HomeMy WebLinkAboutOpening of Bids - 2017 Demolitions Phase 2 Project No 117-121 - Green Demolition Contractors4'
CITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
CHECKLIST' FOR BIDDERS,
Project Name 2017 Demolitions, Phase 2
Project No. 117-121
For Bids Due December 12, 2017
From time to time the South Bend Board of Public Works finds it necessary to reject a bid because
it does not comply with statutory requirements. In preparing your bid, please use the following
checklist in order to make sure that your bid is done in the proper manner.
Proper bid: security included. The bidder has the option of providing either a Certified Check
or Bid Bond.
Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely
executed.
Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments
with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and
Certification, of use of United States Steel Products or Foundry Products.
Proof of MBE/WBE Participation Goal Form [MWBE-1.01. If minimum participation goal is not
met, also provide Evidence of Good Faith Efforts Form [MWBE-2.0],and MBEANBE Contacted
Form [MWB E-2, I],
Acknowledge Receipt of 1�1 LI Addendum(s) included with the bid,
"111"°A All required additional information is included with the bid.
Proposal statements and other affidavits all signed by the proper party with name either
printed or typed underneath signature..
This checklist submitted with the Bid.
This checklist is provided for bidder's use in assuring compliance with required'
documentation; however, it does not include all specifications requirements and does not
relieve the Pjdder of the ne4kd to read and comp
105 M=11111=1
By Authorized Repri
Signature:
Print Name & tl
Version 10117/2018
with the specifications.
.3, Date:
Contractor's Bid for Public Works - 1
w, *I mom K-Samm:1 I BE wel it 211:1
Project Name
Project No.
For Bids Due
Date:
Address:
2017 Demolitions, Phase 2
117-121
December,12,2017
PART I
(Must be completed for all bids
Bidder (Fi
Please type or print)
E-7yk 0 A /Z �' A/ -4 L) 4hA
City/State/Zip:/)&X'Z, I'?/ Telephone Number: 1/4, C)
Agent of Bidder (if Applicable): -1k g
Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the
public works project of: <7)
10 /0 4 e, tt,/Z) f
the City of South Benid. Indiana, in accordance with plans and specifications prepared by:
and ✓dated lVov' for the sum of (enter the Total Bi sashown on he Proposal)
V -7Aq4JJA,Q 7 d-
(Enter sum of Total Bid, all divisions incrud6d, shown on Propo�al) (Numerical)
The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in
the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance
with the notice. Any addenclums attached will be specifically referenced at the applicable page.
I
If additional units of material included in the contract are needed, the cost of it�i rn��! be the same as that
,pr,) 9 mu
shown in the original contract if accepted b the Cif
of $WM Bend�. lfthpblid j-5 e awarded,on a unit
,or achm, t
basis, the itemization of the units shall bes own ona,sepp dwatt n'
The above bid is accepted thiis
Subject to the following conditions:
Gary A. Gilot, President
Elizabeth A, Maradik, Member
(Printed Name
ACCEPTANCE
day of
Suzanna M. Fritzberg, Member
Therese J. Dorau, Member
James A. Mueller, Member Attest: Linda M. Martin, Clerk
Version 10/17/2018 Contractor's Bid for Public Works - 2
PART II
(For projects of $100,000 or more — IC 36-1-12-4)
These statements to be submitted under oath by each bidder with and as part of his bid.
Attach additional pages for each section as needed.
SECTION I EXPERIENCE QUESTIONNAIRE
1. Attach information regarding projects your organization has completed for the period of one
(1) year prior to the date of the current bid.
2. Attach a listing of public works projea;ls currently in process of construction by your
organization.
3. Attach information regarding any failure to complete any work awarded to you and the
location thereof.
4. Attach references from private firms for which you have performed work.
SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE
1. Attach an explanation of your plan or layout for performing proposed work. (Examples could
include a narrative of when you could begin work, complete the project, number of workers,
etc. and any other information which you believe would enable the City of South Bend to
consider your bid.)
2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside
your own firm who have performed part of the work) that you have used on public works
projects during the past five (5) years along with a brief description of the work done by each
subcontractor.
3. If you intend to sublet any portion of the work, attach the name and address of each
subcontractor, equipment to be used by the subcontractor, and whether you will require a
bond. However, if you are unable to currently provide a listing, please understand a listing
must be provided prior to contract approval. Until the completion of the proposed project, you
are under a continuing obligation to immediately notify the City of South Bend in the event that
you subsequently determine that you will use a subcontractor on the proposed project.
4. Attach a listing of equipment you have available to use for the proposed project.
5. Have you entered into contracts or received offers for all materials which substantiate the
prices used in preparing your proposal? If not, attach an explanation for the rationale used
which would corroborate the prices listed.
SECTION III CONTRACTOR'S FINANCIAL STATEMENT
Attachment of bidder's financial statement is mandatory. Any bid submitted without said
financial statement as required by statute shall thereby be rendered invalid. The financial
statement provided hereunder to the City of South Bend awarding the contract must be specific
enough in detail so that said City of South Bend can make a proper determination of the bidder's
capability for completing the project if awarded.
Version 10117/2018 Contractor's Bid for Public Works - 3
When the, prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to th4v Affidavit.
CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION
REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON-
DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL,
PRODUCTS OR FOUNDRY PRODUCTS
(Must be completed for all quotes and bids. Please type or print)
STATE OF
e- SS:
X-1 COUNTY
The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury
that:
I. Contractor has not, nor has any other member, representative, or agent of the firm, company,
corporation or partnership represented by him, entered into any combination, collusion or agreement with
any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding
nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and
without any agreement, understanding or combination with any other person in reference to such bidding.
Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or
indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and
2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals
are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from
participation in this transaction by any Federal department or agency; and
3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in
investment activities in Iran.
a. For purposes of this Certification, "Iran" means the government of Iran and any agency
or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as
amended from tirne-to-time.
b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor
is engaged in investment activities in Iran if either:
i. Contractor, its successor or its affiliate, provides goods or services of twenty
million dollars ($20,000,000) or more in value in the energy sector of Iran;
or
ii. Contractor, its successor or its affiliate, is a financial institution that extends
twenty million dollars ($20,000,000) or more in credit to another person for
forty -Five (45) days or more, if that person will (i) use the credit to provides
goods and services in the energy sector in Iran; and (ii) at the time the
financial institution extends credit, is a person identified on list published by
the Indiana Department of Administration.
Version 1011712018 Contractor's Bid for Public Works - 4
4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any
employee or contract with a person that the Contractor subsequently learns is an unauthorized alien.
Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's
newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's
documentation of enrollment and participation in the E-Verify Program is included and attached as part of
this bid/quote; and
5. Contractor shall require his/her/its subcontractors performing work under this public contract to
certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain
any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien,
and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees
to maintain this certification throughout the term of the contract with the City of South Bend, and understands
that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision
no later than thirty (30) days after being notified by the City.
6. Persons, partnerships, corporations, associations, or joint venturers awarded a contract by the City
of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or
applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions,
or privileges of employment, or any matter directly or indirectly related to employment because of race, sex,
religion, color, national origin, ancestry, age, gender expression, gender identity, sexual orientation or
disability that does not affect that person's ability to perform the work.
in awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any
combination of the foregoing including, but not limited to, public works contracts awarded under public
bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards,
or commissions may consider the Contractor's good faith efforts to obtain participation by those Contractors
certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise
("WBE") as a factor in determining the lowest, responsible, responsive bidder.
In no event shall persons or entities seeking the award of a City contract be required to award a subcontract
to an MBE/WBE; however, it may not unlawfully discriminate against said WBE/MBE. A finding of a
discriminatory practice by the City's MBE/WBE Utilization Board shall prohibit that person or entity from
being awarded a City contract for a period of one (1) year from the date of such determination, and such
determination may also be grounds for terminating the contact for which the discriminatory practice or
noncompliance pertains.
7. The undersigned contractor agrees that the following nondiscrimination commitment shall be made
a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its
agencies, boards or commissions.
Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the
performance of this contract with privileges of employment, or any matter directly or indirectly related to
employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation,
handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of
contract.
1, the undersigned bidder or agent as contractor on a public works project, understand my statutory
obligations to the use of steel products or foundry products made in the United States (I.C. 5-1 ti-8-1). I hereby
certify that I and all subcontractors employed by me for this project will use steel products or foundry
products made in the United States on this project if awarded. I understand I have an affirmative duty to
notify the City in my bid that my proposal does not include the use of steel products or foundry products
made in the United States. I understand it is my sole obligation and responsibility to provide a justification
to the City, subject to review and approval, why the cost of United States made steel or foundry products is
unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry
products made in the United States, the City, through its director of public works, shall make a determination
if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder
Version 10/17/2018 Contractor's Bid for Public Works - 5
may result in forfeiture of contractual payments.
I hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid
for public works are true and correct.
Dated this 1.2 day of _DP, e— , 20
Al
Printed Name and Title
Subscribed and sworn to before me this day of -�,e 20a
My Commission Expires- LO-
Notary Pubiic
County of Residence /A-,,1114
Version 10/17/2018 Contractor's Bid for Public Works - 6
BID/PROPOSAL
CITY OF SOUTH BEND
Project Name 20�17 Demolitions, Phase 2
Project, No.
For Bids Due
DIVISION A:
117-121
December 12, 2017'
PEACK
Asbestos
Item
Description
Abatement
Demolition
Total Amount
No.
[LSUM
[LSUMI
Demolition of 639 N. Brookfield St.
A-01
House and Fence
"Duct Tape
Demolition of 824 College St,
A-02
Multi -Unit and Garage
"Duct Tape and Wrap
Demolition of 1132 Diamond Ave.
A-03
House and Garage
"Duct Tape and Window Glazing
J 'J
12,SP0
Demolition of 1308 Woodward Ave.
A-04
House
Duct Wrap
$
Idt.
Demolition of 1033 W. Rose St.
A-05
House and Fence
**
$
$11"zvo
Tile, Adhesi�lve+, and Floor Covering
A-06
NOT INCLUDED IN BID
Demolition of 1230 N. Brookfield St.
A-07
House
"Floor,
4,J
Mastic+, Tape, and Air Return
Demolition of 112,4 N. Kentucky St
A-08
House and Garage
"Duct
Wrap
Demolition of 11025 Lawndale Ave.
A-09
House
"Ceiling,
1/7Z)
oo
Wall+, and Siding
A-10
Demolition of 1106 Beale St.
House and Fence
$
A-1 I
Demolition of 1240 Queen St.
House
$
$ml
A-12
Demolition of 805 Leland Ave.
"Pipe Wrap and Siding
$
4,
A-1 3
Environmental Allowance
$10,000
DIVISION A TOTAL
"Denotes Homes with Asbestos Material. Verify with inspections & reports for, proper disposal.
+Point Count Attached
Bidder (Firm) Name: b t-,cl
CM e- J)
Version 10117/2018 Contractor's Bid for Public Works - 7 ADDENDUM 2
DIVISION B:
Asbestos
Item
Description
Abatement
Demolition
Total Amount
No.,
[LSUMILSUM
Demolition of 1521 W. Fisher St,
B-0 1
House and Garage
Duct Wrap, Tile, and Floor
B-02
Demolition of 1525 W. Fisher St.
House and Shed
$
8-03
Deolition of 321 McPherson St.
Houmses
B-04
NOT INCLUDED IN BID
B-05
Demolition of 309 Laurel, St.
House, Shed, Fence, and Doghouse
Duct Tape
B-06
Demolition of 214 S. Kentucky St.
$
Houseand Shed
5r—
Demolition of 230 Birdsell St.
8-07
House and Fence
"Siding, Duct Wrap, Duct Tape, and
$
Floor Covering
B-08
NOT INCLUDED IN BID
Demolition of 314 N Walnut St.
B-019
House and Shed
**Duct Wrap and Duct Tape
B-10
Demolition, of 319 LaPorte St.
House and Fence
Demolition of 528 (Euclid St.
B-1 1
House, Garage, and Fence
"Duct
/6, e?/') 49
1,-7, -)sz)
Tape
B-12 I
Environmental Allowance
$10,0010
DIVISION B TOTAL
$ -v
"Denotes Homes with Asbestos Material. Verify with inspections, & reports for proper disposal,
+Point Count Attached
Bidder (F'irm) Name:°'8L�.,�e. I A111 92//
Version 10/17/2018 Contractor's Bid for Public Works - 8 ADDENDUM 2
Asbestos
Item
Description
Abatement
Demolition
Total Amount
No.
[LSUM]
[LSUM]
C-01
NOT INCLUDED IN BID
C-02
Demolen
o1601 Retaining
House, Fence, and Retaining Wall
ro
$ k)
C-03
NOT INCLUDED IN BID
Demolition of 618 Dubafl Ave.
C-04
House, Fence, and Wall
"Duct Wraprf
Demolition of 1804 S. Michigan St.
C-05
House, Garage, and Fence
**Pipe Insulation
Demolition of 2223 Catalpa Ave.
C-06
House, Garage, and Fence
4"oszo
Duct Wrap and Floor Covering
C-07
NOT INCLUDED IN BID
Demolition of 1618 Prairie Ave.
C-08
House
House has been gutted
Demolition of 1222 Miner St.
C-019
House, Garage, and' Fence
** Mastic, Tile, Plaster+, Duct Wrap,
and Duct Tape
C-1 0
NOT INCLUDED IN BID
Demolition of 314 E. Milton St.
C_1 1
House, Fence, and Wall
Floor Covering+, Siding, Duct Wrap,
6)
and Tile
C-12
Environmental Allowance
$10,000
DIVISION C TOTAL
"Denotes Homes with Asbestos Material'. Verify with inspections & reports for proper disposal.
+Point Count Attached
Bidder (Firm) Name:
Version 10/17/2018 Contractor's Bid for Public Works - 9 ADDENDUM 2
DIVISION A TOTAL:
DIVlSION BTOTAL:
DIVISION C TOTAL: L3 V-"/
BID TOTAL (ALL DIVISIONS):
ASBESTOS ABATEMENT UNIT PRICING (required for all bids):
Item No.
Unit Pricing if Required
Unit
Add Per Unit Price
I.
Removal, Management, and Disposal of
Linear Feet
$
Duct Tape Material ContainingAsbestosIt.
Removal, Management, and Disposal of
Square Feet
Duct Wrap Material Containing Asbestos
Removal, Management, and Disposal of
Ill.
Floor Tile and Mastic Material Containing
Square Feet
Asbestos
IV.
Removal, Management, and Disposal of
Square Feet
Plaster Material Containing Asbestos
'S"F7
Removal, Management, and Disposal of
V.
Corrugated Sheet Material Containing
Square Feet
Asbestos
Removal, Management, and Disposal of
VI..
Attic Insulation Material Containing
Square Feet
Asbestos
Removal, Management, and Disposal of
Vill.
Transite Siding Material Containing
Square Feet
$
Asbestos
Bidder (Firm):
Address:
City/State/Zip
A,fv 4 zae� 41 Telephon
3W
10171
P I
(Printed Narne of Person Signing)
Version 10117/2,018 Contractor's Bid for Public Works - 10 ADDENDUM 2
1316 COUNTY -CITY BUILDING PiioNF 574/235-9251
227 W. JEFFERSON BOULEVARD U tv FAX 574/ 235-9171
PEACK
Sou'ri I BEND, INDIANA 46601-183 0 TDIJ 574/ 23,5-5567
J( W
1865
CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR
Date:
To:
From
Subject
Project Name:
Project No.:
F 11 W1111
Date Received:
December 6, 2017
All Planholders
Linda M. Martin, Clerk, Board of Public Works
Addendum Number: I
2017 Demolitions, Phase 2
117-,121
s2
This addendum is being forwarded to you for the above referenced project.
Please sign below and acknowledge receipt of this Addendum by
faxing this sheet to the Board of Public Works at (574) 235-9171
within 48 hours of receipt. A copy MUST also be included with your
bid package upon submittal.
THIS ADDENDUM MAY AFFECT YOUR BID.
Notes:
The attached documents are hereby added to the Specifications and Contract
Documents and become a part of herein.
Compa
Author
Date:
1316 COUNTY -CITY BUILDING 0� '1Z� PHONE 574/ 235-9251
227 W.JEFFERSON BOULEVARD d FAx 574/235-9171
SOUTH BEND, INDiANA466ii1-t830W vH"" TDD 574/235-5567
Y S
.r 1865
CITY OF SOUTH BEND FETE BUTTIGIEG, MAYOR
BOARD OF PUBLIC WORKS
Date: December 7, 2017
To: All Planholders
From Linda M. Martin, Clerk, Board of Public Works
Subject Addendum Number: 2
Project Name: 2017 Demolitions, Phase 2
Project No.: 117-121
ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM
Date Received: 12 — ; —,/ 7
This addendum is being forwarded to you for the above referenced project.
Please sign below and acknowledge receipt of this Addendum by
faxing this sheet to the Board of Public Works at (574) 235-9171
within 48 hours of receipt. A copy MUST also be included with your
bid package upon submittal.
THIS ADDENDUM MAY AFFECT YOUR BID.
Notes:
The attached documents are hereby added to the Specifications and Contract
Documents and become a part of herein.
