Loading...
HomeMy WebLinkAboutOpening of Bids - Studebaker Museum Rooftop Unit Replacements Project No 117-081 - B.C. Mechanical IncCITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK CHECKLIST FOR BIDDERS Project Name Studebaker Museum Rooftop Unit Replacements Project No. 117-081 For Bids Due November 28, 2017 From time to time the South Bend Board of Public Works finds it necessary to reject a bid because it does not comply with statutory requirements. in preparing your bid, please use the following checklist in order to make sure that your bid is done in the proper manner. / Proper bid security included. The bidder has the option of providing either a Certified Check hJ/ or Bid Bond. Bid prepared on the City of South Bend Contractor's Bid for Public Work Form, completely �((( executed. Contractor's Non -Collusion and Non -Debarment Affidavit, Certification Regarding Investments with Iran, Employment Eligibility Verification, Non -Discrimination Commitment, and Certification of use of United States Steel Products or Foundry Products. Proof of MBEIWBE Participation Goal Form [MWBE-1.01. If minimum participation goal is not met, also provide Evidence of Good Faith Efforts Form [MWBE-2.0] and MBEANBE Contacted Form [MWBE-2.1]. Acknowledge Receipt of Addendum(s) included with the bid. All required additional information is included with the bid. Proposal statements and other affidavits all signed by the proper party with name either printed or typed underneath signature. This checklist submitted with the Bid. This checklist is provided for bidder's use in assuring compliance with required documentation; however, it does not include all specifications requirements and does not relieve the bidder of the need to read and comply with the specifications. Bidder: Date: I1-ZVI '- By Authorized Representative: Signature: Print Name & Title: MIe,(L �� ' � ��T° � - �� Project No. 117-081 Contractor's Bid for Public Works - 1 CITY OF SOUTH BEND, INDIANA CONTRACTOR'S BID FOR PUBLIC WORK Project Name Studebaker Museum Rooftop Unit Replacements Project No. 117-081 For Bids Due November 28, 2017 PART I (Must be completed for all bids. Please type or print) Date: t �^ Bidder (Firm): Address: �"d2. Ain&C A�c.,rl , • � City/State/Zip:' ► (ems M I q41 C) Telephone Number: $) a Agent of Bidder (if Applicable): Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of: v"'A- r .. the City of South Bend, Indiana, in accordance with plans and specifications prepared by: and dated _D j 27 1 II for the sum of (enter the Total Bid as shown on the Proposal) T Ent r sum of Total Base Bid) ) (Numerical) The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the City of South Bend. If the bid is to be awarded on a unit basis, the itemization of the units shall be shown on a separate attachment. The above bid is accepted this Subject to the following conditions: BOARD OF PUBLIC WORKS Gary A. Gilot, President Elizabeth A. Maradik, Member James A. Mueller, Member By - --� (� (Signature) (Printed Name of Person Signing) ACCEPTANCE day of Suzanna M. Fritzberg, Mem Therese J. Dorau, Member Attest: Linda M. Martin, Clerk Project No. 117-081 Contractor's Bid for Public Works - 2 20 PART II (For projects of $100,000 or more — IC 36-1-12-4) These statements to be submitted under oath by each bidder with and as part of his bid. Attach additional pages for each section as needed. SECTION I EXPERIENCE QUESTIONNAIRE 1. Attach information regarding projects your organization has completed for the period of one (1) year prior to the date of the current bid. 2. Attach a listing of public works projects currently in process of construction by your organization. 3. Attach information regarding any failure to complete any work awarded to you and the location thereof. 4. Attach references from private firms for which you have performed work. SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE 1. Attach an explanation of your plan or layout for performing proposed work. (Examples could include a narrative of when you could begin work, complete the project, number of workers, etc. and any other information which you believe would enable the City of South Bend to consider your bid.) 2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms outside your own firm who have performed part of the work) that you have used on public works projects during the past five (5) years along with a brief description of the work done by each subcontractor. 3. If you intend to sublet any portion of the work, attach the name and address of each subcontractor, equipment to be used by the subcontractor, and whether you will require a bond. However, if you are unable to currently provide a listing, please understand a listing must be provided prior to contract approval. Until the completion of the proposed project, you are under a continuing obligation to immediately notify the City of South Bend in the event that you subsequently determine that you will use a subcontractor on the proposed project. 4. Attach a listing of equipment you have available to use for the proposed project. 5. Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing your proposal? If not, attach an explanation for the rationale used which would corroborate the prices listed. SECTION III CONTRACTOR'S FINANCIAL STATEMENT Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial statement as required by statute shall thereby be rendered invalid. The financial statement provided hereunder to the City of South Bend awarding the contract must be specific enough in detail so that said City of South Bend can make a proper determination of the bidder's capability for completing the project if awarded. Project No. 117-081 Contractor's Bid for Public Works - 3 When the prospective Contractor is unable to certify to any of the statements below, it shall attach an explanation to this Affidavit: CONTRACTOR'S NON -COLLUSION AND NON -DEBARMENT AFFIDAVIT, CERTIFICATION REGARDING INVESTMENT WITH IRAN, EMPLOYMENT ELIGIBILITY VERIFICATION, NON- DISCRIMINATION COMMITMENT AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (Must be completed for all quotes and bids. Please type or print) STATE OF SS: COUNTY ) The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that: 1. Contractor has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. a. For purposes of this Certification, "Iran" means the government of Iran and any agency or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22-16.5-5, as amended from time -to -time. b. As provided by Incl. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor is engaged in investment activities in Iran if either: i. Contractor, its successor or its affiliate, provides goods or services of twenty million dollars ($20,000,000) or more in value in the energy sector of Iran; or ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for forty-five (45) clays or more, if that person will (i) use the credit to provides goods and services in the energy sector in Iran; and (ii) at the time the financial institution extends credit, is a person identified on list published by the Indiana Department of Administration. —1 Project No. 117-081 Contractor's Bid for Public Works - 4 �. 4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently learns is an unauthorized alien. Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's documentation of enrollment and participation in the E-Verify Program is included and attached as part of this bid/quote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor agrees to maintain this certification throughout the term of the contract with the City of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. 6. Persons, partnerships, corporations, associations, or joint venturers awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of employment, or any matter directly or indirectly related to employment because of race, sex, religion, color, national origin, ancestry, age, gender expression, gender identity, sexual orientation or disability that does not affect that person's ability to perform the work, In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions may consider the Contractor's good faith efforts to obtain participation by those Contractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business —1r Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder. In no event shall persons or entities seeking the award of a City contract be required to award a subcontract to an MBE/WBE; however, it may not unlawfully discriminate against said WBE/MBE. A finding of a discriminatory practice by the City's MBE/WBE Utilization Board shall prohibit that person or entity from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact for which the discriminatory practice or noncompliance pertains. 7. The undersigned contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in the performance of this contract with privileges of employment, or any matter directly or indirectly related to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation, handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of contract. 1, the undersigned bidder or agent as contractor on a public works project, understand my statutory obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1). 1 hereby certify that 1 and all subcontractors employed by me for this project will use steel products or foundry products made in the United States on this project if awarded. I understand I have an affirmative duty to notify the City in my bid that my proposal does not include the use of steel products or foundry products made in the United States. I understand it is my sole obligation and responsibility to provide a justification to the City, subject to review and approval, why the cost of United States made steel or foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel products or foundry products made in the United States, the City, through its director of public works, shall Project No. 117-081 Contractor's Bid for Public Works - 5 make a determination if the price of United States made steel or foundry is unreasonable. I understand that violations hereunder may result in forfeiture of contractual payments. i hereby affirm under the penalties of perjury that the facts and information contained in the foregoing bid for public works