HomeMy WebLinkAbout08/07/1928 Board of Public Works MinutesTta.esday,. August 7th. , 1928.
C7
0
•
9
Board met in regular session at 9 A. 1T. All menbens present.
Minutes of meetings held July 3lst. , and august Ist. , I928, read and apl:roved.
This being the date set bids were received, opened and
street street addition
read for the
pavement
on Victoria
from Miami
to T`Yiiami
He_Lghts
under Improvement
Besol-cation No.2088.
Bids are
as follows:
Albert 0
4Iilliston Co.
Keith iley L.
H. FIdred H. N. Barnes
concrete walk
.20
.20_
.20
.20
,curb
.50
.50
.50
.50
.4 5
marginal curb
.40
.40
.40
grading
.90
.95
.85
I.JO
.90
sheet as-obalt
2167
2.64
2.65
,,asp. concrete
2.57
2.54
2.54
soncrete
2.45
2.50
2.62
2.43
,.storm water inlets
12.50
I2.50
12.50 Ab.
TS i-d
12.50
reset inlets and
man hole covers
3.00
3.00
3.00
3.00
3.00
water eon-, 1. s.
29.00
28.50
27.50
30.00
28.00
water cone. s. s.
22.00
22.30
2I.50
24.pQ
bid
22.00sewer
bid
conn.
I.50
no bid
no bid
no
no
811 -oipe
I.00
no bid
I.00
I.00
..90
This being
the date set.,
bids werereceived,
opened and
read for the
pavement
on Altgeld Street
from Terrine
street to ITiami
Heights addition
under ImT,r-ovement Resolu
tion ITo.2087. Bids are as follows:
Albert
00.
'J`dilliston 00.
Reith Riley 0o.
C.H: !E Bred
H.N.Barnes
concrete walk
.20
.20
.20
.20
curb
.50
.50
.50
.50
.45
marginal curb
.40
.40
.40
grading
.90
.95
.85
.90
.90
sheet as-ohalt
2.67
2.64
2.65
asr. concrete
2.57
2.54
2.54
concrete
2.45
2.50
x2xf[&x
2.62
2.43
storm water. inlets
I2.50 ,
12.50
12.50
x1 x
I2,50
reset inlets and
man hole covers
3.00
3.00
3.00
3.00
3.00
water corn. 1. s.
29.00
28.50
27.50v
30.00
28.00
water Bonn. s. s.
22.00
22.00
2I.50
24.00
22.00
sewer Conn
I.50
8/1 ape
I.00
I.00
I.00
no bid
.90
This being the date set, bids were received opened and read for_ the pavement
of the west one half of Logan street from 1�ishawlm .1venue to St. Joseph Aiver Bridge
under Improvement Resolution No.3063. Bids are as follows:
"illiston Go.
concrete walk
curb
.50
marginal curb
.40
comb. curb & gutter
grading
.75
sheet asphalt
2.40
asr. concrete
2.30
concret e
2.20
storm water inletI2.50
reset inlets and
man hole covers
3.00
water Bonn. 1. s.
water con_. s. s.
20.00
8" pipe
I.00
neith "i ley Co.
.20
.50
.40
I.00
.90
2.46
2.35
I2.50
3.00
27.00
I.00
W. J. Nees C.H. Eldred H.?,!. Reed
.20
.20
.20
.50
.50
.50
.40
no bid
no bid
.80
1.00
.85
.80
.95
.80
2.24
I2550
3.00
38.00
30.00
!90
3.00
25.00
I.00
3.00
35.00
28.00
.90
Xc�c�sk�k�k�kk�k�kk�k��*M�k�kk�k��k�=k�k�k�xk*�k**�kkkk�k�k�k�k�k**�kk�k�k*k�k�k�kk�kl:�k��k*�kk=k�k*X�k�k%��kati�k�k�k��k��tc*�kk�k�kk?k
• This being the date set bids were received opened and read for hhe Tavement
of the north ' of Ford Street from Lake 6treet to Iowa Street under Improvement 'esolu
tion No.2093. Bids are as follows:
curb grading concrete storm 71. inlets 8t1 pipe reset inlet&M.H.C.