Company: 11 C
Authorized Si2naturd' "
Date:
CONTRACTOR:
(Alame, legal slatus eviel adfh-ess)
Groan Damolition Contractors, Inc,
1427 W Dickens Ave Chicago, IL 60614
OWNER:
(Alame, lepi slahis wid adeh-ess)
City of South Bend Indiana
Board of Public Works
227 W Jefferson Blvd
South Bend, IN 46601
SURETY:
(Name, legal dolts imel pi•ineipal place
qfbnshless)
Developers Surety and Indemnity Company
PO Box 19725
Irvine, CA 92623
BOND AMOUNT: 5% not to exceed Seven Thousand Five Hundred Dollars
PROJECT:
(Molne, location or achkess, and Trqiecl mimber, ifew,a))
Wreck and Removal - Project 117-121- 2017 Demolitions Phase 2 - Division C, 10 Properties.
This document has important legal
consequences. Consultation with
an attorney is encouraged with
respect to its completion or
modification.
Any singular reference to
Contractor, Surety, Owner or
other party shall be considered
PILlfal where applicable,
'flie Contractor and Surety are bound to the Owner in the amount set forth above, liar the payinent ol'which the
Contractor and Surety bind themselves, their heirs, executors, administralors, SUCCCssorsand assigns, jointly and
severally, as provided herein, I'lie conditions of this Bond are such that ifthe Owner ncefils the bid of the Contractor
within file tinie specified in the bid (10CUMICitS, Or within such time period as may tic agreed to by file Owner and
Contractor, and (tic Contractor either ( I ) enters into ,I contract with the Owner in accordance with the terms OlSUCh
bid, mid gives Such bond or, bonds as may be specified in the bidding or ('011traCt I)OCLI1111211tS, With SLII'et)' UdIllitIM
in the jurisdiction of the Protect and otherwise acceptable to file Owner, 11ol, the flailliful pe rforn 1,11 ice orsalch Contract
and fior the prompt payment of labor and material l'urnished in file prosecution thereof. or (2) pays to the Owner the
difibrence, not to exceed the amount ot'this Bond, between the anlMult specified in said bid and such larger amount
liar which the 0wiler may in good 1i ilh contract with another party to perform the work covered by said bit], then this
obligation Miall be null and void, otherwise to reillain ill Full fbrCC and CM0. '111C SUIVtV hereby waives any notice of
all agreement between the Owner and Contractor to extend the tinge ill which the 0writer may, accept the bid. Waiver of
notice by file Surety shall not apply to any extension exceediiq?, sixty (60) days in the aggregate beyond the tinic lot -
acceptance ofbids specified in life bid documents, and the Ownet, and Contractor shall obtain the SLII'Ct)"S C011SCIlt 1`61'
an extension beyond sixty (60) days,
Ifthis Bond is issued ill connecti011 NVith a SLibcointractor's bid to as (1, oil tractor, the term. Contractor ill this Bond shall
be decilled to be Subcontractor and the term Owner shall be deemed to be Contractor.
When this Bond has been furnished 10 C011111)1y With as Sllatl.1101y 01'01110' legal IV(lLlirCI1lCnt in the location of the Project,
all), provision in this Bond con1lictirig with said statl.11101'y 01' legal W(ILdIVI'llent Shall be deemcd deleted licrefroin and
provisions conforming to such statutory or 0thCl' lCgat W(JUirernelit,shall be: deemed incorporated herein. When so
furnished, the intent is that this Bond shall be: construed as a.sqilii. ltol�,,bond and not as a coninion law bond
Signed and scaled this 7th (lily of December, 2017
Green Demolitio6dqnt'i'acto In
6
t'Sc
'P" /0,
Developers Surety I and IndemnityCompany)
(.Seal)
(lade) David Parrilli 2 Attorney -In -Fact
a",AUVOW Ycmj IlVra,itrllitMgn airl oirmglrtwll MA GoMnaira Doatn'non'r." nriri vovhlch, t1hi's text "qppovas rill l"ZM An oJt lirrzfl that
charqjo,.r yvrlV ri�cA lh,t, cell,rmu red
AIA Document A3101m— 2010, Copyright(r) 1963, 1970and 2010 by The American Institute of Architects. All rights reserved, VVAMAN�r NA"
Init. mr, tacIN"'ch"d 1"1y L)"S" "„c')Jpyflglht ILA oV �ancl IlMeirnaUonall lvoafies,. sore rrs uoi ¢^t repmducflorr o,'n rfistribiulinn ar fl�lls PM' Eloonrionl, ov
amy P,w6rhn cif K, lieu q, in srwe�(',' civil ,iivJ orfirnirufl and vvM pirour"'("I'lited l,eu the rwaximurn exron'r, P05%ft", urciev Ofe kvn,
Purchasers are permitted to reproduce hen ('10) copies of this document where wrnpleiod. ro report copyright violations ofPdA Contract DocumonW, e-sytatl
'The American Institute of Architects' legal Counsel, copyriglit@aaa.org. (KA I to
POWER OF ATTORNEY FOR
DEVELOPERS SURETY AND INDEMNITY COMPANY
INDEMNITY COMPANY OF CALIFORNIA
PO Box 19725, IRVINE, CA 92623 (949) 263-3300
KNOW ALL BY THESE PRESENTS that except as expressly limited, DEVELOPERS SURETY AND INDEMNITY COMPANY and INDEMNITY COMPANY OF CALIFORNIA, do each
hereby make, constitute and appoint
'Robert H, Walker, Joseph Maderak, Kathy Rzepa, David Parrilill, David Kotula, jointly or severally —
as their true and lawful Attorneys) -in -Fact, to make, execute, deliver and acknowledge, for and on behalf of said corporations, as sureties, bonds, undertakings and contracts of
suretyship giving and granting unto said Attomey(s)-hf-Fact full power and authority to do and to perform every act necessary, requisite, or proper to be done in connection therewith as
each of said corporations could do, but reserving to each of said corporations full power of substitution and revocation, and all of the acts of said Attomey(s)-in-Fact, pursuant to these
presents, are horehy ratified and confirmed,
This Power of Attorney Is granted and is signed by facsimile under and by authority of the following resolutions adopted by the respective Boards of Directors of DEVELOPERS SURETY
AND INDEMNITY COMPANY and INDEMNITY COMPANY OF CALIFORNIA, effective as of January 1st, 2008,
RESOLVED, that a combination of any two of the Chairman of the Board, the President, Executive Vice -President, Senior Vice -President or any Vice President of the
corporations be, and that each of them hereby is, authorized to execute this Power of Attorney, qualifying the attorney($) named in the Power of Attorney to execute, on behalf of the
corporations, bonds, undertakings and contracts of suretyship; and that the Secretary or any Assistant Secretary of either of the corporations be, and each of them hereby is, authorized
to attest the execution of any such Power of Attorney;
RESOLVED, FURTHER, that the signatures of such officers may be affixed to any such Power of Attorney or to any certificate retailing thereto by facsimile, and any such
Power otAttorney or certificate bearing such facsimile signatures shall be valid and binding upon the corporations when so affixed and in the future with respect to any bond, undertaking
or contract of suretyship to which it is attached.
IN WITNESS WHEREOF, DEVELOPERS SURETY AND INDEMNITY COMPANY and INDEMNITY COMPANY OF CALIFORNIA have severally caused these presents to be signed by
their respective officers and attested by their respective Secretary or Assistant Secretary this 6di day of February, 2017.
By: VANdiry,y'�.rp%olw
A IN y
Daniel Young, Senior Mce-Presiderfl,
Z
APO&,
'
1936
5
OCT1907
U)
By:
0
1, C,
fpO
Mark Lansdon, Vice -President
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the
document to Which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
State of California
County of Orange
on Egbrg�ufi—K-127 beforeme, Lucille Raymond kfilolag ... .. .. .. ....... .. .. ................. .... ...... ........... ..
Us Here Insert Name and Tide of tha Offm
personally appeared Daniei_Young and Mark Lansdon
Nome(s) of %nw(s)
who proved to me on the basis of'satisfactory evidence to be the person($) whose flame(s) Ware subscribed
to the within Instrument and acknowledged to me that helshelthey executed the same In hisilier/their authorized
capacity(ies), and that by histheritheir signature(s) on the instrument the person(s), or the entity upon behalf of
LUCILLE RAYMOND which the person(s) acted, executed the instrument.
Commission 0 20811945
Notary Public - Callfortila I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is
Z Orange County true and correct.