are,true and correct. Dated this 99 h day of ,�) c-, �Aec ' �. \-el<L Contractor/Bidder (Firm) 7YLjl- Signature of Contractor/Bidder or Its Agent Printed Name and Title Subscribed and sworn to b ore me this day of 'U , 20� My Commission Expires Nota P 'c County of Residence Theresa A. Suseland Notary Public of Michigan Berrien County Expires 05/08/20 Acting in the County of Project No. 117-081 Contractor's Bid for Public Works - 6 Project Name Project No. For Bids Due BASE BID ir, r 3 tx BID/PROPOSAL tal 1 CITY OF SOUTH BEND {ate, less`,: Studebaker Museum Rooftop Unit Replacements 117-081 November 28, 2017 Item No. Description Quantity Unit Unit Price Total Amount 1 Remove, replace and reconnect rooftop 1 LS _ units RTU-3, 6, 7 and 8. ---- � � COD Bidder (Firm): Address: v2 Ja,•,�s..��.r, City/State/Zip: BASE BID TOTAL_ BY (Signature) AA (Printed Name of Person Signing) Telephone Number: By (Signature) `ei (Printed Name of Person Signing) Project No. 117-081 Contractor's Bid for Public Works - 7 � j SC C >a � a ta a E d. R. a O 3 E w 0.O o -a 3 m m 0 a z 0 Cl AC 0 `0 c 0 0 w a xv3A WU_ N DWI-- mF U w o w=a ` 0 IM © m r I_ww LLw a c �2� m r3 r C a 7 a T; 0 } ill r 0 3 cx z_ c a 4 a 2 q� N G L N 32 L = 0-0 d a a 0 o d = 0 m c CL 0 E 0 0 06 v E c H C� O (6 Q 0 m m w 0 Q N E w z .o V- 00 O ti a`s E u cu a a- m E O p ap� pM 00. c prL p o a © r O so 0) c �p €a O fU N CL {�•j h n 0c CL U N fa L LV L Q d� c N C ii n EU m pCD U +n 4 il-, E W m � � m � � •J m m z Ss- u 00 N �z a co 9 w 0 z V? Ll. N CITY OF SOUTH BENDo-o'''$ MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY ice- DEVELOPMENT PROGRAM i"' '�" FORM MWBE-2.0 EVIDENCE OF GOOD FAITH EFFORTS This completed form should be included as part of the Bids documents related to City of South Bend Public Works Projects requiring Good Faith Efforts to obtain MBEIWBE participation. It is the bidder's sole responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority or Women's owned business as defined by the Indiana Department of Administration ("IDOA"). Project Number: Project Name: Bidder: Contact Person: Address: 117-081 Date: t 1 • zS •- 1 q Studebaker Museum Rooftop Unit Replacements 1—,, gA Q S Telephone: W1 City: _f �.!' + State: ,LIA j Zip: �—t 9 (2, 0 Email: o'O a VA Ili C_ ; To determine whether a bidder has demonstrated good faith efforts to reach the MBENVBE utilization goals set forth in the City of South Bend Public Works Project Specifications, the City and its agencies, boards, or commissions, REQUIRE ALL of the following Good Faith Efforts as listed in the table below`: EVIDENCE OF GOOD FAITH EFFORTS MBEIWBE LIST(S): The bidder reviewed the City of South Bend's Minority and Women Business Enterprise Diversity Development Program, which uses the IDOA approved list of Minority and Women Owned Business as found on their website (http://www.in.govildoa). ACTION (ADVERTISEICONTACT): In order for your bid to be deemed responsive, the City of South Bend requires that all perspective bidders complete no less than 2 of the following: 1. Attend all pre -bid meetings scheduled by the City to inform MBENVBEs of contracting and subcontracting opportunities. 2. Advertise in general circulation and/or trade association publications concerning fRe subcontracting opportunities, and allow MBEIWBEs reasonable time to respond. Perform any and all necessary steps to provide written notice in a manner reasonably calculated to inform MBEIWBEs of subcontracting opportunities and allowed sufficient time for them to participate effectively. Utilize pre-existing services of available community organizations, small and/or disadvantaged business assistance offices and other organizations that provided assistance in the recruitment and placement of MBEANBE firms. "Bidder must circle or otherwise notate which of the two (2) required actions were performed. GOOD FAITH NEGOTIATIONS: The bidder negotiated in good faith with interested MBENVBEs, including providing such MBE/WBE's with adequate information about the plans, specifications and other requirements of the subcontract and did not reject MBENVBEs as unqualified without sound business reasons based on a thorough investigation of their capabilities. SMALL CONTRACT(S): The bidder selected specific portions of the work to be performed by MBENVBEs in order to increase the likelihood of meeting the MBENVBE goals (including breaking down contracts into smaller units to facilitate MBENVBE participation) CONTRACT RECORDS: The bidder has maintained the following records for each MBE/WBE that has bid on the subcontracting opportunity: 1. Name, address, and telephone number; 2. A description of information provided by the bidder or subcontractor; and 3. A statement of whether an agreement was reached, and if not, why not, including any reasons for concluding that the MBENVBE was unqualified to perform the job. *Proper demonstration of Good Faith Effort requires your initials next to all of the above boxes. Any omissions shall be considered grounds for rejection of the bid by the Board of Public Works. The City of South Bend reserves the right to request additional information. Project No. 117-081 