HomeMy WebLinkAboutChange Order No 1 - Gibson Lewis LLC - 2016 Parking Garage Improvements Project No 115-143gyp. > c:. T. _JIBYCE &ASSOCIATES, INC. ENGINEERS I ARCHITECTS Bulletin No. 1 October 2, 2017 Project: City of South Bend 2016 Parking Garage Improvements South Bend, Indiana Owner: City of South Bend Project No.: 115-143 Architect/Engineer: Byce & Associates, Inc. 487 Portage Street Kalamazoo, Michigan 49007 (269) 3 81-6170 Project No.: I6100101 This Bulletin, issued after award of contract, describes proposed deviations from the contract documents for the above project. All work shall conform with the standards and intent of the Contract Documents. Contractor shall submit, in triplicate, an itemized proposal for performing this work. This Bulletin is not an authorization for making a change. Bulletin No. 1: 2016 Parking Garage Improvements South Bend, Indiana BULLETIN DESCRIPTION: Omit the through -wall air conditioning units from the Leighton Plaza Parking Structure and add split systems. DRAWINGS: Item #1: Leighton. Plaza Stair Tower I Sheet: 3 of 5 (Reissued) A. Omit the two -ton through -wall air conditioning unit. B. Add infill of the wall opening left by the removal of the existing through -wall air conditioner with 3" insulated metal panel. The color of the exterior face is to match the surrounding wall. Install sealant around the entire perimeter. The interior face of the opening is to be finished with fiberglass faced gypsum board to match the surrounding wall. C. Add AC -I and CU-1. D. Add a new 20A, 2 pole circuit breaker in existing Panel `RPI' for the new CU-1 and AC-1. E. Add a new 30A, 2 pole, NEMA 4 fusible safety switch for the new AC-1. F. Add a new 30A, 2 pole, NEMA 4 fusible safety switch for CU-1. Sheet: 5 of 5 (Reissued) G. Add "Leighton" to Location column of Air Conditioning Split System schedule. Item #2: Leighton Plaza Stair Tower 2 Sheet: 4 of 5 (Reissued) A. Omit the two -ton through -wall air conditioning unit. B. Add infill of the wall opening left by the removal of the existing through -wall air conditioner with 3" insulated metal panel. The color of the exterior- face is to match the surrounding wall. Install sealant around the entire perimeter. The interior face of the opening is to be finished with fiberglass faced gypsum board to match the surrounding wall. C. Add AC-1 and CU-1. D. Add a new 20A, 2 pole circuit breaker in existing Panel `RPI' for the new CU-1 and AC-1. E. Add anew 30A, 2 pole, NEMA 4 fusible safety switch for the new AC-1. F. Add a new 30A, 2 pole, NEMA 4 fusible safety switch for CU-1. Sheet: 5 of 5 (Reissued) G. Add "Leighton" to Location column of Air Conditioning Split System schedule. End of Bulletin No. 1 Page 2 of 2 Byee & Associates, Inc. a a �rrf. _, mill