SUPPLEMENTAL AGREEMENT NO. 1
THIS SUPPLEMENTAL AGREEMENT NO. 1 is made and entered into this 0, \ day of
2017, by and between The City of South Bend, acting by and through its proper officials
"LOCAL PUBLIC AGENCY" or "LPA", hereinafter referred to as the "LPA", and Troyer Grout, Inc., 550
Union Street, Mishawaka, Indiana 46544, hereinafter referred to as the "CONSULTANT".
WITNESSETH
WHEREAS, the LPA and CONSULTANT did enter into a contract on April 26, 2016 for the consultant
to provide Engineering Services for the Safe Routes to School near LaSalle Intermediate and Marquette
Primary project, Des. No. 1600076, and,
WHEREAS, the LPA has requested certain additional services necessary for the completion of this
contract, and
WHEREAS, the CONSULTANT has agreed to perform the additional services necessary for the
completion of this contract,
NOW, THEREFORE, the parties hereto agree that said contract shall be amended as herein
described:
Task
Current Contract
Addendum
1
Total
Amount
a.
Survey
$20,790.00
$3,660.00
$24,440.00
b.
NEPA Document — Level 1 CE
$5,202.00
$5,202.00
c.
Stage 1 Plans
$62,414.00
$62,414.00
d.
Utility Coordination
$8,902.00
$8,902.00
e.
Preliminary Field Check Meeting
$2,566.00
$2,566.00
f,
Public Information Meeting
$2,547.00
$2,547.00
g.
Third Party QCIQA
$6,160.00
$6,160.00
h.
Stage 3 Plans Submission
$45,164.00
$7,634.00
$52,798.00
i.
Tracings Submission
$27,967.00
$27,967.00
j.
Bid Phase Services
$1,252.00
$1,252.00
k.
Office Construction Administration
$2,144.00
$2,144.00
I.
Geotechnical Report
$14,560.60
$14,560.60
Total
$186,108.00
$25,834.50
1 $210,942.50
Page 1 of 3
The following is a description of the revisions to the Fee Summary:
a. Survey:
• Survey for additional sidewalk and approach replacement along Bergan St., Brookfield St., and
Hamilton St. outside of the original scope of work.
• Survey for Additional sidewalk, curb ramps, and drive approaches outside of the original scope of
work.
h. Stage 3 Plan Submission:
• Additional Design of Sidewalk and Approach replacement along Bergan St., Brookfield St., and
Hamilton St. outside of the original scope of work.
• Additional Design of sidewalk, curb ramps, and drive approaches outside of the original scope of
work.
j. Geotechnical:
• iNDOT has determined that a Geotechnical report will be necessary and will need to be submitted
with Stage 3 plans.
VI. Modification:
This Supplemental Agreement, in the amount of $25,834.50, changes the contracted maximum
not to exceed amount for this contract from $185,108.00 to $210,942.50.
The undersigned attests, subject to the penalties for perjury, that he is the contract party, or that he is the
representative, agent, member or officer of the CONSULTANT that he has not, nor has any other
member, employee, representative, agent or officer of the firm, company, corporation or partnership
represented by him, directly or indirectly, to the best of his knowledge, entered into or offered to enter into
any combination, collusion or agreement to receive or pay, and that he has not received or paid, any sum
of money or other consideration for the execution of this Contract other than that which appears upon the
face of the contract.
Page 2 of 3
IN TESTIMONY WHEREOF, the parties hereto have executed this Supplemental Agreement.
CONSULTANT:
The Troyer Group, Inc.
S ture
John E. Leszczynski
00'
Kyle W. Silveus
LPA
South Bend, Indiana
Board of Public Works
Signature
F �
Preside
7-
Suzanna Fritzberg
Member
l f�
Ifiture
James A. Mueller
Member
UA�=
Signature
Elizabeth A. Maradik
Member
Signature
Therese J. Dorau
Member
Attest,
Signature
Linda M. Martin
Clerk:
Page 3 of 3
1=
-- -• ---�`� ,`tom � �."- —^
mRpwrplk.mw-,eY■.
I -�
MIMI
11 . . . . . . . . . . . . . . . . . . . . . . . . . ...... . . . . . . . . . . . . . . . . . . . . . . . UP
q, Jirm.f,.'PLIA
9
7N, ............
