HomeMy WebLinkAboutChange Order No. 1 - Fellows Streetscape, Phase II Project No 116-041B - Walsh & Kelly Incm A, � �� r �� INTER -OFFICE MEMORANDUM DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING TO: Linda M. Martin, Clerk Board of Public Works FROM: Patrick C. Kerr, Ph.D., P.E., Director of Redevelopment Engineering SUBJECT: Change Order No. 1: Fellows Streetscape Phase II Project No. 116-041 B DATE: July 24, 2017 Herewith is a summary and explanation for the Change Order being submitted: A pay item for Temporary Approach has been added to the project in order to maintain access to properties between the time when approaches are removed and new approaches are constructed. The overall final completion date was not changed. There was a net increase of $5,000 to overall contract amount. Please call me with your questions (5931). Change Order No. 01 Fellows Streetscape, Phase II Project No. 116-041B OWNER: City of South Bend ENGINEER: Patrick C. Kerr, Ph.D., P.E. Indiana Professional Engineer No. 10707546 CONTRACTOR: Walsh & Kelly PROJECT: Fellows Streetscape, Phase II Project No. 116-041B SUBJECT: Change Order 1 ISSUE DATE: August 8, 2017 This Change Order to the Contract document shall supplement, amend, and shall become a part of, and be incorporated as an Addendum to the Contract. The following is a summary and description of the revisions to the Contract by this Change Order: A pay item for Temporary Approach has been added to the project in order to maintain access to properties between the time when approaches are removed and new approaches are constructed The overall final completion date was not changed. Total Change Order Request: $5000.00 Page 1 of 2 Change Order No. 01 Fellows Streetscape, Phase iI Project No. 116-041B The following sections of the Contract Documents are revised as a result of the above changes: BIDDING AND CONTRACT REQUIREMENTS: Bid/Proposal Form: Item Description Quantity Unit Unit Price Total Amount No. 16 TEMPORARY APPROACH 100 TON $50.00 $5,000 SPECIFICATIONS: The following special provisions have been amended or added to the Contract Documents and are issued as part of this Change Order: xxxvlll. TEMPORARY APPROACH A. Prevailing Specifications: 2016, INDOT Standard Specifications Section 205 B. Additions 1. The Contractor shall construct a temporary approach immediately after removal of an approach that is to be replaced and maintain such approach until a new approach has been constructed. No property with an approach shall be without a temporary or new approach between 5 pm and 8 am. 2. A temporary approach shall match INDOT's definition of a temporary stable construction entrance. It is a sediment control measure consisting of a stabilized aggregate pad over geotextile. See INDOT Standard Drawing E 205-TECP-01 for details. 3. Payment shall be made at the Unit Price specified in the Proposal as follows: TEMPORARY APPROACH ................... TON DRAWINGS: The following sheets have been revised and are issued as new sheets as a part of this Change Order: NO CHANGE END CHANGE ORDER 1 Page 2 of 2 Q � `���` ���� :� � ,r�- �� - � � •gin �€a �� � � � � � ,� I