Loading...
HomeMy WebLinkAbout09/27/1954 Board of Public Works Minutes236 September 27, 1954 A regular meeting of the Board of Public Works was held Monday, September 27, 1954, at 10:00 A. MI. All members were present. Minutes of the previous meeting were read and approved. Claims of the following suppliers, in the total amount of $6391.29, were approved and ordered paid: Artcraf t Printers S. W. Gerber Upholstering Co. J. M. Hall, M.D. Indiana & Michigan Electric Co. Office Engineers, Inc. Office Engineers, Inc. South Bend Tribune Tri-County News J. W. Werntz & Son Whitets Radiator Body Shop PARKING METER FUND: Indiana Bell Telephone Co. STREET & TRAFFIC: Aluminum Company of American I? Bearings Service Co. Bearings Service Co. Belleville Lbr. & Supply Co. Walter J. Braunsdorf & Son Chicago Auto Radiator Co. Edwards Iron Works, Inc. Edwards Iron Works, Inc. 3 Elgin Sweeper Co. 1 Elgin Sweeper Co. Drs. Ericksen & Olson The Gibson Co. it Hoffman Bros. Auto Electric Co. Hurwich Iron Co. Indiana Equipment Co. Indiana. Lumber & Mfg. Co. J. C. Lauber Co. McCombIs Service Co. Michia.na Products Corporation HAchigan Calvert Ilardyvare Miller ts Paint Service 1-otor Service �e Parts, Inc. Municipal Supply Co. Off ice -Engineers, Inc. Phillips Petroleum Co. Romy-Hammes Corporation Schuyler Rose, Inc. Schuyler Rose, Inc. Schuyler Rose, Inc. St. Josephts Hospital Scherman-Schaus-Freeman Co. C. A. Schrader Co. Singer General Tire Singer General Tire The Studebaker Corporation � Equipment W. A. R. E u m nt Co. q p Wire & Disc Wheel Sales $163.75 Gafill Oil Co. $10.25 110.00 John W. Gorney 5.00 9.00 Indiana Bell Telephone Co. 62.32 .60 Koontz -Wagner Electric Co. 5.40 38.82 Office Engineers, Inc. 12.14 1.64 Office Supply &. Equipment Co. 111.25 12.60 South Bend Window Cleaning Co. 53.50 12.10 Vaughants Seed Co. 181.94. 3.20 Westron_Corpora.tion 47.39 4.00 Geo. `Nyman & Co. 293.90 SEWAGE WORKS CONSTRUCTION: 9.19 Ed. C. Hans,d/b/a Paid -City Parking Co. 430.00 Indiana Bell Telephone Co. 10.88 109.00 American Steel Dredge Co. 95.84 4.59 Bearings Service Co. .86 13.23 Belleville Lbr. & Supply Co. 10.69 2.90 Belleville Lbr. & Supply Co. 9.50 35.75 J. Burke & Co. 4.50. 5.00 Consolidated Steel & Supply Co. 82.63 76.79 Edwards Iron Works, Inc. 3.81 1.99 Elgin Sweeper Co. 105.71 15.41 Elgin Sweeper Co. 21.51 58.12 Elgin Sweeper Co. 138.28 8.00 Walter Farmer 7.00 9.74 John Haberle 19.80 9.71 Hibberd Printing Co. 32.66 2.12 Indiana Auto Truck Rental 290.28 207.11 Indiana Equipment Co. 10.62 86.52 Koontz-?LTagner Electric Co. 9.32 36.50 C. E. Lee Co. 4.80 18.�3 Memorial Hospital 18.00 21.�., 1 ;_ Michigan Calvert Hardware 3.37 6.25 G. E. `_ever & Son 50.01 .70 1:illerts Paint Service 6.60 119.82 '. oulder ?rotor Co. 17.70 469.55 -National Brake Service 4.31 8.00 Office Engineers, Inc. 2.84 102.06 The Premier Autoware Co. 128.03 129.16 Schuyler Rose, Inc. 4.26 79.00 Schuyler Rose, Inc. 79.00 79.00 Schuyler Rose, Inc. 79.00 153.00 Schuyler Rose, Inc. 79.00 5.00 The S. S. Saunders Co. 283.86 19.05 Scherman-Schaus-Freeman Co. 10.48 15.82 Sinclair Refining Co. 15.60 257.19 Singer General Tire 339.40 58.10 Standard Oil Co. 493.00 8.91 Harry Tomlinson(petty cash) 20.34 135.00 J. W. Werntz & Son 10.09 2.34 First appeared before the Board, Pair. Rawson H. Miurdock, representing rlossberg & Co. ,Inc., and presented to the Board, a petition for the vacating of alley running east and j west between Sample Street and Tutt Street, starting at Carroll Street and ending at ',Tutt Street, the area being that extending 136 feet east from Carroll Street to 14 feet west of Lot 7; all in Anderson Subdivision. Petition was referred to the City Plan aCoinmission for their recommendation. The Board next examined revised drawings of the Re -Plat of Part of Lincoln Plaza, Second Addition, covering sewer construction plans for Ryer Street, Iowa Street, and ,Elwood Avenue. The Board approved the revision indicated. A remonstrance placed with the Board, over the signature of August H. Engstrom and six other owners of real estate abutting and adjoining the 900 block ?"Jest Donald Street, against the paving of this block, was examined by the Board and ordered placed on file. A letter from the contracting firm of Sollitt Construction Company, under date of j :September 21, 1954s pertaining to roof slabs, was referred to the consulting engineers, 1 Consoer, Townsend & Associates, for their advice and recommendation. Then appeared before the Board, V'T'rs. John W. VTcCauslin, requesting permission for ' lithe Daughters of Isabella organization to use a booth in front of the Robertston Department Store in their solicitation of funds on behalf of the Northern Indiana Childrer�Is HHospital. In view of the