HomeMy WebLinkAboutOpening of Bids - Newman Center Site Development Project No. 117-060R - The Robert Henry Corporation..: E=
� 4
I
PT
F� F]
.
77
-t;
k�
�r
Dim
:i0ta.'3'. v -. is':xe�, 'rti. yy�y'iiGflitY
-24
7v ,�
' `'�`
w.. .._ - - - -
} -
/ Y
y 1 _
a
79
-
-
�-
I
-
�°s�ro
4 ,
a v-
4 %-
4g-0Ir
WA-
8
t � -
n W.
ISFil."'I
6 a IKII;-F 1 €-
c
7I�.�.a.h....:G.
_
It.
yy# 4 ka
l_
- r -.-0 :�. _�Min&
Project Name: Newman Center Site Development
Project No. 117-06OR
For Bids Due: July 25, 2017
DIVISION A: NEWMAN CENTER SITE DEVELOPMENTS
Item
No.
Description
Quantity
Unit
Unit Price
Total Amount
1.
lConstruction Engineering
1
LS
$1,963.00
$1,963.00
2.
1 Mobilization and Demobilization
1
LS
$22,264.00
$22,264.00
3.
Video record
1
LS
$1,500.00
$1,500 00
4.
Maintaining Traffic
1
LS
$390,00
$390.00
5.
Inspection Hole
4
EA
$625.00
$2,500.00
6.
Clear Right of Way
1
LS
$3,910.00
$3,910.00
7.
Pavement Removal
491
SYS
$18.52
$9,093.32
8.
Common Excavation
1
LS
$33,000.00
$33,000.00
9.
Temporary Erosion Control
1
LS
$3,450.00
$3,450.00
10.
Temporary Silt Fence
565
LF
$2.90
$1,638.50
11.
Temporary Inlet/Outlet Protection
4
EA
$1,438.00
$5,752.00
12.
lCompacted Aggregate, No. 53, Base
39
TON
$104.65
$4,081.35
13.
HMA for Patching, Type A
5
TON
$446.19
$2,230.95
14.
HMA for Parking Lot
115
SYS
$48.06
$5,526.90
15.
PCCP for Approaces, Sin,
46
SYS
$105.16
$4,837.36
16.
Seeding and Sodding
1148
SYS
$13.69
$15,716.12
17.
Sanitary Sewer Service, including cleanouts
130
LF
$191.13
$24,846.90
18.
Existing Santitary Sewr Service, Removal
1
LS
$4,370.00
$4,370.00
19.
Water Service (fire)
52
LF
$393.70
$20,472.40
20.
Water Service (domestic)
52
LF
$119.49
$6,213.48
21.
Water Tapping Fee
1
LS
$0.00
22.
Fire Protection, Lead-in
1
LS
$0.00
23.
Corporation Stop
1
EA
$0.00
24.
Tee, 16 x16 in.
1
EA
$0.00
25.
Gate Valve, 61n.
1
EA
$0.00
26.
Overhead Utility, Removal
1
LS
$300.00
$300.00
27.
Light Pole, Removal
2
EA
$500.00
$1,000.00
28.
Tree, Remove
2
EA
$2,400.00
$4,800.00
29.
Concrete Sidewalk
252
SYS
$70.31
$17,718.12
30.
Concrete Stairs
17
SYS
$884.00
$15,028.00
31.
Concrete Patio
145
SYS
$54.60
$7,917.00
32.
Handrails for Stairs
76
LF
$0.00
$0.00
33.
PCCP for Drive and Dumpster Pad
293
SYS
$85.76
$25,127.68
34, 11,000
Gallon Grease Trap & all piping
1
LS
$5,865.00
$5,865.00
35.
Dumpster Area Enclosure
1
LS
$3,986.00
$3,986.00
36.
Patio Pavers
928
SFT
$21.79
$20,221.12
37.
Footing and Columns for Patio Canopy
1
LS
$5,556.00
$5,556.00
38.
Concrete Base for Lights
2
EA
$1,800.00
$3,600.00
39.
Conduit for Light Poles
210
LF
$20.00
$4,200.00
40.
Line, Thermoplastic, Solid, White, 4in.
