HomeMy WebLinkAboutIndustrial Wastewater Discharge Permit - Suzuki Garphyttan CorporationCity of South Bend
Department of Public Works
Industrial Pretreatment Program
Significant Industrial User— Permit No. 221865-92310
In accordance with all the terms of Chapter 17 of the City of South Bend's Municipal Code, and
with any applicable provisions of federal or state law and regulations, permission is hereby
granted to:
Suzuki Garphyttan Corporation
4404 Nimtz Parkway
South Bend IN 46628
for the contribution of wastewater into the City of South Bend Publicly Owned Treatment Works.
This permit is granted in accordance with the application filed on 27 July, 2017.
Effective on: 22 October, 2017
Expires on : 21 October, 2022
Any violation of the terms and conditions of this permit shall be deemed a violation of the City of
South Bend Municipal Code and will subject the permittee to the sanctions set out in section 17-
11 through 17-13 of the Municipal Code.
The permittee shall file an application for a renewal permit, a minimum of 90 days prior to the
expiration date.
Approved By: Board of Public Works
Gary A. Gilot, P.E.
Suzanna Fritzber
James A. Mueller
,)I Hy—
Elizabeth A. Maradik
Therese &orau�
Page 4 of 46
FYI: Reminders regarding Suzuki's draft permit:
1) Suzuki shall report flow daily.
2) Suzuki's Authorized Representative shall sign all reports including but not limited to Periodic
Compliance Reports (PCR), Slug Control Plans, Flow Measurement Plans, and corrective actions
in response to permit violations.
3) When collecting composite samples, samples must be obtained over a 24 hour period or for the
duration of discharge within the 24 hour sampling period including, if applicable, multiple batches.
4) Samples shall be obtained through a flow -proportional sampling technique. If Suzuki can
demonstrate that time -proportional sampling is as representative as flow -proportional sampling,
then a time -proportional sample may be collected. If Suzuki chooses to demonstrate that time -
proportional sampling is accurate they must do so within 120 days of the effective date of this
permit or they shall commence flow -proportional sampling at that time. Please see Part II(B)(1) of
your wastewater discharge permit for details.
5) To be submitted with the PCR, the Certified Operator shall sign one of the following statements:
"Pretreatment Standards and Requirements are being met on a consistent basis" or "Pretreatment
Standards and Requirements are not being met on a consistent basis. Additional operation and/or
additional pretreatment is required to meet the Pretreatment Standards and Requirements".
6) Only the Authorized Representative shall be required to sign the certification statement found in
Part III (A)(4) of this draft permit.
7) Section Part 1V (13)(15) has been added in order to clarify the requirements concerning the
Authorized Representative.
8) For all required oral notifications call: 574-277-8515 and dial zero (0) to reach an operator. See
Part 111(1) of your permit for details.
9) With each permit renewal, Suzuki is required to sample for TTOs at least twice before submitting
a new Toxic Organic Management Plan (TOMP).
Page I. of 46
v
Ll