M� Comm, Expires Oct 13, 2018 A
WITNESS my hand and official seal,
Place Notary Seal Above Signature
Lucifl�6y4foncl, Notary Public
CERTIFICATE
The undersigned, as Secretary or Assistant Secretary of DEVELOPERS SURETY AND INDEMNITY COMPANY or INDEMNITY COMPANY OF CALIFORMA, does hereby
certify that the foregoing Power of Attorney remains in full force and has not been revoked and, furthermore, that the provisions of the resolutions of the respective Boards of Director$ of
said corporations set forth In the Power of Attorney are in force as of the date of this Certificate.
717"'
This Certificate is executed in the City of Irvine, California, this day of /2
00T, 5
By: 1936
Cassie Jv"Arrisford, Assistant Se#lary 0
V
ATS-1002 (02/17)
1V!12 191
11HM"MM'AA
IA
CONTRACTOR:
Green Demolition Contractors, Inc.
1427 W Dickens Ave
Chicago, IL 60614
)UM
(Alwne, legal stairs cind atkkess)
City of South Bend Indiana
Board of Public Works
227 W Jefferson Blvd
South Send, IN 46601
SURETY-
(AI,ame, legyal suilux a) id pi,incilml p1we
ql'business)
Developers Surety and Indemnity Company
PO IBox 19725
irvina, CA 92623
5% not to exceed Nine Thousand Dollars
PROJECT:
(M-ane, location o), ew*h-ess, and M-qjeel nwnbel% if crrat�)
Wreck and Removal - Project 117-121- 2017 Dernolitions, Phase 2 - Division A, 12 Properties,
This docurnent has important legal
consequences. Consultation with
an attorney is encouraged with
respect to its completion or
modification.
Any singular refeience to
Contractor, Surety, Owner or
other party shall be considered
Plural where applicable,
'file Contractor and Surety are bound to the OWIlet' ill theallIOUnt set fibrill above, fior the payment of which the
(".ontractor and Surely bind themselves, tkil'1161-S, CXCCLIAMS, ldnliniStf`at0I'S, successors and assigns, ointly and
severally, as provided herein, 'I'lie conditions of this Bond are such that ifthe Owncr accepts file bid of the Conftactoi-
within tile line: specified in (lie bid doCUDICIltS, M \Vithill SUCh HIM period as may be agreed to 1)), the Ownei,and
Contractor, and the Contractor either ('I) enters into it contract With the OMM' in IICCOI-dallCe With the l[CH1111S, Of'SLICII
bi(L and gives such bond or bonds as may be specified in the bidding cats Contract Documents, with a surety admilled
in tho jurisdiction of tile llrqiect and otherwise acceptable to tile ()\\fner, R)I' the J'aill'ifill I)CIII(M-InalICC 01"SLICh ('0111raCt
and liar the prompt payment oaf Labor raid material furnished ill the prosecialion thereof, or (2) pays to the Owner the
difference, not to exceed the aniolint of this Bond, between the allIOUnt specified in said bid and such larger alflOUnt
1,6r which the Owne'r natty ill good f1lith Contract with another party to perk)rrn the work covered by said bid, then this
obligation shall be null and void, otherwise to rollain ill fall 1'01'CO and stied, 'HIC SLII'ely hereby waives any notice of
all agreement between the Owner and Contractor to extend (lie tirric ill which the Owner may accept the bid. Waiver -of
notice by the Surety shall not apply to any extension exceeding; sixty (60) days in the aggregate beyond the little Ibl'
acceptance cal' bids specified it,) the bid doctiments, and the Owner and Contractor shall obtain the Suirety's consent fior
,Ili extension beyond sixty (60) days,
Ifthis Bond is issued in Connection vvilh a Subcontractor's bid to a Contractor, the term Conlractor in this Bond shall
be decined to be Subcontractor and the term Omier- shall be deemed to be Contractor.
When this Bond has been furnished to comply with a statutory or rather legal requirement In the location of the ProJecil,
any provision in this Bond conflicting with said statutory or legal rCtlUireilleot shall be deemed deleted herefironi nand
provisions corillorming to such slatutol-y (a- other legal requirement shall be deemed incorporated herein. When so
Furnished, the intent is that this Bond shall be construed as a statutmy bond and not as, a corninion law bond.
SigllQ)l all(] smiled this 7th day of December, 2017
MlqKael I
DevelopersSurety
r - 7711 —T(M7�
�. .- 1 11 -- -; -1-1 �,- — -- .. . .... ... --- — — - - -- - --. —
David"Parri i - Attorney -In -Fact
GALJTIC'111,111"Y()U sa(,jri an ari�,,Ihna� AUN Gontf,,,mt Guirneral ruuu whkh flih,, tinxt,,appoars kw Fell, An osst,irwn tl"�vd
Own gos will nMa No o[Pscvred,
AIA Document A310111 — 2010. Copyright 0 1963„ 1970 and 2010 by The American Institute of Architects. All rights reserved. WARNJOVAWhds MA'
hait. DovurfnoeiO: stir C'npyikul i—aw an inle wuafiarlM Nc,""Ri'm 11,11naRM''Ou wpirodiuckRprn �,Pr &�,,,,h OmOin of tids MA" [ ,
11100u4`01010, ca
any of 0, u"ay rasiW rn ""evere, 60H mmi.b c6m4nai oidl Ibe prow evrusted kf(he auto flnnurns coAtird pcs�ifliflir,, undel, flhq, hwv
Purchasers are pernnitted to reproduce ten ('to) copies of this document when connpl!elocl. To report copyright violations of AIA Contract Docuinentu, 6-mail
The American Inshlute of Architects" legal counsel, copyrighfi@aia,org, 061110
POWER OF ATTORNEY FOR
DEVELOPERS SURETY AND INDEMNITY COMPANY
INDEMNITY COMPANY OF CALIFORNIA
PO Box 19725, IRVINE, CA 92623 (949) 263,3300
KNOW ALL BY THESE PRESENTS that except as expressly limited, DEVELOPERS SURETY AND INDEMNITY COMPANY and INDEMNITY COMPANY OF CALIFORNIA, do each
hereby make, constitute and appolrit:
***Robert H. Walker, Joseph Maderak, Kathy Rzepa, David Parrilli, David Kotula, jointly or severally'
as their true and lawful Allorney(s)-in-Fact, to make, execute, deliver and acknowledge, for and on behalf of said corporations, as sureties, bonds, undertakings and contracts of
suretyship giving and granting unto said Attorneys) -in -Fact full power and authority to do and to perform every act necessary, requisite or proper to be done in connection therewith as
each of said corporations could do, but reserving to each of said corporations full power of substitution and revocation, and Atl of the acts of said Attomey(s)4n-Fact, pursuaritto these
presents, are hereby ratified and confirmed,
This Power of Attorney Is granted and is signed by facsimile under and by authority of are following resolutions adopted by the respective Boards of Directors of DEVELOPERS SURETY
AND INDEMNITY COMPANY and INDEMNITY COMPANY OF CALIFORNIA, effective as of January 1st, 2008,
RESOLVED, that a combination of any two of the Chairman of the Board, the President Executive Vice -President, Senior Vice -President or any Mce President of the
corporations be, and that each of them hereby is, authorized to execute this Power of Attorney, qualift4rig the attorney(s) named in the Power of Attorney to execute, on behalf of the
corporations, bonds, undertakings and contracts of suretyship; and that the Secretary or any Assistant Secretary of either of the corporations be, and each of them hereby is, authorized
to attest the execution of any such Power of Attorney;
RESOLVED, FURTHER, that the signatures of such officers may be affixed to any such Power of Attorney or to any certificate rotating thereto by facsimile, and any such
Power ofAttomay or certificate bearing such facsimile signatures shall be valid and binding upon the corporations when so affixed and in the future With respect to any bond, undertaking
or contract of suretyship to which it is attached.
IN WITNESS WHEREOF, DEVELOPERS SURETY AND INDEMNITY COMPANY and INDEMNITY COMPANY OF CALIFORNIA have severally caused these presents to be signed by
their respectite officers and attested by their respective Secretary or Assistant Secretary this 5th day of February, 2017,
By, AND 14,�'O%
Daniel Young, Senior Vice -President Z to z""i
CT,6
1936 1 -<
:0-spar
.0.
By: o:.�
Mark Lansclort, Vice President 1,� .........
o to
Anotary public or other officer completing this certificate verifies only the identity of the individual who signed The
document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document,
State of CaVoinia
County of Orange
On February 6,2017 before me, Lucille Raymond, Nok0LEuhdq1_1, . .... .. .. .. .. .. ..... ............... . ... .. . ........
Date Hereln"dNamv ondnGoolthe 0(rxgr
personally appeared . ... .. ..... . . ............... .... . ... Daniel Young and Mark Lansdon
NaMe(&)0f&9W(&)
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) Ware subscribed
to the within instrument and acknowledged to me that helsheithey executed the same in his/herltheir authorized
capacity(ies), and that by histher/their signature(s) on the instrument the person(s), or the entity upon behalf of
LUCILLE RAYMOND which the personts) acted, executed the instrument.