.1
I
I 1 i -W
WOMM-Mi��
NOMM gmeMemm
ww"- MW - - 1 W-ROM" -0 -0-0 O-Wy
Io
South Bend - LaSalle -Marquette SRTS The Troyer Group
Billing Rate Summary
Overhead Rate = 190.51% Profit + Overhead Factor = 8.9%+ 0% = 8.8%
Facility Capital Cost of Money = 0.22%
Position
Labor Rate
Overhead
Labor +
Overhead
Profit
Facilty Capital Cost of
Money
Billable Rate.
Overtime
Senior Project Manager
$65.93
$125.60
$191.53
$16.85
$0.15
$208.53
$241.50
Civil Engineer Project Manager
$49.67
$94.63
$144,30
$12.70
$0.11
$157.10
$181.94
Civil Project Engineer
$37.82
$72.05
$109.87
$9.67
$0.08
$119.62
$138.53
Civil Engineering Design Associate
$23.94
$45.61
$69.55
$6.12
$0.05
$75.72
$87.69
Civil Engineering Associate
$25,45
$48.48
$73.93
$6.51
$0.06
$80.50
$93.22
Landscape Architect
$33.45
$63.73
$97.18
$8.55
$0.07
$105.80
$122.53
Urban Planner
$28.82
$64.90
$83.72
$7.37
$0,06
$91.16
$105.57
Structural Engineer Project Manager
$50.67
$96.53
$147.20
$12.95
$0.11
$160.27
$185.60
Structural Engineering Associate
$26.27
1 $50.05
$76.32
$6.72
$0.06
$83.09
$96.23
Structural Engineering Design Associate
$21.08
$40,16
$61.24
$5.30
$0.05
$66.67
$77.21
QirectorofTransportation
$58.92
$112.25
$171.17
$15.06
$0.13
$186.36
$215.82
Director of Structural Engineering
$51.96
$98.99
$160.95
$13,28
$0,11
$164.35
$190,33
Construction Project Eng./Supervisor
$38.74
$73.80
$112.54
$9.90
$0.09
$122.53
$141.90
Construction Inspector Proj. Manager
$49.67
$94.63
$144.30
$12.70
$0.11
$167.10
$181.94
r
9
Ill Iti
n
TERRITORIAL ENGINEERING, LLC
7908 NOR"I E-I S FATF. ROM) 23
11 ALKERTON' I.NDIANA 4637-I
Phone: 574--58o-34 48
Fav 574-586-2992
Email: teong"<r?te-Ilc.cm-n
FEE SCHEDULE
January' 1, 2016
ITEM RATE
PRINCIPAL 5 114.00/hr
DFSIG\FR S 108.00/hr
CONSTRUCTION RUCTION OBSE'RVATION S 84,00/hr
FIELD CREW CHIEF 5 80,00/hr
FIELD CRY',W MF -1 3ER S 55.00/131.
CONSTRUCTION STAKING
DATA COI.LEC"I ION S1 13.00/17r
FNGINEERING/SURVEYI\G TFCI NICIA'N S 85.t70/17r
SFCRFTARIAI./C:OPIES/RESI:ARCI-I $ 5-'.00/hr
The above field crow rues include standard crew materials and equipment. Rates are tnetet-ed
portal to portal. Additional topics, overnight mailings, Special plotting atld%or forms arcs
additional casks at cost plus 109t,
i r
ROBERTS. S. A1-M P.S.
�cS s_ E r; ii u?>• 0 rA;a;:e
i
2
' F
�rs�. _,�
;� — ;�'�
�-�� — — —
I
�' �� ��� c� � E i
� � i i Y'e ..... ��,
E �
.....,�
II
3
�: `. _
�' •xJ
�M' 4� T_
' � _.
...r -'� E IX �[
F<
Mr. Kyle Silveus, P.E. September 27, 2016
The Troyer Group, Inc. Page 2
LaSalle Safe Routes to School Project — South Bend, IN
Performing up to 25 exploratory test borings to a depth of 5 ft each. In addition, hand auger
borings will be performed as deemed necessary. The actual location, depth, and number
of borings will be dependent on the soil conditions encountered. Standard Penetration Test
(SPT) sampling will be performed at 2'/2-ft intervals. We anticipate that the borings will be
performed with truck -mounted equipment and backfilled at completion of the field work with
auger cuttings and bentonite chips. EEI will locate the test borings using measurements
from existing site features shown on the plans. We will also contact Indiana 811 to arrange
an underground utility line location check. At this time, no pavement cores are planned.
