HomeMy WebLinkAboutOpening of Bids - Studebaker Museum Rooftop Unit Replacements Project No 117-081 - Dynamic Mechanical ServicesCITY OF SOUTH BEND, INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
CHECKLIST FOR BIDDERS
Project Name Studebaker Museum Rooftop Unit Replacements
Project No.
For Bids Due
117-081
November 28, 2017
From time to time the South Bend Board of Public Works finds it necessary to reject a bid
because it does not comply with statutory requirements. In preparing your bid, please use the
following checklist in order to make sure that your bid is done in the proper manner.
V/ Proper bid security included. The bidder has the option of providing either a Certified Check
or Bid Bond.
Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely
executed.
/Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments
V with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and
Certification of use of United States Steel Products or Foundry Products.
Proof of MBEIWBE Participation Goal Form [MWBE-1.0]. If minimum participation goal is not
t/ met, also provide Evidence of Good Faith Efforts Form [MWBE*-2.0] and MBE/WBE Contacted
Form [MWBE-2.1].
nowledge Receipt of
1�
Addendum(s) included with the bid.
All required additional information is included with the bid.
Proposal statements and other affidavits all signed by the proper party with name either
printed or typed underneath signature.
This checklist submitted with the Bid.
Thin checklist is provided for bidder's use in assuring compliance with required
documentation; however, it does not include all specifications requirements and does not
relieve the bidder of the need to read and comply with the specifications. `
Bidder: „ �. [) .ULLC Q U ti Cate: l �, 1 [_7
By Authorized Representative:
Signature:
Print Name & Title:
Project No. 117-081 Contractor's Bid for Public Works -1
O456u TFI AF
PFACK
CITY OF SOUTH BEND INDIANA
CONTRACTOR'S BID FOR PUBLIC WORK
Project Name Studebaker Museum Rooftop Unit Replacements
Project No. 117-081
For Bids Due November 28, 2017
Date:
Address:
City/State/Zip:
PART I
(Must be completed for all bids. Please type or print)
Bidder (Firm): I }-�� k�.i�, i�� C�1C�LVu CCL� V ICis
Agent of Bidder (if Applicable): M
Pursuant to notices given, the unde
public works project of:
c �c� I
Tile hone Number:
4 (0 f5t `s
ned offers to furnish labor and/or material necessary to complete the
� T
the City of Pouth Bend, Indiana, in accordance with plans and specifications prepared by:
(YAIE C .�
and dated I C _1 (� "1 t for the sum of (enter the Total Bid as shown onthe Proposal)
S$ (A zco
(Enter sum of Tdtal Base /1 ( umerical)
The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified
in the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in
accordance with the notice. Any addendums attached will be specifically referenced at the applicable
page.
If additional units of material included in the contract are needed, the cost of units must be the same as
that shown in the original contract if accepted by the City of South Bend. If the bid is to be awarded on a
unit basis, the itemization of the units shall be shown on a separate attachment.
By / /
(Signature)
l
(Printed Name of Person Signing)
ACCEPTANCE
The above bid is accepted this day of
Subject to the following conditions:
BOARD OF PUBLIC WORKS
Gary A. Gilot, President
Elizabeth A. Maradik, Member
Suzanna M. Fritzberg, Member
Therese J. Dorau, Member
James A. Mueller, Member Attest: Linda M. Martin, Clerk
Project No. 117-081 Contractor's Bid for Public Works - 2
20
PART II
(For projects of $100,000 or more — IC 36-1-12-4)
These statements to be submitted under oath by each bidder with and as part of his bid.
Attach additional pages for each section as needed.
SECTION I EXPERIENCE QUESTIONNAIRE
1. Attach information regarding projects your organization has completed for the period of one
(1) year prior to the date of the current bid.
2. Attach a listing of public works projects currently in process of construction by your
organization.
3. Attach information regarding any failure to complete any work awarded to you and the
location thereof.
