Loading...
HomeMy WebLinkAboutAward Quotation - River Walk Subdivision Street Lighting Project No. 117-080 - TGB Unlimited dba ST Bancroft Electricr Sii I I _ .s ■ t \ :5 x � L1 a s• c jar r 21 Y � j ■ Ll Jv: ti 1 wo rr k(h 44r'..a s I ,c BOARD OF PUBLIC WORKS CITY OF SOUTH BEND INDIANA PUBLIC WORKS CONTRACT THIS AGREEMENT, made and entered into this 12th Day of September, 2017, by and between, TGB Unlimited d/b/a SIT Bancroft Electric, 25020 IN-2, South Bend, IN 46619, HEREINAFTER called the Contractor, and the Board of Public Works herein called the "Board". WITNESSETH: That the Contractor covenants and agrees to make the following improvement, as fully set out in the Request for Quotations, Standard Specifications, Special Provisions, Plans, and Bid Proposals, all of which are set forth as a part of this Contract, for: DESCRIPTION: COMPLETION DATE: AMOUNT: FUNDING: RIVER WALK SUBDIVISION STREET LIGHTING SEE SPECIFICATIONS $47,990 BASE QUOTE COLT The unit prices for this improvement were those prices as received and accepted by the Board on the Sth Day of August, 2017. The Contractor further agrees to notify the Engineer when this improvement is completed. This notification shall be in the form of a Completion Affidavit, signed by the Contractor. Upon final acceptance of the improvement by the Engineer, the Contractors final estimate will be presented to the Board for final Payment with one (1) copy of the Completion Affidavit and one (1) copy of a Waiver of Lien, BOARD OF PUBLIC WORKS TGB UNLIMITED D/B/A S/T '- BANCROFT ELECTRIC k Xk u, I = - Gar A. Gilot, Pr sident Elizabeth A. Maradik, Member Printed Name Suza . Fri berg, A. Mueller, Member Signature Therese J. rpordu, Member —Arltest Linda CERTIFICATION (To be completed if Contractor is a Corporation) I, , certify that I am Secretary of the Corporation named as Contractor herein; that who signed this Agreement on behalf of the Contractor was then of said Corporation; that said agreement was duly signed for and in behalf of said Corporation by authority of its governing body, and is within the scope of its corporate powers. Secretary Corporate Seal lei z 2 CITY OF SOUTH BEND, INDIANA CONTRACTOR'S QUOTE FOR PUBLIC WORK 1865 PROJECT NAME: River Walk Subdivision Street Lighting PROJECT NO. 117-080 QUOTES DUE Au ust 8, 2017 (Must be completed for all quotes. Please type or print) Date: August 8, 2017 Firm,: TGB Unlimited (dba) SIT Bancroft Electric Address: 25020 SR 2 City/State/Zip: South Bend, IN 46619 Telephone Number: ( 574 ) 968-2040 Agent of Bidder (if Applicable): NIA Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the public works project of: the City of South Send, Indiana, in accordance with plans and specifications prepared by: Abonmarche Consultants. Inc. and dated - -2017_ _ for the sum of (enter the Total Quote as shown on the Proposal) . _ . One Hundred a�aHundred Dollars a„OO ter Sum of Total Quote plus AiternateshownoPropos,I).,..._._.,_ ) If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any addendums attached will be specifically referenced at the applicable page. If additional units of material included in the contract are needed, the cost of units must be the same as that shown in the original contract if accepted by the City of South Bend. if the quote is to be awarded on a unit basis, the itemization of the units shall be shown on a separate attachment. By Ty Bancroft ---- (Signature) (Printed Name of Person Signing) ACCEPTANCE The above quote is accepted this C�- day of 20 Subject to the following conditions: _ r s C tc.,i�� c 41Z 0 ZIz I %O 4 B D OF PUIC W R S ��-- Gary A. ilo , resid nt M' �1 Elizabeth A. Maradik, Member James A. Mueller, Member Version 10/18/2016 Page - 9 Public Works Quote �G QUOTEIPROPOSAL `. CITY OF SOUTH BEND xti trsf7-R{ PROJECT NAME River Walk Subdivision Street Lighting PROJECT NUMBER 117-080 QUOTES DUE August 8, 2017 Base Quote Item No, Description Quantity Unit Unit Price Total Amount 1. Construction Engineering 1 LS 2. Mobilization/Demobilization 1 L5 300,00 3, 2" PVC Schedule 80 for Lighting with Pull Rope 4,220 LFT 0,00 25,320.00 4. Lighting Handhole 4 EA 5. Light Pole Foundation 19 EA 600.00 11,400.00 6. TESCO Cabinet 1 EA 6,300.00 6,300.00 7. P-1 Foundation 1 EA 600.00 600.00 8, Miscellaneous Equipment for Lighting 1 LS 1 1000.00 1000.00 Total Amount of Base Bid (Items 1 through 8) 47 990.00 Add Alternate A: Install Circuit A Item No. Description Quantity Unit Unit Price Total Amount Al. 4-1/c No. 4 Copper Cable 1,311 LFT 5.00 6,555.00 A2. Light Pole and Luminalre, LED, Install 8 EA 200.00 1,600.00 A3. Miscellaneous Equipment for Lighting 1 LS 300.00 300.00 Total Amount of Add Alternate A (Items Al through A3) $ 455.00 Add Alternate 8: Install Circuit B Item No. Description Quantity Unit Unit Price Total Amount 131, 4.1lc No. 4 Copper Cable 894 LFT 5.00 4,470.00 82. Light Pole and Luminalre, LED, Install 3 EA 200.00 600.00 83. Miscellaneous Equipment for Lighting i LS 300.00 300.00 Total Amount of Add Alternate B (items 1311 through 83) Version 10/18/2016 Page - 13 Public Works Quote Add Alternate C; Instal[ Circuit C Item No. Description Quantity Unit Unit Price Total Amount C1. 4-11c No. 4 Copper Cable 1,678 LFT 5.00 8,390.00 C2. Light Pole and Lumineire, LED, Install 4 EA 200.00 800.00 C3, Miscellaneous Equipment for Lighting i L LS 1 300.00 300.00 Total Amount of Add Alternate C (Items C1 through C3) 9490.00 Add Alternate D: Install Circuit B Item No, Description Quantity Unit Unit Price Total Amount Dl. 4.1/c No, 4 Copper Cable 820 LFT 5.00 4,100.00 132. Light Pale and Luminaire, LED, Install 4 EA 200.00 800.00 D3, Miscellaneous Equipment for Lighting 1 LS 1 300.00 300,00 Total Amount of Add Alternate D (Items D1 through D3) 5,200.00 Add Alternate E. Furnish Light Pole Assemblies Item No. Description Quantityi Unit unit Price Total Amount E1. Light Pole and Lumina€re, LED, Furnish 19 1 EA 3 700.00 70,300.00 Total Amount of Add Alternate E (items E1 through E1) 70 300.00 Total Amount Base Quote Total Add Alternate A: Install Circuit A Total Add Alternate B; Install Circuit B Total Add Alternate C; Install Circuit C Total Add Alternate D; Install Circuit D Total Add Alternate E; Furnish Light Assemblies Quoter (Firm): TGB Unlimited (dba) SIT Bancroft Electric Address: 25020 SR 2 City/State/zip; South Bend, IN 46619Telephone Number: (574) 968-2040_ Ty Bancroft (Printed Name of Person Submitlinq} 47,91, i 8,455.00 5 370.00 9,490.00 5,200.00 70 300.00 Version 1011812016 Page - 14 Public Works Quote 0