HomeMy WebLinkAbout08/26/1946 Board of Public Works Minutes269
(Layne -Northern Company,
No.
1
32t
�1147.20
No.
12
21,
0 96.60
IA�
., ishazvaka, Indiana
No.
2
151
69.00
No,
13
24t
110.40
No.
3
14 t
64.40
No.
14
25 t
115.00
1Bidderts bond in the amount
NO.
4
16t
73.60
No.
15
511
2-04.60 ;I
'j
!�
of s_�250.00
No.
5
14 t
64.40
No.
16
53 t
243.80
No.
6
24t
110.40
No.
17
27 t
10-14.20
No.
7
201
92.00
No.
18
':20 t
92.00
II
No.
8
23t.
105.30
No.
19
221
101.20
• '
No.
No.
9
10
37t
291
170.20
92.00
No.
No.
20
21
24t_
24t
110.40 II
110.40 �
No.
ll
22 t
101.20
I
�
TOTAL
c"12, 428.80 I�
The bids were referred to the
City engineer for
tabulation.and
comparison and the
I
award will be made . at the next
regular meeting.
�l
I
STREET DE PART'.ENT: ."pir. Casimer
Balka, Street Coimnissioner, was
present and matters
pertaining Eo h department were
discussed.
The Conmissioner informed the Board that there was a bad hole in the crossing
• of the Grand Trunk --Iestern Railroad at Thirtieth Street, and the Boaird lirected
the Clerk to write to the Railroad Company and notify them to have the crossing
repaired immediately.
CE11ETERY 1)EPARTIIM''TT: Tir. Stanley Leszczynski, Sexton, was present and matters per
wining o A s epartnent were discussed.
There being no further business to come before the Board, the meeting �,;as
adjourned at 11: 00 A.1I.
August 26, 1
A regular meeting of the Board of Public ':orks was held on 1;onday, August
26, 1946 at 8.30 A.z:Y. All members were -Dresent. I.iinutes of the last meeting
were read and approved. Salary claims in the amount of 12,971.48 were approved
and ordered paid. Claims of the following suppliers in the amount of ?5,506.54
were approved and ordered paid:
Badur Bros.
y778.51 Schrader, C.A. l 46.56
Continental Oil Co.
628.00 Standard Oil Company .757.29
Indiana Bell Telephone
6.00 Standard Oil Company 21109.63
1:!ishawalra Equipment
Co. 14.32 Studebaker Corp. 153.45
1Iishawaka Equipment
Co. 8.67 Studebaker Corp. .06
Sheehan Tire Service
178.31 Studebaker Corp. 1.79
Sheehan Tire Service
4.50 Upco Company 35.15
E. Lgiller (Trans.)
20.00 C. F. Balka (Trans.) 12.50
River Park Lauber Co.
409.60 Sheehan Tire Service 13.80
�{ Royal Typewriter Co.
14.50 Sheehan Tire Service 157.30
Sheehan Tire Service
3.00 South ;send Sand L Gravel 5.20
Building Dept. (Trans.) 180.00
TRAFT+IC DEPARTI:ZJfiTT:
I.Ir. Ernest i:liller, Traffic Engineer, was present and matters
pertaining to his clepartment were discussed.
This being the
date set, bids were received and opened for traffic signal
equipment as follows:
MIc6affery Company
1 uF-2 r46602 Trafflex 6 movement, 14 circuit controller
with flasher, filter, shutdown relay, flashing relay, wired
special for South Bend, complete with 1DIIH-22. time switch
•
I
II
for flashing feature "325.00 each
1 'ERPC-223d `-46711 2 way adjustable 3 section 4" post
mounting signal complete with junction compartrlent and
II
12 ter_--1inal connection block, finish I, ederal. Yellow
at "123.40 each
"45673 pole 81 height 411 pipe shaft, ornamental base
finish Federal Yellow y26.13 each
L,nglewood :electric
Same as above except a discount of 5 percent loth month.
•
South Bend Electric
Same as 1,11cCaffery Bid.
The above bids were referred to the Traffic Engineer, for tabulation and re6-v-
port.