4. Attach references from private firms for which you have performed work.
SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE
1. Attach an explanation of your plan or layout for performing proposed work. (Examples could
include a narrative of when you could begin work, complete the project, number of workers,
etc. and any other information which you believe would enable the City of South Bend to
consider your bid.)
2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms
outside your own firm who have performed part of the work) that you have used on public
works projects during the past five (5) years along with a brief description of the work done
by each subcontractor.
3. If you intend to sublet any portion of the work, attach the name and address of each
subcontractor, equipment to be used by the subcontractor, and whether you will require a
bond. However, if you are unable to currently provide a listing, please understand a listing
must be provided prior to contract approval. Until the completion of the proposed project,
you are under a continuing obligation to immediately notify the City of South Bend in the
event that you subsequently determine that you will use a subcontractor on the proposed
project.
4. Attach a listing of equipment you have available to use for the proposed project.
5. Have you entered into contracts or received offers for all materials which substantiate the
prices used in preparing your proposal? If not, attach an explanation for the rationale used
which would corroborate the prices listed.
SECTION III CONTRACTOR'S FINANCIAL STATEMENT
Attachment of bidder's financial statement is mandatory. Any bid submitted without said
financial statement as required by statute shall thereby be rendered invalid. The financial
statement provided hereunder to the City of South Bend awarding the contract must be specific
enough in detail so that said City of South Bend can make a proper determination of the
bidder's capability for completing the project if awarded.
Project No. 117-081 Contractor's Bid for Public Works - 3
When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation
to this Affidavit.
CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION
REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON-
DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL
PRODUCTS OR FOUNDRY PRODUCTS
(Must be completed for all quotes and bids. Please type or print)
STATE OF 1 }
SS:
IWO:UNTY )
The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury
that:
1. Contractor has not, nor has any other member, representative, or agent of the firm, company,
corporation or partnership represented by him, entered into any combination, collusion or agreement with
any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding
nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid
and without any agreement, understanding or combination with any other person in reference to such
bidding. Contractor further says that no person or persons, firms, or corporation has, have or will receive
directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and
2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals
are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded
from participation in this transaction by any Federal department or agency; and
3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in
investment activities in Iran.
a. For purposes of this Certification, "Iran" means the government of Iran and any
agency or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5,
as amended from time -to -time.
b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor
is engaged in investment activities in Iran if either:
i. Contractor, its successor or its affiliate, provides goods or services of twenty
million dollars ($20,000,000) or more in value in the energy sector of Iran;
or
Contractor, its successor or its affiliate, is a financial institution that extends
twenty million dollars ($20,000,000) or more in credit to another person for
forty-five (45) days or more, if that person will (i) use the credit to provides
goods and services in the energy sector in Iran; and (ii) at the time the
r r. t •r t t• .t_n_t_ _ _t t__
rnancial institution exterrus credit, is a person identlllvd on list publisneu by
the Indiana Department of Administration.
Project No. 117-081 Contractor's Bid for Public Works - 4
4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any
employee or contract with a person that the Contractor subsequently learns is an unauthorized alien.
Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's
newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's
documentation of enrollment and participation in the E-Verify Program is included and attached as part of
this bid/quote; and
5. Contractor shall require his/her/its subcontractors performing work under this public contract to
certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain
any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien,
and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor
agrees to maintain this certification throughout the term of the contract with the City of South Bend, and
understands that the City may terminate the contract for default if the Contractor fails to cure a breach of
this provision no later than thirty (30) days after being notified by the City.
6. Persons, partnerships, corporations, associations, or joint venturers awarded a contract by the City
of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or
applicant for employment in the performance of a City contract with respect to hire, tenure, terms,
conditions, or privileges of employment, or any matter directly or indirectly related to employment because
of race, sex, religion, color, national origin, ancestry, age, gender expression, gender identity, sexual
orientation or disability that does not affect that person's ability to perform the work.
In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any
combination of the foregoing including, but not limited to, public works contracts awarded under public
bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards,
or commissions may consider the Contractor's good faith efforts to obtain participation by those
Contractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business
Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder.