2. Performing appropriate laboratory tests consistent with INDOT requirements including
visual soil classification, hand penetrometer readings, pH, sulfate content, moisture
content, grain size analysis, and Atterberg limit determinations;
3. Preparing a technical report which will include a summary of our findings and
recommendations for geotechnical considerations regarding:
a. Subgrade preparation and improvement, as necessary, for support of the sidewalk;
b. Re -use of onsite soil for fill; and
c. Potential construction problems due to the subsurface conditions encountered
(e.g., soft subgrade difficulties, etc.).
SCHEDULE
We are typically able to mobilize to the site within two to three weeks of notice to proceed and
coordination of our field activities with underground utility owners, the city, and OGE. The field
work will require two to three days to complete. After the field work is completed, the laboratory
testing could take up to two weeks to complete. We anticipate submitting a geotechnical report
within two weeks after the laboratory work is completed.
COST
We propose to provide our services on a time and expense basis in accordance with the attached
unit rates. With that, we estimate the total cost for completing the geotechnical services to be
$14,600. Please recognize that the fee is based on the scope described herein and current INDOT
guidelines. If any significant variations develop during the course of our evaluation, we will advise
you so that our efforts can be effectively directed.
Mr. Kyle Silveus, P.E. September 27, 2016
The Troyer Group, Inc. Page 3
LaSalle Safe Routes to School Project — South Bend, IN
CLOSURE
Thank you for the opportunity. We anticipate that your firm will prepare an agreement outlining the
terms and conditions. We look forward to providing our services on this project. Should you have
any questions about this information, please feel free to contact us.
Sincerely,
EARTH EXPLORATION, INC.
/CoftT. Roosa, P. E.
Senior Geotechnical Engineer
/-1
PP
Kenneth P. Miller, P.E.
Michiana Regional Manager
Enclosure: Cost Estimate
Cost Estimate
LaSalle Safe Routes to School Project
South Bend, Indiana
Unit
Unit Price
Total
GEOTECHNICAL FIELD
1. Mobilization and Field Coordination
a. SPT Rig
1 ea
$260.00
$260.00
b. CPT
ea
$440.00
c. Field and utility coordination
1 LS
$800.00
$800.00
d. Field coordination with property owners
i. 1 - 10
1 LS
$300.00
$300.00
ii. 11 - 25
LS
$500.00
iii. Over 25
LS
$690.00
e. Mileage
40 mi
$3,40
$136.00
2. Truck mounted borings with split spoon sampling
a. Standard
125 ft
$18.50
$2,312.50
b. Night time
ft
$21.80
3. Truck mounted borings with drilling fluid
a. Standard
ft
$18.50
b. Nighttime
R
$21,80
4. Truck mounted core drilling
a. Standard
It
$38,00
b. Night time
ft
$44,80
5. Truck mounted borings
a. Truck mounted borings through bedrock or boulders or concrete
pavement
i. Standard
ft
$36.40
ii. Nighttime
ft
$42.90
b. Bridge deck coring and restoration
I. Standard
ea
$330.00
H. Nighttime
ea
$390.00
6. Cone penetrometer testing
a. Set up
i. Standard
ea
$75.00
ii. Nighttime
ea
$88.50
b. Subsurface profiling
i. Standard
ft
$11.90
ii. Night time
ft
$14.00
c. Profiling with pore pressure measurement
I. Piezometric Saturation
a. Standard
ea
$91.00
b. Nighttime
ea
$107.00
ii . Penetration
a. Standard
ft
$14.20
b. Night time
ft
$16.75
Unit
Unit Price Total
iii. Pore water dissipation test
a. Standard
hr
$184.00
b. Night time
hr
$217.00
iv. Hydraulic conductivity and consolidation
a. Standard
ea
$70.00
b. Nighttime
ea
$83.00
d. Profiling with Shearwave Velocity Measurement
i. Standard
ft
$15.23
ii. Nighttime
ft
$17.97
e. Sample
i. Standard
ea
$22.00
ii. Night time
ea
$26.00
7.
Hand or truck soundings
a. Standard
ft
$11.60
b. Night time
It
$13.70
B.
Hand auger drilling
a. Standard
40 ft
$12.00 $480.00
b. Night time
ft
$14.25
9.
