Loading...
HomeMy WebLinkAbout6.C1 Contract with Schindler Elevator ~ ~ SOUTy 6 ~~ ~ 1, I ~ x'60 \\~ d t .5 \'e „e% Community & Economic Development ~~-°--„~_~,-,~ 1200 County-City Building, 227 West Jefferson, South Bend, Indiana 46601-1830 Phone 574/235-9371 Fax 574/235-9021 To: Redevelopment Commission From: David Relos, Economic Development Planner ~~ Subject: Hotel La Salle Clean Out & Elevator Safety Inspection Date: January 15, 2010 CLEAN OUT The Hotel La Salle is currently being marketed to potential developers. In an effort to have it show better, and for sanitary reasons, Staff feels it would be helpful if the Hotel were cleared of all debris and furniture that have cluttered it for years. Staff has walked the Hotel with three vendors, who in turn submitted proposals for the Hotel's clean out. Staff requests approval for the low bidder, CBRE, whose proposal came in at $36,975 (see attached) for a not to exceed amount of $40,000, in case additional work is uncovered during the clean out. ELEVATOR SAFETY INSPECTION To help facilitate the Hotel's clean out, but primarily for safety reasons, Staff has solicited a proposal from Schindler Elevator to inspect and repair the freight elevator. The freight elevator is one of three elevators in the building, and the only one that is operational (I use that term loosely). Schindler was chosen because they have worked on the Hotel's elevators in the past. It was noted at a site visit with Schindler that many of the elevator doors on each floor are in poor condition, and that on certain floors the door arm locks could stick, causing the door to be left open yet the elevator operational -meaning the door could be left open to an empty elevator shaft. In addition to doing each floor's elevator door maintenance, the attached proposal includes the required 5 year Traction Safety Test, which among other things, tests the elevator's load and braking capacity. The proposal is in the amount of $8,330 (see attached). Staff requests approval for a not to exceed amount of $10,000, to allow for additional work that may be uncovered during inspection and testing. Thank you for your consideration. What We Do Today Makes A Difference! SCHINDLER ELEVATOR CORPORATION 3725 West Cleveland Road Suite 300 South Bend, IN 46628-9779 Phone: 574-243-0022 Fax: 574-243-0077 UPGRADE ORDER AGREEMENT Date: 12/28/2009 To: City of South Bend Economic Development Planner 227 W. Jefferson/Ste 1200 S South Bend, IN 46601 Estimate Number: BMIE-7Z6KCV (2009.4) Customer: Lasalle Building 237 N Michigan St South Bend, IN 46601-1202 Attn: Dave Relos Schindler hereby proposes to furnish and install the following with respect to the equipment located at the above building: Freight Elevator Go over operation of each landing door to insure integrity of car operation. Go over every landing door to insure door lock arms are not sticking. (this could allow the elevator to operate without the doors being closed. Go over every landing door and replace door relating gears which are damaged. (these will have to be custom machined as spare parts are no longer available. Add motor bearing oil. We noticed smoke coming out of hoist motor during our inspection. We can not determine if the motor is failing or if the motor bearings are dry. (owner needs to have electric heater directed on hoist machine) Traction safety test, 5-year / Category Five The ASME A17.1 elevator safety code requires a comprehensive elevator safety test, usually on afive-year basis. These tests are conducted to help insure safe and proper operation of the elevator. Schindler proposes to provide all labor, material and supervision required to perform the following scope of work during regular working hours of the elevator trade: - Inspect the governor trip speed and pull-through calibration. - Load the elevator with weights equal to its rated capacity, and test the safety at rated load and rated speed. - Test the buffer at rated load and rated speed. - Test the brake at 125% of rated load. -Inspect and test normal and final stopping devices Page 1 of 4 BMIE-7Z6KCV 2009.4 C ~- ~z> Test leveling zone and leveling speed. - Test inner landing zone for static control elevators. - Inspect operation of fire emergency service, emergency power system, and power door system as applicable. -Test emergency stopping distance. - Submit the results of the test to required authorities. Note that the testing of elevator safety devices creates the possibility of damage to the elevator equipment. We will take reasonable precautions prior to the test to minimize this possibility, and if defects are found before the test, our technician will stop work and you will be notified