Contractor's Bid for Public Works - 9 CITY OF SOUTH BEND MINORITY AND WOMEN BUSINESS ENTERPRISE DIVERSITY DEVELOPMENT PROGRAM'`''r FORM MWBE-2.1 MBEIWBE CONTACTED rz"may This completed form should be supplied with Bids that pertain to City of South Bend Public Works Projects requiring contacted MBEIWBE to obtain Good Faith Efforts. It is the bidder's sole responsibility to verify whether any listed minority or woman business meets the qualifications of a Minority or Women's owned business. PAGE � OF y Project Number: 117-081 MBEIWBE Participation Goal Project Name: Studebaker Museum Rooftop Unit Replacements Bidder: By: �'i.y a�r-�� Qs ' A- (Signature) (Title) (Date) MBEIWBEFirrrt Owner or Contact at MBEANBE Firm CP �- Telephone: (ua W6..0-s2fi Fax: Emaii: �Cs��fr�C"ics'CboC �CcSl� TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MBE/WBE FIRM: � ��.,� � \ Sr:✓ - �S Lam- '� l �` MBEIWBE Firm Owner or Contact at MBEIWBE Firm Telephone: Fax: Email: TYPE OF WORK SOLICITED FOR THIS PROJECT: RESULTS OF CONTACT WITH THE MBEIWBE FIRM: Project No. 117-081 Contractor's Bid for Public Works - 10 Code D�scri �tion 40100000 .' Heating and ventilation rstd au-.circail-ition U151507 Electronic controls installation Service On September 13, 20I0, the Governor's Commission on Minority and Wnnieta's Business Enterprise approve d.tlte departrxteat':s effort to stream line its recertification process.: instead of conducting an onsite . visit to each company seeping recertification, the department now has the discretion to waive the visit after.A. thorough review of the company's file and recertification clocumerats, We have approved your recertification. and it is valid throu 813112019. Please Mote that IDOA continues toreserve. tEae.r fight to Conduct .a:site visit or phone interview at any time. to certified companies. Although your certification is valid for a three-year period, you are required to submit an annual A davit Of.Cbrrtirured Eligibility (ACE) form, located at http:Ilvrww.in.gov/ido-t/znwbelfiles/ACE For"i.pdf Please remeinber. you must niotify us imrnmediately if a ny changes occur.. Failure to notify us of cftangcs .or to provide an ACE form annually will result in revocation of your certification, Changes include, but are rapt linaitsd to, chdnes t location, contact iulorttiation, ownership and control. We encourage you to visit 1DOA's procurement website, http://www.iiz.goy/idoit124fi4,htm, and upzlate your business Registration Profile. It is important that you review and update your Profile regularly, beeause..state.purchasinb agents and prime c;ontractot•s may use this information to contact yeti for business oppariutrities, her questions regarding your registration profile, you nnay contact our office at. 317-232-3061. . ACCEPTANCE The above bid is accepted this day of subject to the following conditions: Contracting Authority Members: PART II (For projects of $100,000 or more — IC 36-1-12-4) Governmental Unit: City of South Bend Board of Public Works Bidder (Firm) B. C. Mechanical, Inc. Date: 11 /28/17 These statements to be submitted under oath by each bidder with and as a part of his bid. Attach additional pages for each section as needed. SECTION I EXPERIENCE QUESTIONNAIRE What public works projects has your organization completed for the period of one (1) year prior to the date of the current bid? Contract Amount Class of Work Completion Date Name and Address of Owner $ 1,038,761.00 Commercial 8121 /17 INDOT Sub -District Building - Plymouth, IN $ 740,198.00 Commercial 611I17 IUSB Riverside Hall - South Bend, IN $295,000.00 Commercial 9115/17 Howard Ellis School - Niles Community Schools What public works projects are now in process of construction by your organization? Contract Amount Class of Work Expected Completion Date Name and Address of Owner $382,000.00 Commercial 11 /30/17 IUSB Nor#hside Hall -South Bend, IN $652,000.00 Commercial 4/15/18 South Bend Fire Station # 4 3. Have you ever failed to complete any work awarded to you? NO If so, where and why? 4. List references from private firms for which you have performed work. Mike Przybylski - Sanctuary at Holy Cross South Bend, IN - (574) 247-7525 Buddy Freeze - Pokagon Band of Potawatomi - (269) 783-6306 Ronald Stuglik - Knollwood Country Club Granger, IN - (574) 277-1541 Richard Hughes - lCM Products Cassopolis, MI - (269) 445-0847 SECTION 11 PLAN AND EQUIPMENT QUESTIONNAIRE Explain your plan or layout for performing proposed work. (Examples could include a narrative of when you could begin work, complete the project, number of workers, etc. and any other information which you believe would enable the governmental unit to consider your bid.) Please list the names and addresses of all subcontractors (i.e. persons or firms outside your own firm who have performed part of the work) that you have used on public works projects during the past five (5) years along with a brief description of the work done by each subcontractor. If you intend to sublet any portion of the work, state the name and address of each subcontractor, equipment to be used by the subcontractor, and whether you will require a bond. However, if you are unable to currently provide a listing, please understand a listing must be provided prior to contract approval. Until the completion of the proposed project, you are under a continuing obligation to immediately notify the governmental unit in the event that you subsequently determine that you will use a subcontractor on the proposed project. 