Tree Removal
4
LSum
24
Trees, Canopy
4
Ea.
7,5Z, M
3
25
Tree Grates and R-Frame
4
Ea.
l ,150" 00
.� Coo, 00
26
Ornamental Light Poles
4
Ea.
,co
2Z WLs,
27
Light Pole Foundation
4
Ea.
j�,c�Cy
yc,�N,. ces
28
Light Pole Conduit 1 Wiring
112
LF
3 J 00
29
Perennials
84
Each
J� G0
30
Mulch
5
CYS
1 / J�-1 ei0
j 7S;oc�
31
Topsoil
13
CYS
t) <oo
�, / 70 Ord
ALTERNATE #3 TOTAL ��� �� �f00
Alt. #3.- All Work in the West Planting Bed Zone
32
Brick Paver Removal
39
SYS
//6-
33
Concrete Sidewalk, 4"
5
SYS
,ev
34
Top Soil, 12" Depth
12
CYS
90"oz,
66, eo
35
Mulch
4
CYS
J / 5-, Ot)
. c"(*a
36
Perennials
88
Ea.
3.7. oc
ALTERNATE #4 TOTAL
Alt #4 -.All Work in the Parking Landscape Zone
37
Mulch
12
CYS
38
Trees
4
Ea.
r Cr,�o
Ot�Ca•l
39
Shrubs
18
Ea.
00
40
Perennials
62
Ea.
3 ), po
w
41
Liriope 1 Bulbs
642
Ea.
/ ,5 ;00
L & 30, e30
ALTERNATE #5 TOTAL r7� y(�•[sc7
Other
42
Alt. #5 - Monument Lighting
3
Ea.
;ZIv75-;0
43
Alt. #6 - Monument Signage
1
LSum
j r"iw,CO
%-00
44
Alt. #7 - Decorative Benches
2
Ea.�
45
Alt. #8 - New Plaza Planters
3
Ea.
y?�
ALTERNATES TOTAL o4 �� 7)J � G0
#-#8
Version 10/17/2016 Contractor's Bid for Public Works - 9
1 '6
Ai
1
5.
V.
James A. Mueller, Member Attest: Linda M. Martin, Clerk
PART II
(For projects of $100,000 or more - IC 36-1-12-4)
These statements to be submitted under oath by each bidder with and as part of his bid.
Attach additional pages for each section as needed.
SECTION 1 EXPERIENCE QUESTIONNAIRE
1. Attach information regarding projects your organization has completed for the period of one
(1) year prior to the date of the current bid.
2. Attach a listing of public works projects currently in process of construction by your
organization.
3. Attach information regarding any failure to complete any work awarded to you and the
location thereof.
4. Attach references from private firms for which you have performed work.
SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE
1. Attach an explanation of your plan or layout for performing proposed work. (Examples could
include a narrative of when you could begin work, complete the project, number of workers,
etc. and any other information which you believe would enable the City of South Bend to
consider your bid.)
2. Attach a listing of the names and addresses of all subcontractors (i.e. persons or firms
outside your own firm who have performed part of the work) that you have used on public
works projects during the past five (5) years along with a brief description of the work done
by each subcontractor.
3. If you intend to sublet any portion of the work, attach the name and address of each
subcontractor, equipment to be used by the subcontractor, and whether you will require a
bond. However, if you are unable to currently provide a listing, please understand a listing
must be provided prior to contract approval. Until the completion of the proposed project,
you are under a continuing obligation to immediately notify the City of South Bend in the
event that you subsequently determine that you will use a subcontractor on the proposed
project.
4. Attach a listing of equipment you have available to use for the proposed project.
5. Have you entered into contracts or received offers for all materials which substantiate the
prices used in preparing your proposal? If not, attach an explanation for the rationale used
which would corroborate the prices listed. .
SECTION III CONTRACTOR'S FINANCIAL STATEMENT
Attachment of bidder's financial statement is mandatory. Any bid submitted without said
financial statement as required by statute shall thereby be rendered invalid. The financial
statement provided hereunder to the City of South Bend awarding the contract must be specific
enough in detail so that said City of South Bend can make a proper determination of the
Version 10/17/2016 Contractor's Bid for Public Works - 3
bidder's capability for completing the project if awarded.
Version 10/17/2016 Contractor's Bid for Public Works - 4
EO
Premium Concrete Services, Inc.