precedent this would establish, it was deemed inadvisable to i =1 • • • • '-qq 2 • • grant this request, and it was suggested that the organization obtain space for its ibooths in suitable locations on private property. p Next appeared two gentlemen, representing the Ambassador Club of Bethel College, requesting permission to conduct religious services Friday evenings on the sidewalk of Chapin Street at a point of their choosing, at or south of the intersection of Chapin and Monroe Streets. The Board granted the request with the stipulation that "a fairly good lane be maintained for pedestrian traffic", and that no tracts or pamphlets be distributed in violation of the City .ordinance. Next appeared Wm. S. Nickell of Michigan City, Indiana, with a view to installing benches at bus stops in certain locations. Inasmuch as this type of advertising was recently given thorough investigation and condemned by the Board, Mr. Nickell was so advised and dismissed. A petition, dated September 21, 1954, for the vacation of alley between West Donald Street and West Ewing Avenue in Swygart+s 5th Addition, was examined and referred. to the City Plan Commission for investigation and report. Cab -owner Ernest Zick then appeared before the Board, in protest to the Boardts failure to provide him a cabstand and outlined to the Board his safety record and experience over a period of years as a taxicab driver in South Bend. The Board set the next regular meeting at 10:00 A. MI. CST, as a date for a hearing in the matter, and the Clerk was directed to notify the cab owners and operators, together with Otto More- house, president of the Cab Driversi Union, accordingly. :?STREET DEPARMi NT: H. M. Tomlinson, Street Commissioner, being present, brought to the attention of Lithe Board, dust complaints and reports of damage to oiled streets, caused by excessive Muse by the activities of contractors in connection with work involved with the Cityts ;;interceptor sewer system. The Board authorized Commissioner Tomlinson to proceed with certain grading and cleaning work on public property on Bartlett Street, Riverside Drive,;'! jand Gertrude Street. The Board directed that upon completion of this cleaning and ,;grading, the contracting firm of Niles Excavating Company is to be billed in the amount !of $20.00 as their fair share of the cost. VACATION RESOLUTION NO. 2800 - 1954 This being the date set, hearing was had on the resolution heretofore adopted by the Board of Public Works for the vacation of the TEN FOOT PUBLIC WALKWAY between ;'Lots 314 and 315 in EDISON PARK ADDITION and TEN FOOT PUBLIC WALKWAY between lots 333 and;; {334 in EDISON PARK ADDITION and FOURTEEN FOOT PUBLIC ALLEY between Lots 328,329, 330 and 331 in EDISON PARK ADDITION, under Vacation Resolution No. 2800. Attorney Warren Diehl and Leo Witucki, Division Supervisor of the Indiana & Mlichigar .,Electric Company appeared before the Board, representing the Indiana & Michigan Electric (Company regarding existing easements and rights of the Indiana & Michigan Electric Company. The Clerk of the Board having shown, sufficient proofs of publication and no remon- strators having appeared and no written remonstrances having been filed with the Clerk, ,:it was moved, seconded and unanimously carried that the said resolution be finally 'adopted and said walkways and alley be vacated, contingent upon public utility easements and rights being preserved to the -satisfaction of the Indiana & Michigan Electric Company.' The Engineering Department is directed to prepare an assessment roll covering the 11 • assessment of benefits and the award of damages to the surrounding properties. j The time now being eleven otclock, it was so announced, and the Board proceeded with the opening of bids, as follows: • SE�,,rI;R CLEANING EQUIPTLEgINT CITY SALES COMPANY 5909 KENT-JOKE AVENUE CHICAGO, ILLINOIS A non -collusion affidavit and certified check in the amount of '�264.48 accompanied the bid. 1 - OK Champion Power Sewer Cleaning Machine (Truck No. 1 of a set of two machines) Model No- 3W-TF-T equipped as per speci- fications in proposal...... .............. $1243.40 1 - OK Champion Power Sewer Cleaning Machines (Truck No. 2 of a set of two machines) Model 3W-TF-T, equipped as for Truck No.1 except for auxiliary cable drum.......... ��-1181.40 Freight from Factory to South Bend....... 20.00 Total Bid, f.o.b. South Bend, Indiana....;2444.80 ALTERNATE NO. 1: To include both Truck #1 and #2.......... $2644.80 238 The above bid was taken under advisement. i TRUCK BIDS 1 SCHERMLIN-SCHAUS-FREEMAN.CO. A non -collusion affidavit SOUTH AND LAFAYETTE STS . and certified check in the j! SOUTH BEND, INDIANA. amount of '28?