Commission 0,2081945 1
Notary Public - Calitorala I certify under PENALTY OF PERJURY tinder the laws of the State of California that the foregoing paragraph is
Orange County true and correct.
lvl� Comm, Exc�s;Oct�13, 2018 WITNESS my hand and official seal',
Place Notary Seal Above Signature
Lucilleend, Notary Public
CERTIFICATE
The undersigned, as Secretary orAssistant Secretary of DEVELOPERS SURETY AND INDEMNITY COMPANY or INDEMNITY COMPANY OF CALIFORNIA, does hereby
certify that the foregoing Power of Attorney remains in full force and has not lbeen revoked and, furthermore, that the provisions ofthe resolutions of the respective Boards of Directors of
said corporations set forth in [lie Power of Attorney are in force as of the date of this Certificate,
This Certificate is executed in the City of IrvIne, California, this 7 day of No
�ANYq�
oW I' Qi44% V_
OCT 5
w, '1936 o
By; .0
Goggle J.APrristord, Assistant Sectblary
ATS-1002 (02/17)
OTM
-2010 -AIA Document AM
CONTRACTOR:
Green Demolition Contractors, Inc.
1427 W Dickens Ave
Chicago, IL 60614
OWNER:
(jVcvne, legal stams a) 0 atldress,
City of South Bond Indiana
Board of Public Works
227 W Jefferson Blvd
Soothe. Bond, IN 46601
RMV 1-17,41 LH41 11 ki
SURETY.
(Mime, leg(ilst(ttiivtread pi,i)icil)tilpl(it,-,e
qfbitshiess)
Developers Surety and Indemnity Company
PO Box 1972!5
Irvine, CA 92623
5% not to exceed Eight Thousand Dollars
PROJECT:
(Alame, location o)- a(hh-ess, and M-qieo numbel.,
Wreck and Removal - Project 117-121- 2017 Demolitions Phase 2 - Division B, 9 Properties.
This document has important legal
C0rISeqL1enCeS. Consultation with
an attorney is encouraged with
respect to its completion or
modification.
Any singular reference to
Contractor, Surety, Owner or
other party shalt be considered
plural where applicable.
`I'lie C°ontractor and Surety are bound to the ONvner in the amount set lbrth above, for tile Payment of which tile
Contractor- and Surety bind thleniSCIVICS, their IlCill MCLI101-S, administrators, Successor's and assigns, Jointly and
severally, as provided herein, The conditions ofthis Bond are such that if the Owner accepts the bid oflile Conti actor'
within the time specified in the bid (10CLInnerits, or' within such finie period as ina), be agreed to by the Owner aria
Contracior, and the Colilractor either ( I ) oiters into to conlracl with (lie Owner in accordance Nvith (lie tef-IIIS tat` such
bid, and gives such bond w bonds, as may be specified in the bidding or C01111'aCt DOCUITICIIN, with asurety admitted
in theJurisdictioll cif the Project and otherwise acceptable to the Owlier, t'or the faithful pert'61,111"i lice cif such Contract
and I , bi- tile prompt paynicill of labor and millerial Furnished in the prosecution thcTcof'1- or (2) pays to tile Owner the
difTbrenec, not to exceed the amount 01"thiS Bond, between the aniotint spccified in said bid and such Jargeraniouni
1b], which the Owner may in good I'ailh contract with another party to pul'orin the work covewd by said bid, their this
obligation shall be 111.111 and void, otherwise to remain in full 16-ce, and effect- 'I'lle Surely hereby waives any noliccof
an agreement belween (lie Owner and Contractor to extend the tirile ill which the Owner may accept tile bid. Waivel, cal'
notice by the Surety shall not apply to ally extension exceeding sixty (60) (lays in the aggregate beyond the time l'or
acceptance of bids specified ill the bid (10CUITICTItS, and tile O\VnCr and Contractor shall obtain the Surety's consent for
an extension beyond sixty (60) days,
If this Bond is issued in connection with a subconti-actor's bid to a Clonn-actor, the term Contractor in this Bond shall
be deemed to be Subconvacitor and the term Owner shall be deemed to be Contrac(or,
When this Bond has been furnished to C011111fly With as SlatUtOry Of other legal 1,equirelilcrit in the. location cif the Project,
ject,
any provision in (his, Bond contlicting with said statirtoll or legal requirement shall be decreed deleted herefi-on) and
provisions conforming to such statutory 01' other [eg"It requilrenjent,shall be deemed incorporated liercin. When so
Furnished, tile inleni, is that this Bond shall be C01101110d and not as a common law bond.
and scaled this 7th day of' Dqdember, 2017
ti q I lqn'OnAractor�,460.
A Green Pe /I,
(Seal)
PC 1 MA
h �ar' r�y'
Developers Sur and Indemnity Company
-1-1111111- . . ........ ....... .
A
Davril ParrilliAftorney-In-Fact
ipfr,Mll4 pair You sl-iniuld slon all nuullgtlroarli MA Docurnaird, on vvhlil"'11"k twJ s nri R11RE), IjIn clflglnal vvf�'sw o"s that,
I Ipeffl not, and Iibsaumdo
AIA Document A-tA3101" - 20M Copyright Q 1963, 1970 and 2010 byThe American Institute of Architects. All rights reserved. VjArfll TlflMA"
Init. Ejl) U MICI-11 t Is P: 11,04ocind 1Pnyp Laropoind Vnl,urrlalll'NIIM roplol"lucflon c'pr dllsfiibu6c,n of Hfls MA' of
Anly poirtkkn of It" rruay re�suH ore smveA"rk"fl c11W crb'rM'u11l pairmlfies, and wNI be Iriro r oc Ili incl tin 01V vollMrnurn uIllellwirs"N." r"Avo.
Purchasers are permitted to reproduce ten (110) copies of this document when completed. To report copyright violation Is of AIA Contract Documents, ll
The American institute of Architects' legal counsel, copytigtit@aia.org. o61110
POWER OF ATTORNEY FOR
DEVELOPERS SURETY AND INDEMNITY COMPANY
INDEMNITY COMPANY OF CALIFORNIA
PO Box 19725, IRVINE, CA 92623 (949) 263-3300
KNOW ALL BY THESE PRESENTS that except as expressly limited, DEVELOPERS SURETY AND INDEMNITY COMPANY and INDEMNITY COMPANY OF CALIFORNIA, do each
hereby make, constitute and appoint:
'Robert H. Walker, Joseph Maderak, Kathy Rzepa, David Parrilli, David Kotula, jointly or severally'
as their true and lawful Atiorney(s)-in-Fact, to make, execute, deliver and acknowledge, for and on behalf of said corporations, as sureties, bonds, undertakings and contracts of
suretyship giving and granting unto said Allomey(s)-in-Fact foil power and authority to do and to perform every act necessary, requisite or proper to be done in connection therewith as
each of said corporations could do, but reserving to each of said corporations full power of substitution and revocation, and all of the acts of said Attorney(s)-in-Fact, pursuant to these
presents, are hereby ratified and confirmed.
This Power of Attorney is granted and is signed by facsimile under and by authority of the following resolutions adopted by the respective Boards of Directors of DEVELOPERS SURETY
AND INDEMNITY COMPANY and INDEMNITY COMPANY OF CALIFORNIA, effective as of January 1 st, 2008.
RESOLVED, that a combination of any two of the Chairman of the Board, the President, Executive Vice -President, Senior Vice -President or any Vice President of the
corporations be, and that each of [hem hereby is, authorized to execute this Power of Attorney; qualifying the atlorney(s) named in the Power ol'Attorney to execute, on behalf of the
corporations, bonds, undertakings and contracts of suretyship; and that the Secretary or any Assistant Secretary of either of the corporations be, and each of them hereby is, authorized
to attest the execution of any such Power of Attorney;
RESOLVED, FURTHER, that the signatures of such officers may he affixed to any such Power of Attorney or to any certificate relating thereto by facsimile, and any such
Power of Attorney or certifica le bearing such facsimile signatures shall be valid and binding upon the COTT)CIatiOnS when so, affixed and in the future with respect to any bond, undertaking
or contract of suretyship to which it is attached,
IN WITNESS WHEREOF, DEVELOPERS SURETY AND INDEMNITY COMPANY and INDEMNITY COMPANY OF CALIFORNIA have severally caused these presents to be signed by
their respective officers and attested by their respective Secretary or Assistant
Secretary this 6th day of February, 2017.
By,
AND
AN Y
Daniel Young, Senior Vice -President
1936 10.
1 67
By
4
0. 0
Mark Lansdon, Vice -President
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the
document to which this cer-ificate is attached, and not the truthfulness, accuracy, or validity of that document.