Williston .50 .76 2.30 I2.50 .90 3.00 each
This being the date set, bids were received, opened and read for the pavement
of the East L of Lake street from Division atreet to Ford Street under Improvement
Resolution No.2095. Bids are as follmis:
curb grading concrete feset inlets ?'.H.C. 8F1 pipe
Williston Co. .50 .76 2.30.3.00 .90
Tuesday, August 7th. , 1928.
This being the date set, bids were received, opened and read for they'
pavement on Westmoor Street from Olive to Goodlend Avenue under Improvement Resolution
fTo.2094. Bids are as follows:
walk curb m. curb grading sheet asp. asp concrete s.1.I. reset J!,
Albert Co. 20 .50 .40 .702.45 2.35 12250 3.00
"�a ter c onn.. 1. s. S. S. sewer Bonn. 8 " pipe
Albert Co. 29.00 22.00 .9.0-01 .90
This being the date set, bids were received, opened and read for the,
paverpen.t on Kinyon Street from Portage `venue to the east line of Lot I8I Nortl4ffest
i Addition under Improvement resolution No.2I03. Bids are as follows
!
Albert Oo. "illiston Co. ' Reith Ailey C. T.I. Eldred H. ff. Barnes
rwalk .20 .25 .20 .20 .20
� curb .50 .50 .50 /50 .45
marginal curb .40 .40 .40
comb curb&Gutter
grading .85 I.00 .95 .90 .80 •
sheet 2.46 2.50 2.47
asp. concrete 2.36 2.40 2.40
concrete r 2.40 2.50 2.30
i storm water
inl ets 12.50 I2.50c 12.50 15.00 I2.50
reset inlets
I and T%H. C. 3.00 3.00 3.00 3.00 3.00
water c onn. 1. s. 29.00 28.50 27.50 30.00 28.00
water con.n. s. s. 22.00 22.00 21.50 24.00 22.00
sewer corn 1.50 .
I 8" pipe I.00 I.00 I.00 1.00 .90
This being the da ue set, bids were .received, opened and read for
i, the pavement of 22nd., Street from Jefferson Blvd., to St. Joseph Bridge under Impro-
vement Resolution No.2064. Bids are as follows:
Albert Co. "illiston Co. rei.th Riley Co. C. Eldred
wa Uc .20 .20 .20 . I8
curbma rginal .40 .40 .40
i IT. H. C. PC. C. 80.00 75.00 90.00 80.00
comb. curb
it gutter .75 .80 .90 .90
grading .80 :75 I.00 .80
li sheet asp. 2.67 2160 2.65
+ asp. concrete 2.55 2.50 2.54
stretcher block .50 .25 .50 .50
concrete 2.40 2.50 2.50
trees removed 6.50 5.00 8.00 5.00
water conn.ext I0.00 I4.00 I3.00 I4.00
I
curb inlets 18.50 20.00 I8.50 I5.50
�! reset inlets
it and Y.H. 111. 3.00 3.00 3.00 3.00
water-connl.s. 33.00 32.00 32.50 34.00
water conn.s.s.22.50 25.00 27.50 24.00
Ij sewer corm I.06 I.00 1.00 I.20
i 81, pipe I.00 I.00 I.00 .95
I2 T' pipe 1.65 I.75 I.60 2.I0
15" pipe 2.20 2.00 2.00 2.20
IO" pipe I.55 I.50 I.50 I.60
This being the date set, bids were receive;., opened and read for
the r avement on the first alley north of LaSalle ` enue from Lafayette ''treet to the
first alley west of Lafayette Street under Improvement resolution 11o.2104. Bids are
i
as follows:
TH. TT. '?arnes Frame �- Zimr:er Hoban P Roach Alex Bnkowski •
grading h.-D I.00 I.00 2.00
marg. curb .35
concrete 2.00 2.I0 2.25 2080
i1
This beingthe date set, bids were received, opened and read for I'
the pavement of the alley vrest of Forest Avenue from Portage Avenue to a point 6.-4 feet
north of the north line of the first alley south of 'riverside give ender Improvement
+ Resolution 1do.209I. Bids are as follows:
189
Tuesday, August 7th. , 1928.