' 2'7 0
ENGINEERI?\IG DEPART;'ENT: Contractor's bonds in the amount of �1,000.00 were approved
�! and or ere -7-ii-e-T for, Alex R. Niezgodski, itcomb w, Keller Inc., and Ruffner Bros. ;1
The contract for the test borings along the road of the proposed interceptor
server was awarded to B. J. I:'Ioore and Son of Elkhart, Indiana, their bid being,~ in the j
Board's opinion, the lowest amd best bid submitted.
VACATION.RESOLUTION N.O. 2550
This being the date set, hearing gas had on the resolution heretofore adopted
by the Board of Public ?."lorks for the vacation of the alley North of Vassar Avenue
between dilber and College Streets, excepting the North and South cross alleys under
Vacation Resolution Eo. 2550. The Clerk of the Board having shown sufficient proofs
of publication and no remonstrators having appeared and no written reraonstra ces hay.
been filed with the Clerk, it was moved, seconded and unanimously carried that the
said resolution be finally adopted and the said alleys be vacated. The Engineering
Department is directed to prepare an assessment -roll covering the assessrents of
benefits and the awards of daraa ges to the surrounding properties.
VACATION RESOLUTION NO. 2551
This being the date set, hearing was had on the -resolution heretofore adopted
by the Board of Public `� orks for the vacation of the alley ',lest of Pulaski Street f r
the North line of Lot 180, 1.7alnut 3rd Addition to Prairie Avenue - AND - the alley
North of Prairie Avenue from the alley '.`est of Pulaski Street to vacated Jackson
street under vacation resolution No. 2551. The Clerk of the Board. having ,shown
sufficient proofs of publication and no remonstrators having appeared and no written
remonstrances having been filed with the Clerk, it was moved, seconded and unanimous
carried that -t-ie said resolution be finally adopted and the said alleys be vacated.
The Engineering Department is directed to prepare an assessment.roll covering the
assessments of benefits and the awards of damages to the surrounding properties.
VACATION R -]SOLUTIOT•i NO. 2552
This being the date set, hearing ;ras had on the resolution heretofore adopted
by the Board of Public '.`forks for the vacation of the 2nd alley North of Lon` ley Avenu
from Elmer Street to Olive Street under vacation resolution No. 2552. The Clerk of
the Board 'having sho,.rn sufficient proofs of publication and no remonstrators having
appeared and no 'mitten renonstrm ces having been filed with the Clerk, it was moved,
s.econded and unanimously carried that the said resolution be finally adopted and the
said alleys be vacated. The Engineering department is directed to prepare an assess-
ment roll covering the assessments of benefits and the awards of damages to the
surrounding properties.
STREET DEPART Z.HT: The contract be twe-en the City of South Bend and ..,Ix dre,r Toth,
Architect ior pro essional services in connection Frith the building of a new street
Depart�ient Building was signed by the Board.
CE`HETER'_'' DEPARTTTEITT: 1,1r. Stanley Leszezynski, Sexton, was present and matters per-
taining to his department were discussed.
There being no further business to coke before the Board, the meeting was
adjourned at 11:15 A.i.
i{
/le9�!
h
I
September 3, 1946
A regular meeting of the Board of Public ':lorks was held on Tuesday, September
3, 1946 at 8:30 All members were present, i inutes of the last meeting were
read and approved. Claims of the following suppliers in the amount of `<'7,414,83
were approved and ordered paid;
James P. Cor_boy
25.45
Ind. E; -Bich. Elec. Co.
Q 1.12
Indiana Bell Telephone
7.48
i_cClave Printing Co.
10.00
Ind. 8-, -L3ich. Elec. Co.
.56
The i,.irror Press
9.72
Ind. 8, T:iich. Elec. Co.
167.66
South send Lim oer Co.
5.06
Ind. 1dich. Elec. Co.
7,020.04
South ;end Tribune
9.88
Ind. l: IMic Elec. Co. A
111.44
H. y . ,lo:.inski,
9,00
Chicago, South Sore & S.B.
R.R. 4.40
The-1dcCaffery Co.
25.02
Russ Gill T,iotor Sales
8.00
•
•
•
•
•
0