construeti of the sub trunk severer on 3ergan Itreet from Portage Avenue to . Johnson `'treet and local server on Johnson 'street from Hamilton 6treet to 'ffilaon Otreet under Improve- ment Resolution No.2108 in the amount of 13,I96.22. The Board also, approved, the construction bond of same for 50% of the cont--act -rice signed by '4nnployers Liability Assurance `'orporation. The Board gigmed the contract with TI. 1T. Barnes for the pavement of the Ist. , alley north of LaSalle 1 venue from Lafayette Street to the Ist.' alley west of T�afayette under Improvement Resolution No.2I04. The Board also approved the construction bond of same in the amount of T00o of the contract price signed by United States Fidelity and Guaranty Company. ih.e Board signed the contract with Alex Bukorvski for the navernent of the Ist., alley east of 23rd. , Street from Yishawaoa Avenae to 151all Street under Improvement Resolution "To.2098 in the amount of I,898.00. The Board also approved the construction bond of sam� in the amount of I00 of the contract price signed by The United States Guarantee ompany. The Board approved the Guarantee Bond of the Albert construction Company for the sewer and n avement improvement on Lincoln Yanor Second Addition under Improvement resolution ''To.2057 for I0 o of the total cost signed by the Inland Bonding Company. This being the date set, hearing was had on the assessment roll for the serer and r.ave_nent improvement in Lincoln 17anor Second -'Addition under Improve ment Resolution No.2057. In the above named assessment roll, no remonstrators appeared and'' no written remonstrance was filed and the Board, being fully advisee_ in the premises, finds that the several lots and parcels of land have been benefit ad in the amounts shown on said primary assessment roll. The Board, #he.refo-re, decides to take final action on said roll anddeclares same in all things ratified, confirmed and approved without' modification and the proceedings closed. The Board now orders said assessment roll delivered to the Department of Finance. This being the date set, hearinc, eras had on the assessment roll for the sewer and ?pavement improvement in �ioodlawn second 4ddition under Improvement Resolution-`1o.I986. In the above named assessment roll, remonstrators appeared but no written remonstrance was filed and the Board, being fully advised in the premises, finds that the several lots and parcels of land primarily assessed --have been benefited in the amounts named on said assessment roll. The Board, therefore, takes final action on said assessment roll and declares sale in all things ratified, _ confirmed and approved with out modification and the proceedings closed. The Board now orders slid assessment roll delivered to -the Department of Finance. City Engineer, H. G. Wray, filed the following report on the petition for the change in the t me of pavement on Victoria 6treet : i' "This petition does reflect the choice of a majority of the resident freeholders but said petition does not conform to the statute and legally can not be given any consideration in this matter. The statute provides that a retition of this kind reouesting a change in type of pavement other than designated in the Board of "orks nrelirminary order must be signed in ink, dated and Fri nessed. The signatures on thepetition have not been dated or witnessed. F- rmrthermore, a portion of this street does not have a water main. This should ne porvided before entering into contract for the improvement. . Yours very truly, i& T1. ,:,Ir y, city Civil Engine er. 11 After due consideration, the Board apl: ones TtiT1r. Wray's tion and considers said petition not legal as far as a change in the type is concerned. r e c omme nda t of ravernent No legal petition having been filed for a change in the type of pavement other than that specified in the preliminary order for . the pavement on Vic- toria Street from the east curb line of r'iami street to the east line of Miami Hie;:�ghts Addition under Improvement Resolution No12088, the Board this 28th., day of August, 1928, hereby makes a final order for hheet asphalt pavement heavy traffic as the type,;; of mvement with which said street shall be improved and awards the contract for said improvement to Reith Ri 1 ey construction company at their low bid of 19,600.95. The Board approved the order of City :Qigineer, H. G. ?gray, ordering