Skid mounted borings with split spoon sampling
a. Standard
ft
$29.00
b. Night time
ft
$34.20
10.
Skid mounted borings using drilling fluid
a. Standard
ft
$29.00
b. Night time
ft
$34.20
11.
Skid mounted core drilling
a. Standard
ft
$42.00
b. Nighttime
ft
$49.00
12.
Skid mounted boring through bedrock or boulders
a. Standard
ft
$44.00
b. Nighttime
It
$52.00
13.
Skid mounted soundings
a. Standard
It
$16.40
b. Night time
It
$19.30
14.
Skid Mounted Cone Penetrometer Testing (CPT)
a. Set up
i. Standard
ea
$110.00
iL Night time
ea
$130.00
b. Subsurface profiling
i. Standard
ft
$17.30
ii. Night time
ft
$20.50
Unit
Unit Price Total
c. Profiling with pore pressure measurement
€. Piezometric Saturation
a. Standard
ea
$108.00
b. Night time
ea
$127.50
ii. Penetration
a. Standard
ft
$20.00
b. Night time
ft
$23.60
ill. Pore Water Dissipation Test
a. Standard
hr
$216.00
b. Night time
hr
$256.00
iv. Hydraulic Conductivity and Consolidation
a. Standard
ea
$83.00
b. Nighttime
ea
$98.00
d. Profiling with Shearwave Velocity Measurement
€. Standard
ft
$23.60
€€. Night time
It
$27,80
e. Sample
€. Standard
ea
$31.00
I€. Night time
ea
$37.00
15.
Furnishing of a boat
Actual Cost
16.
Barge set-up expenses
a. Navigable water
i. Barge set-up
ea
$5,600.00
ii. Rental of support equipment and/or boat
Actual Cost
ill. Drill rig downtime
hr
$140,00
b. Non -navigable water barge set-up
ea
$4,800.00
17,
Additional disassembly and reassembly
a. Navigable water
ea
$2,000.00
b. Non -navigable water
ea
$1,800.00
18,
Barge mounted borings with split spoon sampling
ft
$32.00
19.
[large mounted core drilling
It
$44.00
20.
Barge mounted boring through bedrock or boulders
ft
$44.00
21.
Barge mounted soundings
It
$19.00
22.
Casing through water
ft
$8.15
23.
Uncased sounding through water
ft
$5.40
24.
Set up for borings and machine soundings
a. Borings and machine soundings less than 20 ft deep
25 ea
$68.00 $1,700.00
b. Rock core borings
ea
$116.00
25.
Additional 2-in. split spoon sampling
ea
$20.00
26.
3-in. split spoon samples
ea
$22.00
27.
34n. Shelby tube samples
ea
$60.00
28.
Bag samples
a. 25-lb sample
ea
$50.00
b 5-lb sample
ea
$32.00
Unit
Unit Price
Total
29.
Field vane shear test
a. Standard
ea
$110.00
b. Night time
ea
$130.00
30.
41/,in. cased hole
ft
$12.00
31.
Installation of Geotechnical Instruments
a. Inclinometer casing installation
i. Standard
ft
$14.07
ii. Night time
ft
$16.60
b. Piezometer installation up to 25 ft below surface
ea
$245.00
c. Piezometer installation deeper than 25 ft below surface
ea
$270.00
d. Metal protective outer cover for inclinometer and piezometer casings
ea
$120,00
32.
Geotechnical engineer
8 hr
$115,00
$920,00
33.
Railroad expenses
Actual Cost
34.
Twenty-four hour water levels
a. Field measurements per borehole
i. Standard
2 ea
$36.50
$73.00
H. Night time
ea
$43.00
b. PVC slotted pipe
ft
$5.60
35.
Special borehole backfilling
a. 0 to 30 ft
i. SPT
a. Standard
25 ea
$105.00
$2,625.00
b. Night time
ea
$124.00
ii . CPT
a. Standard
ea
$45.00
b. Night time
ea
$53.00
b. More than 30 ft
1. SPT
a. Standard
ft
$6.30
b. Night time
ft
$7.50
ii . CPT
a. Standard
ea
$1.88
b. Nighttime
ea
$2.21
c. Pavement restoration
i. Standard
ea
$58.00
ii. Nighttime
ea
$68.00
36.
Dozer rental
Actual Cost
37.
Traffic control
a. Flag crew
3 day
$700.00
$2,100,00
b. Equipment Rental
Actual Cost
c. Flag crew with equipment
day
$800.00
38.
