HomeMy WebLinkAbout11/14/1949 Board of Public Works Minutes595
•
•
•
•
•
•
Where, in Improvement Resolution No..2570-1948 and in all documents pertaining
thereto, reference is made to MIKELL'S ADDITION and/or MIKESELL'S FIRST ADDITION,
these subdivisions are one and the same and thest terms shall be interpreted as re-
ferring to G. W. MIKESELL'S FIRST ADDITION.
Adopted the 7th day of November, 1949 by the
BOARD OF PURL I C *�,1011KS ec SAFETY
Feederick K. Baer
R. S. An.drysiak
Frank J. Bruggner
Attest: Freda G. Noble
Clerk of the Board
STREET DFPAATP'E T: Mr. Melton a. Brannon, Commissioner, was present and matters per-
taining to his department were discussed.
The Clerk was authorized to advertise for one or more Front End Loader Industrial
Tractors for the Street Department. Bids to be returnable on November 28, 1949.
CEi ETffff DEPAzTPr.= 1` ' Mr. Sta.nle;yr' Lesczyznski, Sexton, was present and matters per-
taining to his department were d'io'n ssed.
PARKING 1v TER DEPART1. 7-E]N T : Mr. Maurice C. Vennet, Auditor, presented his report for the
weep ending November 5, 1949.
There being no further business to coke before the Board, the meeting was adjourned
at 10:00 A. V.
ATTEST:
/ _ w
?OARD 0 'PUBLIC �11RT_1.8
j November 14, 1949
A regular meeting of the Board -of Public Works Ams held on Monday, November 14th,
1949. All members were present. Minutes of the previous meeting were read and approved
Claims of the following suppliers in the amount of $13,887.13 were approved and ordered
paid:
Business Systems, Inc
Continental Oil Company
Gibson Company
Haberle, Catherine
I & M Electric Co
I & M Electric Co
I & M Electric Co
I & M Electric Co
J. C. Lauber Co
Linden Hardware Co
I & M Electric Co
Benko-Baraso Co Inc
Business Systems, Inc
A. Cannady Magneto Service
Champion Corporation
Edwards Iron Works, Inc
Edwards Iron Works, Inc
Elliott, B. K. Co
Englewood Electric Co
Grummell & Sons
Indiana Bell Telephone
Indiana Bell Telephone
Indiana Bell Telephone
I & M Electric Co
I & M Electric Co
I & M Electric Co
I & M Electric Co
Indiana Hardware Co
Kuert Concrete, Inc
6.44
Linden Hardware Company
63.88
33.45
McComb Battery Co
3.00
3.12
McComb Battery Co
4.80
127.45
McComb Battery Co
9.55
71596.39
McComb Battery Co
10.74
409.41E
Meyer, G. E. & Son
134.35
.68
Reinke, Carl J.
11500.00
221.13
Royal Rubber Company
174.97
41.25
Shoemaker, 0. J. Inc
27.70
90.00
South Bend Dowel Works
54.88
136.00
Lien Chemical Company
17.40
6.77
Ben Medow, Inc
6.86
2.65
National Brake Service
24.05
24.57
O'Brien Corporation
16.82
1.15
Rieth-Riley Construction Co
11375.22
2.36
Singer General Tire Co
199.36
53.65
Singer General Tire Co
190.33
53.30
Singer General Tire Co
165.01
15.88
Singer General Tire Co
128.93
61.50
Singer General Tire Co
97.05
20.12
Singer General Tire Co
199.02
6.75
Singer General Tire Co
175.00
6.75
Slominski, H. H. MD
21.00
1.80
West Side Hardware Co
94.27
2.44
South Bend Supply Co
5.11
55.20
South Bend Supply Co
110.02
.84
South Bend X-Ray Laboratory
10.00
30.93
McClave Printing Co
37.50
99.60
Kuert Concrete, Inc
18.70
TRAFFIC ENGINEERING: Mr. Ernest Miller, Traffic Engineer, was present and matters
pertaining to his department were discussed.
596
PARKING LOTS:
The following letter was received from the Green Arrow Parking, Inc.,
Board of Public Works,
Room 7, City Hall,
South Bend, Indiana.
Gentlemen:
It is requested that Green Arrow Parking, Inc, be
permitted to change the morning and afternoon park-
ing rate on the lot located at 128-130 N. Main Stay
South Bend, Indiana.
The prevailing rates- are
as follows:
Morning
- 8:00 AM to
1:00 PM ....
250
Afternoon
- 11:00 AM to
7:00 PM ....
250
Evening
- 4:00 PM to
12:,00 PM....
250
The following change is desired:
Morning
- 8:00 AM to
1:00 PM ....
350
Afternoon
- 11:00 AM to
7:00 PM ....
350
Evening
- 4:00 PM to 12:00 M ....
350
All Night
- 4:00 PM to
9:00 AM ....
500
This request is made in view of increased costs of
labor and operation. It is believed that a direct
result of the rate increase will be better service
to the Patrons of Green Arrow Parking, Inc.