7. T . 'Barnes E T. Tranber g Frame a Zim- er Hoban 3 Roach Bukowski
j grading .60 .70 .70 .75 .60
concrete 2.04 2.00 2,02 2.00 2,00
marginal curb 35
This being the date set, bids were received, opened and re ad for _the patfie
went of the first alley east of 23rd., Otreet from Yishawaka Aven��e to :°Mall Street under.
�'m
t improveent Resolution No.2098. Bids are as follows:
H' Barnes Hoban I Roach Frame �c Zimmer Bukowski E. T:". Tranberg
gra ding .65 .80 .70 .60 .80
floonerete 2.00 2.01 2.05 2.00 2.05
m. curb .35
This being the date set, bids wre received, opened and read for the
pave, emt of the Ist. , alley north of. Corby " atre et from Nile s Avenue to Stanfield Street
•
und,r Improvement Resolution No.2099. Bids are as follows:
AT. -Barnes Frame .3P Zimmer E. T. Tranberg Hoban ,? Road. Bukowski
grading .65 .80 I.00 I.00 1.50
iconcrete 2.00 2.05 2.I2 2.io 2.80
a m. curb .35
T:Y,'c�,.'"'G:{CT%k'IC;:)FT?YX7F'1`iCi't`7jC Jk'r*iC*TX.rG�:X?,C�C>;(?C?C:ti JK.`�JK!c J�f yff'%C:<?,k)fC.'1'xC?,CTk]ti�/,•`•.y,.S,CJtC J�C '��C ?,C%�%�
This being the date set- bids were received, opened and read for the
Lab '"ewer
construction of the Johnson-Bergan bunk under Improvement Resol-ation No.2I08.
Bids are as follows:
R. Simeri N, Ind. Const. Ed. DiJulio J. Rothwell Reesh Sorenson Zjbmer
I5 inch I.45 2.00 I.70 I.60 2.00 I.80
12 inch I.40 I.80 I.40 I.40 I.50 I.60
8 icnh .50 .50 .60 1.00 .80 I.00
6 inch .60 .70 .65 .70 .70 I.00
36 inch 7.50 6.45 8.00 8.50 .8.00 9.60
manholes
complete 3- 90.00 70.00 75.00 80.00 I00.00 90..00
7- 85.00
�cx�::L>:alc:?cvfc:F:x�:xxc�cje=k*=k*�cicxx��yc�=k��ickx��cXc**�=k**�c;k:?c*(c�:icIc�X�*��cY,e�cak�rak�c=K�ycxac*�v��(cyc��jck'kxc*�xa�cx�:k
i
All of the above bids handed to City Engineer for tabulation. {
No petitions having been filed for a change to the type of other
pavement
than that specified in the preliminary order for the pavement ement on Chapin street from
Calvert Jtreet to %wing Avenue under Improvement Resolution T�o.2079, the Board this
i' 7th., day of August, I928, herebyx
makes a final order for sheet asphalt heavy traffic pavement as the type of pavement
with which said street hall be improved and awards the contract for said improvement
#o Albert Construction ompany at their low bid of I4,227.2I.
No petitions having been filed for a change in the type of pavement other
than that specified in the preliminary order for the pavement of Nobth Shore Drive
from point 150 feet west of the west line of Lafayette Street to the west line of
Irquois Street under Improvement Resolution No.2076, the Board this 7th., day of August
L . hereby makes a final order for sheet asphalt resurface heavy traffic as the type
of pavement with which said street shall be improved and awards the contract for said
improvement to Williston Construction Company at their low bid of 8,625.50. _.
No nstttions having been filed for the pavement of Kendall street from the it
alley north of 0„chard Street to Dunham street under Improvement Resolution No.2042,
the Board this 7th. , day of August, I928, hereby -sakes a final order for sheet asphalt �
light traffic pavement as the tyre of pavememt with which said street shall be improved
and awards the contract for said improvement to Albert Cons t.,uction Company at their low
bid of 2,612.85.