the .Albert Construction Company to construct or install 2 city standard manhole covers at I8.00 each (old covers found to be broken) in connedtion with I� contract under Improvement Resolution No.2059 on Pulaski Street from Dunham street L;ii to Sample Street. Cl • • • 0 `05 Tues:.ay, ugust 28th., 1928. is This being the date set, bias were received, opened and ,read for the construction of the local sewer in Breokfiled atreet from Prairie Avenue to Indiann Avenue under Improvement Resolution No.2120. Bids are as follows: Ed. Di Julio J. Rothwell C.'T. Reesh No. Ind. Const. Co. I8 tt I.80 I.70 2.10 1.90 15" 1.60' 1.45 1.50 1.35 12" A I.30 1.35 1.30 1.19 8" .50 I.00 .50 1.00 6 t* .60 .70 .55 .57 1'-'anhol es 70.00 70.00 80.00 58.00 This being the date set, bids were received, opened and read for the cons -ruction of the local sewer in Liberty Street frcm Division street to Sample Street under Improvement Resolution No. 2I22. Bids are as follows Edw. Di Julio C. E. Reesh R. Simeri No. Ind. Const. Co. 15 inch I.6G 3.40 I.50 • 12 inch I.30 I.30 I.35 I.27 8 inch .50 /50 /90 I.00 6 inch .60 .55 �55 .50 This being the date set, bids were received, opened and read for the pavement improvement on Sunnyside Avenue under Improvement Resolution No.2116. "Bids are as follows: Albeert Const. Co. Reith Ailey Co. concrete walk .20 .20 concrete curb .50 .50 marginal curb .40 .40 comb. curb & gutter I.00 .90 grading .90 .90 sheet asphalt 2.67 2.65 is asp. concrete 2.56 2.55 storm water inlets #13 18.50 I8.50 reset inlets 8e m. h. c. 3.00 3.00 8 inch pipe I.00 I.00 This being the date set, bids were received, opened and read for the sewers, grading and ravement of various street in connection with Track Elevation tinder Improvement Resolution No.` 5. Bids are as follows: Silliston Co. Albert Const. Co. Aeith Riley Co. walk . I8 . I7 . I8 curb .50 no bid .43 marginal curb .40 .40 .40 comb. curb F,, GutterI.00 .90 .94 grading 1.30 1.25 1.15 sheet asphalt 2. 87 2.75 2.65 temporary paveae_l t I.50 I.35 1.20 asp. concrete no bid 2.64 2.55 manholes complete 80.00 80.00 70.00 curb inlets 20.00 I8150 I8.50 reinforced steel .05 .04 concrete in place 20.00 I8.00 I6.50 lumber in place 65.00 67.50 70.00 storm water inletsI2.50 no bid I2.50 reset inlets 3.00 3.00 3.00 reset or rebuild m. h. c. I0.00 I0.00 I0.00 30" pipe 9.00 8.50 8.90 21" pipe 7.00 5.00 6.00 1811 pipe 4.00 4.00 3.50 sewer cone I.25 1.50 T.00 8" pipe I.00 I.00 I.00 8 F'206 Tuesday, august 28th., 1928. This being the .date set, bids were received, opened and read for the construction of pavement on Angella "venue from east line Harter Heights Addition to Leeper Avenue -under Improvement Resolution No.2I27. Bids are as follows: ' C. H. Eldred Albert Construction Co. Williston Co.i concrete walk .20 .20 +i concrete curb .50 .50 .50 marginal curb no bid 40 .40 curb and gutter .90 /95 .90 !! grading .90 .90 980 sheet asphalt no bid 2.65 267 asp. concrete no bid 2.54 no bid concrete 2.47 - no bid no bid curb inlets I7.00 I8.50 20,00 storm water inlets 15.00 no bid 12.50 reset inlets 3.00 3.00 3.00 reset m. h.. c. 3.00 3.00 3.00 water corn. s.s. 30.00 25.00 24.00 sewer Conn. I.60 I.50 1.25 8" pipe I.00 I.00 I.00 Lighting cable .50 .60 .40 fiber conduit .25 .35 .40 I . This being the date set, bids were receiv id, opened and I� read for the pavement of the Ist. , alley north of LaSalle Avenue from DaPorte Avenue �i to Cottage Grove Avenue under Improvement Resolution Nr,.2I15. Bids are as follows: Hoban A Roach E. T. Tranberg Frame s Zimmer C. H. Eldred grading .65 .65 .90 1.00 l concrete pavement I.95 I.90 2.20 2.00 1+ storm water inlets 9.00 no grid I2.50 I2.50 is standard round inlets I2.00 reset inlets 3.00 no bid no bid no bid Iii ; reset man hole C. 3.00 3.00 3.00 8" pipe .70 .90 I.00 I.00 p 3; manhole curb -A cover I5.00 70.00 75.00 80.00 catch basin I0.00 20.00 I7.00 20.00 { This being the date set, bids were received, opened and read for the goads, curb and walk improvement on 36th. , atreet from Jeffersnn to f1rehall Street under Improvement desolation Ido.2II4. Bids are as follows: H. N. Barnes rra-e & Zimmer. Eston Ball walk , I4 . I5 . I5 curb .40 .45 .40 grading .50 .50 .60 i jc*��=tc���kkk�c�c?c3c�ctKK.kxxrcYtc�c�cicic*7k��*��*K*k*kkKk�(c*��c**x*;c:k�;c*!c�*�x�cx*�kk=?