Loading...
HomeMy WebLinkAboutChange Order No. 2 - Calvert Street Lift Station Replacement - HRP Construction Inc9� � Date Name BOARD OF PUBLIC WORKS AGENDA ITEM REVIEW REQUEST FORM ust 11. 2017 Jacob M. Klosinski Department Utilities Wastewater Purchasing ® Carol Kurzhal Check the. 'Approp riate Item Type ReouiredforAll Submissions L J Agreement LJ Contract L] Proposal LJ Addendum ❑ Professional Services ❑ Resolution ❑ Bid Opening ❑ Bid Award ❑ Req. to Advertise ❑ Title Sheet ❑ Quote Opening ❑ Quote Award ® Change Order No. 2 ❑ CIO & PCA No. ❑ PCA ❑ Ease/Encroach. ❑ Traffic Control �I Other: Company or Vendor Name HRP Construction, Inc. New Vendor ❑ Yes ® No ❑ If Yes, Approved by Purchasing MBEIWBE Contractor ❑ MBE ❑ WBE MBE/WBE Contractor Requested ❑ No ❑ Yes Name of Company Project Name Calvert Street Lift Station Replacement Project Number Funding Source Account No. Amount Terms of Contract 116-053 Wastewater Capital Account 642-0630-415-43-66 Lump Sum and Unit Prices Purpose/Description The Division of Utilities recommends the Board of Public Works approval of Change Order No. 2 which includes changes to the scope of work adjusted guantities, and 30-dayextension to Final Completion (see Inter -Office Memorandum for Details). ❑ Required Contractor's Certification Form Attached (Non - Collusion. Non -Discrimination, Non -Debarment, E-Verifv. Iran, etc.) Amount of ❑ increase $ ® Decrease $ 7,197.60, +30 Days to Final Completion (Utility Conflict) Previous Amount $ 927,805.80 Current Percent of Change:--0.78%; Previous +1.18%% New Amount $ 920,608.20 Total Percent of Change: +0.40% Dispersal After Approval Copy Original ® ❑ Al Greek, Director of Utilities ® ❑ Jacob M. Klosinski, Assistant City Engineer ® ❑ Carol Kurzhal, Director of Financial Services, Environmental Services INTER -OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF UTILITIES TO: Members of the Board of Public Works Eric Horvath, Director of Public Works Michael Schmidt, Board of Public Works Attorney FROM: Al Greek, Director of Utilities Jacob M. Klosinski, Assistant City Engineer SUBJECT: Agenda Request Form — Change Order No. 2 Project No. 116-053: Calvert Street Lift Station Replacement DATE: August 11, 2017 The Division of Utilities is requesting the Board of Public Works approval of Change Order No. 2 for Project No. 116-053 Calvert Street Lift Station Replacement. Refer to attached documents for supporting details. Change Order No. 2 addresses the following changes: Item 22: Lift Station Lift Station, decrease in cost due to change in wall sleeve arrangement ($ 2,305.60) Item 5: Temporary Erosion and Sediment Control Erosion Control, decrease in cost due to silt fence quantity reduction ($ 998.00) Item 16: Doghouse Manhole Manhole Structure No. 4, decrease in cost due to reduction of fittings ($ 3,454.00) Item 16: Doghouse Manhole Doghouse Manhole, Testing Credit ($ 308.00) Item 22: Lift Station Concrete, Testing Credit ($ 132.00) NET DECREASE FOR CHANGE ORDER NO. 2 ITEMS ($ 7,197.60) Original Contract Sum $ 917,000.00 Net change by previously authorized change orders $ 10,805.80 The contract sum prior to this change order $ 927,805.80 By this change order, the project amount decreases by ($ 7,197.60) The new contract sum including this change order is $ 920,608.20 This Change Order represents a total change of -0.78% Total change for the entire project +0.40% Time Extensions resulting from Change Order No. 2: Substantial Completion. + 0 days Final Completion: +30 days The time extension addresses an adjustment to Final Completion to compensate for American Electric Power's delay in completing the permanent power connection to the Lift Station. AEP's delay impacted the demolition schedule of the decommissioned lift station. The funding sources for the construction of this project is Utilities, Wastewater Capital Account (642-0630-415-43-66). If there are questions regarding the subject change order, please contact Al Greek (Ext. 4210) or Jacob M. Klosinski (Ext. 9496) at the Division of Utilities. Z.11 Excavar1REQUE `r lTO: City of South Bend Attn: Jacob Klosinski 3113 Riverside Drive South Bend, IN 46628PROJECT: Calvert Street Lift Station HRP project: 1483 RE: Wall Sleeve CreditDescription of Request: Credit for materiacd; using double link eBasis of Proposal: Lead time to man f ( I�P STR�UCTIONi •SEW,ERS•WATER4 19 a of c�EtiUieE FOR CHANGE ORDI ENGINEER: difference between in then lift station. ire wail sleeves. DATE: July 25, 2017 RFCO #: 3 Rev. 1 South Bend pI ind wall sleeves and coring a hole and CITY U.O.M. Desction CbsC Each l Extended Cost; 4 EA 8" x 1' Fig X PE $ E224,00 I $ 896.00 2 EA 8" MJ Plug wl Accessories $ 1315.00 $ 630.00 3 EA 8" x 1' MJ X MJ Wall Sleeve wl Megalugs $ 1846.00 $ 2,538.00 4 EA 8" SS Flange Pack $ I . ' 33.00 $ 132.00 I $ 4,196.00 Add: 9—Ty U.O.M. Description :C stlEach ; Extended Cost 3 FA 8" x 3' Flg X PE $ : 1373A0 $ 1,119.00 E .3 EA 8" Zip Flange $ 60.00 $ 180.00 2 EA 8" Blind Flange $ I j351.00 $ 702.00 3 EA 8" SS Flange Pack i $ j 33.00 $ 99.00 " $ 2,100.00 . Net Credit wl HRP mark-up E $ 2,305.60 Shipping: 5777 Cleveland Mailing: P.O. Box 266 Joe Sagga s HRP Const uc ion Inc. Date I Bend, IN 466 8- 418 Phone 574-271-7800 Bend, IN 466; - 266 FAX 574-271-0524 HRP CONSTRUCTION1 r EXCAVATING•SEWERS•WATERMAINS "CW0%k&29 90 BE Of e gwicz If REQUEST FOR CHANGE ORDER r DATE: July 25, 2017 + RPCO #: 4 Rev. 1 TO: City of -South Bend Attn: Jacob Klosinski 3113 Riverside Drive South Bend, IN 46628 ' PROJECT: Calvert Street Lift Station OWNER:' City of South Bend HRP Project: 1483 RE: Silt Fence Credit ENGINEER: DLZ Description of Request'. - Credit for not installing slit fence on the south and east sides of the site as Indicated on the erosion control plan sheet. Basis of Proposal: Silt fence was not needed. Owner asked for credit. Length not installed = 3B0' Cost for Installation & removal per foot = $2.50 Credit with HRP mark-up = $998.00 Joe Saggars HRP Construction Inc. -7-as—/-7 Date Shipping: 5777 Cleveland Road South Bend, IN 46628-9418 Phone 574-271-7800 Mailing: P.O. Box 266 South Bend, IN 46624-0266 FAX 574-271-0524 ExCAVA rr1 E ' .. o, REQUE! IRP 3T FOR CHANGE ORD 1 Il f i TO: City of South Bend 1 Attn: Jacob Klosinski 3113 Riverside Drive South Bend, IN 466281 PROJECT: Calvert Street Lift Statlon: OWNER: t HRP Project: 1483 i ROE: Structure 4 piping j ENGINEER* Description of Request: Credit for notlir'stalling a portion of the piping Basis of Proposal: Piping would Ibe; Into the existing flow chanty credit. I Ns DATE: August 2, 2017 RFCO #: 5 Rev. 2 City of South Bend DLZ 1 inside structure 4. .I. Owner modified plumbing and asked for Deduct: 1 I QTY U.O.M. Description I Cost Each Extended Cost 1 EA 8" x 2' Fig X PE ; $ 330.00 $ 330.Q0 1 EA 8" Flanged 90 1 $ 618,00 $ 618.E30 1 EA 8" Mind Flange i 351.00 $ 351,00 1 EA 8" Flanged Tee $ 1,067.00 $ 1,067. i 0 4 EA 8" Flange Pack I $ 33.00 $ 132.i 0 2 EA 8" Pipe Anchor ; $ 195'00 !E $ 390:Q0 II 2 HR 2-Man Sewer Crew: w/ Equipment $ 126.00 $ 252.10 I i I $ 3,140.gO * 401 lined pipe & fittings Net Credit wl HRP mark-up i $ . 3,454.10 Joe(�Iggars "- HRP Qdnstruction Inc. 21-4-1_? Date Shipping: Mailing: 5777 Cleveland Road ' South Bend, IN P.O. Box 266 South Bend, IN 3 $ Phone 574-271-7800 6 FAX 574-271-0524 HRP GUNSTRUCTION1 EXCAVATING-SEWERS•WATERMAINS "('W'Juz9 9, B, Cry -&-Ivtae ", REQUEST FOR CHANGE ORDER DATE: July 25, 2017 { R1FCO #: 6 TO: City of South Bend Attn: Jacob Klosinski 3113 Riverside Drive South Bend, IN 46628 ' PROJECT: Calvert Street Lift Station OWNER. City of South Bend HRP Project: 1483 RE: Structure #1 & ##4 vacuum test ENGINEER: DLZ Description of Request: Structures ##1 & #4 are doghouse manholes. Doghouse manholes are not vacuum tested. Basis of Proposal: Owner asked for credit. Description _,ty Unit Unit Price Extension 2-man sewer crew with equipment 2 HR $126.00 $252.00 Testing Equipment 2 HR $28.00 $56.00 Total for Change Order $308.00 Jd%Sagga►s °0 HRP Construction Inc. %—-7 Date Shipping: 5777 Cleveland Road South Bend, IN 46628-9418 Mailing: P.O. Box 266 South Bend, IN 46624-0266 Phone 574-271•-7800 FAX 574-271-0524 HRP z CUNSTRUCTIUN1 EXCA VA TING-SEWERS-WA r7 fI TERMAI NS npJ EZo REQUEST FOR CHANGE ORDER DATE: July 25, 2017 TO: City of South Bend- RFCO M 7 Attn: Jacob Klosinski 3113 Riverside Drive South Bend, IN 46628 ' PROJECT: Calvert Street Lift Station OWNER: City of South Bend HRP Project: 1483 RE: Concrete testing ENGINEER: DLZ Description of Request: Concrete testing company failed to make field cylinders on two occasions. Basis'of Proposal: Owner asked for credit. Description f3ty unit Unit Price Extension Field Cylinder wl Pioneer mark-up 8 EA $15.75 $126.00 Total Change Order w/ HRP mark-up $132.00 J16e Saggars HRP Construction Inc. 7 Date Shipping: 5777 Cleveland Road South Bend, IN 46628-9418 Mailing: P.O. Box 266 South Bend, IN 46624-0266 Phone 574-271-7800 FAX 574-271-0524