CONTRACTOR'S QUOTE FOR PUBLIC WORK
PROJECT NAME: Leeper Park Rose Garden Irrigation
PROJECT NO. 1021-2017
QUOTES DUE September 26t", 2017 @ 9:30am.
(Must be completed for all quotes. Please type or print)
q- 26, Za/ % Firm: (�� SSGO l rr q�d�,o JAC
5
Ve
City/State/Zip: 150tJ&,J ?'k Jelephone Number: 2 77-9657
Vbw
Agent of Bidder (if Applicable): C5 rya as Hen
Pursuant to notices given, the undersighed offers to furnish labor and/or material necessary to complete the
public works project of:
4e-el2er �,er use �A-+c�e.�► r��an
the City of South Bend, Indiana, in accordance with plans and specifications prepared by:
The City of South Bend, Department of Public Works
and dated— / ] ] for the sum of (enter the Total Quote as shown on the Proposal)
reQ "V% Er• hL exn "" too ($ /dj 3$4 )
(Enter Sum of Total Quote plus Alternates s6ow6 on Proposal) (Numerical)
If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any
addendums attached will be specifically referenced at the applicable page.
If additional units of material included in the contract are needed, the cost of units must be the same as that shown
in the original contract if accepted by the City of South Bend. If the quote is to be awarded on a unit basis, the
itemization of the units shall be shown on a separate attachment.
By
77A/ �-- (5i ature)
PA Uti ^.l _ g�, —J X o e
(P(inted Name of PersoOl Signing)
ACCEPTANCE
The above quote is accepted this day of �` �( c~(3t h_... 20 / 7
Subject to the following conditions:
BOARD OF PU IC VV�b
Gar Gilo , Pre sf ent
Elizabeth`. Maradik, Member
James Al. Mueller, Member
Suzanna M. Fritzb rg, Member
TIN "'e J. Dora ember
AJte t: Linda M. Mart n, Cler
Version 10/18/2016 Page -12 Public Works Quote
QUOTE/PROPOSAL
CITY OF SOUTH BEND
PROJECT NAME I-.eeper Park Rose Garden Irrigation
PROJECT NO, 1021-2017
QUOTES DUE September 2VI, 2017 @ 9:30am
Item
No.
Description
Quantit
Unit
Unit Price
Total Amount
Materials and installation to
1
complete irrigation at the Leeper
1
$
Park Rose Garden.
Total Amount of Quote
$
Firm: IA-) "6
Address: 162-6 &,.A &Id 14y-2
City/State/Zip: a Telephone Number: (,S7y) Z77-9815'1
bb3
Fax Number: ASH ) 277-98a0
By
(Signature)
77A0^9t,l .I- /J/>"1 Pe
(Printed Name of Person igning)
Version 1011 B12016 Page -16 Public Works Quote
BOARD OF PUBLIC WORKS
CITY OF SOUTH BEND, INDIANA
PUBLIC WORKS CONTRACT
THIS AGREEMENT, made and entered into this 24th Day of October, 2017, by and between,
WISSCO Irrigation, Inc., 1820 South Bend Ave., South Bend, IN 46637, HEREINAFTER called
the Contractor, and the Board of Public Works herein called the "Board".
WITNESSETH: That the Contractor covenants and agrees to make the following improvement,
as fully set out in the Request for Quotations, Standard Specifications, Special Provisions, Plans,
and Bid Proposals, all of which are set forth as a part of this Contract, for:
DESCRIPTION: LEEPER PARK ROSE GARDEN IRRIGATION
COMPLETION DATE: SEE SPECIFICATIONS
AMOUNT: $10,380
FUNDING: PARK BOND
The unit prices for this improvement were those prices as received and accepted by the Board on
the 26th Day of September, 2017.
The Contractor further agrees to notify the Engineer when this improvement is completed. This
notification shall be in the form of a Completion Affidavit, signed by the Contractor. Upon final
acceptance of the improvement by the Engineer, the Contractors final estimate will be presented
to the Board for final Payment with one (1) copy of the Completion Affidavit and one (1) copy of
a Waiver of Lien.
BOARD OFPU3LIC O S WISSCO IRRIGATION, INC.
Gar A. Oil o President Elizabeth A. Maradik, Member Printed Name
S zanna 1-hritAU9 K,J s A. Mueller, Member
MekA� ,i --
Member `-Attest: Linda M.
Clerk
Signature
CERTIFICATION (To be completed if Contractor is a Corporation)
1, , certify that I am Secretary of the Corporation named as
Contractor herein; that who signed this Agreement on behalf of the Contractor
was then of said Corporation; that said agreement was duly signed for and in
behalf of said Corporation by authority of its governing body, and is within the scope of its
corporate powers.
Secretary
Corporate
Seal
=�f.�-s i�d F.r,••'-`. '-5?:f�Yf �.� x�a s�u;r 41
El