In no event shall persons or entities seeking the award of a City contract be required to award a subcontract
to an MBE/WBE; however, it may not unlawfully discriminate against said WBE/MBE. A finding of a
discriminatory practice by the City's MBEIWBE Utilization Board shall prohibit that person or entity from
being awarded a City contract for a period of one (1) year from the date of such determination, and such
determination may also be grounds for terminating the contact for which the discriminatory practice or
noncompliance pertains.
7. The undersigned contractor agrees that the following nondiscrimination commitment shall be
made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any
of its agencies, boards or commissions.
Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in
the performance of this contract with privileges of employment, or any matter directly or indirectly related
to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation,
handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of
contract.
1, the undersigned bidder or agent as contractor on a public works project, understand my statutory
obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1). 1
hereby certify that I and all subcontractors employed by me for this project will use steel products or
foundry products made in the United States on this project if awarded. I understand I have an affirmative
duty to notify the City in my bid that my proposal does not include the use of steel products or foundry
products made in the United States. I understand it is my sole obligation and responsibility to provide a
justification to the City, subject to review and approval, why the cost of United States made steel or
foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel
products or foundry products made in the United States, the City, through its director of public works, shall
Project No. 117-881 Contractor's Bid for Public Works - 5
"t F
BID/PROPOSAL
CITY OF SOUTH BEND
Project Name Studebaker Museum Rooftop Unit Replacements
Project No. 117-081
For Bids Due November 28, 2017
BASE RID
Item
NO.
Description
Quantity
Unit
Unit Price
Total Amount
1
Remove, replace and reconnect rooftop
1
LS
----
ou
1 3CO"
units RTU-3, 6, 7 and 8.
BASE BID TOTAL I kog
By
(Signature)
(Printed Name of Person Signing)
Bidder (Firm): T�
Address: I �o0(o ( 1e
City/State/Zip: Mt Telephone Number:
�af C
ab� —.0
By
(Signature)
Vice Re icA
(Printed Name of Person Signing)
Project No. 117-081 Contractor's Bid for Public Works - 7
H
w
0
w
N
EZz0 oQ
mWC. 00 �
7 W F
F- m
zz �cc
NLL �2
0mp m
o
�-2� m
0p �
L
a
F-
W
0
z_
E
z�
o "gW.
C7
ti
T
m m o
D�
a. m
v
o c
Q.
0E
00
Q W
mm
o
a
df]
M0
M
A
a.
cJ
°L)
CL
U)o
V,
U
co
[L,1
a
0
Ui C
a D
16Q
ar
)U
ND
� Z
fl.
W
D
rn
a
Q
m
E
N
Z
M,
u
E
M
z
co
O
O
z
.L3
� d
CITY OF SOUTH BEND f""s
MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY rF f11�y
DEVELOPMENT PROGRAM
FORM MWBE-2.0
EVIDENCE OF GOOD FAITH EFFORTS
This completed form should be included as part of the Bids documents related to City of South Bend Public
Works Projects requiring Good Faith Efforts to obtain MBEIWBE participation. It is the bidder's sole
responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority
or Women's owned business as defined by the Indiana Department of Administration ("IDOA").
Project Number: 117.081 Date: 1t l�
Project Name:
Bidder:
Contact Person
Address:
C ity:
Email:
Studebaker Museum Rooftop Unit
101
State:
r-u C_ `es
Telephone:
Zip: ` Lxo),
A . l
To determine whether a bidder has demonstrated good faith efforts to reach the MBE/WBE utilization goals set
forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or
commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below`':
EVIDENCE OF GOOD FAITH EFFORTS
MBEIWBE LIST(S): The bidder reviewed the City of South Bend's Minority and Women Business
Enterprise Diversity Development Program, which uses the IDOA approved list of Minority and Women
Owned Business as found on their website (http://www.in.gov/idoa).
ACTION (ADVERTISEICONTACT); In order for your bid to be deemed responsive, the City of South
Bend requires that all perspective bidders complete no less than 2 of the following:
1. Attend all pre -bid meetings scheduled by the City to inform MBE/WBEs of contracting and
subcontracting opportunities.
