HomeMy WebLinkAboutProposal - St Joe Valley Metronet, Inc. - Add Locations to the Metronet during Phase One�;�-�. - ! i � .. :3 E _ �'���� ,� ;� � - r ,I . � i■ Imm r "MIA t��k to k INTER -OFFICE MEMORANDUM Information Technologies Department 227 W Jefferson Blvd (574) 245-6000 TO: Board of Public Works, Linda Martin CC: Dan O'Connor FROM: Michael E. Sniadecki, Director of Infrastructure SUBJECT: City of South Bend -Metronet Buildout Phase 1 Connecting our facilities for reliability and performance DATE: 11 /02/17 Linda, Jennifer, Michael & George, Please see the attached quotes and spreadsheet regarding the addition of eight COSB locations to the Metronet during phase one of this project. The overall initiative is to connect all city facilities to the Metronet within two years. Currently, Metronet serves as the backbone to share IT services/network connectivity throughout many of the city facilities. Metronet provides significant savings as well as better, faster, more reliable/redundant connectivity. The Office of Innovation and Technology team reviewed the quote and give favorable recommendation. Below are locations within phase one that have no network connection, very slow circuit, and/or lack of redundancy: 1) Building Department 2) Central Fire 3) Fire Station #5 4) Fire Station #2 5) Park Maintenance 6) Street Department 7) Colfax Garage 8) Wayne St Garage Phase one of the Metronet Buildout would be a onetime cost of $73,249. Metronet is a "sole source" vendor. They are the only ones that can do this work. Thank you, Michael E. Sniadecki Metronet Connectivity -Phase 1 Locations Address Building 125 S Lafayette St Central Fire 1222 S Michigan St Fire #5 2221 Prairie Ave Fire #2 402 Charles Martin Sr Dr Parks Maintenance 1020 High St Street Dept 731 S Lafayette St Colfax Garage 126 N Main St Wayne St Garage 121 E Wayne St Total Metronet Quote $10,750.00 $4,900.00 $11,270.00 $5,100.00 $5,525.00 $14, 550.00 $10,725.00 $10,429.00 $73,249.00 4 u M, SU771,7777, 4?:! 77M,777 .Mm