No pei tions having be en fi 1 ed f or a change in the type of pavement other
than that specified in the preliminary order for the pavement of Jefferson Street from
17alnut Street to Sherry Street under Improvement Resolution IIo.204I, the Board this
7th., day of August, I928, hereby makes a final order for sheet asphalt pavement light
traffic as the type of pavement with which said street shad be improved and awards the
contract for said improvement to Reith Riley Construction ompany at their low bid of I•
5, 284.40.
No petitions having been filed for the change of the type of -oavement_.other
than that specified in the rreliminaxy order for the -p-avement of Yedison Street from
Palmer Bbul"evard to Harriett Street under Improvement Resolution No.2083, the Board this
7th., day of August, I928, hereby makes a final order for sheen asphalt heavy traffic
pavement as the type of pavement with which said street shall be improved and awards
the contract for said improvement to Reith Riley Construction Company at their low bid o
!j 8,203.80 for sheet as shalt.
190 . Tuesday, l ugust 7th. , 1928.
The Board signed the eontnact with Hoban and Roa h for the avement
of the alley west of lain street from Navarre Street .to Bartlett Street under Improve9
ment. Resolution No.207I in the a-.,.ount of I, `335.00. The Board also: a-pproved the con-
stru,cti�n bond of same in the amount of 50% of the contract price signed by the .Southern
Surety o.
This being the date set, continued hearing was had on the Resolution
for the vacation of the Ist. , alley east of-yIalnut 6treet from Dunham street to ample
Street under Improvement Resolution No.2I06.
In the above named 3lestQn r v resolution, the Board decides. to take
final action on said Vacation Resolution and rescinds all former action on same, de-
claring same in all . things null and void and the proceedings closed.
In the matter of Improvement Resolution No.209I for the avement of
the fi rst alley west of Forest. Avenue from Portage Acrenue to Riverside �ive, the Board
finds that 22 resident property owners out of 42 have signed the remonstrance. This
constitutes a majority and therefore the Board declares all former action taken of same i
as null and void and the proceedings closed.
In the muter of Improvement resolution 14o.2099 for the pavement of
the Ist. 1 alley north of `'orby Street from Niles Avenue to ''tanfield atreet under
Improvement 'resolution No.2099, the Board finds that 4 resident property ovm�rs out of
5 have signed this remonstrance. This number constitues a majority and therefore the
Board. declares all former action taken on same null and void and all action rescinded
and the proceedings closed.
Upon the recommendation of vim. F. (walls, the Board approved the
petition of the Brehmer Elentrical Companu for installing a flood light standard at
the corner of South Yain treet and Yonroe Jtreet.
City engineer, H. G. Wray, filed primary ..4ssesement roll for the
local sewer improvement on Kenmore and Sample ''treet from � ord street to a point 201
east of the east line of Belleville 3rd. , Unit under Improvement `des olut ion No. I996.
In the above named assessment roll, the Board hereby orders that
on the 8th. , day of August; I928, said Board will meet in their office in the City
Hall at 7-I5 P. 1%, to hear and receive remonstrances from all persons whose property
has been assessed for said improvement and will decide whether the several lots and
parcels of land ttimArilyassessed for said improvement have been or will -benefited
i# the amounts shown on said roll or in a greater or less sum than that: shown on said
primary assessment roll.
City '�gineer, H. G. 17ray, filed primary assessment roll for the
sewer and pavement Amseovements in Lincoln ITanor ''econd Addition under Improvement
Resolution No.2057.
In the above named assessment roll, the Board hereby orders that
on the 28th. , day of August, I928, this Board will meet in their office in the City
Hall at IA:00 A. IA. , to .hear and receive remonstrances from all r.ersons whose property
has been assessed for said improvements and vdll decide whether the several lots and
rarcels of land primarily assessed for said improvements have been or will be benefitedsi
in the amounts named on said assessment roll or in a greater or less sum than that named
on said roll. The Board further orders that notice of said hearing of assessment roll
shall be published in the South Bend News Times and Tribune on the I6th., day of
August, I928, according to law.
Claims amounting to 8,902.38 signed and approved by the Board.
The Board approved the petition of the -northern Indiana Public `'ervice';
Company to lay gas mains in the east section of the City.
Meeting adjourned at II-30.
Attested:
-d'A / '
le z ofthe Board
.
•
•
0
•
NA
•