2. Advertise in general circulation and/or trade association publications concerning
subcontracting opportunities, and allow MBEIWBEs reasonable time to respond.
3. Perform any and all necessary steps to provide written notice in a manner reasonably
calculated to inform MBE/WBEs of subcontracting opportunities and allowed sufficient time for
them to participate effectively.
4. Utilize pre-existing services of available community organizations, small and/or disadvantaged
business assistance offices and other organizations that provided assistance in the
recruitment and placement of MBE/WBE firms.
"Bidder must circle or otherwise notate which of the two (2) required actions were performed.
GOOD FAITH NEGOTIATIONS: The bidder negotiated in good faith with interested MBE/WBEs,
including providing such MBE/WBE's with adequate information about the plans, specifications and
other requirements of the subcontract and did not reject MBE/ BEs as unqualified without sound
business reasons based on a thorough investigation of their capabilities.
SMALL CONTRACT(S): The bidder selected specific portions of the work to be performed by
MBE/ BEs in order to increase the likelihood of meeting the MBE/WBE goals (including breaking
down contracts into smaller units to facilitate MBE/WBE participation)
CONTRACT RECORDS: The bidder has maintained the following records for each MBE/WBE that has
bid on the subcontracting opportunity:
1. Name, address, and telephone number;
2. A description of information provided by the bidder or subcontractor; and
3. A statement of whether an agreement was reached, and if not, why not, including any reasons for
concluding that the MBE/WBE was unqualified to perform the job.
*Proper demonstration of Good Faith Effort requires your initials next to all of the above boxes. Any
omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of
South Bend reserves the right to request additional information.
Project No. 117-081 Contractor's Bid for Public Works - 9
CITY OF SOUTH BEND
MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY
DEVELOPMENT PROGRAM
FORM MWBE-2.1
MBEIWBE CONTACTED
This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects
requiring contacted MBENVBE to obtain Good Faith Efforts. It is the bidder's sole responsibility to verify
whether any listed minority or woman business meets the qualifications of a Minority or Women's owned
business. f
PAGE II OF_
Project Number: 117-081 MBEANBE Participation Goal 1 `70
Project Name: Studebaker Museum Rooftop Unit Replacements
Bidder: DQ r 'e,C-TKO
By: < <, rr I C��Yt I t L
ignature) (Title) (Date)
MBE/WBE Firm
Owner or Contact at MBEIWBE Firm
Telephone: Fax: Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
RESULTS OF CONTACT WITH THE MBEANBE FIRM:
MBENVBE Firm N -�
Owner or Contact at MBENWBE Firm
Telephone: Fax: Email:
TYPE OF WORK SOLICITED FOR THIS PROJECT:
RESULTS OF CONTACT WITH THE MBENVBE FIRM:
Project No. 117-081 Contractor's Bid for Public Works - 10
THE CINCINNATI INSURANCE COMPANY
CONTRACTOR (Name, legal status and address):
Dynamic Mechanical Services, Inc.
1606 Chestnut Street
Mishawaka, IN 46545
OWNER (Name, legal status and address):
CITY OF SOUTH BEND BOARD OF PUBLIC WORKS
227 W JEFFERSON BLVD SUITE 1400N
SOUTH BEND, IN 46601
BOND AMOUNT:
5% of bid
SURETY (Name, legal status and principal place of business):
THE CINCINNATI INSURANCE COMPANY
6200 S. GILMORE ROAD
FAIRFIELD, OHIO 45014-5141
PROJECT (Name, location or address, and Project number, if any):
Studebaker Museum Rooftop Unit Replacements
This document has important legal
consequences, Consultation with
an attorney is encouraged with
respect to its completion or
modification.
Any singular reference to
Contractor, Surety, Owner or
other party shall be considered
plural where applicable.