State of California
County of Orange
Or, February 6, 2017 before me, Lucille Raymprud.Uptqry jq,
Date Hove Insert Name and T& of he Officet
personally appeared Daniel Young antLlyieroL nsdon
Nwn9(s)o1s1gner(s)
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) Ware subscribed
to the within instrument and acknowledged to me that helshelthey executed the same in his1herAheir authorized
capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of
LUCILLE RAYMOND which the person(s) acted, executed the instrument.
Commission 0 2081945
Notary Public - California I certify tinder PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is
Z Orainge County true and correct.
M Comm, Ex Ires Oct 13 HIS
WITNESS my hand and official seal.
"
Place Notary Seal Above Signature .
Lucilt l i3ykond, Notary Pubiic
CERTIFICATE
The undersigned, as Secretary or Assistant Secretary of DEVELOPERS SURETYAND INDEMNITY COMPANY or INDEMNITY COMPANY OF CALIFORNIA, does hereby
certify that the foregoing Power of Attorney remains in full force and has not been revoked and, furthermore, that the provisions of the resolutions of the respective Boards of Directors of
said corporations set forth in the Power ofAttorney are in force as of the date of this Certificate.
p e"5 ? . ........ /4 This Certificate is executed in the City of Irvine, California, this 1-7 day of '%NVANY0
By: ME 0 T, 5
1936
Cassle J rrsford, �!ss �Fsfa_nt SeWfaq 0
�7 IFO
ATS-1002 (02117) .............
co
a
z
w
3
(D
CD
S
z
3
90
>
CL
51-
rn
m
Co
3
CD
CD ID
-a W
zo,
Sr
(n
0
CD
D 0
CL
a
CD o
RL
CD
CD CD
CL
w
CL
R
co
m 0
m >
03
CD
T
CL CD
0
Rolowy-,
z
N IF
z
M
3
5p
E
ol ;:; --I
m
c 0o
LM
rr r
CL
m
L9 M
*0 0
0 c
= CL
Lo. cr
cr m
0
(D
z
=r 0
in
(D
>
z
0
m M 0
r.L < g —0
-3 m m --I
-n r- m z
0 � 0 0
0 03 -0030 n
M
-u
> M
0 Cl) z Z
I -j M
* Or" d co cn --i
0 0 M CD 3:
F3 :5 L rT, ca
Z M
ur --] z
m
a ;a
-z
cr X
co
m
M 0
m -1
W m
so:
ID.
ID
0
0 <
0 fm
-" E
cu W!
M,
0
m
Zf
0 0
m
CITY OF SOUTH BEND
MINORITY AND WOMEBUSINESS ENTERPRISE DIVERSITY
DEVELN OPMENT PROGRAM
FORM MWBE,-2.0
EVIDENCE OF GOOD FAITH EFFORTS
This completed form should be included as part of the Bids documents related to City of South Bond Public
Works Projects requiring Good Faith Efforts to obtain MBE/WBE participation. It is the bidder's sole
responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority
or Women's owned business as defined by the Indiana Department of Administration ("IDOA").
Project Number: 117-121 Date: W a 2, )'0
Project Name:
Bidder:
Contact Person:
Address:
City:
Email:
KiTFANT-ri"i NHTMMIT-111112�
I
Zip:
To determine whether a bidder has demonstrated good faith efforts to reach the MBEANBE utilization goals set
forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or
commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below*:
EVIDENCE OF GOOD FAITH EFFORTS
MBE BE LIST(S,): The bidder reviewed the City of South Bend's Minority and Women Business
Enterprise Diversity Development Program, which uses the IDOA approved list of Minority and Women
Owned Business as found on their website (hftp://www,in.gov/idoa).
ACTION (ADVERTISE/CONTACT): In order for your bid to be deemed responsive, the City of South
Bend requires that all perspective bidders complete no less than 2 of the following:
J) Attend all pre -bid meetings scheduled by the City to inform! MBEAIVBEs of contracting and
(71
subcontracting opportunities.
2. Advertise in general circulation and/or trade association publications concerning subcontracting
opportunities, and allow MBEANBEs reasonable time to respond.
3. Perform any and all necessary steps to provide written notice in a manner reasonably calculated
to inform MBE/WBEs of subcontracting opportunities and allowed sufficient time for thern to
participate effectively.
4� � Utilize pre-existing services of available community organizations, small' and/or disadvantaged
business assistance offices and other organizations that provided assistance in the recruitment
and placement of MBE/WBE firms.
"Bidder must circle or otherwise notate which of the two (2) required actions were performed.
GOOD FAITH NEGOTIATIONS: The bidder negotiated in good faith with interested MBENVBES,
including providing such MBEANBE's with adequate information about the plans, specifications and other
requirements of the subcontract and did not reject MBE/WB,Es as unqualified without sound business
reasons based on a thorough investigation of their capabilities.
J
SMALL CONTRACT(S): The bidder selected specific portions of the work to be performed by
MBEANBEs in order to increase the likelihood of meeting the MBE/WBE goals (including breaking down
contracts into smaller units to facilitate MBEANBE participation)
CONTRACT RECORDS: The bidder has maintained the following records for each MBE/WBE that has
CONTRACT
'�o
bid on the subcontracting opportunity:
s rt y ,
!
number;
1. Name, address, and telephone number;
2 , 'ddescription of information provided by the bidder or subcontractor; and
. A statement of whether an agreement was reached, and if not, why not, including any reasons for
of e tw s reached,
st t m t w t r a g r em e
0 e
statement
was u u aliti 0 to
n d h the BE BE a unqualified perform the job.
co clu ing t at M �V
*P—r6per demonstration of Good Faith Effort requires your initials next to all of the above boxes. Any
omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of
South Bend reserves the right to request additional information.
Version 10/17/2018 Contractor's Bid for Public Works - 12
11
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY
DEVELOPMENT PROGRAM
57
FORM MWBE-2.1
MBE/WBE CONTACTED
This completed form should be supplied with Bids that pertain to City of South Bond Public Works Projects
requiring contacted MBEfWBE to obtain Good Faith Efforts. It is the bidder's sole responsibility to verify
whether any listed minority or woman business meets the qualifications of a Minority or Women's owned
business.
PAGE 'OF
Project Number: 117-121 MBEANBE Participation Goal 21
Project Name: 2Q,1 7 nn �Deofitioj)p, Phase 2
Bidder:/ If/
(Title) (Date)
I MBEANBE Firm
� / V
Owner or Contact at BENVBE Firm
Telephone: Fax: Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT�
RESULTS OF CONTACT WITH THE MBE/WBE FIRM:
MBENVBE Firm
Owner or Contact at MBEANBE Firm
Telephone: Fax: Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
RESULTS OF CONTACT WITH THE MBEIWBE FIRM:
Version 10/17/2018 Contractor's Bid for Public Works - 13
-FORM96
CONTRACTOR'S BID FOR PUBLIC WORK
State Form: 52414 (R2 / 2-13) / Form 96 (Revised 2013)
Prescribed by State Board of Accounts
PART I
(To be completed for ail bids. Please type or print)
Date (month, day, year), December 12, 2017
11. Governmental Unit (Owner): City of South Bend Department of Public Works
2. county: St. Joseph
3. Bidder (Firm): Green Demolition Contractors Incorporated LLC
523 Northbrook Drive
City/State/ZIPcode:- Michigan City, Indiana 46360
4, Telephone Number: 773-477-7160
5. Agent of Bidder (if applicable):
Pursuant to notices given, the undersigned offers to furnish, labor and/or material necessary to complete
the public works project of City of South Bend Department of Public Works
(Governmental Unit) in accordance with plans and specifications prepared by
of Public Works.
City of South Bend Department
and dated November 2017 for the sum of
7
The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in the
notice of the Vetting. If alternative bids apply, the undersigned submits a proposal for each in accordance with the
notice. Any addendums attached, will be specifically referenced at the applicable page.
If additional units of material included in the contract are needed, the cost of units must be the same as
that shown in the original contract if accepted by the governmental unit. If the bid is to be awarded on a unit
basis, the itemization of the units shall be shown on a separate attachment.
The contractor and his subcontractors, if any, shall not discriminate against or intimidate any employee,
or applicant for employment, to be employed in the performance of this contract, with respect to any matter
directly or indirectly related to employment because of race, religion, color, sex, national origin or ancestry.
Breach of this covenant may be regarded as a material breach of the contract.
CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS
(if applicable)
1, the undersigned bidder or agent as a contractor on a public works project, understand my statutory
obligation to use steel products made in the United States (I.C. 5-16-8-2). 1 hereby certify that I and all
subcontractors employed by me for this project will use U.S. steel products on this project if awarded. I
understand that violations hereunder may result in forfeiture of contractual payments.