712 Richmond Street
Elkhart, IN 46516
(574) 264-0196
SECTION I EXPERIENCE QUESTIONAIRE
1) PUBLIC WORKS PROJECTS COMPLETED IN PAST YEAR:
CONTRACT
AMOUNT
CLASS OF
WORK
COMPLETION
DATE
NAME &ADDRESS OF
OWNER
$105,219
10-01-2017
CITY OF SOUTH BEND
$112,154
7-21-2017
CITY OF KENDALLVILLE
$ 56,150
8-03-2017
CITY OF ELKHART
2) PUBLIC WORKS PROJECTS IN PROCESS
CONTRACT
AMOUNT
CLASS OF
WORK
COMPLETION
DATE
NAME & ADDRESS OF
OWNER
$414,337
11/15/2017
INDOT R-37326
KENDALLVILLE
3) HAVE NEVER FAILED TO COMPLETE ANY WORK THAT WAS AWARDED TO US.
4) REFERENCES:
a. NISOURCE —MR. TONY LOPEZ —1039 PENNSYLVANIA AVE SOUTH BEND, IN 46601
b. LOZIER MANUFACTURING— MR. KEN MURR--402 N MAIN MIDDLEBURY, IN 46540
E01
Premium Concrete Services, Inc.
712 Richmond Street
Elkhart, IN 46516
(574) 264-0196
SECTION II PLAN AND EQUIPMENT QUESTIONAIRE
1) 100 Wayne Street Plaza & Streetscape - Schedule:
After given the notice to proceed Premium Concrete Services, Inc. will contact Indiana 811 to
locate all utility lines within construction limits. Sidewalk traffic maintenance will begin, including
use of barrels and signage supplied by Premium Concrete Services, INC. Layout and staking of site
will be next. Then the excavation and grading will begin in base bid area and any alternate areas
selected, removal will be by Acorn and/or Premium Concrete. After removal, waterproofing
membrane will be examined. Next will be paver base placement and compaction, with a crew
consisting of 3-5 workers. After excavation and grading phases are complete, concrete and paver
work will commence. Crews of 4-6 workers will install. Depending on alternates selected,
electrical contractor will complete his work at the appropriate time. Top Soil and plantings will be
placed as soon as concrete and pavers are complete. Project with be completed within 60 days.
2) a) TCS Inc. —1810 W. Pacific Ave. Knox, IN 46534 —Traffic Maintenance, Signs and
Thermoplastic Lines.
b) Acorn Landscaping — 3680 W Sample St South Bend, IN 46619 —Top Soil and Sodding.
c) Kachur Tree Service, LLC- 316 Fulkerson Rd Niles, MI 49210- Tree Removal.
d) Walsh & Kelly Inc. — 24358 IN-23 South Bend, IN 46614 —Asphalt Paving.
e) Ritschard Brothers, Inc. —1204 W. Sample St. South Bend, IN 46619 — Removals
Premium Concrete Services, Inc. Does not require bonding for its subcontractors
3) Will supply list of subcontractors soon after award of project.
4) Equipment use for project: Bobcat, Mini Excavator, Excavator, Compactor, Roller, Walk -behind
Saw, Cut-off Saw, Vibra Strike, Dump Truck. Current plan is to used owned equipment, however
depending on workload some rental equipment may be necessary.
5) Yes, Premium Concrete Services, Inc. has quotes for all materials in proposal.
4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any
employee or contract with a person that the Contractor subsequently learns is an unauthorized alien.
Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's
newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's
documentation of enrollment and participation in the E-Verify Program is included and attached as part of
this bid/quote; and
5. Contractor shall require his/her/its subcontractors performing work under this public contract to
certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain
any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien,
and that the subcontractor has enrolled in and is participating in the E-Verify Program. The Contractor
agrees to maintain this certification throughout the term of the contract with the City of South Bend, and
understands that the City may terminate the contract for default if the Contractor fails to cure a breach of
this provision no later than thirty (30) days after being notified by the City.
6. Persons, partnerships, corporations, associations, or joint venturers awarded a contract by the City
of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or
applicant for employment in the performance of a City contract with respect to hire, tenure, terms,
conditions, or privileges of employment, or any matter directly or indirectly related to employment because
of race, sex, religion, color, national origin, ancestry, age, gender expression, gender identity, sexual
orientation or disability that does not affect that person's ability to perform the work.