The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the
Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and
severally, as provided herein. The conditions of this Bond are such that if the Owner accepts the bid of the
Contractor within the time specified in the bid documents, or within such time period as may be agreed to by the
Owner and Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with the
terms of such bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with
a surety admitted in the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful
performance of such Contract and for the prompt payment of labor and material furnished in the prosecution
thereof; or (2) pays to the Owner the difference, not to exceed the amount of this Bond, between the amount
specified in said bid and such larger amount for which the Owner may in good faith contract with another party
to perform the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full
force and effect. The Surety hereby waives any notice of an agreement between the Owner and Contractor to
extend the time in which the Owner may accept the bid. Waiver of notice by the Surety shall not apply to any
extension exceeding sixty (60) days in the aggregate beyond the time for acceptance of bids specified in the bid
documents, and the Owner and Contractor shall obtain the Surety's consent for an extension beyond the sixty (60)
days.
If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond
shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor.
When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the
Project, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted
herefrotn and provisions conforming to such statutory or other legal requirements shall be deemed incorporated
herein. When so furnished, the intent is that this Bond shall be construed as a statutory bond and not as a
common law bond.
Signed and sealed this 28 day of November.2017
Dynamic Mechanical Services, Inc.
(Principal) (Seal)
(Witness)
Ti e) j L,- Pr
THE CINCINNATI INSURANCE COMPANY
Sur ty) (Seal)
fitness)
Titie) "
The Company executing this bond vouches that this document conforms to American institute of Arri3itects Document A310, 2010 Edition.
S 2000- AIA (11/10) PUBLIC
THE CINCINNATI INSURANCE COMPANY
Fairfield, Ohio
POWER. OF ATTORNEY
KNOW ALL MEN 13Y THESE PRESENTS: That THE CINCINNATI INSURANCE COMPANY, a corporation organized under the laws of
the Slate of Ohio, and having its principal office in the City of Fairfield, Ohio, does hereby constitute and appoint
Tracie House, Rebecca Mann, Wendy McSorley, Kathleen Goepfrich, Nancy Fedder, Lisa Meek, Thomas Cassady, Jr., Gregg Brasseur,
of South Bend, IN its IT -tic and lawful Attorney(s)-in-Fact to sign, execute, seal
and deliver on its behalf as Surely, and as its act and deed, any and all bonds, policies, undertakings, or other like instruments, as follows;
Twenty Five Million Dollars and 001100 ($25,000,000.00)
This appointment is made under and by authority of the following resolution passed by the Board of Directors of said Company
at a mecling held in the principal office of the Company, a quorum being present and voting, on the 61"1 day of December, 1958, which
resolution is still in effect:
"RESOLVED, that the President or any Vice President be hereby authorized, and empowered to appoint Attorneys -in -
Fact of the Company to execute any and all bonds, policies, undertakings, or other like instrurnents oft behalf of the
Corporation, and may authorize any officer or any such Attorney -in -Fact to affix the corporate seal; and may with or
without cause modify or revoke any such appointment or authority. Any such writings so executed by such Attorneys -in -
Fact shall be binding upon the Company as if they had been duly executed and acknowledged by the regularly elected
officers of the Company."
This Power of Attorney is signed and sealed by facsimile under and by the authority of the following Resolution adopted by the
Board of Directors of tite Company at a meeting duly called and held oil the 711, day of December, 1973.
"RESOLVED, that the signature of the President or a Vice President and the seal of the Company may be affixed by
facsimile on any power of attorney granted, and the signature of the Secretary or Assistant Secretary and the seal of the
Company may be affixed by facsimile to any certificate of any such power and any such power of certificate bearing
such facsimile signature and seal shall be valid and binding on the Company. Any such power so executed and sealed
and certified by certificate so executed and sealed shall, with respect to any bond or undertaking to which it is attached,
continue to be valid and binding on the Company."
