Loading...
HomeMy WebLinkAboutOpening of Quotations - Bowen Street Drainage Improvements Project No. 116-082A - Rieth Riley Construction Co., Inc.3 y4 6 ti When the prospective Contractor is unable to certify to any of the statements below, It shall attach an explanation to this Affidavit. CONTRACTOR'S NON -COLLUSION AFFIDAVIT, NON -DEBARMENT AFFIDAVIT, EMPLOYMENT ELIGIBILITY VERIFICATION, NONDISCRIMINATION COMMITMENT FOR CONTRACTORS AND CERTIFICATION OF USE OF UNITED STATES STEEL PRODUCTS OR FOUNDRY PRODUCTS (Must be completed for all quotes and bids. Please type or print) STATE OF INDIANA ) ) SS: St. Joseph _ COUNTY ) The undersigned Contractor, being duly sworn upon his/her/its oath, affirms under the penalties of perjury that: 1. Contractor has not, nor has any other member, representative, or agent of the firm, company, corporation or partnership represented by him, entered into any combination, collusion or agreement with any person relative to the price to be bid by anyone at such letting nor to prevent any person from bidding nor to induce anyone to refrain from bidding, and that this bid is made without reference to any other bid and without any agreement, understanding or combination with any other person in reference to such bidding. Contractor further says that no person or persons, firms, or corporation has, have or will receive directly or indirectly, any rebate, fee, gift, commission or thing of value on account of such sale; and 2. Contractor certifies by submission of this proposal that neither contractor nor any of its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and 3. Contractor has not, nor has any successor to, nor an affiliate of, Contractor, engaged in investment activities in Iran. a. For purposes of this Certification, "Iran" means the government of Iran and any agency or instrumentality of Iran, or as otherwise defined at Ind. Code § 5-22- 16.5-5, as amended from time -to -time. b. As provided by Ind. Code § 5-22-16.5-8, as amended from time -to -time, a Contractor is engaged in investment activities in Iran if either: Contractor, its successor or its affiliate, provides goods or services of twenty million dollars ($20,000,000) or more in value in the energy sector of Iran; or ii. Contractor, its successor or its affiliate, is a financial institution that extends twenty million dollars ($20,000,000) or more in credit to another person for forty-five (45) days or more, if that person will (i) use the credit to provides goods and services in the energy sector in Iran; Version 7/28/2016 Contractor's laid for Public Works - 15 and (ii) at the time the financial institution extends credit, is a person identified on list published by the Indiana Department of Administration. 4. Contractor does not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the Contractor subsequently learns is an unauthorized alien. Contractor agrees that he/she/it shall enroll in and verify the work eligibility status of all of Contractor's newly hired employees through the E-Verify Program as defined by I.C. 22-5-1.7-3. Contractor's documentation of enrollment and participation in the E-Verify Program is included and attached as part of this bid/quote; and 5. Contractor shall require his/her/its subcontractors performing work under this public contract to certify that the subcontractors do not knowingly employ or contract with an unauthorized alien, nor retain any employee or contract with a person that the subcontractor subsequently learns is an unauthorized alien, and that the subcontractor has enrolled in and Is participating in the E-Verify Program. The Contractor agrees to maintain this certification throughout the term of the contract with the Clty of South Bend, and understands that the City may terminate the contract for default if the Contractor fails to cure a breach of this provision no later than thirty (30) days after being notified by the City. f. Persons, partnerships, corporations, associations, or joint venturers awarded a contract by the City of South Bend through its agencies, boards, or commissions shall not discriminate against any employee or applicant for employment in the performance of a City contract with respect to hire, tenure, terms, conditions, or