{.00 accompanied c the bid. 1 - 1955 Studebaker E5 1/2 Ton Pickup equipped as per proposal... 1 - 1955 Studebaker E10 3/4 Ton Pickup equipped as per proposal ......................... .. Allowance for two 1946 Studebaker Trucks... Total for two units, less allowance........ L. 0. GATES CHEVROLET CORPORATION 333 WESTERN AVENUE SOUTH BEND, INDIANA. 1 - 1954 Chevrolet 1/2 Ton Pickup Model 3104 Standard equipped ......................... $1290.00 $1427.20 200.00 $2517.20 A non -collusion affidavit and certified check in the amount of '.,?240.00 accompa.ni the bid, 0%1560.52 Less trade-in and discount ................. 430.52 3 0 -= 1 - 1954 Chevrolet r,Todel 3604, 3/4 Ton Pickup Standard equipped =n)1723.35 Less trade-in and discount ................. )53.35 Total for two units, less allowance........ The above bids were taken under advisement. GEO. 17. FIFE & SON STREET SYEEPER BID 4500 1:11ARCY LANCE INDIANAPOLIS 51 INDIA NA $2400.00 A non -collusion a.ffidavi and bid bond accompanied the bid. 1 - Elgin 81-D Street Sweeper as per proposal ....$11,118.75 The above bid was taken under advisement. A proposal submitted by Taylor Construction Company for the construction of fifty concrete posts on Lincoln Way East, the repair of twenty -fide additional posts, and welding, cupping, and installation of the required 21" steel pipe for the restoration of the river bank protective fence, as per legal adv&rtisement, was examined and taken under advisement. IMPROVEMENT RESOLUTION NO. 2779 Certificate of Completion was furnished by Wilbur H. Gartner & Associates accom- panied by Contractorls Completion Affidavit of the contract oetween the City of South Bend, Indiana, Owner, and the Niles Escavating Company, Contractor, for the construction of the local sewer improvement on GERTRLTDE STREET from 233 feet south of Prairie Avenue to the center line of lot 31 in Sumption Prairie Addition unae_ Improvement Resolution No. 2779, 1951� has been completed in accordance with plans and specifications for this project. RESOLUTION ACCEPTING FINAL ESTIMATE RESOLUTION NO. 2779 - 1954 BE IT RESOLVED by the Board of Public Works and Safety of the City of South Bend, Indiana., that the Final Estimate and Primary Assessment Roll submitted to the Board by the City Civil Engineer or his duly authorized representative on this 27th day of September, 1951T on the ir-rtprovement known as the GE RTRUDE STREET LOCAL SE1VER, as describe< in Improvement Resolution No. 2?79, 1954, passed by the Board of Public Works and Safety on June 14, 1954, and confirmed by said Board on July 12, 1954, be and the same is here- by adopted, and the Clerk of this Board is hereby _requested to give notice of the hear- ing of Special Benefits on said Improvement, as required by Section N.111 or 120 of an Act entitled, "An Act Concerning M��unicipal Corporations" approved TV -arch 6, 1905. R. S. Andrysiak J. A. Bickel Board of Pu is Wor s & Safety Ward H. Croth6rs er o e Board • 0 40 239 • RESOLUTION NO. 2793 - HAWTHORNS DRIVE LOCAL SEWER NILES EXCAVATING CO. A non -collusion affidavit NILES, MICHIGAN and a certified check in the amountof $100.00.-, ac c om- TOTAL EXTENSION OF ITEMS ..... $2142.50 panied the bid. Completion date on or before December 15, 1954. The above bid was referred to the engineer for tabulation and report. The Board next considered and approved agreement for engineering services to be entered into between the City of South.Bend and Wilbur H. Gartner & Associates in connection with the General Street Improvement Program, which hereby becomes a part of these minutes: THIS AGREEMENT made and entered into this 27th day of September, 1954, by and between the CITY OF SOUTH BEND, INDIANA, a municipal corporation, acting by and through its Board of Public Works and Safety (hereinafter for convenience referred to as "City") and WIILBUR H. GARTNER & ASSOCIATES, Civil Engineers of South Bend, Indiana, (hereinafter for convenience referred to as "Engineers"). WHEREAS, the City is contemplating a General Street Improvement Program, which includes the re -surfacing or replacing of the paved roadway on various arterial streets in the City, and WHEREAS, the Engineers are qualified and experienced in the design and constructs of pavements and the necessary appurtenances therewith and are capable of serving the City in such matters. j NOW, THEREFORE, in consideration of certain amounts hereinafter specified to be • paid to the Engineers by the City, the Engineers agree to do, at their own cost and expense, all of the engineering work hereinafter specified, to the full satisfaction of the Mayor of the City, its Board of Public Works and Safety and in complete fulfill- ment of the legal requirements of the Ordinances and