Laserfiche WebLink
464 <br />IMPROVEMENT RESOLUTION NO. 2831 <br />FINAL CONFIRMATION OF IMPROVEMENT RESOLUTION <br />For the improvement of 29th Street from the South line of Pleasant Street to <br />the North line of Northside Boulevard by constructing a. Class "C" pavement and Roll type <br />cement concrete curbs, under Improvement Resolution. No. 2831, 1956, adopted March 12, 1956 <br />and first confirmed on April 3, 1956. <br />No written remonstrances or remonstrances against said improvement bearing the, <br />signatures of fifty-one (51%) or more of the resident property owners on said street to <br />be improved, having been filed within the ten (10) day period following the da.te and time` <br />of the hearing on said improvement, therefore <br />BE IT RESOLVED, by the Board of Public Works and Safety of the City of South <br />Bend, Indiana, that Improvement Resolution No. 2831, 1956, duly adopted by this Board on: <br />March 12, 1956, and first confirmed on April 3, 1056, be and same is in all things finally <br />confirmed and the improvemend is hereby ordered made. <br />R. S. Andrysiak <br />Frank J. Bruggner <br />Irving J. Smith <br />There being no further business to come before the Board, the meeting was ad- <br />journed at 10:55 A.M. (DST). <br />Attest: <br />C erk <br />i <br />APRIL 17, 1956 <br />A special meeting of the Board of Public Works & Safety was held Tuesday, Ap- <br />ril 17, 1956 at 2:00 P.M. (DST). The following persons were present• <br />Mayor Edward F. Voorde <br />Peter <br />Beczkiewicz <br />Irving J. Smith <br />Raymond S. Andrysiak <br />A. <br />G. <br />Thernstrom, Grand Trunk Railroad <br />Frank J. Bruggner <br />W. Luckadoo; <br />Bert-Gadacz, <br />Grand 'Trunk Railroad <br />N.J. Indiana & Illinois <br />Anthony J. Sabo <br />D. <br />B. <br />In -old, N.Y. Central <br />Ernest H. Miller <br />Clem Hazinski <br />J. <br />F. <br />Prosser, N.Y. Central <br />J. Charles Dutrieux <br />C. <br />L. <br />L. <br />C. <br />Nolan, N.Y. Central <br />Chapleau, Attorney <br />Robert Huff <br />p,� <br />F <br />,.. <br />Irving J. Smith, <br />introduced Mayor Voorde. <br />Mayor Voorde <br />problem of the Sample <br />railroad yards west. <br />r. _arabaugh, Attorney <br />Chairman, called the meeting to order at 2:00 P.M. He then <br />thanked <br />and Olive <br />everyone for <br />being <br />present and <br />then discussed <br />the overall <br />crossing. <br />He also <br />suggested <br />the possibly of <br />moving the <br />The Mayor then introduced Ernest H. miller, Traffic Engineer, who displayed <br />`charts drawn from the results of the survey he had taken on march 7th and 8th at the Sam <br />!ple-Olive Streets Crossing. This chart showed the peak hours of traffic and the amount <br />of time trains blocked the crossing. <br />Mayor Voorde then introduced Captain Hazinski, of the Traffic Division. Ca.p- <br />ta.in Hazinski explained the result of recent 2-year study of increasing number of accidents <br />in the immediate area of the Olive -Sample St. crossing. Reason for increase is traffic <br />using surrounding streets to avoid crossing the tracks at Sample and Olive Streets. <br />Mr. D. B. Ingold, Superintendent of the New York Central Railroad Company ex- j <br />plained that moving the yards west would interfere with U. S. #20. Also, if the railroad, <br />yards were moved out 10 miles, cost of operating would be too great. More time would be <br />needed for moving purposes. <br />Mr. A. G. Thernstrom, of the Grand Trunk Railroad Company agreed with Mr. In oldts <br />statement. Mr. Thernstrom feels that Grand Trunk is not responsible for the traffic hold= <br />up at Sample -Olive Street crossing and he does not feel that there is sufficient s ace to' <br />locate switching yards between Olive Street and Mayflower Road. p <br />• <br />:7 <br />F_ I <br />L <br />• <br />• <br />