ACCEPTANCE
The above bid is accepted this day of , subject to the
following conditions:
Contracting Authority Members:
PART II
(For projects of $150,000 or more -- IC 36-9-12-4)
Governmental Unit: City of South Bend Indiana Department of Public Works
Bidder (Firm) Green Demolition Contractors Incorporated LLC
Date (month, day, year): December 12, 2017
These statements to be submitted under oath by each bidder with and as a part of his bid.
Attach additional pages for each section as needed.
SECTION I EXPERIENCE QUESTIONNAIRE
What public works projects has your organization completed for the period of one (1) year prior to the
date of the current bid?
Contract Amount
Class of Work
Completion
Date
Name and Address of Owner
See attached
2. What public works projects are now in process of construction by your organization?
Contract Amount
Class of Work
Expected
Completion
Date
Name and Address of Owner
See Attached
523 Northbrook Drive
Michigan City, IN 46360
Office: 312-409-4771
Fax: 773-477-7149
Incorporated in the State of Indiana
Union Shop
PROJECT EXPERIENCE GOVERNMENT
City of South Bend Indiana
1316 County -City Bldg. Rm. 1316
South Bend, Indiana 46601
Mr. Toy Villa
574-235-5920
Demolition of 103 Abandoned Properties
Scope of Work:
Wreck and Remove Complete with Grading and Seeding of 120 Properties
Cook County Land Bank Authority
69 W. Washington Suite 2938
Chicago, IL 60602
Mr. Mustafaa Saleh
312-603-8015
Scope of Work:
2015/16
$ 1,878,922.00
2015/16/17
$ 925,000.00
Open Ended Contract ongoing through the depletion of Grants/Funds Demolition of Abandoned /
Vacant Homes throughout Chicago and Cook County.
Brown & Momen, Inc.
823 E. Drexel Square
Chicago, IL 60615
Mr. David Clark
312-788-0770
Marshall Field Garden Apartments Building 5
Chicago. IL
Scope of Work:
Interior selective removals of all finishes multi story level HUD Building
2016/2017
$744,000.00
" 1....- .� . ,
523 Northbrook Drive
Michigan City, IN 46360
Office: 312-409-4771
Fax: 773-477-7149
City of Chicago/Wight Co.
2500 North Frontage Road
Darien, IL 60561
Dennis Podzimek
630-918-9428
City Hall Space Consolidation
Scope of Work:
Multiple Interior Floor Selective Removals of Finishes and Furnishings.
Working in strict adherence with Municipal Building — Security Procedures
IHC Companies
1500 Executive Dr.
Elgin, IL 60123
Tom Carrano
847-841-7713
Niles North US 2014Summer Renovation
Skokie, Il
Scope of Work:
Selective and gut removals of Locker Rooms - Kitchen Cafeteria- Entrances
and other various areas
Lee & Ryan Construction
1707 Melody Ln.
Greenfield, IN 46140
Ryan Keane
317-467-6577
Edward Hines VA
Hines, Il
Scope of Work:
2014
$498,800.00
2015
$524,000.00
2014
$190,000.00
Main Hospital North Entrance removal of Front Structural Fagade, floors and roof with all adjoining
finishes.
Barton Malow Company
150 N Upper Wacker Dr R650
Chicago, IL 60606
Brian Courtney
312-281-0821
523 Northbrook Drive
Michigan City, IN 46360
Office: 312-409-4771
Fax: 773-477-7149
January 2015
Argonne National Laboratory $212,000.00
Argonne National Lab — Materials Engineering Building 370
Building 360 Expansion
Scope of Work:
Green Demolition performed wreck removals within Building 370 adjacent to an ongoing
Phosphorous Experiment working in direct conjunction with electric, communications systems,
sprinkler systems, natural gas and steam while performing lead and asbestos abatement. Green
Demolition performed a Building Wreck within 10 feet of a Linear Accelerator without service
interruptions to the electric, water, sewer, natural gas, steam and communications systems.
523 Northbrook Drive
Michigan City, Indiana 46360
Office: 312-409-4771
Fax: 773-477-7149
December 12, 2017
City of South Bend Department of Public Works
South Bend, Indiana
Re: 2017 Demolitions Phase 2
Project Number 117-121
Public Works Projects Awarded 1 In Progresss
Wredling Middle School $ 59,000.00
Norris Recreation Center
West Leyden High School $ 704,000.00
Cicero School District 99 $ 200,000.00
Park District of Highland Park $ 55,000.00
Skokie SD $ 157,300.00
Grass Lake $ 88,000.00
Zion $ 22,500.00
Chicago Transit Authority East Lake, Milwaukee and Illinois Sub Stations Upgrades $ 498,000.00
Chicago Transit Authority Broadway Sub Station $198,000.00
Oak Brook Police Department $68,000.00
Respectfully submitted,
Michael Brough, President
Green Demolition Contractors, Inc.
k7T, F . +. . e . �. •
APPROVED AND FILED
CONNIE LAWSON
INDIANA SECRETARY OF STATE
04/06/2017 07:54 AM
BUSINESS ID 2015061100177
BUSINESS TYPE Domestic Limited Liability Company
BUSINESS NAME GREEN DEMOLITION CONTRACTORS INCORPORATED
PRINCIPAL OFFICE ADDRESS 523 NORTHBROOK DRIVE, MICHIGAN CITY, IN, 46360, USA
YEARS 2017/2018
NAME MICHAEL BROUGH
ADDRESS 523 NORTHBROOK DRIVE, MICHIGAN CITY, IN, 46360, USA
TITLE President
NAME
ADDRESS
Michael Brough
523 Northbrook Drive, Mich City, IN, 46360, USA
IN WITNESS WHEREOF, THE UNDERSIGNED HEREBY VERIFIES, SUBJECT TO THE PENALTIES OF PERJURY, THAT THE
STATEMENTS CONTAINED HEREIN ARE `TRUE, THIS DAY April 6, 2017.
SIGNATURE
TITLE
Michael J Brough
Registered Agent
Business ID: 2015061100177
Filing No.: 7567738
1316 COUNTY -CITY BUILDING � ,:� � /; PHONE 574/235-925I
227 W. JEFFERSON BOULRVARD '. t7 FAX 574/ 235-9171
Souni BEND, INDIANA 46601-1830 S 'a Fs.; TDD 574/ 235-5567
w
CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR
BOARD OF PUBLIC WORKS
2017 Demolitions, Phase 2
117-121
Addendum No. 2
Date: December 7, 2017
To: All Planholders
From: Roger T. Nawrot, PE & PLS, Assistant City Engineer `//
I. Summary of Revisions
1. One house has been removed from the bid.
a. C-03 —1121 Oak Park Street
The following information is to be changed/added to the contract documents:
II. Special Provisions
1, REPLACE, Section XX.B. Lc
C. Division C: 7 Houses, C-02, 04, 05, 06, 08, 09, 11
III. Bid/Proposal
6. REPLACE Bid/Proposal form with the attached revision.
Attachments:
Revised Bid Form (4 pages)
This addendum consists of a total 6 pages inclusive of "Acknowledgement of Receipt of
Addendum" sheet-
Have you ever failed to complete any work awarded to you? No If so, where and why?
4. List references from private firms for which you have performed work.
See attached
SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE
1. Explain your plan or layout for performing proposed work. (Examples could include a narrative of when
you could begin work, complete the project, number of workers, etc. and any other information which you
believe would enable the governmental unit to consider your bid.)
See Attached
2. Please list the names and addresses of all subcontractors (i.e. persons or firms outside your own firm
who have performed part of the work) that you have used on public works projects during the past five (5)
years along with a brief description of the work done by each subcontractor.
See Attached
523 Northbrook Drive
Michigan City, W 46360
Office: 312-409-4771
Fax: 773-477-7149
References Private
CR Realty Advisors
325 West Huron
Chicago, I160654
Cell: 847.721.7906
Office: 312.332.7100
Brown & Momen, Inc.
823 East Drexel Square
Chicago, IL 60615
Mr. David Clark
312-788-0770
Rockford Construction
Grand Rapids, MI 49508
Brock Burgess
616-437-4226
LaPorte, In
Meijer
Cook County Land Bank Authority
69 W. Washington Suite 2938
Chicago, IL 60602
Mr. Mustafaa Salch
312-603-8015
3. If you intend to sublet any portion of the work, state the name and address of each subcontractor,
equipment to be used by the subcontractor, and whether you will require a bond. However, if you are
unable to currently provide a listing, please understand a listing must be provided prior to contract
approval. Until the completion of the proposed project, you are under a continuing obligation to
immediately notify the governmental unit in the event that you subsequently determine that you will use a
subcontractor on the proposed project.