Regulations of the City and . the Statutes of the State of Indiana applicable to the foregoing described work. DIVISION A - Designs, Detailed Plans, Construction Drawings, Estimates of Cost, Specifications and Contract Documents For the preparation of complete designs, plans construction drawings, speci- • • 0 " fications, estimates of cost and contract documents for all work to be done under the General Street Improvement Program, as prepared under Division A, the fee will i sum equal to three per cent(3%) of the estimated construction cost of the work. Services to be rendered under Division A are as follows: (1) The Engineers shall make all necessary field surveys, and prepare complete designs, plans, profiles and specifications for all improvements to be constructed under this program. The streets to be so improved are to be designated and authorized by the City. (2) The Engineers shall prepare detailed estimates, showing the estimated quantities and estimated construction costs of the various pavements to be constructed, including other necessary work and appurtenances essential to same. (3) The Engineers shall prepare complete specifications for the various phases of the work, including proposal forms, contract forms, bond forms, and all other features essential to complete contract documents. (4) The Engineers shall supply a reasonable number of copies of the plans and specifications to the City. be a (5) The Engineers shall supervise the making of any test borings or test pits if needed for the purpose of determining sub -grade conditions on the various streets to be improved. All costs in the making of such test borings or test pits are to be borne directly by the City, and are not included in the Engineerst fees as herein set forth. (6) The Engineers shall assist the City in interesting experienced and qualified contractors in bidding on the work, and assist the City in receiving con- struction bids and in the awarding of construction contracts. 240 (7) The three per cent (3%) fee detignated for work under Division A will be due and payable upon completion and delivery of detailed plans, estimates of cost and specifications, to the City. The amount of the fee so paid at that time shall be based upon the Engineert' estimated construction cost of the Work, and shall be subject to the approval of the Board of Public Works & Safety. DIVISION B - CONSULTING SERVICES AND GENERAL SUPERVISION.DURING CONSTRUCTION The Engineers will furnish all necessary field engineering to lay out, supervise, and inspect the work and also will furnish consulting services during construction. The fee for this service is to be an additional two per cent(2%) of the construction cost of the work; provided, however, that as hereinafter agreed, the total fee shall not in any event emceed five per cent (5%) of the actual construction cost of the overall project. Engineering services to be rendered under Division B shall include: (1) To furnish the constructing contractor the necessary bench marks, lines and grades required for constructing the improvement. (2) To furnish the necessary inspection to insure the installation of the complete work in accordance with the plans, specifications and contract documents. (3) To prepare partial and final esti:,-nates of cost for approval by the Board of Public Works and Safety. (4) To furnish such consulting services as may be required during the period of construction. (5) To furnish the City with final construction "as built" drawings of each project. The two per cent (2c%) fee for services rendered under Division B will be due and payable in monthly increments based upon monthly estimates of construc- tion work performed. The total amount of the fees for which provision is made in this contract shall be computed on the basis of total actual con- struction cost of each contract and the Engineers, shall not be entitled to receive as full payment from the City more than a total of five per cent (5%) of such total actual construction cost. IN WITNESS 117HEREOF, the City of South Bend, Indiana, acting by and through its Board of Public Works and Safety, and Wilbur H. Gartner & Associates, by Wilbur H. Gartner, Owner, have signed this agreement this 27th day of September 1954 - CITY OF SOUTH BEND, INDIANA BY: R. S. Andrysiak J. A. Bickel I. A. Hurwich Board of Public Works 8-. Safety WILBUR H. GARTNER & ASSOCIATES BY; Wilbur H. Gartner Owner A letter from the attorneys for the Chicago, South Shore, and South Bend Railroad addressed to the City Attorney, under date of September 22, 1954, was ordered filed. There being no further business to come before the Board, the meeting was adjourne at 12:50 P.M. Attest: ��L�. Clerk U • • .0 0 • •