4. What equipment do you have available to use for the proposed project? Any equipment to be used by subcontractors may also be required to be listed by the governmental unit. 5. Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing your proposal? If not, please explain the rationale used which would corroborate the prices listed. SECTION III CONTRACTOR'S FINANCIAL STATEMENT Attachment of bidder's financial statement is mandatory. Any bid submitted without said financial statement as required by statute shall thereby be rendered invalid. The financial statement provided hereunder to the governing body awarding the contract must be specific enough in detail so that said governing body can make a proper determination of the bidder's capability for completing the project if awarded. m m ni CONTRACTOR,. Veyn e, legalstrillis and addrex� ) B,C, MECHANICAL, INC. 882 Anderson Road Niles, M. 149.120 OWNER. (Name, .legal slaws and irrlh'vmv) -,A1 A* Document A31OTM - 2010 Bid bond No, GR11915 SURETY: (Alante, legal.slatirs and principal This document has important legal irlaco vj'busine,s.v) consequences. Consultation with an attorney is encouraged with Granite Re, Ind. respect to 10 completion or 14001.Qualibrook Dr modification. Oklahoma City, OK 73134 Studebaker National Museum/City of South Bond Board of Public Works 201 South Cha in street South Bend, V46628 BOND AMOUNT; Five Percent of the Bid Amount (5,00% of Bid Amount) PROJECT, (more, location or address, raid :Project number, if any) Studebaker Museum.RTl1 Replacement: Project; . Project No, 117.081 Any singular reference to Contractor, Surety, Owner or other party shall he considered plural where applicable. The Contractor and Surety ore boundl.to the Owner in the amount set forth above, for file payment of which the Contractor and Surety bind tbemselves, their heirs, executors, administrators, successors and assigns, jointly and severally, m provided herein. The conditions of this Bond are such that iftho.Owneraccepts the (lid of the Contractor within the tinge specified in the bid. documents, or within such time period as may be agreed. to —by the Owner and Contractor, and the Contractor either (1) ethers into a contract with the Owner in accordance with the ternis of such bid, and jives such bond or bonds.ris may be specified in the bidding or. Contract Documents, with a surety admitted in the.jurisdiction of the Project and otherwise acceptable to the U.wncr, for the faithful performance of such .Contract arid for tile prompt payment of labor and material filmished it) the prosecution thereof, or (2) pays to the Owner the difference, not to exceed the amount of this Bond, between the atuount specifier: its said. bid and such largeramount for which the Owner may in good: faith contract with anolher parly.to perform the work covered{ by said.bid, then this obligation shall be null and void, otherwise to remain in full force and effect. ilic Surety 1sGreliy waives any no tice oftin agreement between die -Owner and C'.ontractor to extend the time in which die Owner nutty accept the bid, Waiver of police by: the Surety shall not apply to any. extension execeding sixty (60):lays in the figgyragate, beyond the time for iiccoptanco of bids.specified in tho bid documents, and the Owner and Contractor shrill obtain the Surety's consent for ail extension beyond sixty (6.0) days. Ifthis Bond Is issued ill connection With.a subcontractor's bid to a Contractor, the terin Contractor in this Bond shall be deemed to be Subcontractorand the term Owner shall be decine;d to he Contractor. Whell this Bond huts been ftir€ushed .to comply with.a stattnory or duller legal requiconient ill the:.Itication of the Project, any provision ill this Bond conflicting.with said statutory or legal requirement shrill be deemed deleted.herefrom and provisions. conformingto such statutory orother legal requirement shrill be deemed Incorporated herein, When so furnished, the intent is that this Bond shall be construed as a statutory bond: arid not as a common law bond. SigmW and senWd this Li day of Ngvember, 2017 f (seat) f rctw , (,$eat} (7RINConnie Smith, A rrfaHn-Fact MA i7ACejh' ant A310'"— 2010. Copyright01963, 1920 and 2010 by Tile American dnstltote of Architects. All rights reserved. WARNING: .INs MAR Laturrient is proteded by U,s. copyreobt tow and lnternatlonal Treaties, Onauthorlteri re()roceuction or Alstrlbttt€on of tilts AtAO Document, or any portion of it, may Fe" It io sweep Civll 11rd,0411€€101_ penalties, and will 6e prosecuttrl to The rnivirrivni extMt po,s9lble under the late, yr . ,19M art penal tc is repro, Re en Ctlj7 @ ft oft° cume`rlt'Witen comp 2 e , rl —rvp6jt co€7yno 9 Yt 8 n 0 n C O[UfEten , 2•ETt@ii The Anter€can test€tute or Architect9' legal counsel, cottyriclhtoala.o. ta.l,u