�C�C7kkkk=Ekkkjc*7kkak This being the date set, bids were receive:'_, opened and j read for the grade, curb and walk improvement . on Sherrill Street from Chapin Street i to 'Kendall Street under Improvement Resolution No.2II3. aids are as follows: 'I Frame Zimmer Eston Ball { concrete walk .I5 .I6 j curb .45 .40 grading .50 .58 �I ��*��=�**�*�,kkk��k�kk*kkkkkkkkkkk*kk1=kkkk�kkx�C7c!c�;*;:*�c*�ck�kk$c��ck%kkkknkk�xkkk�c�=kk'Kk�S=5k�7k� i II This being the d, to set, bids .were roceived, opened and read for the grade, curb and walk improvement.on Iowa Street from Jefferson Streeet to 7ashington Street under Improvement Resolution No.2II0. Bids are as follows: Alex Bulowski Frame A Zimmer Eston Ball, H. Y. Barnes concrete walk. .I5 .I6 .I6 .I4 concrete curb .40 .45 .40 .45 grading .40 .60 .75 .40 This being the date set, bids were received, opened and read for the grade, curb and walk improvement on La se Street from Jefferson Blvd., to Vashington Avenue under Improvement Resolution No.2I11. Bids are as follows: Alex Bukowyci Eston Ball Frame a Zimmer 7. N. Barnes concrete walk .I5 .I6 .I6 .I4 concrete curb .40 .40 .45 .40 grading .40 .78 .60 .40 0- 0 • 0 Tuesday, August 28th. , I928. `07 • • • • City ngineer, -'Tray, fi.led.the following primary assessment rolls; which were adopted by the Board: �Lssessment roll for the pavement of 36th. - Street from %'risha;vaLa _venue to T?orth Side Blvd., under Improvement Resolution _�o.20I4. Assessment roll for the pavement of ' oodside Street from I ichigan Street to Fellows Street under Improvement Resolution No.2000. Assessment roll for the pavement of '.7illisu. `street from Indiana Avenue to Calvert Street under Improvement Resolution ",,To.2998. Assessment roll for the pavement of C lvert Street fmm Arrest line of Sampson Street to Ernsperger Street u--hder Improve ment Resolution No.2009. Assessment roll for the pavement of Calvert Street from line Street to Sampson Street under Improvement Resolution No.20IO. - Assessment roll for the pavement of Scout Street from Indiana .venue to Calvert Street under Improvement Resolution 1,To.I943. Assessment roll for the Davement of Scott Street from. Indiana Avenue to Chica.7o, South Bend & Southern Railroad Co., under Improvement Resolution PTO. I94I. In all of the above named assessment rolls, the Board hereby orders that on the 4th., day of Se-nternber, I928, this Board will meet in their office in the .City Hall at IO:00 A. p`., to hear and receive remonstrances from all persons whose rroperty has been assessed for said improvements and will decide whbther the several lots and parcels of land primarily assessed for said improvements have been or will be benefited in the amounts named on said assessment rolls or in a .greater or less sum than that nanied on said rolls. The Board further order that notices . of said hearings shall be published in the South Bend News Times and Tribune on the 3lst. , day of Au,;ust and on the Ist. , day of September I928, according to law. City Hhgineer, H. r7. ':;Tray, 'fled the following primary assessment ryolls, which were adopted by the Board: Assessment roll for the pavement of Clyde Street from Indiana Avenue to Da.bail Avenue under Improvement Resolution 7o.I993. Assessment roll for the pavement of C'Ptalpa Avenue from St. Joseph South Bend and Southern Railway right of way to Indiana Avenue under Improvement Resolution No.I992. Assessment roll for the pavement of Indiana Avenue from E. line Leer Street to T. line of alley east of Clyde Street under Improvement Resolution No.1994. Assessment roll for the pavement of Peashwa._y Avenue from deeper Avenue to Southern Lichigan Railway right of way under Im-;rovement .Resolution No. I980. In all of the above na:: ed .assessment rolls, the Board hereby o-_-ders that on the 5th. , day of September, I928, this Board will meet at its office in the City Nall at 7-I5 P. Y. , to hear and receive remonstrances from all persons whose rroPerty has been assessed for said improvements and will Beside whether the sev-,ral lots and parcels of land have been or will be benefited in the amounts named on said assessment rolls or in a greater or less sum than that named on said rolls. The Board further orders that notices of said hearings shall be Published in the South Bend News Times and Tribune on the 3Ist. , day of August, I928 and on the Ist. , day of Sept ember I928, according to law. City �rigirieer. TT. G. dray, f'-led the following -primary assessment rolls