Loading...
HomeMy WebLinkAboutResolution No 50-2017 - Pilot Program for Pavement Temperature Monitoring��Y�]�i�Y [���laC�3��► ��fil RESOLUTION OF THE CITY OF SOUTH BEND BOARD OF PUBLIC WORKS FOR A PILOT PROGRAM FOR PAVEMENT TEMPERATURE MONITORING WHEREAS, the City of South Bend Board of Public Works ("Board") is the contracting body for the City of South Bend, Indiana ("City"); and WHEREAS, enFocus will assist the City's Division of Traffic and Lighting to mount infrared temperature sensors ("sensors") for pavement temperature measurement on six (6) traffic light poles in various locations throughout the City (see Exhibit B attached hereto for tentative, planned locations); and WHEREAS, to power and send the data collected, enFocus will need connections for power and Ethernet installed to the sensor; and WHEREAS, the sensors will be mounted temporarily for the 2017-2018 Winter and Spring seasons; and WHEREAS, all installations and removals of sensors are to be paid for by the City; and WHEREAS, the sensors readings will be compared to manual temperature readings taken daily to validate the accuracy and reliability of the sensors; and NOW THEREFORE, BE IT RESOLVED that temporary sensors shall be supplied by enFocus and installed on traffic poles in various locations consistent with Exhibit B by Street Department, Traffic or their agents and such installations as directed by City Engineering. At conclusion of the test period within 90 days the equipment will be returned to enFocus. There is no compensation by the City to enFocus or enFocus to the City for this pilot program. ADOPTED at a meeting of the Board of Public Works of the City of South Bend, Indiana held on November 14, 2017 at 1308 County -City Building, 227 West Jefferson Boulevard, South Bend, Indiana 46601. BOARD OF PUBLIC WORKS Gary A. Gilot, President Elizabeth A. Maradik, Member James Mueller, Member TEST: 5 !! JJ __ inda M. Martin, Clerk Potential Benefits: Temperature Measurement System of Sensors for Smart Road Anti -icing and Deicing Objective To increase the efficiency of winter road management by providing more accurate road temperature measurements. Premise Anti -icing (proactive snow and ice control before the storm through brine application for "bottom -up" melting) and Deicing (snow and ice control using reactive brine and prewetted road salt application for "top -down" melting) regiments rely primarily on road temperature measurements as the guiding principle on how much salt and brine needs to be placed. This is because the effectiveness of these ice melting agents can vary as much as 10X from a drop in temperature of 10°. The current system in place is only accurate to a degree or two. As such, current deicing regiments put the safety of residents first and overuse deicing material. We can preserve safety, protect the environment, and save money with smarter real- time sensing using an internet of things solution. Potential Benefits Reduced Salt and Brine Usage • Direct Cost Savings a A 10% reduction would conservatively save $60,000 a year in material costs. o Estimated reduction in material usage of 10-40%. Reduced Vehicle Maintenance and Use o Deicers are highly corrosive and area significant contributor towards the cost of vehicle maintenance o Effective anti -icing regiments vastly increase the effectiveness of plowing efforts during the storm. Reduced Damage to Roads o Plows damage the roads and are one of the primary reasons roads need to be repaved. a Improved Anti -icing regiments decrease the need for plowing. Safe • Improved accuracy o Fewer trouble spots that cause accidents. o Note too little is ineffective and too much brine can actually make the pavement more slick than if we did nothing —accuracy is critical for safety • "Hot Spot" Monitoring o Direct temperature measurements of known hot spots to ensure accurate deicing. • High priority locations such as hospitals, schools, and Downtown have their own sensor. Environmental Impact • Reduced Chloride Loading (Calcium Chloride Deicer) o Less corrosive waterways. • Reduced BOD Loading(Anti-ices with beet sugar added to drive lower melting point temperature) o Improved oxygen levels in the surrounded aquatic ecosystems. CONFIDENTIALITY NOTICE: This document and its contents are confidential. If you have received this document in error, please destroy immediately. ?XHIBIT $ 3NSOR LOCATIONS BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM Date Name October 26, 2017 Kara M. Boyles Department Division/Bureau Engineering DPW BPW Date 11/14/17 Phone Extension 5933 "Agreement IJ Contract U Proposal H Addendum ❑ Professional Services ® Resolution ❑ Bid Opening ❑ Bid Award ❑ Req. to Advertise ❑ Title Sheet ❑ Quote Opening ❑ Quote Award ❑ Change Order No. ❑ CIO & PCA No. ❑ PCA ❑ Ease/Encroach. ❑ Traffic Control: n Other: Company or Vendor Name New Vendor MBE/WBE Contractor MBE/WBE Contractor Requested Project Name Project Number enFocus. ❑ Yes ® No ❑ If Yes, Approved by Purchasing ❑ MBE ❑ WBE ❑ No ❑ Yes Name of Company _Sensors for PavementTemperature Monitoring 117-112 Funding Source NIA Account No. NIA Amount NIA Terms of Contract Completion date of November 30th, 2017. Purpose/Description Access to six (6) traffic light poles in various locations to mount Previous Amount $ Current Percent of Change: % New Amount $ Total Percent of Change: % Dispersal After Approval Copy Original ❑ ❑ ❑ ❑ ❑ ❑