of any extra cost involved to make the necessary corrections. Any damages resulting from the test, or defects noted during the test, will need correction before a satisfactory report can be submitted to the governing authority, and if necessary we will provide you with an estimate for any associated costs. Repair to Doors Price: $8,330.00, plus applicable taxes. (Quotations valid for 60 days; price based upon work during regular working hours of regular working days.) Payment: Work will be invoiced as repairs and inspections are completed. Balance due upon completion, within 30 days of invoice. Schindler retains title to any equipment furnished hereunder until final payment is made. Page 2 of 4 BMIE-7Z6KCV 2009.4 The attached terms and conditions are incorporated herein by reference. Acceptance by you as owner's agent or authorized representative and subsequent approval by our authorized representative will be required to validate this agreement. Proposed: By: Bill Mielke For: Schindler Elevator Corporation Title: Sales Representative Date: 12/28/2009 Approved: By: Todd Julian Title: Branch Manager Date: Accepted: By: For: S. B. Redevelopment Commission Title: Date: Page 3 of 4 BMIE-7Z6KCV 2009.4 TERMS AND CONDITIONS 1. Any changes to the building to meet local or state codes are to be made by Purchaser. Any changes in the Work required due to building conditions discovered in the performance of the Work will be paid by Purchaser. 2. No work, service materials or equipment other than as specified hereunder is included or intended. 3. Purchaser retains its normal responsibilities as Owner of the equipment which is subject of this Agreement. 4. Schindler will not be liable for damages of any kind, in excess of the Price of this Agreement, nor in any event for special, indirect, consequential or liquidated damages. 5. Any cutting and patching is by others and not included in this work. 6. Neither party shall be responsible for any loss, damage, detention or delay caused by labor trouble or disputes, strikes, lockouts, fire, explosion, theft, lightning, wind storm, earthquake, floods, storms, riot, civil commotion, malicious mischief, embargoes, shortages of materials or workmen, unavailability of material from usual sources, government priorities or requests or demands of the National Defense Program, civil or military authority, war, insurrection, failure to act on the part of either party's suppliers or Subcontractors, orders or instructions of any federal, state, or municipal government or any department or agency thereof, acts of God, or by any other cause beyond the reasonable control of either party. Dates for the performance or completion of the work shall be extended by such delay of the time as may be reasonably necessary to compensate for the delay. 7. Schindler guarantees that the equipment will comply with the foregoing specifications and if promptly notified in writing will, at Schindler's expense, correct any defects in such equipment occurring within one year from the date of final acceptance, which are not due to ordinary wear and tear or to improper use, care and maintenance. The correction of such defects constitutes the limit of the responsibility. THERE ARE NO OTHER WARRANTIES OR GUARANTEES, EXPRESSED OR IMPLIED, OTHER THAN OF TITLE. The equipment installed under this agreement requires maintenance service, such as periodic examinations, lubrication and adjustment made by competent elevator mechanics. This guarantee is not intended to supplant this normal servicing of the equipment and it is not to be construed that Schindler will provide free maintenance service of this type, except as may be provided under other provisions of the contract, or that Schindler will correct, without charge, breakage, maladjustment or other troubles occurring as a result of improper or inadequate maintenance. 8. Purchaser agrees to defend, indemnify and hold Schindler harmless from and against any claims, lawsuits, demands, judgments, damages, costs and expenses arising out of this Agreement except to the extent caused by or resulting from the sole and direct fault of Schindler. 9. Any proprietary material, information, data or devices contained in the equipment or work provided hereunder, or any component or feature thereof, remains our property. This includes, but is not limited to, any tools, devices, manuals, software (which is subject to a limited license for use in this building/premises/ equipment only), modems, source/ access/ object codes, passwords and the Schindler Remote Monitoring feature ("SRM") (if applicable) which we will deactivate and remove if the Agreement is terminated. Page 4 of 4 BM I E-7Z6KCV 2009.4