privileges of employment, or any matter directly or indirectly related to employment because of race, sex, religion, color, national origin, ancestry, age, gender expression, gender identity, sexual orientation or disability that does not affect that person's ability to perform the work. In awarding contracts for the purchase of work, labor, services, supplies, equipment, materials, or any combination of the foregoing including, but not limited to, public works contracts awarded under public bidding laws or other contracts in which public bids are not required by law, the City, its agencies, boards, or commissions may consider the Contractor's good faith efforts to obtain participation by those Contractors certified by the State of Indiana as a Minority Business ("MBE") or as a Women's Business Enterprise ("WBE") as a factor in determining the lowest, responsible, responsive bidder. In no event shall persons or entities seeking the award of a City contract be required to award a subcontract to an MBE/WBE; however, It may not unlawfully discriminate against said WBE/MBE. A finding of a discriminatory practice by the City's MBE/WBE Utilization Board shall prohibit that person or entity from being awarded a City contract for a period of one (1) year from the date of such determination, and such determination may also be grounds for terminating the contact for which the discriminatory practice or noncompliance pertains. 7. The undersigned contractor agrees that the following nondiscrimination commitment shall be made a part of any contract which it may henceforth enter into with the City of South Bend, Indiana or any of its agencies, boards or commissions. Version 7/28/2016 Contractor's Bid for Public Works - 16 QUOTE/PROPOSAL CITY OF SOUTH BEND PROJECT NAME Bowen Street Drainage Improvements PROJECT NO. 116-083A QUOTES DUE August 22, 2017 — 9:30 AM EST Responding Firm Name: Item No. Description Quantity Unit Unit Price Total Amount 1 Construction Engineering LS 1 $ $ 2,544.00 2,544.00 2 Mobilization and Demobilization LS 1 $ $ 7,521.50 7,521.50 3 Clearing Right of Way LS 1 $ $ 753.50 753.50 4 Pavement, Remove SYS 224 $ $ 11.50 2,576.00 5 Curb, Concrete, Remove LFT 20 $ $ 16,50 330.00 6 Excavation, Common LS 1 $ $ 13,583.00 13,583.00 7 Structure Backfill LS 1 $ $ 9,906.00 9,906.00 8 Compacted Aggregate, No. 53 Base TON 50 $ $ 40.00 2,000.00 9 HMA, Surface, Type B, 9.5 mm TON 25 $ $ 156.00 3,900.00 10 HMA, Base, Type B, 19.0 rnm TON 74 $ $ 104.00 7,696.00 11 Curb, Concrete LIFT 20 $ $ 58.00 1,160.00 12 Geotextiles SYS 300 $ $ 6.00 1,800.00 13 1500 Gal, Drywell Structure EACH 4 $ $ 6,112.00 24,448.00 14 Casting, Furnish and Adjust to Grade, EACH 4 $ $ Drywell 332.00 1,328.00 15 Pipe, Circular, 8 IN LIFT 40 $ $ 84.00 3,360.00 16 Power Pole Support DAY 6 $ $ 1400.50 8,403.00 17 Maintenance of Traffic LS 1 $ $ 891.00 891.00 Total Amount of Quote $ 92,200.00 Version 7/28/2016 Contractors Bid for Public Works -18 T 9 9 J w� , �. fA94 V7 U. U�; ���. ��i _.F';„"�i;.�$. �"'�i'�'"'.m.w!:.. £14 .,.. .� �,'.53.�'- .f,us...R b nz r 16 •� � � Cyr �, �� � _ -� _ cY � Cal _i it Al I , C , �- `JJJljf'6�A,- � A�:Q` CERTIFICATE OF QUALIFICATION to provide CONSTRUCTI01 SI R-y'IC`I S for PUBLIC WORKS PROJECTS to the STATE OF MILAtvA Thss Certification Board, ha -ring duly considered application for qualiacation in te—.,js of apparnt rxrerie❑ce and fin-�,uc151 resources; and unclef the applicable Indicna Coda 4-13.E—I' end adopted rules of This B=d, bemby iSTies a Certificate of Q121if1£a-ftn to provide coustruction s:. iic4es tG the Staze ofkdi2na for Public Works Project to: RIETH RILEY CONSTRUCTION CO INC 3626 ELKHART RD PO SOX 477 GOSHEN IN 45527-0477 Phone 574-675-5183 Fax 574-375-2405 Company Official KEITH ROSE for the tw.eirty-seven month period statV d hcfeia: unless revoked by this Board for cause, and in the classincadons of s,cic: s stated Belo;.. This ccrtilica. z supercedes any pi-nriou3 ceshntcate. 