Centerline surveying
Actual Cost
Subtotal (Geotechnical Field) $11,706.50
Unit
Unit Price
Total
GEOTECHNICAL LABORATORY
39.
Sieve analysis for soils
6 ea
$48.00
$288.00
40.
Hydrometer analysis
6 ea
$55.00
$330.00
41.
Sieve analysis for Aggregates
a. Analysis by Washing (AASHTO T-11)
ea
$75.00
b. Analysis by Using (AASHTO T-27)
ea
$131.00
42.
Liquid limit
4 ea
$33.00
$132.00
43.
Plastic limit & plasticity index
6 ea
$24.00
$144.00
44.
Liquid Limit Ratio
ea
$74.00
45.
pH test
6 ea
$16.00
$90.00
46.
Loss on Ignition Test
a. Loss on Ignition Test (Conventional)
ea
$23.00
b. Loss on Ignition Test (Sequential)
ea
$61.00
c. Organic content based on Clorimeter
ea
$23.00
47.
Topsoil Tests
a. Phosphorus tests
ea
$20.00
b. Potassium tests
ea
$20.00
48.
Moisture Content Tests
a. Moisture Content Test (Conventional)
ea
$6.50
b. Moisture Content Test (Microwave)
ea
$8.00
49.
Expansion Index of Soils
ea
$230.00
50.
Specific Gravity Test
ea
$35.00
51.
Unit weight determination
ea
$17.00
62.
Hydraulic Conductivity Test
a. Constant Head
ea
$225.00
b. Failing Head
ea
$275.00
53
a. Unconfined Compression Test
ea
$44.00
b. Remolding of soil samples with chemical admixtures in
chemical soil modification/stabilization
(3 samples is equal to 1 unit)
ea
$110.00
c. Point Load Strength Index of Rock
ea
$42.00
54
Compressive Strength and Elastic Moduli of Intact Rock
a. Compressive Strength of Intact Rock
ea
$105.00
b. Elastic Moduli of Intact Rock
ea
$420.00
55
Consolidation Test
ea
$430.00
56
Triaxial test
a. Unconsolidated - Undrained (UU)
ea
$336.00
b. Consolidated - Undrained (CU)
ea
$500.00
c. Consolidated - Drained (CD)
ea
$700.00
d. Pore Pressure measurement with a. or b.
and use of back pressure for saturation
ea
$242.00
57
Direct Shear Test
ea
$520.00
58
Moisture -Density Relationship Test
a. Standard Proctor
ea
$136.00
Unit
Unit Price Total
b. Modified Proctor
ea
$147.00
59 Soil Support Testing
a. California Bearing Ratio Test
ea
$515.00
b. Subgrade Resilient Modulus
ea
$600.00
60 Collapse Potential Evaluation Test
a. Silty Soil (Loess)
ea
$370.00
b. Cohesive or Expansive Soils
ea
$441.00
61 Water Soluble Sulfate Test
ea
$100.00
62 Water Soluble Chloride Test
2 ea
$100.00 $200.00
63 Soil Resistivity Test
ea
$131.00
64 a. Slake Durability Index Test
ea
$122.00
b. Jar Slake Test
ea
$13.00
Subtotal (Geotechnical Laboratory) $1,184.00
GEOTECHNICAL ENGINEERING
65
Geotechnical profile and related work
a. Without soil subgrade drawings
First mile
LS
$1,150.00
Each additional mile
mi
$525.00
b. With soil subgrade drawings
First mile
LS
$1.365,00
Each additional mile
mi
$600.00
c. Soil subgrade drawings (only)
First mile
LS
$350.00
Each additional mile
mi
$220.00
66
Geotechnical report
a, Without soil subgrade investigation
First mile
1 LS
$1,660.00 $1,660.00
Each additional mile
mi
$700.00
b. With soil subgrade investigation
First mile
LS
$1,900,00
Each additional mile
mi
$800,00
c. Soil subgrade investigation (only)
First mile
LS
$600,00
Each additional mile
mi
$360.00
67
Settlement analysis and recommendations for embankment
a. Proposed embankment
ea
$495.00
b. Proposed and existing embankment
ea
$550.00
68
Ground modification design
ea
$1,450.00
69
Slope stability analysis
a. C, 0 or C & 0 analysis
ea
$770.00
b. Corrective measures
ea
$770.00
c. Stage construction corrective method
ea
$1,340.00
70
Bridge foundation analysis and recommendations
a. Shallow foundation
