HomeMy WebLinkAboutChange Order No 1 - Gibson Lewis LLC - Fire Station No 4 Project No 116-066. a ! —Z City of South Bend Project No. 116-066 Change Order No. 1—11/9117 OWNER: City of South Bend ENGINEER: City of South Bend Engineering Kara M. Boyles, P.E. Professional Engineer No. 10809510 CONTRACTOR: Gibson -Lewis, LLC. PROJECT: Fire Station #4 Project No. 116-066 SUBJECT: Change Order Explanation ISSUE DATE: November 9, 2017 This Change Order to the Contract document shall supplement, amend, and shall become a part of, and be incorporated as an Addendum to the Contract. The following is a summary and description of the revisions to the Contract by this Change Order: Item Qtv Unit Price Days Total 1. New CurblWalk/Path 1 LS $129,224.00 15 $129,224.00 2. Tapered Roof Insulation 1 LS $2,617.00 0 $2,617.00 3. Temporary Basin 1 LS $12,831.00 12 $12,831.00 4. Storm Doors 1 LS $5,470.00 0 $5,470.00 Net Chancre Order Amount $150,142.00 1) New CurbMalk/Path: New curbing and sidewalks will be installed around the site. An asphalt path way will also be installed as part of the new building. This includes all removals of existing materials. 2) Tapered Roof Insulation: Tapered roof insulation is needed to completely insulate the sloped roof areas. 3) Temporary Basin: A temporary storm water basin needs to be installed to collect storm water until the dedicated basin can be installed. The dedicated basin cannot be installed until the demolition of the existing building is complete. 4) Storm Doors: Garage -style storm doors will be installed on the exterior wall of the second floor balcony. This will reduce the risk of weather damage to mechanical and electrical system beneath the balcony.