400
LF
$0.95
$380.00
41.
Line, Thermoplastic, Solid, Blue, 4in.
60
LF
$5.00
$300.00
42.
Pavement Message Marking, Thermoplastic,
2
EA
$290.00
$580.00
43.
Outdoor Light and Post
2
EA
$4,000.00
$8,000.00
44.
ISign Post, Square, Type 2, Reinforced Anchor Base 20
LF
$37.501
$750.010
145.
Sign, Sheet With Legend 0.0801n. 3
SFT
$75.00
$225.00
DIVISION A TOTAL $299,310.20
DIVISION B: SAMPLE STREET AND EDDY STREET IMPROVEMENTS
Item
No.
Description
Quantity
Unit
Unit Price
Total Amount
1.
Construction Engineering
1
LS
$1,963.00
$1,963.00
2.
Mobilization and Demobilization
1
LS
$2,943.00
$2,943.00
3.
Video record
1
LS
$728.00
$728.00
4.
Maintaining Traffic
1
LS
$390.00
$390.00
5.
Inspection Hole
4
EA
$624.61
$2,498.44
6.
Clear Right of Way
1
LS
$1,320.00
$1,320.00
7.
Sign, Remove & Relocate
3
EA
$200.00
$600.00
S.
Pavement Removal
408
SYS
$15.53
$6,336.24
9.
Common Excavation
1
LS
$17,920.00
$17,920.00
10.
Curb, Concrete, Remove
430
LF
$8.28
$3,560.40
11.
Temporary Erosion Control
1
LS
$0.00
12.
Temporary Slit Fence
326
LF
$3.00
$978.00
13.
Temporary Inlet/Outlet Protection
3
EA
$191.71
$575.13
14.
Compacted Aggregate, No. 53, Base
25
TON
$68.40
$1,710.00
15.
HMA for Patching, Type A
7
TON
$308.00
$2,156.00
16.
HMA for Right of Way, Full Depth
96
SYS
$105.38
$10,116.48
17.
1 HMA Wedge and Level, Type A
86
TON
$137.92
$11,861.12
18.
Curb and Gutter, Type B
126
LF
$38.48
$4,848.48
19.
Standard Curb
333
LF
$31.12
$10,362.96
20.
Concrete Sidewalk
332
SYS
$70.31
$23,342.92
21.
Concrete Curb Ramp
37
SYS
$197.00
$7,289.00
22.
Seeding and Sod
161
SYS
$28.75
$4,628.75
23.
Line, Thermoplastic, Crosswwalk, 61n.
89
LF
$2.75
$244.75
24.
Line, Thermoplastic, Stop Bar, 24in.
11
LF
$9.60
$105.60
25.
Line, Thermoplastic, Solid Yellow, 4in,
590
LF
$0.95
$560.50
26.
Sign Post, Square, Type 2, Reinforced Achor Base
20
LF
$37.50
$750.00
27.
Sign, Sheet With Legend 0.080in.
9.8
SFT
$75.00
$735.00
28.
Line, Thermoplastic, Solid, White, 4in.
600
LF
$0.95
$570.00
29.
Line, Thermoplastic, Solid, Blue, 4in.
20
LF
$5.00
$100.00
30.
Pavement Message Marking, Thermoplastic,
1
EA
$290.00
$290.00
31.
Pavement Message Marking, Thermoplastic, No
1
EA
$290.00
$290.00
DIVISION B TOTAL $119,773.77
DIVISION C: EDDY STREET AND BEYER AVENUE IMPROVEMENTS
Item
Na.
Description
p
Quantity
Unit
Unit Price
Total Amount
1.
Construction Engineering
1
LS
$1,000.00
$1,000.00
2.
Mobilization and Demobilization
1
LS
$3,248.00
$3,248.00
3.
Video record
1
LS
$728.00
$728.00
4.
Maintaining Traffic
1
LS
$390.00
$390.00
5.
Inspection Hole
4
EA
$625.00
$2,500.00
6.
Clear Right of Way
1
LS
$1,320.00
$1,320.00
7.
Sign, Remove, Relocate
2
EA
$100.00
$200.00
8.
Pavement Removal
250
SYS
$18.40
$4,600.00
9.
