Loading...
HomeMy WebLinkAbout02/26/1951 Board of Public Works Minutes• CEMETERY DEPARTMENT: Stanley Leszczynski, Sexton, was present and matters pertaining to his Department were discussed. There being no further business to come before the Board, the Meeting was adjourned at ll.15 a.m. ATTEST: BOA//OFPUBLI WW KS & SAFETY February 26, 1951 A regular meeting of the Board of Public Works was held on Monday, February 26, 1951 at 9:30 a.m. Mr. Baer was absent. Minutes of the previous meeting were read and approv- ed. Claims of the following suppliers in the amount of $4,314.36 were approved and order ed paid: Business Systems, Inc. 40.91 Edwards Iron Works, Inc. 80.64 Business Systems, Inc. 16.64 Edwards Iron Works, Inc. 69.95 Business Systems, Inc. 11.43 Edwards Iron Works, Inc. 95.80 Business Systems, Inc. 56.45 Edwards Iron Works 21.53 City Water Works 9.75 Indiana Bell Telephone Co. 7.69 Flowers, Lewis & Son 83.29 Indiana Equipment Co. 190.35 Kalay Motor Service 2.90 Indiana Equipment Co. 107.29 Levy -Ward Grocer Co. 10.70 Kaylor Spring Co. 74.86 McCaffery Company 48.50 Korte Brothers, .Inc. 122.48 Shoemaker, 0. J. 41.76 McClave Printing Co. 36.75 Shoemaker, 0. J. 23.69 Miami Hardware Co. 50.48 South Bend Awning Company 77.00 Oliver Corporation 10.68 STREET & TRAFFIC: Scherman-Schaus-Freeman Co. 101.16 American Steel Dredge Co. 1,000,00 Sheehan Tire Service, Inc. 50.73 American Steel Dredge Co. 11000.00 Smogor Lumber Co. 94.08 Bearings Service Co. 1.14 PAL ING METER DEPT: Business Systems, Inc. 19.41 Englewood Electrical. Supply 11.07 Century Tool & Metal Co. 197.50 Indiana Equipment Co. 400.00 Century Tool & Metal Co. 147.75 TRAFFIC ENGINEERING DEPARTMENT: Ernest Miller, Traffic Engineer, was present and matters pertaining to his Department were discussed. The bid of the Englewood Electrical Supply Company was accepted for traffic signal equipment and cable, their bid being, in the Board's opinion, the lowest and best bid received, subject to the approval of the Common Council. The bid of the South Bend Electric Company on electric cable was determined not to meet specifications for rubber covered underground cable for traffic signal use and was, therefore, rejected. ENGINEERING DEPARTMENT: A Contract Bond was approved and ordered filed for J. J. DeGro VACATION RESOLUTION NO. 2651 The Hearing on Vacation Resolution Number 2651 was continued until March 26, 1951* The Temple Beth -El was granted permission for the erection of a canopy over the cit sidewalk at the front entrance to the building on Lafayette Boulevard to be used Sunday, March 4, 1951. The canopy will be erected on March 3 and removed on March 5, STREET DEPARTMENT: Melton 0. Brannan, Street Commissioner was present and matters per- taining to his Dep artment ware discussed. CEMETERY DEPARTMENT: Stanley Leseezynski, Sexton, was present and matters pertaining to his Department were discussed. PARKING METER DEPARTMENT: Maurice C. Vennet, Auditor, presented his report for the week ending February There being no further business to come before the. Board, the meeting was adjourned at 11:00 a.m. ATTEST: BOARD PUBLIC -WORKS & SAFETY • • • L� •