Loading...
HomeMy WebLinkAboutAmendment No. 1 to Professional Services Agreement - Jones Petrie Rafinski - Additional Marriott Hotel Site development� � ~ ° ° = ir " $ | | | This is EXHIBIT K, consisting of pages, referred to in and part of the Agreement between Owner and Engineer for Professional Services dated , AMENDMENT TO OWNER -ENGINEER AGREEMENT Amendment No. 1 1. Background Data: a. Effective Date of Owner -Engineer Agreement: b. Owner: De artment of Public Works, City of South Bend, Indiana C. Engineer: Jones Petrie Rafinski Corporation (JPR) d. Project: 1 17-064 Marriott Hotel Site Development at Hall of Fame, Phase 3 2. Description of Modifications: [NOTE TO USER: Include the following paragraphs that are appropriate and delete those not applicable to this amendment. Refer to paragraph numbers used in the Agreement or a previous amendment for clarity with respect to the modifications to be made. Use paragraph numbers in this document for ease of reference herein and in future correspondence or amendments.] a. Engineer shall perform or furnish the following Additional Services: A. Construction Administration: Periodic reviews of site construction will be completed to ensure the contractor(s) is providing the level of quality that is required for the project. It is anticipated that the site work will be constructed in two phases. The construction administration services will include: 1. Reviews of site construction, when requested by the City, will be completed to ensure the Contractor(s) is providing the level of quality that is required for the project; 2. JPR will provide clarification/interpretations of the Contract Documents if such interpretations are necessary for the proper execution or progress of work; 3. JPR shall render written recommendations on claims, disputes and other matters in question between the owner and contractor relating to the execution or progress of the project as provided by the Contract Documents; 4. Review and approve, or take other appropriate action and forward to the client for final disposition, the contractor's submittals such as Shop Drawings, ,Product Data and Samples with respect to Contract Documents produced by JPR; 5. Prepare responses to Request for Information (RFI) provided by the contractor; 6. Provide field reports describing observations, problems and recommended solutions; 7. Provide punch lists and based on site observations; Page I (Exhibit K— (Amendment to Owner -Engineer Agreement) — Attachment 1) EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright 0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. � 1 L ALP T. of This is EXHIBIT K, consisting of pages, referred to in and part of the Agreement between Owner and Engineer for Professional Services dated , AMENDMENT TO OWNER -ENGINEER AGREEMENT Amendment No. 1 1. Background Data: a. Effective Date of Owner -Engineer Agreement: 4V C) C mw H. w! b. Owner: Department of Public Works, City of South Bend, Indiana c. Engineer: Jones Petrie Rafinski Corporation (JPR) d. Project: 1 17-064 Marriott Hotel Site Development at Hall of Fame, Phase 3 2. Description of Modifications: [NOTE TO USER: Include the following paragraphs that are appropriate and delete those not applicable to this amendment. Refer to paragraph numbers used in the Agreement or a previous amendment for clarity with respect to the modifications to be made. Use paragraph numbers in this document for ease of reference herein and in future correspondence or amendments.] a. Engineer shall perform or furnish the following Additional Services: A. Construction Administration: Periodic reviews of site construction will be completed to ensure the contractor(s) is providing the level of quality that is required for the project. It is anticipated that the site work will be constructed in two phases. The construction administration services will include: 1. Reviews of site construction, when requested by the City, will be completed to ensure the Contractor(s) is providing the level of quality that is required for the project; 2. JPR will provide clarification/interpretations of the Contract Documents if such interpretations are necessary for the proper execution or progress of work; 3. JPR shall render written recommendations on claims, disputes and other matters in question between the owner and contractor relating to the execution or progress of the project as provided by the Contract Documents; 4. Review and approve, or take other appropriate action and forward to the client for final disposition, the contractor's submittals such as Shop Drawings, Product Data and Samples with respect to Contract Documents produced by JPR; S. Prepare responses to Request for Information (RFI) provided by the contractor; 6. Provide field reports describing observations, problems and recommended solutions; 7. Provide punch lists and based on site observations; Page 1 (Exhibit K— (Amendment to Owner -Engineer Agreement) -- Attachment 1) EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright © 200$ National Society of Professional Engineers for EJCDC. All rights reserved. -r-7 a x t� Ck p