Loading...
HomeMy WebLinkAboutIndustrial Wastewater Discharge Permit - Pioneer Metal Finishing 2424 Foundation DriveCity of South Bend Department of Public Works Industrial Pretreatinent Program Significant Industrial User - Permit No. 160445-88012 In accordance with all the terms of Chapter 17 of the City of South Bend's Municipal Code, and with any applicable provisions of federal or state law and regulations, permission is hereby granted to: Pioneer Metal Finishing 2424 Foundation Drive South Bend IN 46628 for the contribution of wastewater into the City of South Bend Publicly Owned Treatment Works. This permit is granted in accordance with the application filed on 14.1uly, 2017. Effective on: 8 October, 2017 Expires on the: 7 October, 2022 Revised: Any violation of the terms and conditions of this permit shall be deemed a violation of the City of South Bend Municipal Code and will subject the permittee to the sanctions set out in section 17-11 through 17-13 of the Municipal Code. The permittee shall file an application for a renewal permit, a minimum of 90 days prior to the expiration date. Approved By: Board of Public Works Gary A. Gilot, P.E. Suza ,.a M i ritzberg J4Ces A. Mueller -Qkulk ---- Elizabeth A. Maradik Therese,J. Dorau 3 FYI... Below is a summary of items found in the body of Pioneer Metal Finishing's draft discharge permit: 1) Pioneer Metal Finisling, shall report flow daily. 2) Pioneer Metal Finishiing's Authorized Representative shall sign all reports including, but not limited to, Periodic Compliance Reports {PCR), Slug Control Plans, Flow Measurement Plans, and Corrective Actions in response to permit violations. 3) When collecting composite samples, samples must be obtained over a 24 hour period or for the duration of discharge within the 24 hour sanpling period including, if applicable, multiple batches. 4) Samples shall be obtained through a flow -proportional sampling teclu-iique. If Pioneer Metal. Finishing, can demonstrate that tirne-proportional sampling is as representative as flow - proportional sampling, then a time -proportional sample may be collected. Please see Part II (B) (1) of your wastewater discharge permit for details. 5) To be submitted with the PCR, the Certified Operator shall sigh one of the following statements found on Part III (A) (3) of this draft permit: "Pretreatment Standards and Requirements aje being met on a consistent basis" or "Pretreatment Standards and Requirements are not being met on a consistent basis. Additional operation and/or additional pretreatment is required to meet the Pretreatment Standards and Requirements". 6) Only the Authorized Representative shall be required to sign the certification statement found in Part III (A)(4) of this permit. 7) Section Part IV (B) (15) has been added in order to clarify the requirements concerning the Authorized Representative. 8) For all after hours (4:00 pin) required oral notifications call: 574-277-8515 and dial zero (0) to reach an operator. See Part III (I) (2) of thus permit for details. If you have any questions, feel free to contact me or Ms. Lauren Trapp at (574) 235-5852 or via email at ltrapp@soulhbendin.gov Sincerely� Vq � Manny Bueno Pretreatment Coordinator City of South Bend Division of Environmental Services 3113 Riverside Drive South Bend, IN 46628 574-277-8515 enclosures: Industrial Wastewater Discharge Drat! Permit cc: file 2 F7 a W7 I