which viere adopted by the Board: A-ssessment roll for the Pipe serer on O'Brien Street .from Vassar to Elwood Avenue under Improvement Resolution TTo.2034. Assessment roll for the local sewer in Queen Street from 1701 east of Blaine Livenue to east 1 ine_ of Lot I44 Northwest. Addition under Improvement Resolution 'STo.2048. Assessment roll for the local sewer in Ung ''treet from center line of Blaine Avenue to tenter line of Lot I9 in* Northwest Addition under Improvement Resolution No.2047. Assessment roll for the pipe sewer in Johnson Street from Vassar to Elwood Avenue under Improvement Resolution IN .2032, Assessment roll for the pipe sewer in Adams Street from, Vassar to Humboldt under Improvement Resolution No.2026 Tuesday, August 28th. , 1928. Rssessm ent roll for the, Pipe sewer in Fox Street between Southeast 2run'�: Sewer and Samps-on Street under Improvement Resolution No.I987. In all of the above named assessment rolls, the Board hereby orders that on the I2th. , day of September, 1928, this Board meet in their office in the City Hell at 7-I5 P. Y., to hear and receive rermonstrances from all persons whose pronerty has been assessed for said improvements and iAll decide whether the several lots and parcels of land primarily assessed for said improvements have been or will be benefited in the amounts shown 'on said assessnent rolls or in a greater: or less sum than that shown on said rolls. The Board further orders that notices of said hearings shall be published in the South Bend News Times and Tribune on the 31st. day of .August and on the 7th., day of September I928, according to law. City Engineer, H. G. 1,7rwr, filed primary assessment roll for the ?pavement of the Ist. , alley west of Miami Street from Broadway to Indiana Avenue under Improvement Resolution No.2065. In the above named assessment roll, the .Board hereby orders that on the I2th. , day of September"19�8, this Board will meet in their office in the City Hall at 7-I5 P. Y`., to hear and receive remonstrances from all persons whose property has been assessed for said improvement and will decide whether the several lots and parcels of land have been or will be benefited in the amounts named on said roll or in a greater or less sum than that named on said roll. The Board further orders that notices of said hearing shall be published in the South Bend clews Times and Tribune on the 5th. , day of ae-ptember and on the 6th., day of September I928 according to law. Claims amounting to 7,290.67 were signed. -:and: -approved by the Board. The Board approved the salary of H. G. ;Dray in the amount of 333.33 and that of Hazel A. Turner in the amount of I00.00 for track elevation work and hereby orders City Controller to pay same. The Board signed the contract with 'lestinghouse electric and manufacutring Company for lighting equipment for the 1"unicipal Air Fort. City sr, ineer, H. G. `tray, filed the following copies of contracts which were signed and app_ oved by the Board: Copy of contract for the light traffic sh- et as-phalt ravement imnrove�-nent on .endall Street from alley north of Orchardd Street to Dunham Street, in accordance with the terms of the contract between the Gity and the filbert Construction Company, contractors under Improvement Resolution No.2042. A -mount of contract 216I2.85. Copy- of contract for the heavy traffic sheet asphalt pavement improvement on Chapin Street from Calvert Itreet to Ewing Avenue under improvement Resolution No.2079 in accordance with the terms of the contract between the City and the Albert Construction Company, contractors. (amount of contract 14,227.21. Cop, of contract for the light traffic sheet asphalt -pavement on the south ;L of "Jestmoor. �'treet from the west line of Olive Street to the east line of Lincoln Manor 3rd. , Addition, in accordance with the terms of the contract between the City and the Albert Construction Commny, contractors, under imbrovement resolution No.2094. Amount of contract 9,736.I5. Partial estimate !To.I for the light traffic concrete -pavement improvement on fist alley east of 23rd. , street from 1.7-iishawaka Avemre to Udall Street, in accordance with the terr:s of the contract between the City and Alex Bukowski , contractor. 'Zhe ,_Board sighedcdnd approved same in the amount of 1609.28. !Le-eting adjourned at I2:00 A. 11. j Attestdd: !I I. Cle#k of the Board • C7 • 0- W