Yours very truly,
sl W. F. Sheehan
li GARBAGE:
Mr. Herman F. Waechter presented a check in the amount of $17,875,00 .'as-suiety
for a Performance Bonds and this was approved by the Board.
Prior to the submission of the garbage contract to the Common_ Council for their
approval, the Board and the Contractor re -considered provisions 19 of the contract dated
November 7, 1949 and agreed to eliminate the said paragraph #19 due to the fact that the
matter was not covered in the specifications.
�j ENGINEERING DEPARTMENT:
VACATION RESOLUTION No. 2610, 1949
jI r Mr. Raymond Andrysiak, City Engineer, filed primary assessment roll showing the
awaids of damages and the assessments of benefits in the matter of the vacation of:
i 1. 'The first East-West alley South of Linden Avenue from Falcon Street Westward to
the'center line of Section 9, except where the North and South alleys cross. 2. The
first East-West alley North of Colfax Avenue from Falcon Street Westward to the center
line of Section 9, except where the North and South°alleys cross. 3. Colfax Avenue
1 from Falcon Street Westward to the center line of Section 9, except where the North and
South alleys cross, and except the 18 center feet to be used as a public alley.4,The
first East-West alley South of`Colfax Avenue from Falcon Street Westward to the center
line bf Section 9, except where the North and South alleys cross.,S The first East-West
alley South of Washington Street from Kaley Street �,,estward to the center line of Sec-
tion 9, except where the North and South alleys cross. 6. The first East-West alley j
l South of Jefferson Street from Bendix Drive Westward to the center line of Section 9,
except where the North and South alleys cross. j
I
NOTE: "Section 9,11 as referred to above is Section 9 of T. 37 N. R. 2 E of the 2nd P.M.!
The -following property may be injuriously or beneficially affected by such vacation:
Lots
numbered
1001
to 1009 inclusive
Lots numbered 1052 to 1067 inclusive
Lots
numbered
1012
to 1029 inclusive
Lots numbered 1072 to 1085 inclusive
Lots
numbered
1032
to 1049 inclusive
And lot numbered 1069 I
PART
OF SECOND
PLAT
OF,LA SALLE PARK
Lots
numbered
1. to
8 inclusive
RUS8ELL'S SUB.
OF LOT NUMBER 1068 IN
LA SALLE PARK 2nd PLAT
Lots numbered 101E to 1029 inclusive.
Lots numbered 21 to 48 inclusive Lots numbered 89 t& inclusive -
Lots unmbered 55 to 82 inclusive Lots numbered 123 to 136 inclusive
h lst PLAT OF LA SALLE PARK ,j
n
L�
0
•
•
•
0
-1w
597
9
•
•
•
Lots numbered 137 to 258 inclusive Lots numbered 381 to 432 inclusive
Lots numbered 265 to 316 inclusive Lots numbered 439 to 464 inclusive
Lots numbered 323 to 374 inclusive
PART OF SECOND PLAT OF LA SALLE PARK
In the above named assessment roll, the Board hereby orders that it will meet in
the City Hall at 11:00 A, M, on the 5th day of December, 1949, for the purposes of
hearing and receiving remonstrances from all persons interested in or affected by said
vacation, and the Board further orders that notice of said hearing, togtther with the
amount of damages awarded and benefits assessed be addressed to the property owners by
publishing same on the 18t4 day of November and on the 25th day of November,1949, in
the South Bend Daily Tribune and the Weekly Mirror.
R. S. Andrysiak
F. K. Baer
Frank J. Bruggner
Freda G. Noble,
Clerk
STREET DEPARTMENT: Mr. Melton 0. Brannon, Street Commissioner, was present and matters
pertaining to his Department were discussed.
This being the date set to receive bids for a building for the Street Department,
the following sealed bids were opened and publically read:
Miller Steel & Supply Co., Inc.,
920 Plum Street,
Elkhart, Indiana.
A Non -Collusion Affidavit and Cashier's Check
in the amount of $933.70 accompanied bid.
1 lot knocked down and packaged material only
for 401x200' steel arch rib all metal building,
clear span interior, height 20' from floor love
to inside of arch rib, with 2 solid endwalls,
16 sidewall windows and 4 sidewall 12'xl2:tdoor
assemblies ..................... 9133.7.00
Thomas L. Hickey, Inc., A Non -Collusion Affidavit and Bidderts Bond
712 North Niles Avenue, in the amount of $1,000.00 accompanied bid.
South Bend, Indiana All material and labor necessary to complete
Construction of footings only for Street Depar
ment;building $3,656.00
Alternate #1
Footing & Erection of building... $6,856.00
Alternate No. 2
Unit'price on installation of steel sash, glaz
` painting and flashing .............. $ 26,00
Carl'J. Reinke & Sons A.Non-Collusion Affidavit and Bidders Bond in
741 '31st Street, the amount of $17000.00 accompanied bids.