See Attached
4. What equipment do you have available to use for the proposed project? Any equipment to be used by
subcontractors may also be required to be listed by the governmental unit.
See Attached
5. Have you entered into contracts or received offers for all materials which substantiate the prices used in
preparing your proposal? If not, please explain the rationale used which would corroborate the prices
listed.
See Attached
SECTION III CONTRACTOR'S FINANCIAL_ STATEMENT
Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial
statement as required by statute shall thereby be rendered invalid. The financial statement provided hereunder to
the governing body awarding the contract must be specific enough in detail so that said governing body can make
a proper determination of the bidder's capability for completing the project if awarded.
I. Welcome and Introductions
Sign -in
Direct all questions, in writing, during bidding:
Tara Weigand, Project Engineer for South Bend Public Works, twei and @southbendin. Cloy
Questions due by 5:00 p.m. (Local Time) Tuesday, December 5, 2017
Project Overview
A. Work includes the demolition of several Vacant and Abandoned homes. Work is
divided into three divisions with 8-11 houses each.
1. Each division will be awarded to the lowest responsive/responsible bidder in that
division.
B. Work includes the removal of the complete structure including basement, basement
flooring, and other basement walls or stairways, and all other appurtenant work on the
site as specified in the bid specifications, as well as removal and disposal of all
demolition materials, remediation of asbestos containing materials as necessary, and
final filling, grading and white dutch seeding of the site.
C. Contractor must provide Asbestos Abatement Unit Pricing for bid to be considered
responsive.
D. Concrete sidewalks, drive approaches, curbing, curb ramps in the right of way are to
remain in place in existing condition.
III. Schedule
A. Contractor shall complete the work for all Divisions awarded within the following
timeframe from the date the Notice to Proceed is issued.
1. Division A shall be forty-four (44) calendar days.
2. Division B shall be thirty-six (36) calendar days.
3. Division C shall be thirty two (32) calendar days.
B. Upon notification of award, the Contractor must send "Notification of Demolition and
Renovations Operations" to IDEM.
C. Notice to Proceed will be effective upon the end of the ten (10) working day notification
period for notice of demolition.
D. Within two (2) business days of the Notice to Proceed, Contractor must secure at least
three (3) demolition permits for each Division awarded from the Building Department.
Thereafter the Contractor shall secure the remainder of the permits for each Division
within two (2) additional business days.
E. Contractor must complete work entirely, including backfilling and seeding, on no less
than four (4) properties within two (2) calendar weeks per each division awarded.
F. Once demolition of structure on a site begins, it must proceed continuously until
removal of all debris.
G. Liquidated Damages - $500/ calendar day — Special Provisions Section XVI.B.2
IV. Bidding Overview
A. Plans and Specifications
1. The Contract Documents are on file and available for public inspection
commencing on the first advertise date during regular working hours at the
Department of Public Works (1316 County -City Building, South Bend, Indiana), and
at MACIAF 3215-A Sugar Maple Court, South Bend, IN 46628. Additionally, the
Contract Documents will be available that same day for inspection or purchase at
American Reprographics Company ("ARC", located at 1303 Northside Blvd., South
Bend, Indiana, 46615), http://www.e-arc.com, (574) 287-2944, toll free at (800)
783-7231. There will be a non-refundable charge for reproduction as set by ARC
for every set of documents for all bidders.
B. Bid Requirements
1. Bids must be on the City of South Bend Contractor's Bid for Public Work Form,
accompanied by a Certified Check or Bid Bond in the amount of not less than five
percent (5%) of the base bid plus any alternates, in a sealed envelope noting the
project name, number and your company's information on the front.
2. Acknowledgement of receipt of any Addendum must be included in bid submission.
a. Addenda will be published on the ARC website.
3. MWBE Forms must be completed, signed, and handed in with the bid submission.
These forms are shown in the bid proposal, Contractor's Bid for Public Works,
sheets 8, 9,10.
4. A checklist for bidders is included in the Contractor's Bid for Public Works, sheet 1.
5. Bids are due at the Office of the Board of Public Works, County -City Building
Room 1316, 227 West Jefferson Blvd, South Bend, Indiana, 46601 until the hour of
9:30 a.m., Local Time, on December 12, 2017.
C. Award of Bid
1. The anticipated bid award date is December 21, 2017. Bids remain subject to
acceptance for sixty calendar days after bid opening.
2. Upon award, the successful Bid provider shall supply the following bonds
a. Payment Bond within seven (7) days of the Notification of Award for an amount
equal to one hundred percent (100%) of the contract amount.
b. Performance Bond within seven (7) days of the Notification of Award for an
amount equal to one hundred twenty-five percent (125%) of the contract
amount.
3. Payments for work completed during this project will be made every thirty (30)
calendar days. Consistent with provisions of IC 36-1-12-14, the Board of Public
Works shall retain a percentage of payments throughout the duration of the project.
4. Materials and properties purchased under contract with the Owner that becomes a
permanent part of the structure or facilities constructed are not subject to the
Indiana Gross Retail Tax (Sales Tax). The exemption number will be furnished to
the Contractor upon award.
V. Comments by Department of Public Works
A. Three houses have been removed from the bid.
1. A-06 --1523 Elwood Avenue
2. C-07 —1614 Kendall Street
3. C-10 — 225 E Calvert Street
VI. Contractor Questions
J
0
CIA
N
`°
N
\r`
o
�
s
C�
Id
UN
s
WVIT
\
�
1
1r�
ti,
1316 COUNTY -CITY BuILDINO
227 W. JEFFERSON BOULEVARD
SOUTH BEND, INDIANA 46601-1830
Date: December 6, 2017
To: All Planholders
PHONE 574/235-9251
FAX 574/ 235-9171
TDD 5741235-5567
CITY OF SOUTH BEND PETS BUTTIGIEo, MAYOR
BOARD OF PUBLIC WORKS
2017 Demolitions, Phase 2
117-121
Addendum No. I
From: Roger T. Nawrot, PE & PLS, Assistant City Engineer
I. Summary of Revisions
1. Three houses have been removed from the bid.
a. A-06 —1523 Elwood Avenue
b. C-07 — 1614 Kendall Street
c. C-10 — 225 E Calvert Street
2. The completion date for all Divisions has been changed to March 30, 2018 for all work
excepting seeding. Contractors will have until April 27, 2018 to complete seeding work
for all Divisions.
3. Certificate of Appropriateness has been obtained from the Historical Preservation
Commission for 805 Leland Avenue (A-12).
The following information is to be changed/added to the contract documents:
H. Special Provisions
1. REPLACE, Section XII.B.6
6. Contractor may commence demolition work at more than one demolition site,
provided that Contractor performs Work continuously on each site. Clearing and
grubbing of sites may begin in advance of demolition, if desired, provided organic
and inorganic debris is promptly removed from the site or fenced as a hazard. Once
demolition of a structure commences on a site, progress shall be continuous through
removal of all debris. Inspections of the completed demolition sites and Department
of Public Works approval is required before Contractor proceeds to the next property
or properties to be demolished. There will be no relief of this schedule if the same
Contractor is awarded contracts for more than one Division of this project, or other
separate contracts for work under the City's Vacant and Abandoned Housing
Initiative. Multiple contracts to the same Contractor must be performed
simultaneously, not consecutively.
2. REPLACE, Section XII.B.10
10. The demolition work, including clearing and grubbing, asbestos abatement,
complete demolition of structures, backfilling, and grading, for all divisions shall have a
completion date of March 30, 2018. Contractors shall complete seeding of the sites by
April 27, 2018.
3. REPLACE, Section XX.B.1
1. The Work of this project is offered in three (3) Divisions: Division A, Division B, and
Division C.
a. Division A: 11 Houses, A-01, 02, 03, 04, 05, 07, 08, 09, 10, 11, 12
b. Division B: 9 Houses, B-01, 02, 03, 05, 06, 07, 09, 10, 11
C. Division C: 8 Houses, C-02, 03, 04, 05, 06, 08, 09, 11
4. REPLACE the section numbers for the following section titles with those listed below.
XXI. SAFETY AND SITE SECURITY
XXII. TEMPORARY EROSION CONTROL
XXIII. ASBESTOS ABATEMENT
XXIV. DEMOLITION AND CLEARING
XXV. CONCRETE APPROACH, SIDEWALK, AND CURB REMOVAL
XXVI. TOPSOIL AND MULCHED WHITE DUTCH SEEDING
III. Bid/Proposal
7. REPLACE Bid/Proposal form with the attached revision.
Attachments:
Revised Bid Form (4 pages)
Pre -Bid Agenda (2 pages)
Pre -Bid Sign In Sheet (I page)
-This addendum consists of a total 10 pages inclusive of "Acknowledgement of Receipt of