ea
$475.00
Unit
Unit Price Total
b. Deep foundation
i. Deep foundation analyses
ea
$840.00
ii. Wave equation analyses
ea
$325.00
iii. Liquefaction analysis
ea
$260.00
iv. Group - 3D analysis
ea
$420.00
c. Settlement analysis for bridge pier foundation
i. Bridge pier
ea
$380.00
ii. Embankment plus pier
ea
$420.00
iii. Embankment plus pier plus all other loads
ea
$485.00
d. Foundation on bedrock
ea
$370.00
71 Retaining structure analysis recommendations
a. Conventional retaining structures and other types such
as MSE Walls and Bin walls
I: Shallow foundation
ea
$860,00
it. Deep foundation
ea
$1,130,00
ill. Settlement analysis for retaining wall foundation
ea
$370,00
b. Pile retaining structure analysis and recommendations
I. Free standing structure
ea
$1,000.00
ii. Retaining structure with tie -back system
ea
$1,450.00
c. Drilled -in -pier retaining structure analysis
I. Free standing structure
ea
$1,025.00
!I. Retaining structure with tie -back system
ea
$1,470.00
d. Soil nailing wall analysis
ea
$990.00
72 Seepage analysis
ea
$1,400.00
73 Deep dynamic compaction analysis
ea
$1,400.00
Subtotal (Geotechnical Engineering) $1,660.00
CONSTRUCTION INSPECTION AND MONITORING
74
Pressuremeter testing services
day
$1,600.00
75
Mobilization of testing equipment
LS
$160.00
76
a. Monitoring geotechnical instrumentation
hr
$75.00
b. Field Inspector
hr
$75.00
77
Integrity testing
Actual Cost
78
Field Compaction Testing
a. Dynamic Cone Penetration Test (DCPT)
hr
$75.00
b. Light Weight Detlectomete€ Test (LWD)
hr
$75.00
79
Dynamic pile analysis
ea
$1,025.00
80
Static load test
ea
$1,025.00
81
Dynamic pile load test
Actual Cost
82
CAPWAP-C analysis
ea
$480.00
83
Final construction inspection report
ea
$925.00
Subtotal (Construction Inspection and
Monitoring)
FOUNDATION EVALUATION BY NON-DESTRUCTIVE METHODS
84
a. Surface test[Pier or foundation
Actual Cost
b. Borehole testlPier or foundation
Actual Cost
Unit
Unit Price Total
GEOPHYSICAL INVESTIGATION
85
Geophysical Investigations
Actual Cost
GEOTECHNICAL PROJECT MANAGEMENT
86
Project Management
a. Project Coordination
mi
$1,620.00
b. Project Website
LS
$3,420,00
87
Geotechnical Review
a. Structure Report
ea
$325.00
b. Roadway Report
mi
$275.00
Subtotal (Non -Destructive, Geophysical and Project Management)
PAVEMENT INVESTIGATION
1.
Mobilization of coring equipment
LS
$200.00
2.
Mobilization mileage for coring equipment
mi
$1.85
3.
Pavement core (partial depth)
ea
$125.00
4.
Pavement core (full depth)
a. Standard
ea
$190.00
b. Night time
ea
$223.00
S.
Sub -base sample
ea
$60.00
6.
Cement concrete pavement core density determination
ea
$33.00
7.
Cement concrete core compressive strength test
ea
$31.50
8.
Bituminous extraction test
ea
$84.00
9.
Sieve analysis of extracted aggregate test
ea
$56.00
10.
Recovery of asphalt from solution by Abson method
ea
$350.00
11.
Theoretical maximum specific gravity test
ea
$70.00
12,
Bulk specific gravity test
ea
$30.00
13,
Air voids calculation
ea
$28.00
14.
Core report for partial depth core
ea
$34.00
15.
Core report for full depth core
ea
$42,00
16.
Pavement analysis and report
ea
$770.00
Subtotal (Pavement Investigation)
Summary of Fees
Geotechnical Field $11,706.50
Geotechnical Laboratory $1,184.00
Geotechnical Engineering $1,660.00
Construction Inspection and Monitoring
Non -Destructive, Geophysical and Project Management
Pavement Investigation
Estimated Total $14,560.50