IN WITNESS WHEREOF, THE CINCINNATI INSURANCE COMPANY has caused these presents to be sealed with its corporate
seal, duly attested by its Vice President this 100' day of May, 2012.
p'u lnap•�
t� THE CINCINNATI INSURANCE COMPANY
r7 rnRKWATE
� SEAL
Vice ['resident
STATE OF OHIO ) ss:
COUNTY OF BUTLER )
Olt this 10"' day of May, 2012, before me came the above -named Vice President orTHE CINCINNATI INSURANCE COMPANY,
to the personally known to be the officer described herein, and acknowledged that the seal affixed to the preceding instrument is the corporate
seal of said Company and the corporate seal and the signature of the officer were duly affixed and subscribed to said instrument by the
authority and direction of said corporation.
♦d? MAHK J. H I LER, Attorney at Law
NOTARY PUBLIC - STATE OF OHIO
My commission has no expiration
'••..;, ofI►•* date, Section 147.03 O,R,C,
1, tite undersigned Secretary or Assistant Secretary of THE CINCINNATI INSURANCE COMPANY, hereby certify that the above
is a true and correct copy of the Original flower of Attorney issued by said Company, and do hereby further certify that the said Power of
Altoniey is still in full force and effect.
,GIVEN under illy hand and seal of said Company al Fairfield, Ohio.
this day of
0 g /
SEAL
13N-1005 (5/12)
Assistant Secretary
2
yKervices
ic
ec
echanical
Dynamic Mechanical Services, Inc
SECTION I EXPERIENCE QUESTIONNAIRE
1606 Chestnut Street
Mishawaka, IN 46545
Phone: 574-257-0123
Fax: 574-257-0126
What public works projects has your organization completed for the period of one (1) year prior to the
date of the current bid?
Contract Amount
Class of Work
Completion
Date
Name and Address of Owner
732.350.00
PlumbinglHVAC
812017
Elkhart Community Schools
What public works projects are now in process of construction by your organization?
Contract Amount
Class of Work
Expected
Completion
Date
Name and Address of Owner
423,200.00
PlumbinglHVAC
512018
School City of Mishawaka
Your Single Source Provider For ALL Of Your Mechanical Needs
3
Have you ever failed to complete any work awarded to you? No
if so, where and why?
4. List references from private firms for which you have performed work.
Premier 1 Construction Al Lusk 574-239-7016
Woodcox Building Contractors Adam George 574-272-6905
DJ Construction Adam Tohulka 574-533-1645
SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE
1. Explain your plan or layout for performing proposed work. (Examples could include a narrative of when
you could begin work, complete the project, number of workers, etc. and any other information which you
believe would enable the governmental unit to consider your bid.)
We plan to provide sufficient labor and material to complete the project according to plans and specs.
2. Please list the names and addresses of all subcontractors (i.e. persons or firms outside your own firm
who have performed part of the work) that you have used on public works projects during the past five (5)
years along with a brief description of the work done by each subcontractor.
Michiana Sheet Metal 1606 Chestnut St. Suite A. Mishawaka, IN 46545 Sheet Metal
Valley Insulation PO Box 414 Mishawaka, IN 4654 Insulation
Brite Electric PO Box 1190 Granger, IN 46530 Electrical
3. If you intend to sublet any portion of the work, state the name and address of each subcontractor,
equipment to be used by the subcontractor, and whether you will require a bond. However, if you are
unable to currently provide a listing, please understand a listing must be provided prior to contract
approval. Until the completion of the proposed project, you are under a continuing obligation to
immediately notify the governmental unit in the event that you subsequently determine that you will use a
subcontractor on the proposed project.
Subcontractors will be provided after contract is awarded.
4. What equipment do you have available to use for the proposed project? Any equipment to be used by
subcontractors may also be required to be listed by the governmental unit.
Crane
Have you entered into contracts or received offers for all materials which substantiate the prices used in
preparing your proposal? If not, please explain the rationale used which would corroborate the prices
listed.
Yes
SECTION III CONTRACTOR'S FINANCIAL STATEMENT
Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial
statement as required by statute shall thereby be rendered invalid. The financial statement provided hereunder to
the governing body awarding the contract must be specific enough in detail so that said governing body can make
a proper determination of the bidder's capability for completing the project if awarded.