1611.01 Concrete Construction of Roads & Curbing 16il-02 Asphalt Constraction of Roads and Parking Lots 162201 Gen Contr-brdgs,vdcts,elvd hwys,rhvy,finls U23.03 Sayers andlorlVater LTnas 1744.01 Earthmoving and land Clearing 1794.02 Excavation - - 1755.02 Demolition of Pavements and Roads CERTIFICATION DATE 112112016 EXPIRATION DATE 4121/2018 THIS CERTIFICATE UMIED BYE STATE OF Z�DL -nk PUBI iC _V10 XS DMSION CERTIFICi�TIOFTBOA$D, 402 VEST WAST UOI STREET, ROO i 4 I67, L` DT—k i.A2OLTS, L LA'4 4.620 <, ALSO AM AS TBE OFFTCLAL ATOTICE OF EXPRATIO'l Tracy L. Gross, Exxec&je Cr;,tary Certz,cation Board GAPI-V'QZ SLR Fort S,-eSP R_ r. GTIM Trrlirkak QuatwumSm ISSUED BY _ s _ INDIANAPOLIS, IN June 17, 2016 TO P-rF IiRII.EYCONSTRUCTION GOSHE, I, M who has filed with the Department a Contractor's Statement of Experience and Financial Condition as required under Indiana Code 8-23-10, is hereby qualified to bid at any Department of Transportation letting in Classes of Work and within the amount and other limitation of each classification as listed below, for such period as the uncompleted work on hand from all sources does not exceed theAggregate amount. Classification references by name or symbol are in accordance with the definitions in the Contractor's Statement of Experience and Financial Condition. This certificate supersedes any certificate previously issued, but is subject to revision or revocation according to the law, if and when changes in the financial condition of the contracting firm or other facts justify such: revision or revocation - 'stand August 1, 2016 T hru July 31, 2017 AGGREGATE................ ........................................ :........................ ...................................................... SU1,iLLV11TI;I) 0083 CLEANISI;AL CRACKSIJOIi~ TS: PCCPA-1 1A PVNff.............................................................................. $5,000,0oo 0103 3-SIDED BOX STRUCTURE(S) W/SPAN,>20FT.................................. ..•-...................... .......... ...... -.........,$iTITM- MD 0290 SEWER AND PIPE CLEANINCr AND I.MG...... ........... .............................................................. ........... $5,000,000 0318 TRAFFIC CONTROL:V'0W AND ICE REMOVAL.................................................................................$LNLI1' i ED 0390 UNDERSEAL "A ATERPROOPING NIEML BRANE................ ...................................................... ..............$UNLI��fiTED A(A) CONCRETE PAVEMENT, GENERAL ..... ................... ........... ...................................... ,.................. ....:......$UNLPi3IMD A(B) CONCRETE PAVE14=, LI&IITED......................................................................................:..................$UNYLIVIITED D(A) ASPHALT PAVING: CFRf BMA PLANT .................... ............ ............... ...... .......... ................................. $UNLIIvffI'1 D C(A) HEAVY GRADING ... .............................. ............... .................... ................................................................. $UNL1IvIfI'EI) C(B) LIGHT GRADING .... :...................................... ...................... .........................:......................................... $UNLTiiSTED D(A) HWY OR RR BRIDGES OVER WATER.................................................................. ......................... $UMLLNUTED D(B) HWYORRRBRIDGES OVER HIGHWAYS ................... ..........SUNZMiTED D(C) HWY BRIDGES REQ PROTECTION OF RR TRACKS .................. .......................................................... SUINLI&ffr D E(C) BRIDGE DECK OVERLAY AND IVILNOR REPAIR ....................................... ........................................... .SU,NI RAITIM E(E) SNIA.LL STRUCTURES AND DP —UN 4GE ITE- vlS...... ........................ ......... ..................... .................. ..... $UNITWTED E(F) SURFACE'PYL,kSONRY AND MS C CONCRETE .................. —.-- ............................................... ..... —.3UNLWITED E(M DEEP SEWER ANIWOR EXCAVATION .................... ............... ---- ............................ .......... .............-.-.$UNLiRvIlTED E(R) ROAD b1ILLLNG..... ................................ .................................... .............................................. .................. .SUNLNHJ-=D E(T) DENIOLITION...................:......................................................................_,.............:..................................$UNu IrI')rD I ` PREQUALI 1CAT(ON ENGINEER State Fam' 20508 (R315-05)