Common Excavation
1
LS
$15,240.00
$15,240.00
10.
Curb, Concrete, Remove
300
LF
$7.62
$2,286.00
11.
Temporary Erosion Control
1
LS
$0.00
12.
Temporary Silt Fence
500
LF
$3.00
$1,500.00
13.
Temporary Inlet/Outlet Protection
1
EA
$300.00
$300.00
14.
Compacted Aggregate, No. 53, Base
1
TON
$1,035.00
$1,035.00
15.
HMA for Patching, Type A
6
TON
$568.00
$3,408.00
16.
HMA for Right -of -Way, Full Depth
4
SYS
$464.11
$1,856.44
17.
Standard Curb
15
LF
$51.00
$765.00
18.
Modified Combination Curb
200
LF
$45.66
$9,132.00
19.
Concrete Sidewalk
220
SYS
$70.31
$15,468.20
20.
Concrete Curb Ramp
25
SYS
$197.00
$4,925.00
21.
PCCP for Approaches, 6in
45
SYS
$98.00
$4,410.00
22.
Drywell, 6ft Diamter
1
EA
$6,600.00
$6,600.00
23.
Seeding and Sodding
250
SYS
$16.22
$4,055.00
24.
Curb Identification Marker
5
EA
$100.00
$500.00
DIVISION C TOTAL $85,466.64
ADD ALTERNATE Al: PATIO AWNING
Item
Description
Quantity
Unit
Unit Price
Total Amount
No
Al.
Patio Awning
1
LS
$71,930.00
$71,930.00
ALTERNATE 1 $71,930.00
I
i 7G4
R
sriq.
-
YfY9€ON 'W r4EiE 4n,
-.
T, - 7 .c > _,-
A
ad
. -
;�"�
J� :
` i•xq
Pf
.ems-r� -• '�.
!', III I Tot MUM Im! �� fll!! P7TWl"lWM
EXTRACT FROM BY-LAWS OF THE COMPANIES
"Article V, Section 8, Attorneys -in -Fact. The Chief Executive Officer, the President, or any Executive Vice President or Vice President
may, by written instrument under the attested corporate seal, appoint attomeys-in-fact with authority to execute bonds, policies,
recognizances, stipulations, undertakings, or other like instruments on behalf of the Company, and may authorize any officer or any such
attorney -in -fact to affix the corporate seal thereto; and may with or without cause modify of revoke any such appointment or authority at any
time."
CERTIFICATE
I, the undersigned, Vice President of the ZURICH AMERICAN INSURANCE COMPANY, the COLONIAL AMERICAN
CASUALTY AND SURETY COMPANY, and the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, do hereby certify that the
foregoing Power of Attorney is still in fall force and effect on the date of this certificate; and I do further certify that Article V, Section 8, of
the By -Laws of the Companies is still in force.
This Power of Attorney and Certificate may be signed by facsimile under and by authority of the following resolution of the Board of
Directors of the ZURICH AMERICAN INSURANCE COMPANY at a meeting duly called and held on the 15th day of December 1998.
RESOLVED: "That the signature of the President or a Vice President and the attesting signature of a Secretary or an Assistant Secretary
and the Seal of the Company may be affixed by facsimile on any Power of Attorney... Any such Power or any certificate thereof bearing such
facsimile signature and seal shall be valid and binding on the Company."
This Power of Attorney and Certificate may be signed by facsimile under and by authority of the following resolution of the Board of
Directors of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at a meeting duly called and held on the 5th day of
May, 1994, and the following resolution of the Board of Directors of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at a
meeting duly called and held on the loth day of May, 1990.
RESOLVED: "That the facsimile or mechanically reproduced seal of the company and facsimile or mechanically reproduced signature
of any Vice -President, Secretary, or Assistant Secretary of the Company, whether made heretofore or hereafter, wherever appearing upon a
certified copy of any power of attorney issued by the Company, shall be valid and binding upon the Company with the same force and effect
as though manually affixed.
IN TESTIMONY WHEREOF, I have hereunto subscribed my name and affixed the corporate seals of the said Companies,
this 25th day of July 2017 .
�I iwr
y.. UAL
logo
Thomas O. McClellan, Vice President