South Bend, Indiana
r Alternate " Art
Purchase of building only $ 101000,00
Alternate "B"
Footings, walls, no concrete floors
and erection of building as per plans 7682.5
Alternate "C►r
Footing and building constructed ac-
cording to plans on file and accordin
to manufacturers specifications 177682.50
1949. All bids were rejected and will be re -advertised with bids returnable on December 5,
Rose & Katz, Clothiers and various other merchants were given permission to string
Christmas decorations from the building to the electric lamp posts in front of their
buildings.
CEMETERY DEPARTMENT: Mr, Stanley Leszczynski, Sexton, was present and matters perta
to his Department were discussed.
The Sexton informed the Board that Clinton Knoblock, an employee of the City
Cemetery, reported an injury incurred in the course of his duties. The Board directed
Mr. Knoblock to have an examination by Dr. Slominski.
'PARKING METER DEPARTMENT Mr. Maurice C. Vennet, Auditor, presented his report for the
week ending November 12, 1949,
I
Councilman Glass appeared before the Board to register a complaint on bus service
and the Board directed that the following letter be sent to the Northern Indiana Transit
Company:
Northern Indiana Transit Co.,
105 East Washington Street,
South Bend, Indiana.
Gentlemen:
One of the City Councilmen, Mr. Walter G. Glass
has advised the Board recently that a number of his consistuents
have complained to him that the schedule of the North Side bus
service has been reduced from 10 to 15 minute intervals.
Please be kind -enough to give us a report on this
matter so that we may notify Mr. Glass.
There being no further business to come before the Board, the meeting was adjourned
at 10:00 A. M.
ATTEST:JF
r T
November 21, 1949
A regular meeting of the Board
of Public
Works was held on Monday, November 21st,
1949 at 9:00 A. M. All members were present.
Minutes of the previous meeting were read
and approved. Salary claims in the
amount of
$25 686.91 were approved and ordered paid.
Claims of the following suppliers in
the amount
of $42,620.00 were approved and
ordered
paid:
Armstrong, Charles
17.00
Sheehan Tire Service
.90
Abbott, L. C.
7.00
Sheehan Tire Service
33.50
Crane Company
5.54
South Bend Foundry
172.50
Englewood Electric Supply
8.24
South Bend Fovxidry
36.00
Indiana Bell Telephone Co
10.30
Shoemaker, 0. J. Inc
10.60
Indiana Bell Telephone Co
99.97
Vitality Feed Store
2.45
Janowszyk, Joseph
57.98
West Side Hardware Co
101.95
Miller Bryant Pierce
14.00
Wheeler & Hamilton
42.50
Continental Oil Company
17747.44
Rose, Jacob
39.39
Continental Oil Company
261.16
Saunders, S. S. Co
142.20
Forbes Typewriter Co
16.50
Saunders, S. S. Co
142.20
Harmon, V. E. Dr.
3.00
Seneca Petroleum Co
414.95
Hoffman Brothers Auto Electric
129.89
Seneca Petroleum Co
414.95
Miami Hardware Co
21.02
Sheehan Tire Company
3.25
Mishawaka Equipment Co
26.07
Smogor Lumber Company
199.26
Mittler Supply Company
7.80
Smogor Lumber Company
87.99
National Mill Supply Co
6.52
Perley, Arthur P Insurance
5.50
Retco Alloy Company
35.30
Standard Oil Company
182.93
PARKING METER DEPARTMENT
Dual Parking Meter Co
8.99
West Side Lumber Yard
14.10
Indiana Bell Telephone Co
6.75
SEWAGE DISPOSAL:
Consoer, Townsend & Associates
827.90
Independent Concrete Pipe Co
6,715.80
Fattore Construction Co
187432.54
Nolan, Thomas D. Construction
12,107.16
TRAFFIC DEPARTMENT: -,Mr. Ernect Miller, Traffic
Engineer, was present and matters pertain.
ing to his Department were discussed.
RAIL ROADS:
The following letter was drafted by the Board and directed to be sent to the three
Railroads whose tracks constitute the grade crossing at Olive and Sample Streets;
Dear Sir:
The Board of Public Works and Safety at their
regular meeting held on Monday, November 21,,1949 gave
permission for you to proceed with the impr6l�n nt=at -the
intersection of Sample and Olive Streets, as detailed in
the New York Central signal department pland revision #
dated May 24, 1949.
You may discontinue the use of watchmen, other
than those occupying the tower for the control of traffic,
as soon as the installation has been completed, including the
illumination of the entire area, in accordance with the
proposal submitted by the Traffic Engineer of the City.
•
4
•
0
0-
0
This being the date set, hearing was held on the Resolution heretofore
adopted by. the Board of Public Works for the vacation of a section of
Colfax Avenue and several sections of alleys in undeveloped land in
Section 9 and 10 in T 37 N R-2 E in preparation for re -platting that
Area under vacation Resolution No. 2610. The Clerk of the Board having
shown sufficient proofs of publication and no remonstrators having appeared
and no written remonstrances having been filed with the Clerk, it was
moved, seconded and unanimously carried that the said Resolution be finally
adopted and the said alleys and streets vacated. The Engineering Depart-
ment is directed to prepare an assessment roll covering the assessments
of benefits and the award of damages to the surrounding properties.