Loading...
HomeMy WebLinkAboutChange Order No. 1 - 2017 Demolitions Phase I - Project No 117-065 - Ritschard Bros IncCITY OF SOUTH BEND DEPARTMENT OF PUBLIC WORKS PROJECT CHANGE ORDER DATE: PROJECT NO: PROJECT NAME: CONTRACT DATE: CHANGE ORDER NO, SUBJECT OF CHANGE ORDER: 10-10-2017 117-065 2017 Demolitions, Phase 1 06-27-2017 (Notice to Proceed 07-13-17 1 See attached Change Order Memo for more details: Division A: Remove in Entirety Division 6: Add: Building Repair Remove Environmental Allowance Alf items completed substantially as planned. See attached Comparison of Estimate for overruns and underruns, The original contract sum $ 102,059.00 Net change by previously authorized change orders $ 0.00 The contract sum prior to this change order $ 102,059.00 By this Change Order, the project amount is The new contract sum including this change order This Change Order represents a total change of Total change for entire project ❑ increased ® Decreased $ 25,290 $ W69 -32.9 % -32,9 % Original contracted completion date/time 09-11-2017 Extension of date/time by previous change orders 0 days Dateltime extension by this change order 40 days New completion dateltime 10-21-2017 RECOMMENDED FOR APPROVAL O CT R Poject Manager CITY OF SOUTH BEND BOARD OF PUBLIC WORKS Approved Date: O)v k6 12. hcH&i�,, Printed Name and Title Ritschard Bros., Inc. Company name 1204 W. Sample Street Address South Bend IN 46619 City, State, Zip A. Therese J. Dorau Change Order No, 01 2017 Demolitions, Phase 1 Project No.117-065 OWNER: City of South Bend ENGINEER: Patrick C. Kerr, Ph.D., P.E. Indiana Professional Engineer No. 10707546 CONTRACTOR: Ritschard Bros., lnc,�R— PROJECT: 2017 Demolitions, Phase I Project No. 117-065 SUBJECT: Change Order 1 ISSUE DATE: October 10, 2017 This Change Order to the Contract document shall supplement, amend, and shall become a part of, and be incorporated as an Addendum to the Contract. The following Is a summary and description of the revisions to the Contract by this Change Order: 1) Division A has been removed from the project. This reduces the overall project by $32,744, 2) Environmental allowance has been removed from the project due to non -necessity. This reduces the overall project by $10,000. 3) BuIIdIng Repair has been added to the project to address the exposure of the wall at 3610 W Western Avenue as part of the removal of the wall at 3602-2308 W Wester Avenue. This has increased the cost by $17,464 and extended the completion time by 40 days. The overall final completion date has been Increased by 40 days. Total Change Order Request: ($25,290) SHEET 1 OF 3 Change Order No. 01 2017 Demolitions, Phase I Project No. 117-065 The following sections of the Contract Documents are revised as a result of the above changes: BIDDING AND CONTRACT REQUIREMENTS: Bid/Proposal Form: o DIVISION A: 414 N OLIVE STREET ■ REMOVAL IN ITS ENTIRETY o DIVISION C: 3602 W WESTERN AVENUE REMOVE 4 1 ENVIRONMENTAL ALLOWANCE 1 1 LS $ 10,000.00 $ 10,000.00 = AD D: 6 BUILDING REPAIR 1 LS $ 17,454.00 $ 17,454.00 SPECIFICATIONS: The following special provisions have been amended or added to the Contract Documents and are issued as part of this Change Order: XIV. PROSECUTION AND PROGRESS A. Prevailing Specifications: 2016, INDOT Standard Specifications Sec. 108 B. Additions: 1. The project will have a completion date of sixty (60 100) calendar clays for all work. The contract time will start when the Notice to Proceed is delivered and signed. 2. The Contractor shall have twenty-four (24) calendar days to complete demolition work on each site once work has begun on that site. The Contractor shall have twenty-four (14) calendar days to complete building repair work on each site once building repair work has begun on that site. XLIII. BUILDING REPAIR A. Prevailing Specifications: None B. Additions: 1. Work to be performed shall include furnishing all labor, services, materials, Insurance and equipment to install vinyl siding and repair features associated with the east face wall of 3610 Western Avenue. Such work shall include: a. Insulating the existing exposed wall cavity with batt insulation. b. Furnishing and installing new plywood sheathing to the exterior of the wall. SHEET 2 OF 3 Change Order No. 01 2017 Demolitions, Phase I . Project No.117-065 c. Wrapping newly sheathed wall with Tyvek (or equal) wrap and tape all joints. d. Furnishing and installing vinyl siding that matches the existing on the south side or meets the property owner's approval. e. Furnishing and installing new gutter and downspout on the east wall. f. Repairing roof edge on east wall. g. Furnishing and installing metal corner pieces at northeast corner of the building to encapsulate the cut brick and block. 2. Payment for BUILDING REPAIR shall be the Lump Sum Unit Price for BUILDING REPAIR as set forth in the bid/proposal. DRAWINGS: The following sheets have been revised and are issued as new sheets as a part of this Change Order: NO CHANGE END CHANGE ORDER 1 SHEET 3 OF 3 MAIN n-1