In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any
combination of the foregoing including, but not limited to, public works contracts awarded under public
bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards,
or commissions may consider the Contractor's good faith efforts to obtain participation by those
Contractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business
Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder.
In no event shall persons or entities seeking the award of a City contract be required to award a subcontract
to an MBE/WBE; however, it may not unlawfully discriminate against said WBE/MBE. A finding of a
discriminatory practice by the City's MBE/WBE Utilization Board shall prohibit that person or entity from
being awarded a City contract for a period of one (1) year from the date of such determination, and such
determination may also be grounds for terminating the contact for which the discriminatory practice or
noncompliance pertains.
7. The undersigned contractor agrees that the following nondiscrimination commitment shall be
made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any
of its agencies, boards or commissions.
Contractor agrees not to discriminate against or intimidate any employee or applicant for employment in
the performance of this contract with privileges of employment, or any matter directly or indirectly related
to employment, because of race, religion, color, sex, gender expression, gender identity, sexual orientation,
handicap, national origin or ancestry. Breach of this provision may be regarded as material breach of
contract.
I, the undersigned bidder or agent as contractor on a public works project, understand my statutory
obligations to the use of steel products or foundry products made in the United States (I.C. 5-16-8-1). 1
hereby certify that I and all subcontractors employed by me for this project will use steel products or
foundry products made in the United States on this project if awarded. I understand I have an affirmative
duty to notify the City in my bid that my proposal does not include the use of steel products or foundry
products made in the United States. I understand it is my sole obligation and responsibility to provide a
justification to the City, subject to review and approval, why the cost of United States made steel or
foundry products is unreasonable. Prior to award and upon submission of bid which does not use steel
products or foundry products made in the United States, the City, through its director of public works, shall
make a determination if the price of United States made steel or foundry is unreasonable. I understand that
Version 10/17/2016 Contractor's Bid for Public Works - 6
u as
N
.�
6��.,
��-.��
- } �.
*,
- ;mot ��,� ' � � r � . ��
w ;; ��;� — __ V ,� . �a -
��`
R
fpN - ff'T IWIW
WL
1316 COUNTY -CITY BUILDING
227 W.JEFFERsoN BOULEVARD
SOUT€€ BEND, INDIANA 46601-1830
Date:
To:
From
Subject
PHONE 574/235-9251
FAX 574/235-9171
TDD 574/ 235-5567
CITY OF SOUTH BEND PETE BUTTIGIEG, MAYOR
BOARD OF PUBLIC WORKS
November 14, 2017
All Bidders
Linda M. Martin, Clerk, Board of Public Works
Addendum Number: 1
Project Name: Wayne Street Plaza and Strectscape
Project
Number: 116-047R
ACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM
Date Received:
%el;
This addendum is being forwarded to you for the above referenced project.
Please sign below and acknowledge receipt of this Addendum
by faxing this sheet to the Board of Public Works at (574) 235-9171.
A copy MUST also be included with your bid package upon
submittal.
THIS ADDENDUM MAY AFFECT YOUR BID.
Note:
The attached documents are hereby added to the Specifications and Contract
Documents and become a part of herein.
Company
r j-c m i 43^.
Authorized Signature:
Date:a L /
p
. . . . . . . . . . . . . . . .
w§ Is -I qw
' � ' x r::. �.. j:
� _
mn xa�C �' v .. � h
k a. �
.. . � ., Y
. a
f� c'
_ ��
�Y' a
�+ a � d
2 e �
ul ��1 r� L
- � �..� � -
i
�� �'� '��
;^- x ..
ih..
r °:
y ,.
y' • ., �
�.�_
_. ,fir' ,�. =� � � � .. '�4
+ 5 � � @� a `�N �M qi
�. = �� . , �
gt
;�' �� ,�
� � �, d�.
�� � � E ,�_.. �� � ., � „ �„
K _� ��
� -�
L
�a� , n • eF
l5 fit .-�. � P R., f.+��4=4'�... � v � _'?'x
��- xxxtvy a
ry46Y x,yT` r - 'T'.... 'ram. P n.. �� �' � a '- '
'�
- A � �
{ _!
� _ _ _.
� _ � �
... _ --. �._.. _ — _.__—._.__—. _ �. _.. ..._. __ ._ _ _ ... _— _ _ __ _ lA___ _ — _ _ ___ _— __
It_. ..... � ._ _.